CITY GURGAON. Countdown to a magnificent lifestyle
|
|
- Blanche McCarthy
- 5 years ago
- Views:
Transcription
1 CITY GURGAON Countdown to a magnificent lifestyle
2 Ramprastha - A Tradition of Quality & Commitment Providing exceptional value to its customers by creating premium homes at affordable prices Amongst the first to introduce the concept of integrated townships
3 Ramprastha City Gurgaon - Location
4 Ramprastha City Gurgaon - Excellent Connectivity
5 Commercial
6 The View, lies in the midst of many modern facilities and everyday amenities. Located in the 450 acre integrated township, Ramprastha City on Dwarka Expressway it is a well-planned township. The View has been designed for comfort and optimum utilisation of space ensures that each apartment is roomy.
7 Consultants of the Project Principal Architect - Nivedita & Uday Pande Consultants Landscape Consultant - DesignCell Parking Consultant - WSP Lighting Consultant - Lightbook Irrigation - Chandra Prakash
8
9 CONSTRUCTION UPDATE
10 Best Brands for Best Quality Lift UPVC Doors/ Windows Wiring Switches Tiles Paint External Paint Internal Weather coat Acrylic Emulation Doors Door Hardware C.P. Fittings Stainless Steel Sink White Chinaware MCB Board PVC Pipe
11 (Block A, B, C, D & E Pre-Final Finishing Work) UPVC Windows Vitrified Tiles Ceramic Tiles Anti-Skid Tiles Granite Counters Stainless Steel Sink Doors Lifts Wiring Basement
12 Exterior Look Side Elevation of view tower
13 Basement Car Parking Reinforcement work, Drainge work & PCC work for Trimix Trimix flooring work in basement area
14 Balcony
15 Entrance Lobby
16 Elevator Granite flooring in lift lobby area & OTIS make lift
17 Fire Exit View of Stair-Case shows kota stone flooring in Tread & Riser
18 Living Room Interior View of Drawing / Dining area showing vitrified flooring, EN CRAFT UPVC door & balcony railing work
19 Bedroom Interior View of bedroom showing Durian door shutter, EN CRAFT UPVC door & window, Asian vitrified flooring & Balcony railing work.
20 Switches
21 Kitchen Interior View of kitchen area showing tile work on wall, flooring & granite top.
22 Bathroom Interior Wall & floor tiles,wooden beading, Ceramic tiles in wall & floor & UPVC UPVC Window in Toilets window in Toilets
23 Lift Machine Room Construction in Progress Lift special feature - Automatic Rescue Device (ARD)
24 Overhead Tank Construction in Progress
25 Fire Fighting Shaft
26 Final finishing work in progress a. Building Plaster b. Balcony Grills c. Lift Lobby d. Entrance Lobby e. Basement f. Basement Ramp g. CP Fittings h. External Painting i. Internal Painting j. Water Testing k. Fire-fighting Testing l. Overhead Tanks m. UG Water Tanks n. S.T.P. o. Commissioning of Lifts p. Final Touchup /Repair Work q. Landscaping r. Roads
27 Services Construction in progress for U.G. Water Tank Construction in progress for S.T.P.
28 Entertainment & Internet facility - FTTH (Fiber To The Home) High-Speed Internet Connection Landline / Intercom Connection I.P.T.V. (Internet Protocol Television) Connection D.T.H. (Direct-To-Home) connection option from: a. Airtel b. Tatasky c. Videocond2h
29
30 Security System Boom Barriers at Entry & Exit of the Complex and the Basement Parking Card Access Control System in Main Entrance Lobby IP Cameras for a. Main Entrance Lobby b. Main Lift Lobby c. Basement Lift Lobby d. Basement Parking e. Entry & Exit of the Complex
31
32 Connecting Road under Construction
33 Connecting Road 24 Mtr. wide Work in Progress
34 THANK YOU