SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

Size: px
Start display at page:

Download "SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd."

Transcription

1 SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] in the format prescribed by MoEF, GOI 3 Environmental management plan [EMP] 4 Approved Mining/ Quarry Plan 5 Topo sheet Duly marking the project site with 10 Kms Radius 6 Original Village Maps duly marking project site. Adjacent village maps of the project site is located at vicinity of the village boundary 7 Latest Google Map Duly marking the project site 8 Latest Site Photographs 9 Year wise production audit report from DMG if it is ongoing/expansion/modification project 10 Land Documents a. Notification OR Letter of Intent from Department of Mines and Geology b. District Task Force committee Proceedings c District Mineral Survey Report proposed as per Notification No. S.O.141 dated 15th January 2016 d. Compliance of the earlier E.C in case of Renewal, Expansion, Modification e. Lease Deed in case of Renewal, Expansion, Modification f. Renewal Notification OR Deemed Extension Letter etc., g. RTC h. NOC from Forest Department - Compulsory 1st Stage Clearance in case of Forest Land i. NOC from Revenue Department in case of Government, Patta Land j. NOC from Forest Department in case of Government, Patta Land k. Regarding Applicability of ESA/ESZ l. Joint inspection report in case of Government Gomal Land m. Copy of order of conversion of the land for non Agricultural -mineral/ quarrying purpose in case of private/patta land n. Allotment letter/gazette Notification in case River sand quarrying o. Other Specify X 11 Disputes if any and copy of documents/ orders there off X Comparative statement of the project profile between the existing and 12 the proposed with difference thereof in case of Expansion and Modification project 13 Certified report of the status of compliance of the conditions stipulated

2 14 in the E.C from the regional office of MoEF& CC in case of proposal involving expansion and medication Cluster Certificate From Dept of Mines and Geology details regarding Quarries within 500mts from the applied Quarry area. 15 Accreditation certificate for Consultant Letter of Authorization issued by the company, Partnership/ proprietor if the authorized signatory other than the proprietor himself for filing of application before SEIAA DD towards processing fee in accordance with G.O No. FEE 46 EPC 2013 dated amended from time to time 18 Any other document relevant to the project proposal ( Specify) Consultant has obtained Stay order from High Court (W.P No /2016(G M-RES))

3 SEIAA KARTAKA BRIEF NOTE FOR MINING/ QUARRYING PROJECTS Sl. No PARTICULARS INFORMATION 1 Name & Address of the Project Proponent 2 Name & Location of the Project 3 Co-ordinates of the Project Site M/s. Sharada Construction Pvt. Ltd. (Prop: Sri. Shankar S/o. Baliram Morge) Hupla Village, Bhalki Taluk, Bidar District, Karnataka. Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sy. No. 144/6(P), Hupla village, Bhalki Taluk, Bidar District, Karnataka Latitude: N Longitude: E Type of Mineral 5 6 New / Expansion / Modification / Renewal Type of Land [ Forest, Government Revenue, Gomal, Private/Patta, Other] Building Stone (Basalt) Quarry New Patta Land 7 Whether the project site fall within ESZ/ESA No 8 Area in Ha Ha 9 Actual Depth of sand in the lease area in case of River sand 10 Depth of Sand proposed to be removed 11 Rate of replenishment in case of Building Stone (Basalt) Quarry

4 river sand mining as specified in the sustainable sand mining guideline 2016 Measurements of the existing Fresh land quarry pits in case of 12 ongoing/expansion/modification of mining proposals other than river sand 13 Annual Production Proposed 75,000 Tons/annum (Metric Tons/ CUM) / Annum 14 Quantity of Topsoil/Over 7,330 Cu,m of soil produced in the area burden in cubic meter 15 Mineral Waste Handled 32,895 Tons (Metric Tons/ CUM)/ Annum 16 Project Cost (Rs. In Crores) 5.89 crores 17 Environmental Sensitivity a. Nearest Forest None within 5 kms b. Nearest Human Habitation Hupla 1.15 Kms(S) c. Educational Institutes, Bhalki 6.30 Kms(W) Hospital d. Water Bodies Hupla Lake kms (E) 18 e. Other Specify -- Applicability of General Condition of the EIA Notification, Details of Land Use in Acres a. Area for Mining/ Quarrying 2-09 b. Waste Dumping Area 0-02 c. Top Soil Storage Area d. Mineral Storage Area 0-02 e. Infrastructure Area f. Road Area 0-02 g. Green Belt Area/Buffer 0-18 Zone h. Unexplored area -- i. Others Specify Method of Mining/ Quarrying Semi Mechanised Method Open quarrying 21 Rate of Replenishment in case River sand project 22 Water Requirement a. Source of water b. Total Requirement of Water in KLD Drinking water : Borewell from the village Dust Suppression: River Water Dust 10.5 KLD Suppression

5 23 Storm water management plan 24 Any other information specific to the project (Specify) Domestic KLD Other 1.25 KLD Total KLD Drains will be constructed along the boundary of activity area Remarks:-