Engineering Procurement Construction (EPC) Operation & Maintenance Provision of Technical Manpower Asset Integrity Services Vessel Support Services

Size: px
Start display at page:

Download "Engineering Procurement Construction (EPC) Operation & Maintenance Provision of Technical Manpower Asset Integrity Services Vessel Support Services"

Transcription

1 Engineering Procurement Construction (EPC) Operation & Maintenance Provision of Technical Manpower Asset Integrity Services Vessel Support Services

2 We are committed to delivering technically challenging mega-projects safely, on time, on budget to the highest standard of quality.

3 VISION STATEMENT We aim to provide reliable and qualitative services to the Nigerian energy industry. 60% 10% 30% MISSION STATEMENT To be Nigeria's best Engineering, Procurement and Construction Company in the energy sector. We will achieve this by: Leading the industry in HSE, performance and environmental stewardship Developing a sustainable and diverse business Attracting and retaining smart, flexible, and adaptable people Adapting to changing markets and consistently delivering as sold to our customers 01

4 C O R E V A LU E S Performance Excellence: We are committed to delivering technically challenging mega-projects safety, on time, on budget, to the highest standard of quality. Fair Return: We provide the highest quality product for the best cost and deliver on what we promise. Ethics: Mutual respect, integrity, honesty and open communication at all levels are the driving force for how we build relationships with our staff, clients, contractors and suppliers. Safety: We are driven by an unwavering promise to keep our people and sites 100% Safe. Sustainability: Environmental protection and social responsibility - the foundations of sustainable development - are integral to our continued 02

5 Operational Philosophy SAFETY We are committed to providing a safe and healthy work place for our employees and partners, ensuring operations are carried out in the manner that protect personnel, the environment and the host communities. 01 QUALITY We carefully design every process to yield the highest organizational excellences and greatest client satisfaction. Quality is carefully contained in our culture and it's in the fabric of our organization. 02 COST EFFECTIVENESS We carefully design every process to yield the highest organizational excellences and greatest client satisfaction. Quality is carefully contained in our culture and it's in the fabric of our organization. 03 LOCAL CONTENT DEVELOPMENT Our collective corporate strategies is to systematically accelerate the transfer of technology, engineering experience, and specialized know-how from our expatriates and foreign technical partners to indigenous nationals

6 ABOUT INDEXPRO ndexpro International Services Limited is registered in Nigeria and located Iour representative offices in Lagos, Port-Harcourt, Rivers State, and Eket, Akwa Ibom State of Nigeria to support Oil and Gas Business in Nigeria and the West African Sub-region, providing maximum local resources deployment and also to ensure accessibility and quick response to EPC needs of most Oil and Gas operators in Nigeria with the most efficient cost and timely delivery. We also have our International office in Houston TX, USA. We are a company of choice to many major operators and assets owners in Nigeria, with a track record consistently delivering successful projects. IndexPro delivers engineering solutions ranging from conceptual studies to FEED, detailed engineering design and follow-on. IndexPro Construction and Engineering Teams have robust diversified experience in fabrication and installations on topside and floating vessels. We deliver sea fastening operations on vessels and fabrication and installation aids for deep water wellhead installation programs. IndexPro delivers a complete range of procurement solutions, We cover both fixed platforms, floating and sub-sea production systems. We have executed successful materials delivery project for our clients on major projects. IndexPro has extensive offshore operation and maintenance experience, deploying some of the industry's most experience personnel with over 20 years in running the operation of fertilities including FPSOs, FSOs, Flow Stations and Offshore Platforms. 04

7 We aim to provide reliable and qualitative services to Nigerian energy industry. 05

8 ENGINEERING IndexPro provides broad range of professional services for Fixed Platforms, Marine and Offshore Projects, including: Conceptual /FEED / Detail / Production Engineering Design & Analysis Construction Management Modification Design & Analysis of Marine Structure Project Feasibility Studies (New-Build/Conversion/Modification) On-Site Supervision / Technical Support / Survey Analysis for Naval Architecture & Anchor Mooring Engineering Drawings/Analysis Reports for Client Approvals and Classification Society Verifications. 06

9 07

10 CONSTRUCTION OFFSHORE AND ONSHORE FLOATING & FIXED PL ATFORMS At IndexPro, Construction Management (CM) is our core strength. IndexPro's CM Team is composed of seasoned experts and line leadership who have experience steering some of the most complex construction jobs in the energy sector. IndexPro offers complete construction management services by outsourcing some of the best hands in the construction industry for project execution. Our CM services include: Health, Safety and Environment Management Field Engineering Quality Assurance Contracts Management Field Procurement Materials Management Field IT Support Field Project Controls Constructability Analysis Construction Planning. 08

11 09

12 TOTAL CORROSION MANAGEMENT IndexPro International Services offers comprehensive corrosion management solutions, in-situ, for FPSOs, platforms and rigs both onshore and offshore, including customized and comprehensive auditing, inspection, planning, execution and project management services. The company's total corrosion management solutions for the marine and offshore industry include: Corrosion Audits / Inspections Provision of Skilled Personnel Surface Preparation and Painting Scaffolding Services Rope Access Services Supply of Equipment such as UHP Units, Air Compressors, Airless Spray Pumps, Etc. 10

13 One important component of Corrosion Management, and one that is comonly used by IndexPro in the upstream Oil and Gas industry, is the use of Corrosion Inhibitors. 11

14 PROCUREMENT SERVICES SUPPLIES OF HIGH PRESSURE VALEVES & PIPING SYSTEMS IndexPro with wide range of partnerships with OEMs offers high quality, quick and efficient service when it comes to wide variety high pressure valves, fittings and piping solutions. PIPES MANIFOLD FITTINGS ANSIB 16.9 FITTINGS DRILLING VALVES TOPSIDE VALVES SUB-SEA VALVES FLANGES AND CONNECTORS MANIFOLDS HOSES SUB-SEA FITTINGS AND FLANGES COMMISSION, SERVICE AND MAINTENANCE 12

15 13

16 Clientele/Partners w w w. i n d e x p r o l t d. c o m 14

17 15

18 N A M E O F C L I E N T 8 Amazon Energy Ltd. / NAOC Kwale Gas Flare Down Project D U R AT I O N 8 On-going D AT E : 8 July 2018 Above Ground and Under Ground Piping Fabrication and Erection of Structural Pipe Support and Piping for Tie-in and Mechanical Installation on site at Kwale in Delta State. 16

19 17

20 E X P E R I E N C E S VESSEL SUPPORT AND OFFSHORE WELDING AND FABRICATION SERVICES 18

21 19

22 Oando Exploration/Vandrezzar Energy Services Limited AKEPO 1 WELLHEAD And 15km Pipeline Design IndexPro executed the Front End Engineering, detailed Engineering and Construction Engineering to cover the entire Deck Structure, Process Piping and 6 X 15km Pipeline to tie-in the production at Crude Processing Facility (CPF) to be installed within NAOC Beneboye Flow Station Perimeter. IndexPro execute detailed Engineering for Modification of the existing Metering Package. The Scope of Service involved Re-engineering of Mystras Metering Skid and Project Management for and Commissioning. Design and Construction of Land-field location Helipad for Elcrest E&P D U R AT I O N 8 6 Months D AT E : 8 July Material Procurement, Fabrication of the Bladder Tank Frame. Inspection, Blasting, Painting and Delivery of 2 Sub-sea Bladder Containment Tank (PO issued already). Minor Refurbishment of existing Bladder Containment Tanks: Inspection, Shot Blasting, Painting and Delivery of 2 Sub-sea Bladder Containment Tank. (PO issued already) Minor Engineering, Procurement of Materials, Fabrication and Delivery of 1 Sub-sea Bladder Containment Tank Framework (Mudmat and i-beam Stands). Rigging Specifications and Procurement for the Support Frame and Bladder Containment Tank Storage, Operation/Deployment and Maintenance Manuals/ Procedure. As-Built Drawings for the Sub-sea Bladder Containment Frame Work. D AT E : 8 JULY 2014 Snepco/Marine Platforms Sub-Sea Bladder Tank Support D U R AT I O N 8 24 DAYS

23 CEONA / Marine Platforms VCM Sub-Sea Parking Stand, Lifting Yoke and Hang-off Collars 1. Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.) 2. Material Procurement 3. Onshore Fabrication of the Sub-Sea VCM Parking Stand, Lifting Yoke and 4 No. Hang-off Collars. NDT Inspection, Padeye Pull Test,blasting, painting and delivery at Eko Support Base - Lagos D U R AT I O N 8 34 Days D AT E : 8 Aug 2014 Saidel / Marine Platforms Stanchions, Spreader Bars and Conrete Mattress 1) Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing.) 2) Procurement and Fabrication and load out to Brawal Jetty of Stanchion for Rover Nelson, and Jason 51, Concrete Mattress Deployment Frame and Spreader Bars, 3) Sea-fastening of 128 Nos. Stanchions on River Nelson and Jascon 55. D U R AT I O N 815 Days D AT E : 8 March 2018 Marine Platforms A Frame & Winch Sea- Fastening Grillage Refurbishment Total Refurbishment: (I) Load out from MPL base-onne. (ii) Refurbishment of A-Frame & WINCH Seafastening Grillage (iii) Fabrication of 10No. Cruciform Plate (iv) Blasting and Painting (v) As-Built (vi) Close out Documentation (vii) Delivery at MPL Yard - Onne D U R AT I O N 815 Days D AT E : 8 Sept

24 CHEVRON / Marine Platforms Fabrication Of IUTA Lifting Frame 1. Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing). 2. Procurement: (Material Procurement, Inspection and Verification. 3. Onshore Fabrication: (Fabrication of IUTA Lifting Frame (ii) NDT Inspection, blasting and painting (iii) Delivery at Quay Side FOT - Onne, (iv) Close Documentation. D U R AT I O N 8 7 Days D AT E : 8 November 2014 Bumi Armada/Rostrum Oil & Gas Fabrication Of Boomrest, Crane Foundation & Crossover Platform 1. Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing.) 2. Procurement: (Material Procurement, Inspection and Verification. 3. Onshore Fabrication: (I) Fabrication of CraneFoundation (ii) Crane Boom Rest Cross Over Platform and (iv) Crane Pedestral Reinforcement (v) NDT Inspection (vi) blasting and painting (vii) Delivery at Kidney Island Port Harcourt (ix) Close Documentation. D U R AT I O N 8 29 Days D AT E : 8 Dec CEONA / Marine Platforms Limited Deck Strengthening Onboard the Normand Pacific Project SOW include the following: key task; labour; materials; tools; facilities; personnel and consumables required to undertake the preparation; welding and finishing work for the list task below. (I) Deck Strengthening work (ii) On-deck Strengthening (iii) Under-deck Stiffening (iv) On deck Stiffening (v) Works management - Documentation, As-built Dossier, Supervision of welding personnel during works onboard, HSE management, Interface with the Normand Pacific Personnel and Logistics. 22 D U R AT I O N 8 14 Days D AT E : 8 October2014

25 THOME Installation Remote FO Monitoring 1) Remove section of 6 FO cargo pipeline and carry fabrication to fit new flow meter which will be supplied by the equipment maker (2) Remove section of ½ inch fuel supply and return pipeline for port and starboard main engine, carry out fabrication of the pipeline and install new flow meters (1 on each fuel supply/ return line) (3) Remove section 3/8 inch fuel supply and return pipeline for auxiliary engine No 1 & 2, carry out fabrication of the pipeline and install new flow meters 4) Install electrical cabinet and cable and keep ready for termination which shall be carried out by the equipment supplier D U R AT I O N 8 14 Days D AT E : 8 Oct 2014 SNEPCO / Marine Platforms / AGIP Modification of Surfer Landing/ Demob of Normard Pacific 1) Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings. 2) Procurement:( Material Procurement, Inspection and Verification. (3) Key Task; labour; materials; tools; facilities; personnel and consumables required to undertake the preparation; welding and finishing work on the Suffer landing. 4) Works management -Documentation, As-built Dossier, Supervision of welding personnel during works onboard, HSE management, Interface with the Normand Pacific Personnel and Logistics. D U R AT I O N 88 Days D AT E : 8 Oct 2014 SNEPCO/LADOL/Marine Platforms Mobilization Support at Sea Eagle 1) Seafastening of Equipment, Containers and Structural Frame work. 2) Works management - Documentation, Material Control, tool, Consumables, Supervision of welding personnel during works onboard, HSE management, Interface with the Normand Pacific Personnel and Logistics. D U R AT I O N 8 3 Days D AT E : 8 October

26 CEONA / Marine Platforms PP00011-ABO-12 Well Completion (Installation And Fabrication) 1. Engineering: (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.) 2. Material Procurement: Review of Engineering Drawings and Preparation of Sop Drawings. - Material Procurement. - Fabrication - NDT / Load Test Inspection - Blasting and Painting. - Loading out and deliver to Onne. E59 D U R AT I O N 8 27 Days D AT E : 8 January 2015 Total / Marine Platforms West Jupiter ROV Project 1) Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing.) 2) Procurement: (Material Procurement, Inspection and Verification. 3) Onshore Fabrication: (i) Fabrication of A-Frame and WINCH Grillage. (ii) Access Platforms (iii) Access Ladder (iv) Stair Access Platform (v) A-Frame & WINCH Frame Brackets (vi) NDT Inspection, blasting and painting (iii) Delivery at Quay Side FOT - Onne, (iv) Close Documentation. D U R AT I O N 8 16 Days D AT E : 8 Jan CHEVRON / Marine Platforms Fabrication of 4 Nos. GE Hose Reel & 4 Nos Spreader Bar 1. Engineering: (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built.) 2. Material Procurement: Engineering Drawings Reviewed - Preparation of Shop Drawings. - Material Procurement. - Fabrication of the 4 Nos Hose Reel and 4 Nos Spreader bar. - NDT Inspection & Load Test - Blasting & Painting. - Loading Out and Deliver to FOT Onne. 24 D U R AT I O N 8 10 Days D AT E : 8 October 2015

27 CHEVRON / MPL ROV Tooling Basket 1. Material Procurement, Fabrication of the ROV Blacket Frame and the ROV Tooling Basket. Inspection, blasting, painting and delivered at FOT, Onne. 2. Rigging Specification and Load Test for the ROV Tooling Basket Frame. 3. As-Built Drawings for the ROV Tooling Basket Frame. D U R AT I O N 8 9 Days D AT E : 8 January 2016 CHEVRON / Marine Platforms Fabrication of Cargo Skip Man Riding Basket, Waste Skip & Gas Rack 1. Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing.) 2. Procurement: (Material Procurement, Inspection and Verification. 3. Onshore Fabrication: (i) Fabrication of Cargo Skip and Waste Skip. (ii)ndt Inspection, blasting and painting (iii) Delivery at Quay Side FOT - Onne, (iv)close Documentation. D U R AT I O N 8 15 Days D AT E : 8 July 2015 ARIOSH / OCEAN INSTALLER LTD H-LINK 1. Engineering (IFC Drawing Review, Prepared Show Drawings, Weld Mapping and As-Built.) 2. Material Procurement 3. Onshore Fabrication of the Sub-Sea H-Link. 4. NDT Inspection,Padeye Pull Test,blasting, painting and delivery at Ladol - Lagos D U R AT I O N 810 Days D AT E : 8 Feb

28 ARIOSH / Ocean Installer Ltd. Spreader Bar 1. Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing). 2. Procurement: (Material Procurement, Inspection and Verification. 3. Onshore Fabrication: (Fabrication of 4 No. Spreader Beam (ii) NDT Inspection, blasting and painting (iii) Delivery at Ladol Yard - Lagos, (iv) Close Out Documentation. D U R AT I O N 8 15 Days D AT E : 8 February 2016 ARIOSH / Ocean Installer Ltd. CHUTE 1) Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing). 2) Procurement: (Material Procurement, Inspection and Verification. 3) Onshore Fabrication: (Fabrication of 4No. Chutes (ii) NDT Inspection, blasting and painting (iii) Delivery at Ladol Yard - Lagos, (iv) Close Out Documentation. D U R AT I O N 8 16 Days D AT E : 8 March 2016 ARIOSH / Ocean Installer Ltd. Manifold Grillage 1. Engineering: (IFC Drawing Review, Raise Technical Query if any, Prepared Show Drawings, Weld Map Drawings, and As-Built Drawing). 2. Procurement: (Material Procurement, Inspection and Verification. 3. Onshore Fabrication: (Fabrication of Manifold Grillage (ii) NDT Inspection, blasting and painting (iii) Delivery at Ladol Yard - Lagos, (iv) Close Out Documentation. 26 D U R AT I O N 8 5 Days D AT E : 8 March 2016

29 ARIOSH / Ocean Installer Ltd. 8" AND 4" CLAMP 1) Engineering: (IFC Drawing Review, Prepared Show Drawings, Weld Mapping and As-Built). 2) Material Procurement 3) Onshore Fabrication of the 2Nos 8" & 4" Clamp 4) NDT Inspection, Padeye Pull Test,blasting, painting and delivery at Ladol - Lagos D AT E : 8 March 2016 D U R AT I O N 8 8 Days MPN / MPL ROV Grillage (Jascon 55) 1. Material Procurement, Fabrication of the ROV Grillage (A-Frame and WINCH Frame). Inspection, blasting, painting and delivered at FOT, Onne. 2. Rigging Specification and Load Test for the ROV A- Frame and WINCH Frame. 3. As-Built Drawings for the ROV Grillage. D AT E : 8 April 2016 D U R AT I O N 8 9 Days CHEVRON / Marine Platforms Ltd. AGBAMI Phase Three Project 1) Engineering: (IFC Drawing Review, Prepared Show Drawings, Weld Mapping and As-Built.) 2) Material Procurement 3) Onshore Fabrication of the 1 No. Production Manifold Grillage, 2 Nos. Suction Pile Grillage. 4) NDT Inspection, Padeye Pull Test, Blasting, painting and delivery at FOT Onne 5) Sea-fastening of the fabricated items onboard African Inspiration D U R AT I O N 825 Days D AT E : 8 Sept

30 SNEPCO / Marine Platforms Ltd. BONGA SIL / LWI Project 1. Engineering: (IFC Drawing Review, Prepared Show Drawings, Weld Maping and As-Built). 2. Material Procurement 3. Onshore Fabrication of the 1No. Coil Tubing, 1 No.CROSS IWOCS 33 Grillage, 1 No. Moonpool Gillage, 1 No. LARS Lunching & Recovery system Grillage, 1 No. CROSS WRP Grillage, 1 No. Dive Spread Structural Grillage. 4. NDT Inspection, Padeye Pull Test,blasting, painting and delivery at FOT Onne. 5. Sea-fastening of the fabricated coil tubing onboard BOA Deep C. D U R AT I O N 8 37 Days D AT E : 8 January 2017 SNEPCO / Marine Platforms Ltd. BOOR Engineering Support Project 1) Material Procurement, Fabrication of the 1 No. Riser Recovery Frame(Chute), 2 No of Holdback padeyes, 2 No. Drip tray and 2No. Coral Stantion, 1 No. Diving LARS Grillage, 1 No. Snatch block padeye, 1No Hang Off Frame 2) Inspection, blasting, painting and delivered at FOT. 3) Sea-fastening of the above mentioned fabricated item onboard African Vision. 4. As-Built Drawings for the above mentioned fabricated items. D U R AT I O N 8 28 Days D AT E : 8 May 2017 SNEPCO / Marine Platforms Ltd. BOOR Engineering Support Project 1) Material Procurement, Fabrication of the 1 No. Suffer Ladder 2) Inspection, blasting, painting and delivered at FOT. 3) Sea-fastening / Installation of the Suffer Ladder on board MV PRIMUS. 4) As-Built Drawings for the above mentioned fabricated items. 28 D U R AT I O N 8 13 Days D AT E : 8 September 2017

31 We are privately owned, led by active, experienced management and driven by values that underpin everything we do.

32 HEAD OFFICE Km 22, Port Harcourt-Aba Expressway, Port Harcourt, Rivers State (0) indexproltd CONTACT PERSON Emmanuel Omunakwe +234 (0)