1 Bids for the construction of Water Supply Well PW-14 (), will be received by the City of Westerville, Ohio until the revised closing date and time indicated in this Addendum No. 02 and will be publicly opened and read immediately thereafter. Addendum No. 02 Please acknowledge receipt of both Addendum No. 0 1 (issued November 9, 2017 and attached hereto for convenience) and this Addendum No. 02 by submitting a copy of this Addendum No. 02 with your Sealed Bid REVISED CLOSING DATE & TIME PROJECT MANUAL Cover, Notice to Bidders, and Information to Bidders The Bid Closing Date and Time shall be changed to 4:00 p.m. (EDT) on Thursday, November 16, INFORMATION & CLARIFICATIONS REQUEST FOR INFORMATION: The following is in response to RFIs received by the City of Westerville, Ohio. Addendum No. 02 November 13, 2017

2 TO ALL BIDDERS: THIS ADDENDUM SUPPLEMENTS THE ORIGINAL DRAWINGS AND SPECIFICATIONS AND SHALL BE TAKEN INTO ACCOUNT IN PREPARING BIDS, AND SHALL BECOME PART OF THE CONTRACT DOCUMENTS. Revise the Contract Documents as follows: QUESTIONS: Question: How do the 3-5 conduit for electric service terminate? Answer: They connect to 3 of the 6 existing spare conduit. See notes on revised plan 10 detail 1/10. Question: Is the pump controller, meter and disconnect switch mounted on pipe or tubing & unistrut? Answer: Provide the mounting rack detailed in details 1/11, B/11 & A/11. See revision to details 3/11 on revised plan 11. Question: What are the specs on the surge arrestor on detail 5/11? Answer: Provide Delta LA603 for 4 wire volt. Question: Sheet #11 Detail #5, the drawing calls out "utility meter", no model or specification listed in drawing or specs. Answer: Provide meter trim per City of Westerville Division of Power requirements. The meter will be provided by the City. Question: Sheet #10 Detail #3 shows service feeders from meter to transformer as (4) #3 in 2" conduit. Sheet #11 Detail #5 shows service feeders from meter to transformer as (4) #1 in #2" conduit. Which one is correct? Answer: Provide per detail #3 sheet 10. Question: Sheet #11 Detail #5; the drawing calls out 100 amp 480 VAC 3 pole, S/N, UL Service Entrance Label. What does 'S/N' call for? Switched Neutral or Solid Neutral? Answer: Solid Neutral. Addendum No. 02 November 13, 2017

3 SPECIFICATIONS: Specification The UL listing requirements shall be waved for the Flowmeter transmitter portion of installation only. DRAWINGS: Item D.E. 1 Drawing 10 See attached plan with modifications to detail 1/10 Item D.E. 2 Drawing E11 See attached plan with modifications to detail 3/11 & 5/11 This ADDENDUM modifies the CONTRACT DOCUMENTS. All BIDDERS shall govern themselves accordingly and note the changes listed above. End of Items. Addendum No. 02 November 13, 2017

4 N:\BennettEngineering\Projects-Dwg\2015\ City of Westerville Well Pump Addition\E DWG Mon, Nov 13, :17am NO. 1 DESCRIPTION REVISIONS AS NOTED APPROVAL/DATE FINAL EDITS MDR/ (WTP) 10 ANNUNCIATOR & VALVE PIT ELECTRICAL SHEET 10.DWG 11

5 N:\BennettEngineering\Projects-Dwg\2015\ City of Westerville Well Pump Addition\E DWG Mon, Nov 13, :17am NO. 1 DESCRIPTION REVISIONS AS NOTED APPROVAL/DATE FINAL EDITS MDR/ (WTP) 11 ONE LINE RISER DIAGRAM & DETAILS SHEET 11.DWG 11

6 Bids for the construction of Water Supply Well PW-14 (), will be received by the City of Westerville, Ohio until the closing date and time of 4:00 p.m. (EDT) on Wednesday, November 15, 2017 and will be publicly opened and read immediately thereafter. Addendum No. 01 Please acknowledge receipt of this Addendum No. 01 on the Bid Schedule submitted with your Sealed Bid INFORMATION & CLARIFICATIONS Queries from Pre-Bid meeting, Westerville PW-14 [ (WTP)], November 3, SECTION Type of motor shaft. Is vertical hollow shaft correct? Response: the pipe described here is possibly misleading. The motor is connected to the suction adapter (below bowl assembly) and not directly to the lineshaft. Action: Item 2.2.A. delete, vertical hollow shaft,. SECTION Is the requirement for a foot valve correct? Why not check valve instead? Response: Foot valve is correct. The most recent well constructed at Westerville (PW-10) has a foot valve. Action: none Addendum No. 01 November 9, 2017

7 SECTION Questions regarding the number of, the inside diameter of, and the material for probe tube(s) inside the Pitless Adapter. Responses: The tube(s) house water level probes and/or other wires/cable. The 1.5 inch inside diameter for the tube(s) can be reduced to provide improved fit. Although initially only one tube is required, the specified number will remain at two to provide future flexibility should another probe be warranted. There appeared to be some confusion as to the type of material specified for the tubes. It was suggested the tubes be specified as PVC; however, paragraph clearly specifies the tube material to be PVC. Actions: Paragraph Replace 1.5 with Paragraph Replace 1.5 with SECTION A question was raised concerning discharge of water to Alum Creek during testing. Can the discharges be overland to the creek or are the discharges required to be piped all the way to the creek? Response: Paragraph requires that discharges be piped all the way to Alum Creek using the negotiated easements. Action: none General. A question was raised as to who is responsible for collection, preservation and analytical testing of well water to meet Ohio EPA requirements. Response. Nothing in the plans or specifications addresses water sampling. Action: CONTRACTOR is not required to perform any of the described actions. The City (OWNER) will provide everything necessary to meet Ohio EPA requirements. Addendum No. 01 November 9, 2017

8 REQUEST FOR INFORMATION: The following is in response to RFIs received by the City of Westerville, Ohio. Q1. The prints call for 20 of screen and the specs call out 15 of screen. Which is correct? A1. The correct information is as follows: The screen extends from 55' to 70'; therefore it is 15 feet. The correct screen size is Q2. Is it possible to obtain a copy of the sign-in sheet from the November 3 pre-bid conference? A2. The sign-in sheets have been attached. This ADDENDUM modifies the CONTRACT DOCUMENTS. All BIDDERS shall govern themselves accordingly and note the changes listed above. End of Items. Addendum No. 01 November 9, 2017