Arts Center- Building needs

Size: px
Start display at page:

Download "Arts Center- Building needs"

Transcription

1 Arts Center- Building needs

2 Built in 1928

3 Last renovated in 1986

4 Priority 1- fascia repair Loose, rotting and missing fascia needs to be replaced to prevent water intrusion. There are seven different pieces of trim at 1,600 LF per run which totals 11,200 LF.

5 Rotting and loose fascia

6 Missing and loose fascia

7 Broken crown molding

8 Missing soffit

9 Rotten fascia and crown molding

10 Rotten fascia and crown molding

11 Weathered fascia and crown molding

12 Rotten and loose crown molding

13 Rotten fascia and freeze board

14 Loose and weathered fascia

15 Rotten soffit and old down spouts

16 Missing crown molding

17 Rotten soffit and fascia

18 Rotten and missing crown molding

19 Rotten fascia and missing soffit

20 Priority level 2- door replacement Most of the doors need replacing because of rotting wood or veneer separation from being exposed to the weather.

21 Front doors are not sealing

22 Doors sagging from weak frames

23 Seals and hardware need to be replaced at minimum

24 Rusted out hinges that are weak

25 Veneer separating

26 Veneer separating and brick molding rotten

27 Upgrade door to commercial grade

28 Needs commercial door installed with new hardware

29 Doors need replacing due to veneer separation

30 Door missing hardware

31 Window sill rotten

32 Patch job on window sill

33 Windows needing reglazed and painted

34 Window sill rotten

35 Priority level 3-HVAC issues Window units need to be replaced with wall pack units to control humidity. Controls need to be in place to monitor and set scheduling to maximize energy efficiency.

36 Window units causing humidity issues

37 Window units causing humidity issues

38 Window unit needs to be replaced with a wall pack unit

39 Priority level 4-cosmetic Building cosmetic issues

40 Painting needed and possibly match other areas in the front of the building

41 Damaged louvers

42 Damaged louvers

43 Damaged louvers

44 Railing needs painting

45 Railing rusted thru at base

46 Railing rusted at stairs

47 CRACK IN FOUNDATION

48 Mortar joints repointed in places

49 Painting needed

50 Replace sagging acoustic ceiling tile, possibly change size to 24 x 24 to reduce chance of sagging

51 Porch ceiling needs painting

52 Ceiling needs painting

53 Ceiling tiles need replaced, leak no longer exists

54 Electrical outlet needs to be mounted and secure

55 Ceiling repair needed

56 Window lintel cracked, needs replacing

57 Window lintel needs replacing

58 Needs storm windows installed on windows to prevent rot

59 Supporting plant life

60 Priority Level 5- landscaping Landscaping needs some planning and updating

61 Landscaping needed

62 Need more ground cover with grass or bedding

63 Landscaping needed to address bare area

64 Landscaping needed to address bare area

65 Covered shelter, left entrance

66 Pave to trash receptacle

67 Current upgrades New roof, approximately 3 years old

68 New roof

69 Recent repairs Steps before Steps after

70 Recent roof replacement

71 Cost assessment Priority 1- Replace all fascia and trim $ 165, Priority 2- Door and hardware replacement $ 80, Priority 3- HVAC update $ 225, Priority 4- Cosmetic issues (additional exterior repairs and paint) $ 481, Priority 5- Landscaping $ 40, Total needs Priority 1-5 (26.78/SQFT)= $991, Additional interior repairs (17.00/SQFT)= $629, Total projected needs (43.78/SQFT)= $1,620,000

72 Cost comparison Arts Center- Facility is roughly 37,000 square feet and at the average renovation cost it would total about 1,850,000. Library- Facility is roughly 20,603 square feet and the current renovation will cost about 1,215,000 without any major outside work as needed at the Arts Center.