1 SCHEDULE OF CONDITION Fulham, London SW6 FOR Mr S Of XXXX Limited Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by:

2 CONTENTS SCHEDULE OF CONDITION Elevations page 4 Internal Rooms page 12 GROUND FLOOR AREA Other Matters page 22 FIRE REGULATIONS DISABILITY AND DISCRIMINATIONS ACT ASBESTOS REGISTER Limitations page 24 Signature Document page 25 2

3 Address: Prospective Tenant: Repairing Covenant, Redecorating Covenant, Reinstatement and Statutory Regulation Covenant Yield Up Clause: Fulham London SW6 Mr S XXXX Limited We have not seen a copy of the lease and we have therefore assumed the property has a full repairing and insuring covenant or will have under the proposed lease. We have assumed it is a standard lease with no unusual or onerous clauses. Your Legal Adviser should confirm this and advise us of any unusual or onerous clauses immediately. Photographs: We typically take approximately 150 photographs during the course of a Schedule of Condition. We reserve the right to produce these photographs to establish the condition of the property over and above the ones included in the report. Orientation: All directions are taken as if viewing the property from the front. The Schedule of Condition offers a detailed description of the condition of the property. We assume that D2 use has been granted for Assembly of groups and Leisure use. The Schedule of Condition is to be read in conjunction with the Property Report. 3

4 ELEVATIONS All directions given as you face the property. Under the terms of most Leases there is a redecoration covenant requiring redecoration on termination of the Lease we assume this will take place or appropriate agreed monetary compensation in lieu of this to the new tenants. 4

5 FRONT ELEVATION Main Roof: DESCRIPTION CONDITION ACTION REQUIRED Asbestos roofing Moss on asbestos roof indicates the asbestos is starting to deteriorate. We can see sections have been replaced to the right hand side An asbestos report is required, including samples to determine what sort of asbestos it is. Obtain confirmation that it is alright to have public events beneath Moss on asbestos roof Partly replaced roof 5

6 Wooden Walkway: Wooden walkway runs across the roof with a warning sign Do no use timber walkways at any time Both the roof and the walkway have been inspected from ground level Close up inspection Walkway Walkway Flat roof building adjoining property on right hand side The junction of the flat roof and the building to rent is allowing water into the building Water damage occurring due to the condition of the adjacent flat roof building. Landlord to repair or advise lessees. General view of flat roof Water getting into building Gutters and Downpipes: Cast iron and plastic gutters and downpipes Outlet to far left hand side two units away Gutters are hidden behind the metal trays for the service duct work Signs gutters leaking, particularly to right hand side where brickwork has moss on it and white staining Ensure all gutters are watertight and falling towards the downpipe. Remove moss, repair and secure as necessary, ensure downpipes are clear. Blocked drain downpipe from roof Gutters hidden behind service tray 6

7 External Services: Two metal trays run the length of the property at high level (gutter level) for the services. Walls Finish: Looking up at service trunking Timber clad General view of walls Poor condition of external timber with patch repairs The entirety of the front of the property requires recladding. Poor condition of timber to front Structural frame internally Stretcher Bond brickwork underneath the cladding Patch repair with the rot Moss and water damaged Repair, prepare and redecorate Moss and water damage Water damage coming from flat roof area/gutter 7

8 Walls to adjacent property (not forming part of the lease): Stretcher Bond brickwork to building with flat roof Much of the wall is covered with graffiti Landlord to remove graffiti or contact lessees to remove graffiti Graffiti covered wall Windows and Doors: Timber entrance door Heavily marked Repair, prepare and redecorate Roller shutter doors to right hand side with timber cill Marked front door Blue paint marks Timber cill needs redecoration and repainting Timber cill needs redecorating Paint on roller shutter door 8

9 Sliding metal shutters, approximately one metre in height revealing a suspended concrete floor. The slab is approximately 200mm thick Behind shutters is a void Clear void Sliding metal shutter revealing concrete floor Single glazed windows Concrete floor Rubbish in concrete floor area Close up of windows Steel stair access with 6 steps and a landing Primed but not had a finishing coat of paint. Underneath that is fly tipping Repair, prepare and redecorate Parking / Concrete Area: Directly in front of building We are advised there are two parking spaces, one either side of steps. Metal stairs with rubbish underneath Concrete area is raised to right hand side Make good rough concrete and remove fly tipping from area Left hand parking space Right hand parking space 9

10 REAR ELEVATION We are advised that there was no access to the rear. We would comment that there is a railway line to the rear Roofs: DESCRIPTION CONDITION ACTION REQUIRED (See below) Asbestos roofing Gutters and Downpipes: Walls: Windows and Doors: Action Required Summary for all of the above areas: To be advised how access is possible to maintain these areas or exclude from the full repairing and insuring lease. 10

11 INTERNAL All directions given as you face the property. Under the terms of most Leases there is a redecoration covenant requiring redecoration on termination of the Lease we assume this will take place or appropriate agreed monetary compensation in lieu of this to the new tenants. 11

12 Front wall Front wall Close up of studwork to front wall Ceilings: DESCRIPTION CONDITION ACTION REQUIRED Pitched asbestos sheeting visible Need an asbestos report Lightweight metal trussed frame Rusting to roof frame Disused pipes to right hand side (all directions given as you face the property) 12

13 Walls: Painted brickwork and blockwork Signs of water penetration adjacent to roller shutter door Repair, prepare and redecorate. Open studwork Disused pipes and signs of water penetration on brickwork adjacent to roller shutter door Right hand side of front wall staining visible and flaking paint Floors: Suspended concrete, cast in situ Detailing: Windows to front wall Roller shutter door Entrance door Services: Lighting Close up of studwork Surface puckered and signs of old fixing points and cut of I beams. One window boarded up Paint marks visible Marked Make good and seal Repair, prepare and redecorate Repair, prepare and redecorate. Repair, prepare and redecorate. 13

14 Right hand side wall Middle of right hand wall Right hand wall covered Rear of right hand area in paint graffiti Ceilings: DESCRIPTION CONDITION ACTION REQUIRED Pitched asbestos sheeting visible Lightweight metal trussed frame Old flue to rear right hand corner Rusting to roof frame Not been made watertight and is allowing water in Need an asbestos report Make watertight Make watertight Roof vent in roof allowing water in 14

15 Walls: Painted brickwork and blockwork with boarding at high level Walls generally dirty and marked. Graffiti covered to front right hand side Cut off I beams Clean and redecorate Floors: Above graffiti area I beams cut off Concrete Marked Clean Ramp Marked Marked floor Clean Void Area: Painted brickwork Ramp Poor condition needs repointing Repoint and redecorate Void area 15

16 Rear wall Left hand side Left side middle Right hand side Ceilings: DESCRIPTION CONDITION ACTION REQUIRED Pitched asbestos sheeting visible Need an asbestos report Lightweight metal trussed frame Rusting to roof frame Walls: Painted brickwork Plastic soil and vent pipe Deteriorating, water staining and in poor condition Repair, prepare and redecorate Note the external of this wall has not been seen so the ground level cannot be identified 16

17 Floors: Concrete Manhole to centre of rear Surface puckered and signs of old fixing points Make good and sea Detailing: Single glazed metal windows running entire length Manhole to centre with soil and vent pipe in background (rear left hand corner) Some corrosion Use a rust stop agent and redecorate. Note: external has not been seen. Metal windows 17

18 Left hand side wall Front of wall Rear of wall High level view of wall Ceilings: DESCRIPTION CONDITION ACTION REQUIRED Pitched asbestos sheeting visible Obtain asbestos report Lightweight metal trussed frame which has been in use throughout the property. These roofs in turn require a lightweight cladding Rusting to roof frame Roof Lights: Asbestos sheeting There are a variety of roof lights. Clear roof lights were traditional corrugated roof lights Lightweight cladding Looking into roof Roof light Roof light 18

19 Walls: Painted and unpainted blockwork and painted brickwork, with painted boarding at high level Cracking: Paint deteriorating and boarding at high level has had various repairs There are vertical cracks to the rear left hand side and these run the length of blockwork All painted areas need redecoration Floors: Concrete Repair boarding at high level to left hand side Cracking Surface puckered and signs of old fixing points More cracking Make good and seal 19

20 OTHER MATTERS SERVICES Electrics The electrics were located on the front wall. These have not been tested. ACTION REQUIRED: The Landlord or present Lessees should provide an Institute of Electrical Engineers (IEE) test and report by an NICEIC approved electrician or equivalent. Heating No heating sources were noted. Energy Efficiency Older properties such as this will not be as energy efficient as modern properties. We feel that energy efficiency will become very important in years to come and may well affect re-saleability of a property. We are advised this is already starting to happen to some extent in the office sector. There are many areas where energy efficiency and heat loss could be improved and reduced in this particular building, particularly with regard to insulation of the roofs. We would be more than happy to advise you further on this once you understand better your occupational requirements of the building. Disability Discrimination Act You should be aware that it is now a requirement to give average access to the disabled and make reasonable amendments to the property as is necessary to accommodate them. ACTION REQUIRED: You should ask to see if a report has been carried out in line with the Disabilities Act highlighting areas that can be improved or have been improved. 20

21 Asbestos Register We noted asbestos in this property. This was commonly used post war until it was banned only in the last ten or so years, although it is rumoured that it was still used after this point in time. It is now a requirement for any public building to have an asbestos register, indicating whether there is or is not asbestos and if so where it is. ACTION REQUIRED: An Asbestos Register should be provided by the outgoing tenant/landlord. You should note that work involving products containing asbestos is covered by Health and Safety legislation and you are recommended to seek the advice of the Local Authority Environmental Health Officer before proceeding with any such work. We are not asbestos surveyors. 21

22 LIMITATIONS As per our original Terms of Engagement, we would remind you specifically that: We have not inspected parts of the structure that were covered, unexposed or inaccessible during our inspection. We therefore cannot confirm that such parts are free from defect, structural or otherwise. We have not determined whether any hazardous materials such as high alumina cement, calcium chloride, asbestos etc have been used in the construction. Our report is for the use of the party to whom it is addressed above and no responsibility is accepted under the Third Parties Act or for any third parties who use this report in whole or in part. We have not carried out a comprehensive test of any electrical, mechanical or drainage services. We therefore cannot confirm that they are operational and in good condition. If you wish us to arrange tests please advise. We have not carried out or arranged for specialists to undertake any reports, for example an environmental report or an audit report upon the property. We are therefore unable to advise whether any contaminated or other adverse environmental issues affect the site. This report does not constitute a Structural Survey (now known as a Building Survey). 22

23 Signature Document in Relation to Fulham, London SW6 Schedule of Condition This signature document represents page 25 and 26 of a 26 page Schedule of Condition relating to: Parsons Green Lane, Fulham, London SW6 as prepared by XXXX Chartered Surveyors You should ensure your Legal Advisor gets this document signed by the relevant parties and agreed prior to legal commitment to purchase. Delete/amend as you require. Lessees Representative We verify that this is a true and accurate record of the condition of: Fulham, London SW6 As inspected By XXXX Chartered Surveyors Signed:..... Dated: For and on Behalf of XXXX Chartered Surveyors 23

24 Lessee Mr S of XXXX Limited has seen and forwarded this document on by recorded delivery on.... to the owners/landlords or their legal representatives in relation to the proposed Lease. Signed:... Mr S of XXXX Limited Dated: Landlords Representative (delete as applicable) Print Name:.... for and on behalf of..... has inspected and read the Schedule of Condition for an on behalf of. and accepts that it is a true and accurate record. Signed: Dated:. For and on Behalf of:..... I have the authority to sign this document on behalf of the aforementioned company. 24