1 Arts Center- Building needs
2 Built in 1928
3 Last renovated in 1986
4 Priority 1- fascia repair Loose, rotting and missing fascia needs to be replaced to prevent water intrusion. There are seven different pieces of trim at 1,600 LF per run which totals 11,200 LF.
5 Rotting and loose fascia
6 Missing and loose fascia
7 Broken crown molding
8 Missing soffit
9 Rotten fascia and crown molding
10 Rotten fascia and crown molding
11 Weathered fascia and crown molding
12 Rotten and loose crown molding
13 Rotten fascia and freeze board
14 Loose and weathered fascia
15 Rotten soffit and old down spouts
16 Missing crown molding
17 Rotten soffit and fascia
18 Rotten and missing crown molding
19 Rotten fascia and missing soffit
20 Priority level 2- door replacement Most of the doors need replacing because of rotting wood or veneer separation from being exposed to the weather.
21 Front doors are not sealing
22 Doors sagging from weak frames
23 Seals and hardware need to be replaced at minimum
24 Rusted out hinges that are weak
25 Veneer separating
26 Veneer separating and brick molding rotten
27 Upgrade door to commercial grade
28 Needs commercial door installed with new hardware
29 Doors need replacing due to veneer separation
30 Door missing hardware
31 Window sill rotten
32 Patch job on window sill
33 Windows needing reglazed and painted
34 Window sill rotten
35 Priority level 3-HVAC issues Window units need to be replaced with wall pack units to control humidity. Controls need to be in place to monitor and set scheduling to maximize energy efficiency.
36 Window units causing humidity issues
37 Window units causing humidity issues
38 Window unit needs to be replaced with a wall pack unit
39 Priority level 4-cosmetic Building cosmetic issues
40 Painting needed and possibly match other areas in the front of the building
41 Damaged louvers
42 Damaged louvers
43 Damaged louvers
44 Railing needs painting
45 Railing rusted thru at base
46 Railing rusted at stairs
47 CRACK IN FOUNDATION
48 Mortar joints repointed in places
49 Painting needed
50 Replace sagging acoustic ceiling tile, possibly change size to 24 x 24 to reduce chance of sagging
51 Porch ceiling needs painting
52 Ceiling needs painting
53 Ceiling tiles need replaced, leak no longer exists
54 Electrical outlet needs to be mounted and secure
55 Ceiling repair needed
56 Window lintel cracked, needs replacing
57 Window lintel needs replacing
58 Needs storm windows installed on windows to prevent rot
59 Supporting plant life
60 Priority Level 5- landscaping Landscaping needs some planning and updating
61 Landscaping needed
62 Need more ground cover with grass or bedding
63 Landscaping needed to address bare area
64 Landscaping needed to address bare area
65 Covered shelter, left entrance
66 Pave to trash receptacle
67 Current upgrades New roof, approximately 3 years old
68 New roof
69 Recent repairs Steps before Steps after
70 Recent roof replacement
71 Cost assessment Priority 1- Replace all fascia and trim $ 165, Priority 2- Door and hardware replacement $ 80, Priority 3- HVAC update $ 225, Priority 4- Cosmetic issues (additional exterior repairs and paint) $ 481, Priority 5- Landscaping $ 40, Total needs Priority 1-5 (26.78/SQFT)= $991, Additional interior repairs (17.00/SQFT)= $629, Total projected needs (43.78/SQFT)= $1,620,000
72 Cost comparison Arts Center- Facility is roughly 37,000 square feet and at the average renovation cost it would total about 1,850,000. Library- Facility is roughly 20,603 square feet and the current renovation will cost about 1,215,000 without any major outside work as needed at the Arts Center.