CERVANTES COMMUNITY CENTER RE-ROOFING NEW MEXICO STATE UNIVERSITY

Size: px
Start display at page:

Download "CERVANTES COMMUNITY CENTER RE-ROOFING NEW MEXICO STATE UNIVERSITY"

Transcription

1 420 CENTER DR,, NM 95% CD SUBMITTAL DRAWING INDEX TITLE SHEET T1.1 PROJECT DATA, VICINITY MAP, INDEX ARCHITECTURAL DEMOLITION FLOOR, CEILING & ROOF PLANS FLOOR & CEILING PLAN & ROOF PLAN MECHANICAL M1.0 HVAC SCHEDULES AND NOTES M2.1 HVAC PLANS ELECTRICAL E0.1 ELECTRICAL LEGEND, RISER, NOTES AND DETAILS E1.1 ELECTRICAL PLANS COMMUNITY BUILDING MARCH 24, 2016 WDG PROJECT NO: ARCHITECT PROJECT LOCATION SITE LOCATION MAP PROJECT DATA DRAWN BY: MO CHECKED BY: JQ TITLE SHEET T1.1 CD's 95% SUBMITTAL WDG ARCHITECTS WILLIAMS DESIGN GROUP, INC S. MAIN, NM P F CONTACT: DAVID CLARKE CONSULTANTS MECHANICAL / PLUMBING / ELECTRICAL, NM ph. (575) Contact: BOB BEASLEY RBM ENGINEERING 1065 SOUTH MAIN STREET BLDG D SUITE A OWNER, NM 88005

2 KEYED NOTES GENERAL NOTES 1 DEMOLITION FLOOR PLAN 2 DEMOLITION REFLECTED CEILING PLAN 3 ROOF DEMOLITION PLAN DRAWN BY: CHECKED BY: MO JQ DEMOLITION FLOOR, CEILING & ROOF PLANS CD's 95% SUBMITTAL , NM 88005

3 KEYED NOTES GENERAL NOTES 1 FLOOR PLAN 2 REFLECTED CEILING PLAN 3 ROOF PLAN PATCH PARAPET WALL AT EXISTING SCUPPER SEALANT REMOVE & REINSTALL OR BEND EXISTING COUNTER FLASHING UP TO ALLOW INSTALLATION OF TERMINATION BAR & SEALANT PATCH & PAINT EXISTING STUCCO COPING TYP. TERMINATION BAR FASTENERS W/ NEOPRENE WASHER AT 12" O.C. EXISTING STRUCTURE SEALANT SEALANT TERMINATION BAR SINGLE-PLY ROOF MEMBRANE BONDING ADHESIVE LAP MEMBRANE OVER METAL SCUPPER OPENING 3 SIDES AND ROOF LEVEL SINGLE-PLY ROOF MEMBRANE BLOCKING, INSULATION, COVER BOARD, AND ROOFING PER MANUF. INSTRUCTIONS TPO ROOFING TAPERED INSULATION 1/2" PER FOOT REVERSE SLOPE EXISTING STRUCTURE 5/8" DENS DECK ROOF BOARD P.T. WOOD BLOCKING EXISTING DECKING RIGID INSULATION 1 1/2" RIGID INSULATION EXISTING DECKING NEW PLYWOOD DECK 5/8" DENS DECK ROOF BOARD RIGID INSULATION-CUT DOWN TO FIT UNDER BASE OF EXISTING SCUPPER LEVEL 1x P.T. WOOD BLOCKING DRAWN BY: CHECKED BY: MO JQ 4 ROOF CRICKET AT EXISTING PARAPET 5 TERMINATION BAR AT EXISTING PARAPET 6 SCUPPER AT EXISTING PARAPET FLOOR & REFLECTED CEILING PLAN & ROOF PLAN CD's 95% SUBMITTAL , NM 88005

4 AIR CONDITIONING UNIT SCHEDULE (O.P.C.I.) PLUMBING FIXTURE SCHEDULE DIFFUSER SCHEDULE MINIMUM PIPE MATERIAL SCHEDULE SERVICE TYPE LOCATION MATERIAL REQUIRED COMMENTS PIPE MATERIAL SUBSTITUTION NOTES: INSULATION REQUIREMENTS:, NM GAS INFORMATION 95% CD WALL CLEANOUT SCHEMATIC DETAIL KEYED NOTES SINGLE LINE GAS PIPING SCHEMATIC DRAWN BY: CAD CHECKED BY: RBM ACU INSTALLATION SCHEMATIC PIPE SUPPORT ON ROOF CONDENSATE DRAIN TRAP SCHEMATIC ROOF GAS PIPE SUPPORT & CONNECTION SCHEMATIC HVAC SCHEDULES AND NOTES 1065 S. MAIN ST. BLDG D STE. A, NM (575) FAX (575) rbm@rbm.cc M1.0

5 HVAC & PLUMBING LEGEND HVAC & PLUMBING GENERAL NOTES:, NM % DOCUMENT GENERAL NOTES: CD DRAWING KEYED NOTES: DRAWN BY: CAD CHECKED BY: RBM EXISTING / DEMOLITION HVAC & PLUMBING PLAN NEW HVAC & PLUMBING PLAN HVAC PLANS 1065 S. MAIN ST. BLDG D STE. A, NM (575) FAX (575) rbm@rbm.cc M2.1

6

7