1 Detail Booklet Series 56s.xx CAE Steel Frame Construction February 2019 Sto products are intended for use by qualified professional contractors, not consumers, as a component of a larger construction assembly as specified by a qualified design professional, general contractor or builder. They should be installed in accordance with those specifications and Sto s instructions. Sto Corp. disclaims all, and assumes no, liability for on-site inspections, for its products applied improperly, or by unqualified persons or entities, or as part of an improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, or for other construction activities beyond Sto s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to Sto products, and to the structure of the building or its components. STO CORP. DISCLAIMS ALL WARRANTIES EXPRESSED OR IMPLIED EXCEPT FOR EXPLICIT LIMITED WRITTEN WARRANTIES ISSUED TO AND ACCEPTED BY BUILDING OWNERS IN ACCORDANCE WITH STO S WARRANTY PROGRAMS WHICH ARE SUBJECT TO CHANGE FROM TIME TO TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. Sto Canada Sales Centre Toronto 1821 Albion Road Unit 1-2 Etobicoke, ON M9W 5W8 Tel: (416) Property of Sto Corp. All Rights Reserved.

2 General Notes Detail No.: 56s.GN.CAE Page 1 of 4 Structural - Wind and Axial Loads 1. Design for maximum allowable deflection normal to the plane of the wall of L/ Design for wind load in conformance with code requirements. 3. Frame Construction: space studs maximum 406mm (16 inches) on center using either 2x4 or 2x6 wood framing or minimum 18 gauge galvanized steel stud framing. 4. Maximum ultimate wind load resistance: positive 12.1 kpa (253 lb/ft 2 ), negative 6.03 kpa (-126 lb/ft 2 ). Refer to the Sto Design Guide for details of wind load resistance tested assemblies. Fire 1. Insulation board is noncombustible as defined by CAN/ULC S114 with 0 flame spread and 0 smoke development (CAN/ULC S102). 2. Non-Combustible Construction: system is permitted in non-combustible construction, without sprinklers, setback or height limitations (other than wind load height restrictions). 3. Fire Resistant Rated Construction: system maintains hourly fire resistance rating of concrete, concrete masonry, and non-load bearing steel frame wall assemblies. Moisture Protection 1. Refer to Sto Tech Hotline No BSc, Critical Detail Checklist for Wall Assemblies, and No BSc Moisture Control Princples for Design and Construction of Wall Assemblies, for basic details and principles that must be employed in design and construction of wall assemblies to control moisture. 2. StoGuard functions as the air barrier and moisture barrier (AMB) in the system and conforms with the requirements of ASTM E2570, Standard Test Methods for Evaluating Water-Resistive Barrier (WRB) Coatings Used Under Exterior Insulation and Finish Systems (EIFS) or EIFS with Drainage. The moisture protection provided by StoGuard protects walls against moisture damage from rain during the construction process and in the event of a breach in the wall cladding while in service. Flashing must always be integrated with the AMB in the wall assembly to direct water to the exterior of the cladding, not into the wall assembly, particularly at potential leak sources such as windows. 3. The function of an air barrier should not be confused with that of a vapour retarder. A vapour retarder is placed in the wall to resist differential vapour pressures, whereas the air barrier is designed to resist the structural live loads induced by air pressure difference. (continued on next page) improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for other construction activities beyond Sto s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to Sto products, and to the structure of the building or its components. TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. Property of Sto Corp. All Rights Reserved.

3 General Notes Detail No.: 56s.GN.CAE Page 2 of 4 Moisture Protection (cont d) Generally a vapour retarder is placed on the warm side of the wall. Specifically, it is placed on the interior side of the insulation in cold climates and on the exterior side of the insulation in warm humid climates to minimize condensation within the wall assembly. A vapour retarder may not be necessary depending on the wall components, the range of temperature/humidity conditions inside and outside, and the mechanical ventilation of the building. A vapour retarder should not be used on the interior side of walls in warm humid climates. Refer to applicable building codes for further guidance. 4. The system functions to resist water penetration based on testing in accordance with ASTM E331, (Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference) and also drains incidental water in the event of a breach of the outer facing (lamina). 5. The system is vapour open with vapour permeable air and moisture barrier, insulation board, and lamina components. If a vapour barrier is required refer to information on StoGuard VapourSeal. 6. Precautions must be taken to keep insulation board dry during construction and while in service. R-value, adhesion and other properties can be compromised if insulation stays wet. During construction protect with tenting, base coat, or other protection to maintain insulation board integrity and properties. Thermal Insulation 1. The system employs noncombustible continuous exterior mineral wool insulation in compliance with ASTM C612, Standard Specifcation for Mineral Fiber Block and Board Thermal Insulation, and as per CAN/ULC S716.1, Standard for Exterior Insulation and Finish Systems System and Materials. The insulation comes in 51, 76, or 102mm (2, 3, or 4 inch) thicknesses with an RSI value of RSI m 2 K/W (R-4.0 ft 2 h F / Btu per inch). 2. The system employs specially designed thermal dowels for attachment of the insulation to the supporting structure to minimize thermal bridging. Impact Resistance 1. Heavy reinforcing mesh layer 373 g/m 2 (11 oz/yd 2 ) is recommended for ground floors and other areas at risk of impacts or abuse. Alternative materials stucco, stone, tile may be more suitable in areas with heavy pedestrian traffic, vehicular traffic (e.g., porte cocherre), and industrial areas. improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for other construction activities beyond Sto s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to Sto products, and to the structure of the building or its components. TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. Property of Sto Corp. All Rights Reserved.

4 General Notes Detail No.: 56s.GN.CAE Page 3 of 4 Acoustics 1. Outdoor-Indoor Transmission Class has been measured and calculated at 45 in accordance with ASTM E1332, Standard Classification for Rating Outdoor-Indoor Sound Attenuation, and ASTM E413, Classification for Rating Sound Insulation. Aesthetics 1. Slight surface irregularities may be apparent in the finished wall surface for brief periods during the day in critical light. Smooth or fine texture finishes are discouraged. Minimum 1.5 mm (Medium) or heavier textures are preferred to hide surface imperfections. On some occasions surface mount dowels may read through the finished wall surface as the building ages. This can be remedied by recoating (or prevented by using countersunk dowels). Joints 1. System requires joints at: - Expansion, deflection, control, or cold joints in supporting construction - Changes in building height - Dissimilar construction or materials - Floor lines in multi-level wood frame construction Regulatory Compliance 1. StoGuard Air and : complies with LA-WRB performance requirements of CAN/ULC S716 and ASTM E2178 as per NBC Div. B Clause (1)(a), Air Barrier Material Properties. 2. StoGuard Air and : meets the performance requirements of ASTM E2357 as per NBC Div. B Clause (1)(c), Airtightness. 3. System: utilizing a noncombustible thermal insulation the system is exempt from full-scale assessment applicable to combustible cladding and/or insulations as outlined in Article As such, it is also exempt from the Article s building height limitations and may be used on buildings without height restriction (other than wind load height restrictions), including in retrofit installations where a building may be greater than 3 storeys and unsprinklered. Further, being a noncombustible cladding, comprised of noncombustible material (save minor combustible components), StoTherm ci Mineral may be used where spatial limitations restrict unprotected openings to <10% as per NBC Div. B Table (1). Article is not applicable as the system does not utilize a foam plastic insulation. improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for other construction activities beyond Sto s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to Sto products, and to the structure of the building or its components. TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. Property of Sto Corp. All Rights Reserved.

5 General Notes Detail No.: 56s.GN.CAE Page 4 of 4 Sustainability 1. Insulation board is made of 70% recycled content. 2. StoGuard Air and, Sto adhesive, and Sto lamina components comply with VOC requirements of SCAQMD Rule System has high potential for LEED and other sustainability program credits based on efficient and effective use of continuous exterior insulation and resulting reductions in greenhouse gas emissions Other 1. Always construct a site built mock-up using materials and sub-trades associated with the project to verify installation, sequencing, detailing, and aesthetics, and test the performance of the window/wall assembly and other selected critical detail areas for air leakage, water infiltration, and structural adequacy in relation to design wind pressures. Correct any deficiencies shown by the mock-up and testing before commencing work. 2. Refer to Product Bulletins, StoTherm ci Mineral Design Guide, Installation Guide, and guide Specifications and Details, for additional information. 3. The final design of the project is the responsibility of the Design Professional. Sto accepts no liability for design, engineering, or workmanship of any project. The notes provided herein are in addition to Sto Guide Details, Guide Specifications, and other items available at For Questions or Assistance: Sto Technical Services Phone : +1 (800) Help Desk: helpdesk.stocorp.com Website: improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for other construction activities beyond Sto s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to Sto products, and to the structure of the building or its components. TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. Property of Sto Corp. All Rights Reserved.

6 StoGuard Air and Product Use Information Detail No.: 56s.SG.CAE Page 1 of 2 Fluid Applied Air and Products Sto Gold Coat - Roller or spray applied vapor-permeable air & moisture barrier designed for use in StoTherm ci Systems. Sto VaporSeal R - Roller or spray applied air barrier and vapour barrier (< 60 metric perms). Provides superior protection against vapour diffusion, moisture intrusion and air leakage. Sto Gold Coat TA - Trowel applied vapour-permeable air & moisture barrier for use behind siding, brick, stone, adhered veneer, and StoTherm ci Systems. Detail Component Products Sto Gold Fill - Trowel applied joint treatment and air barrier material used to treat rough openings, corners, and sheathing joints with StoGuard Mesh or Sto Detail Mesh. Sto RapidGuard - One-component air barrier and waterproof material used to protect rough openings, sheathing joints, seams, cracks, penetrations, and other transitions in above grade wall construction. StoGuard Fabric - Non-woven cloth reinforcement to treat joints, inside and outside corners and rough openings when embedded in Sto Gold Coat, Sto Emerald Coat, Sto AirSeal or Sto VaporSeal. StoGuard Mesh - Glass fiber, self-adhesive mesh for use with Sto Gold Fill and Sto Gold Coat TA as part of the StoGuard assembly. StoGuard Transition Membrane - Flexible air barrier material used to make connections with adjoining construction to achieve continuity of the air barrier assembly at dynamic joints and dissimilar materials. StoGuard Tape - A self-adhering membrane composed of spun bond polyester fabric laminated to rubberized asphalt adhesive for use as rough opening protection at windows and doors. StoGuard Primer required.

7 StoGuard Air and Product Use Chart Detail No.: 56s.SG.CAE Page 2 of 2 StoGuard Products for Transition Components, Joint Treatments and Rough Opening Protection Transition Components StoGuard Product(s) Joints and Corners Rough Opening Protection Flashing and Penetration Static Joints and Seams Dynamic Joints and Seams StoGuard Fluid Applied Air & with StoGuard Fabric 1 Sto Gold Coat TA with StoGuard Mesh embedded 1 Sto Gold Fill with StoGuard Mesh or Sto Detail Mesh embedded 1 Sto RapidGuard StoGuard Tape with StoGuard Primer StoGuard Transition Membrane embedded with any StoGuard Fluid Applied Air & 1 Contact Sto Tech Services for more information. improperly designed or constructed building, for the nonperformance of adjacent building components or assemblies, of for other construction activities beyond Sto s control. Improper use of Sto products or use as part of an improperly designed or constructed larger assembly or building may result in serious damage to Sto products, and to the structure of the building or its components. TIME. For the fullest, most current information on proper application, clean-up, mixing and other specifications and warranties, cautions and disclaimers, please refer to the Sto Corp. Property of Sto Corp. All Rights Reserved.

8 System Components Detail No.: 56s.00 CAE Light Gauge Steel Stud Framing StoGuard Air and Joint Treatment StoGuard Air and Sto DrainScreen 10mm Mineral Wool Insulation Board (See Note 2) Sto Reinforcing Mesh Sto Base Coat (with Embedded) Sto Primer (Optional) StoTherm ci Mineral System Components: 1. StoGuard Air and 2. Sto DrainScreen 10mm 3. Mineral Wool Insulation Board as specified by Sto Sto Primer (optional) 6. Sto Base Coat Refer to StoTherm ci System Bulletins and Specifications, Sto Product Bulletins, Tech Hotlines, and 2. Mechanical Fasteners not 56s.02 for mechanical attachment pattern and additional information. 3. Components not identified as Sto are furnished by other trades who install the Sto products. Refer to project specific contract documents.

9 System Components: Ultra-High Impact Resistance Detail No.: 56s.01 CAE Light Gauge Steel Stud Framing StoGuard Air and Joint Treatment StoGuard Air and Sto DrainScreen 10mm Sto Base Coat (with Sto Intermediate Mesh) StoTherm ci Mineral System Components: 1. StoGuard Air and 2. Sto DrainScreen 10mm 3. Mineral Wool Insulation Board as specified by Sto 4. Sto Intermediate Mesh Sto Primer (optional) 7. Sto Base Coat Ultra-high impact resistance recommended at all ground floors to a minimum height of 6'-0" (1.8 m) above finished grade and other areas accessible to pedestrian traffic, abnormal stress or impact. 2. Refer to StoTherm ci System Bulletins and Specifications, Sto Product Bulletins, Tech Hotlines, and Sto Installation and Mineral Wool Insulation Board (See Note 2) Sto Base Coat (with Embedded) Sto Primer (Optional) 3. Mechanical Fasteners not 56s.02 for mechanical attachment pattern and additional information. 4. Components not identified trades who install the Sto products. Refer to project specific contract documents.

10 Mechanical Attachment Pattern and Components Detail No.: 56s.02-1 CAE Date: Feburary 2019 A. 6-Fastener Configuration on Frame 6" (152mm) 16" (406mm) 8" (203mm) 8" (203mm) 1. Additional framing may be needed to accommodate fastener spacing. 2. Allow adhesive to dry before adding fasteners. 6" (152mm) 12" (304mm) 3. 2" insulation will use surface mounted fasteners, 3" and 4" insulation will use countersunk fasteners. 24" (610mm) 4. Please refer to StoTherm ci Mineral Design Guide and StoTherm ci Mineral Install Guide for information on wind loads and fasteners B. 9-Fastener Configuration on Frame 4" (102mm) 8" (203mm) 8" (203mm) 16" (406mm) 8" (203mm) 48" (1220mm) 8" (203mm) 5. Refer to detail 56s.GN for general notes on the StoTherm ci Mineral system. 6. Components not identified 4" (102mm) 24" (610mm) 48" (1220mm)

11 Mechanical Attachment Pattern and Components Detail No.: 56s.02-2 CAE Date: Feburary 2019 C. 8-Fastener Configuration / Solid Substrate 6" (152mm) 12" (304mm) 6" (152mm) 18" (458mm) 6" (152mm) 18" (458mm) 6" (152mm) 1. Allow adhesive to dry before adding fasteners. 2. 2" insulation will use surface mounted fasteners, 3" and 4" insulation will use countersunk fasteners. 3. Please refer to StoTherm ci Mineral Design Guide and StoTherm ci Mineral Install Guide for information on wind loads and fasteners 6" (152mm) 24" (610mm) 4. Refer to detail 56s.GN for general notes on the StoTherm ci Mineral system. 15" (380mm) 18" (458mm) 48 (1220mm) 15" (380mm) 5. Components not identified

12 Termination at Grade - Flush with Foundation or Slab Edge Detail No.: 56s.03A CAE Date: Feburary 2019 Sto Base Coat (with Sto Reinforcing Mesh Embedded) Light Gauge Steel Stud Framing StoGuard Air and Sto DrainScreen 10mm Mineral Wool Insulation Board (See Note 4) Sto Primer (Optional) 1. Terminate system minimum 8 (200mm) above finished grade, higher for areas with heavy snow accumulations, or where required by code. 2. Ultra-high impact resistance recommended at all ground floors to a minimum height of 6'-0" (1.8 m) above finished grade and other areas accessible to pedestrian traffic, abnormal stress or impact. StoGuard Air and Detail Component Flashing, Sloped 3. Refer to StoTherm ci 4. Mechanical Fasteners not StoGuard Transition Membrane Embedded in StoGuard Air and (Protect with StoCoat Acryl Plus or Flashing) Insect screen recommended Terminate Assembly 8 (200 mm) Above Grade, min. Backer Rod & Sealant w/ Weep Holes 5. Components not identified

13 Termination at Grade - Overlapping Slab or Foundation Detail No.: 56s.03B CAE Sto Base Coat (with Sto Reinforcing Mesh Embedded) Light Gauge Steel Stud Framing StoGuard Air and Sto DrainScreen 10mm Mineral Wool Insulation Board (See Note 4) Sto Primer (Optional) 1. Terminate system minimum 8 (200 mm) above finished grade, higher for areas with heavy snow accumulations, or where required by code. 2. Ultra-high impact resistance recommended at all ground floors to a minimum height of 6'-0" (1.8 m) above finished grade and other areas accessible to pedestrian traffic, abnormal stress or impact. StoGuard Air and Detail Component 3. Refer to StoTherm ci 4. Mechanical Fasteners not Flashing, Sloped StoGuard Transition Membrane Embedded in StoGuard Air and (Protect with StoCoat Acryl Plus or Flashing) Insect screen recommended Terminate Assembly 8 (200 mm) Above Grade, min. Backer Rod & Sealant w/ Weep Holes 5. Components not identified

14 Aesthetic Feature Band Detail No.: 56s.04 CAE Sto DrainScreen 10mm StoGuard Air and Mineral Wool Insulation Board (See Note 5) Sto Base Coat (with Embedded) Sto Flexyl (with Sto Mesh or Sto Detail Mesh Embedded); Return Vertically 4" (102 mm) min. Above and Below Feature Band Sto Primer (Required over Sto Flexyl and Sto Base Coat Above and Below) Thick Build-Out, 2-4 in. ( mm) 1. Feature band attached with adhesive and supplemental fasteners. Bands greater than 12" (300mm) in height will require two horizontal rows of fasteners spaced every 12-16" ( mm) o/c. 2. Slope top surface of feature band minimum 27 degrees. Increase slope for northern climates to prevent snow and ice accuulation. 3. Limit thickness of buildout to reduce maintenance associated with projecting architectural features. 4. Refer to StoTherm ci 5. Mechanical Fasteners not 6. Components not identified

15 Aesthetic Reveal Detail No.: 56s.05 CAE Sto DrainScreen 10mm Sto Base Coat (with Sto Reinforcing Mesh Embedded) Mineral Wool Insulation Board (See Note 4) StoGuard Air and 3/4" (19 mm) min. 2 1/2" (64 mm) min. Ovelap of Sto Detail Mesh w/ Sto Reinforcing Top and Bottom of Reveal Sto Detail Mesh Option 1 with Sto Detail Mesh Sto DrainScreen 10mm Sto Base Coat (with Sto Reinforcing Mesh Embedded) Mineral Wool Insulation Board (See Note 4) StoGuard Air and 3/4" (19 mm) min. Sto Primer (Optional) Sto Primer (Optional) Sto Base Coat (with Sto Detail Mesh Embedded) 1. Slope bottom surface of reveal minimum 27 degrees. Increase slope for northern climates to prevent snow and ice accumulations. 2. Maintain minimum 3/4 inch (19 mm) thickness of insulation board at base of reveal. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 5. Components not identified Option 2 with Continuous Sto Mesh

16 Receptor-Type Window Sill Detail No.: 56s.23A-1 CAE StoGuard Air and Light Gauge Steel Stud Framing StoGuard Air and Moisture Barrier Rough Opening Protection 1. Consult with window and sealant manufacturers to verify window installation and detailing and to assure no water leakage into the wall assembly. Consult with window manufacturer regarding window and/or flashing assembly thermal breaks to avoid condensation. Test the final assembly using materials and trades associated with the project to verify performance. Correct any deficiencies associated with excess air leakage, water infiltration into the wall assembly, or structural inadequacies. 2. Construct a site built mockup using materials and subtrades associated with the project to verify installation sequencing, detailing, and aesthetics. 3. Refer to StoTherm ci 4. Components not identified trades who install the Sto products. Refer to project specific contract documents. Step 1 - Rough Opening Protection

17 Receptor-Type Window Sill Detail No.: 56s.23A-2 CAE Sto DrainScreen 10mm Weep Holes Sto RapidGuard Mineral Wool Insulation Board, Pre-Wrapped around Rough Opening (See Note 5) StoGuard Air and Step 2 - Receptor with End Dam Light Gauge Steel Stud Framing StoGuard Air and Moisture Barrier Rough Opening Protection Sto Adhesive applied to pre wrap and set in place while wet. End Dam Set in Sealant Sill Receptor w/ Weep Holes (Sill Flashing Extender Not Shown for Clarity) Angle (As Needed for Attachment of Sill Receptor and Support) StoGuard Air and Rough Opening Protection min 12.5 mm 1. Consult with window and sealant manufacturers to verify window installation and detailing and to assure no water leakage into the wall assembly. Consult with window manufacturer regarding window and/or flashing assembly thermal breaks to avoid condensation. Test the final assembly using materials and trades associated with the project to verify performance. Correct any deficiencies associated with excess air leakage, water infiltration into the wall assembly, or structural inadequacies. 2. Construct a site built mockup using materials and subtrades associated with the project to verify installation sequencing, detailing, and aesthetics. 3. Install diagonal mesh (not shown) at all corners. Use full width Sto Detail Mesh 12" (300 mm) long and center on corner at 45º. Embed in Sto Base Coat. 4. Refer to StoTherm ci 5. Mechanical Fasteners not 56s.02 for mechanical attachment pattern and additional information. 6. Components not identified trades who install the Sto products. Refer to project specific contract documents.

18 Receptor-Type Window Sill Detail No.: 56s.23A-3 CAE Sto Base Coat (with Sto Reinforcing Mesh Embedded) Sto Reinforcing Mesh Sto Primer (Optional) Backer Rod & Sealant (Entire Perimeter Bears Against Base Coat on One Side and Window Frame on the Other Side) Sill Receptor w/ Weep Holes Sill Extender w/ Continuous Bead of Bottom Mineral Wool Insulation Board, Pre- Wrapped around Rough Opening (See Note 4) StoGuard Air and Light Gauge Steel Stud Framing StoGuard Air and Moisture Barrier Rough Opening Protection Sto DrainScreen 10mm Sto Adhesive applied to pre wrap and set in place while wet. Spray Polyurethane Foam Insulation Air Seal, Backer Rod & Sealant (Air Seal Entire Perimeter) Jamb Receptor Window Assembly Angle (As Needed for Attachment of Sill Receptor and Support) StoGuard Air and Rough Opening Protection Sto RapidGuard 1. Consult with window and sealant manufacturers to verify window installation and detailing and to assure no water leakage into the wall assembly. Consult with window manufacturer regarding window and/or flashing assembly thermal breaks to avoid condensation. Test the final assembly using materials and trades associated with the project to verify performance. Correct any deficiencies associated with excess air leakage, water infiltration into the wall assembly, or structural inadequacies. 2. Construct a site built mockup using materials and subtrades associated with the project to verify installation sequencing, detailing, and aesthetics. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 56s.02 for mechanical attachment pattern and additional information. 5. Components not identified trades who install the Sto products. Refer to project specific contract documents. Step 3 - Window and Sill Flashing, Cladding, and Perimeter Weather and Air Seals

19 Receptor-Type Window Head Detail No.: 56s.23B-1 CAE StoGuard Air and Moisture Barrier Detail Component Light Gauge Steel Stud Framing StoGuard Air and StoGuard Air and Moisture Barrier Rough Opening Protection Flashing StoGuard Air and StoGuard Air and Moisture Barrier Rough Opening Protection 1. Consult with window and sealant manufacturers to verify window installation and detailing and to assure no water leakage into the wall assembly. Consult with window manufacturer regarding window and/or flashing assembly thermal breaks to avoid condensation. Test the final assembly using materials and trades associated with the project to verify performance. Correct any deficiencies associated with excess air leakage, water infiltration into the wall assembly, or structural inadequacies. 2. Construct a site built mockup using materials and subtrades associated with the project to verify installation sequencing, detailing, and aesthetics. 3. Refer to StoTherm ci 4. Components not identified trades who install the Sto products. Refer to project specific contract documents. Step 1 - Rough Opening Protection, Head Flashing

20 Receptor-Type Window Head Detail No.: 56s.23B-2 CAE Mineral Wool Corner Board, Pre-Wrapped around Rough Opening (See Note 5) Sto DrainScreen 10mm Step 2 - Receptor and Window Light Gauge Steel Stud Framing StoGuard Air and Moisture Barrier StoGuard Air and Moisture Barrier Rough Opening Protection Spray Polyurethane Foam Insulation Head Receptor Window Assembly Flashing Jamb Receptor Stone Wool Insulation Board, Pre-Wrapped Sto Adhesive applied to pre wrap and set in place while wet. StoGuard Air and StoGuard Air and Moisture Barrier Rough Opening Protection 1. Consult with window and sealant manufacturers to verify window installation and detailing and to assure no water leakage into the wall assembly. Consult with window manufacturer regarding window and/or flashing assembly thermal breaks to avoid condensation. Test the final assembly using materials and trades associated with the project to verify performance. Correct any deficiencies associated with excess air leakage, water infiltration into the wall assembly, or structural inadequacies. 2. Construct a site built mockup using materials and subtrades associated with the project to verify installation sequencing, detailing, and aesthetics. 3. Install diagonal mesh (not shown) at all corners. Use full width Sto Detail Mesh 12" (300 mm) long and center on corner at 45º. Embed in Sto Base Coat. 4. Refer to StoTherm ci 5. Mechanical Fasteners not 56s.02 for mechanical attachment pattern and additional information. 6. Components not identified trades who install the Sto products. Refer to project specific contract documents.

21 Receptor-Type Window Head Detail No.: 56s.23B-3 CAE Mineral Wool Corner Board, Pre-Wrapped around Rough Opening (See Note 4) Sto Primer (Optional) Sto Reinforcing Mesh Sto Base Coat (with Sto Reinforcing Mesh Embedded) Sto DrainScreen 10mm Light Gauge Steel Stud Framing StoGuard Air and StoGuard Air and Moisture Barrier Rough Opening Protection Air Seal, Backer Rod and Sealant (Air Seal Entire Perimeter) Head Receptor Window Assembly Flashing Jamb Receptor Backer Rod & Sealant (Entire Perimeter, with Weeps at Head. Bears Against Base Coat on One Side and Window Frame on the Other Side) StoGuard Air and StoGuard Air and Moisture Barrier Rough Opening Protection Spray Polyurethane Foam Insulation 1. Consult with window and sealant manufacturers to verify window installation and detailing and to assure no water leakage into the wall assembly. Consult with window manufacturer regarding window and/or flashing assembly thermal breaks to avoid condensation. Test the final assembly using materials and trades associated with the project to verify performance. Correct any deficiencies associated with excess air leakage, water infiltration into the wall assembly, or structural inadequacies. 2. Construct a site built mockup using materials and subtrades associated with the project to verify installation sequencing, detailing, and aesthetics. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 56s.02 for mechanical attachment pattern and additional information. 5. Components not identified trades who install the Sto products. Refer to project specific contract documents. Step 3 - Cladding and Perimeter Weather and Air Seals

22 Soffit: Insulated and Unvented Detail No.: 56s.30 CAE StoGuard Air and Structure StoGuard Joint Treatment Backer Rod and Sealant Dissimilar Material or Wall Construction Sto Drip Edge Profile Light Gauge Steel Stud Framing Sto DrainScreen 10mm Mineral Wool Insulation Board, Pre-Wrapped (See Note 4) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Nominal 3/8 inch (10 mm) Gap for Drainage Sto Drip Edge Profile (See Drawing Below) Sto Reinforcing Mesh Sto Primer (Optional) 1. Continue StoGuard air and moisture barrier onto dissimilar material or construction where required after verifying substrate material compatibility. Refer to Sto Detail 56s.53 for typical detailing of inside corner if substrate material or construction is dissimilar. Refer to Sto Detail 56s.54A if substrate material is similar at inside corner " (10 cm) thick insulation board typically required for proper lap of accessory with mesh "tail." For thinner sections of insulation board pre-wrap insulation board with Sto base coat and mesh. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 5. Components not identified

23 Soffit: Uninsulated and Vented Detail No.: 56s.31 CAE StoGuard Air and StoGuard Joint Treatment Structure Soffit Vent Casing Bead Backer Rod and Sealant Dissimilar Material or Wall Construction Light Gauge Steel Stud Framing Sto DrainScreen 10mm Mineral Wool Insulation Board, Pre-Wrapped (See Note 4) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Insect screen recommended Nominal 3/8 inch (10 mm) Gap for Drainage Sto Drip Edge Profile (See Drawing Below) Sto Reinforcing Mesh Sto Primer (Optional) 1. Prevent "communication" of vented air space with conditioned interior air to reduce the likelihood of condensation on materials in the vented space. 2. Typical soffit board is gypsum sheathing in compliance with ASTM C Refer to Sto Specification No. F601S and Sto Detail Series 14.xx. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 5. Components not identified Sto Drip Edge Profile

24 Floor Line Without Deflection Detail No.: 56s.40 CAE StoGuard Air and StoGuard Air and Joint Treatment Mineral Wool Insulation Board (See Note 5) Structure 1. This detail is typically limited to low-rise construction where no floor line deflection is anticipated. Refer to Sto Detail 56s.41A, B, or C for a floor line condition with deflection. 2. attachment is typically at 8" (20.3 cm) on center or less vertically. Add C-channels or other attachment means along slab edge if necessary to conform with required fastener spacing. Sto DrainScreen 10mm Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) 3. Provide fire stopping at floor line as needed. 4. Refer to StoTherm ci 5. Mechanical Fasteners not 6. Components not identified

25 Floor Line With Deflection - Drainage at Floor Line with Cant Bead Detail No.: 56s.41A CAE Sto DrainScreen 10mm StoGuard Air and StoGuard Transition Membrane Structure Backer Rod Slotted Deflection Track Mineral Wool Insulation Board, Top and Bottom with Slight Slope to Exterior (See Note 5) StoGuard Air and Moisture Barrier Joint Treatment Sto Reinforcing Mesh Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Horizontal Deflection Joint: Backer Rod & Sealant w/ Weeps. Sealant Applied to Base Coat as per Sealant Manufacturer Instructions Cant Bead of Sto RapidGuard 1. attachment is typically at 20.3cm (8") on center or less vertically. Add C-channels or other attachment means along slab edge if necessary to conform with required fastener spacing. 2. Provide fire stopping at floor line as needed. 3. Lower section of system to be complete and Sto transition components applied as shown, before next section of system (starting with the Sto DrainScreen) can be installed. 4. Refer to StoTherm ci 5. Mechanical Fasteners not 6. Components not identified

26 Floor Line With Deflection - Drainage at Floor Line With Transition Membrane Detail No.: 56s.41B-1 CAE StoGuard Air and StoGuard Transition Membrane Backer Rod Structure Slotted Deflection Track Sto DrainScreen 10mm Sto TurboStick Mineral Wool Insulation Board, Top and Bottom (See Note 4) StoGuard Transition Membrane Applied from Face of StoGuard Air & and Lapped onto Top of Insulation Board with Slight Slope for Bottom of Joint StoGuard Air and Moisture Barrier Joint Treatment Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Step 1 1. attachment is typically at 8" (20.3 cm) on center or less vertically. Add C-channels or other attachment means along slab edge if necessary to conform with required fastener spacing. 2. Provide fire stopping at floor line as needed. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 5. Components not identified

27 Floor Line With Deflection - Drainage at Floor Line With Transition Membrane Detail No.: 56s.41B-2 CAE StoGuard Air and StoGuard Transition Membrane Backer Rod Structure Slotted Deflection Track Mineral Wool Insulation Board, Top and Bottom (See Note 4) Sto DrainScreen 10mm Sto TurboStick StoGuard Transition Membrane Applied from Face of StoGuard Air & and Lapped onto Top of Insulation Board with Slight Slope for Bottom of Joint StoGuard Air and Moisture Barrier Joint Treatment Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Insect screen recommended Step 2 1. attachment is typically at 8" (20.3 cm) on center or less vertically. Add C-channels or other attachment means along slab edge if necessary to conform with required fastener spacing. 2. Provide fire stopping at floor line as needed. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 5. Components not identified

28 Floor Line With Deflection - Drainage at Floor Line with Flashing Detail No.: 56s.41C CAE Sto DrainScreen 10mm StoGuard Air and StoGuard Air Detail Component StoGuard Transition Membrane Structure Backer Rod Slotted Deflection Track StoGuard Air and Moisture Barrier Joint Treatment Sto Reinforcing Mesh 1. attachment is typically at 20.3cm (8") on center or less vertically. Add C-channels or other attachment means along slab edge if necessary to conform with required fastener spacing. 2. Provide fire stopping at floor line as needed. 3. Lower section of system to be complete and Sto transition components applied as shown, before next section of system (starting with the Sto DrainScreen) can be installed. Flashing Sealant Mineral Wool Insulation Board, Top and Bottom (See Note 5) Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Horizontal Deflection Joint: Backer Rod & Sealant w/ Weeps. Sealant Applied to Base Coat as per Sealant Manufacturer Instructions 4. Refer to StoTherm ci 5. Mechanical Fasteners not 6. Components not identified

29 Balcony Floor/Wall Detail No.: 56s.42A CAE Light Gauge Steel Stud Framing StoGuard Air and Sto DrainScreen 10mm Mineral Wool Insulation Board, Pre-Wrapped (See Note 7) Sto Base Coat (with Embedded) Sto Primer (Optional) Balcony Slab Recess Balcony Waterproof Membrane and Finished Flooring Backer Rod & Sealant w/ Weeps Balcony Cant and Air Seal Transition Material 1. Detail apples to Balcony Protected Overhead by Balcony Ceiling Above. 2. Slope balcony to direct water away from wall. 3. Consider the use of high or ultra-high reinforcing meshes on balcony walls to supplement standard reinforcing mesh for added abuse and impact resistance. 4. Verify compatibility of StoGuard Air and Moisture Barrier with balcony waterproof membrane material where they interface or lap one another. 5. Counter flash balcony membrane on wall if not fluid applied. 6. Refer to StoTherm ci 7. Mechanical Fasteners not 8. Components not identified

30 Balcony Ceiling/Wall Detail No.: 56s.42B CAE StoGuard Transition Membrane Embedded in StoGuard Air and Backer Rod Slotted Deflection Track Sto DrainScreen 10mm StoGuard Air and Light Gauge Steel Stud Framing Backer Rod and Sealant Balcony Skim Coat of Sto Base Coat Sto Primer Smooth StoColor Acryl Plus 1. Detail applies to Balcony Protected by Balcony Ceiling Above. 2. Underside of balcony may also be finished with Sto Finish or other Sto smooth or textured coatings. 3. Refer to StoTherm ci 4. Mechanical Fasteners not 5. Components not identified Mineral Wool Insulation Board, Pre-Wrapped at Termination (See Note 4) Sto Base Coat (with Embedded) Sto Primer (Optional)

31 Horizontal Termination at Dissimilar Cladding Detail No.: 56s.50 CAE StoGuard Air and StoGuard Air and Moisture Barrier Detail Component Sto Base Coat (with Embedded) Backer Rod and Sealant with Weep Holes StoGuard Air and Wood Blocking Masonry Sill Brick Cavity Wall StoGuard Transition Membrane Embedded in StoGuard Air and Light Gauge Steel Stud Framing Sto DrainScreen 10mm Sealant Mineral Wool Insulation Board, Pre-Wrapped (See Note 2) Flashing Sto Primer (Optional) 1. Refer to StoTherm ci 2. Mechanical Fasteners not 3. Components not identified

32 Vertical Termination at Dissimilar Cladding Detail No.: 56s.51A CAE StoGuard Air and Masonry Veneer or Other Dissimilar Material Sto Adhesive used to fill gap between substrate and Pre-Wrapped Mineral Wool System Sealant and Backer Rod Mineral Wool Insulation Board, Pre-Wrapped (See Note 3) Light Gauge Steel Stud Framing Sto DrainScreen 10mm Sto Base Coat (with Embedded) Sto Primer (Optional) Sto Reinforcing Mesh 1. Sto adhesive applied the full length of vertical terminations. Apply adhesive to the pre-wrapped insulation board and set in place while adhesive is wet. The Sto DrainScreen should be held back 1" (25mm) from termination point to allow space for adhesive. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified

33 Vertical Termination at Dissimilar Backup Wall Construction Detail No.: 56s.51B CAE StoGuard Transition Membrane Embedded in StoGuard Air and CMU Backup StoGuard Air and (Minimum Two Coats on CMU Wall Surface) Masonry Veneer or Other Dissimilar Material Sto Adhesive Sealant and Backer Rod Light Gauge Steel Stud Framing Sto DrainScreen 10mm Sto Primer (Optional) Sto Reinforcing Mesh Sto Base Coat (with Sto Reinforcing Mesh Embedded) 1. Sto adhesive applied the full length of vertical terminations. Apply adhesive to the pre-wrapped insulation board and set in place while adhesive is wet. The Sto DrainScreen should be held back 1" (25mm) from termination point to allow space for adhesive. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Mineral Wool Insulation Board, Pre-Wrapped at Termination (See Note 3)

34 Vertical Expansion Joint in Back-Up Wall Detail No.: 56s.52A CAE Light Gauge Steel Stud Framing StoGuard Air and Sto Adhesive min. 25mm from Point Where Mineral Wool is to Terminate StoGuard Transition Membrane Embedded in StoGuard Air and Sto DrainScreen 10mm 1. Sto adhesive applied the full length of vertical terminations. Apply adhesive to the pre-wrapped insulation board and set in place while adhesive is wet. The Sto DrainScreen should be held back 1" (25mm) from termination point to allow space for adhesive. 2. Refer to StoTherm ci Sto Primer (Optional) Sto Reinforcing Mesh Sto Base Coat (with Embedded) Sealant and Backer Rod Sto Adhesive Mineral Wool Insulation Board, Pre-Wrapped at Termination (See Note 3) 3. Mechanical Fasteners not 4. Components not identified

35 Vertical Expansion Joint in Back-Up Wall, StoTherm ci and Dissimilar Cladding Detail No.: 56s.52B CAE StoGuard Transition Membrane Embedded in StoGuard Air and StoGuard Air and Sto Adhesive Masonry Veneer or Other Dissimilar Material Sealant and Backer Rod Light Gauge Steel Stud Framing Mineral Wool Insulation Board, Pre-Wrapped at Termination (See Note 3) Sto Primer (Optional) Sto Base Coat (with Embedded) Sto Reinforcing Mesh 1. Sto adhesive applied the full length of vertical terminations. Apply adhesive to the pre-wrapped insulation board and set in place while adhesive is wet. The Sto DrainScreen should be held back 1" (25mm) from termination point to allow space for adhesive. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified

36 Inside Corner with Dissimilar Backup Wall Detail No.: 56s.53 CAE StoGuard Transition Membrane Embedded in StoGuard Air and StoGuard Air and (Minimum Two Coats on CMU Wall Surface) Light Gauge Steel Stud Framing Sealant and Backer Rod Mineral Wool Insulation Board, Pre- Wrapped (See Note 2) 1. Refer to StoTherm ci 2. Mechanical Fasteners not 3. Components not identified Sto Adhesive CMU Backup Sto DrainScreen 10mm Sto Base Coat (with Embedded) Sto Primer (Optional) Sto Reinforcing Sto DrainScreen Mesh StoGuard Transition Membrane Sealant and Backer Rod Stone Wool Insulation Board, Pre-Wrapped Sto Adhesive Plan view

37 Inside and Outside Corner with Common Substrate and StoMesh Corner Bead Reinforcement Detail No.: 56s.54A CAE Sto DrainScreen 10mm Mineral Wool Insulation Board (See Note 3) StoGuard Air and Sto-Mesh Corner Bead Standard (Embedded in Sto Base Coat) Sto Base Coat (with Embedded) Sto Primer (Optional) StoGuard Joint Treatment Light Gauge Steel Stud Framing 1. Provide joint at interior corner if movement is anticipated. Refer to Sto Detail 56s Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Return Sto Reinforcing Mesh 6 in. Inside Corner, (Overlap StoMesh Corner Bead 4 in. ea. Side, min.)

38 Inside and Outside Corner with Common Substrate and Detail No.: 56s.54B CAE Sto DrainScreen 10mm Mineral Wool Insulation Board (See Note 3) StoGuard Air and Sto Base Coat (with Embedded) Sto Primer (Optional) StoGuard Joint Treatment Light Gauge Steel Stud Framing 1. Provide joint at interior corner if movement is anticipated. Refer to Sto Detail 56s Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Return Sto Reinforcing Mesh 6 in. Inside Corner Sto Reinforcing Mesh Return 8 in. (200mm) min. Around Corner

39 Termination at Parapet - Front Detail No.: 56s.60A CAE Backer Rod & Sealant Metal Coping StoGuard Transition Membrane Embedded in StoGuard Air and Moisture Barrier (or Compatible Roofing Membrane) Wood Blocking StoGuard Detail Component Roof Structure 1. Refer to StoTherm ci 2. Mechanical Fasteners not 4. Components not identified Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Mineral Wool Insulation Board, Pre-Wrapped (See Note 2) Sto DrainScreen 10mm StoGuard Air and Light Gauge Steel Stud Framing

40 Termination at Parapet - Back Detail No.: 56s.60B CAE StoGuard Transition Membrane Embedded in StoGuard Air and (or Compatible Roofing Membrane) Wood Blocking StoGuard Detail Component Sto DrainScreen 10mm StoGuard Air and Moisture Barrier Light Ga. Steel Stud Framing Termination Bar for Roof Membrane Backer Rod and Sealant Metal Coping Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Mineral Wool Insulation Board, Pre-Wrapped (See Note 2) 1. Refer to StoTherm ci 2. Mechanical Fasteners not 4. Components not identified StoGuard Air and Moisture Barrier Detail Component Z-Flashing StoGuard Detail Component Wood Blocking StoGuard Air and Insulation Roof Structure Roof Membrane Cover Board Roof Insulation Mineral Wool Insulation Board, Pre-Wrapped (See Note 2) Termination Bar for Roof Membrane Roof Membrane Backer Rod and Sealant with Weep Holes

41 Parapet with Cornice Feature Detail No.: 56s.61 CAE Wood Construction as Required StoGuard Transition Membrane Embedded in StoGuard Air and (or Compatible Roofing Membrane) Metal Coping StoGuard Air and Joint Treatment Extends 2 in. (51 mm) min. at Vertical and Horizontal Surfaces 1. EPS cornice feature may not be permitted on elevations requiring the use of mineral wool insulation. Consult with authority having jurisdiction before including in design and/or installing. Backer Rod and Sealant Pre-Wrapped Cornice Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Sto Reinforcing Mesh Light Gauge Steel Stud Framing View of Mesh Overlap Cornice Feature Pre-Wrapped with Sto Base Coat (with Sto Mesh Embedded) Sto EPS Insulation Cornice Feature Embedded in Base Coat Laps Sto Mesh on Cornice 2 1/2 in. (64 mm) min. and Ties in with Field Mesh with minimum 2 1/2 in. (64mm) Overlap either direction. View of Pre-Wrapped Cornice 1/2 in. (13 mm) min. Gap Between Top Surface of Cornice Feature and Underside of Wood Construction Mineral Wool Insulation Board, Pre-Wrapped at Termination (See Note 6) StoGuard Air and 2. Cornice feature attached with Sto TurboStick Adhesive; also used as filler and rasped smooth at any gaps between feature band and base layer of insulation board. 3. Cornice feature may also be attached directly to StoGuard where applicable. 4. Supplemental mechanical attachment of feature band maybe necessary in some cases. Verify installation method for adequate attachment before commencing work. 5. Refer to StoTherm ci 6. Mechanical Fasteners not 7. Components not identified

42 Diverter Flashing at Roof/Wall Abutment Detail No.: 56s.62 CAE StoGuard Air and Sto Base Coat (with Sto Reinforcing Mesh Embedded) Sto Primer (Optional) Step Flashing Terminate StoTherm ci 2 in. (51 mm) Above Finished Roof Roof Shingles Roof Underlayment Roof Structure Drip Edge Flashing Step Flashing Light Gauge Steel Stud Framing Mineral Wool Insulation Board, Pre-Wrapped (See Note 3) StoGuard Air and Detail Component Sto DrainScreen 10mm Insect screen recommended Diverter Flashing Gutter Fascia 1. Maintain minimum 2" (51 mm) gap between roof shingles and StoTherm ci termination. Increase gap for low slope roofs to prevent snow and ice accumulations. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Backer Rod and Sealant Around Vertical Leg of Diverter Flashing Diverter Flashing Drip Edge Flashing StoGuard Air and Moisture Barrier Joint Treatment

43 Gravel Stop Detail No.: 56s.63 CAE Gravel Stop Gravel Roof Ballast Continuous Cleat Wood Blocking Roof Membrane Roof Insulation Sto TurboStick Sto TurboStick 1/4" (6 mm) Min. Gap Between Top of Mineral Wool Insulation Board and Wood Blocking Roof Air Barrier Roof 1. Refer to StoTherm ci 2. Mechanical Fasteners not 3. Components not identified Sto Primer (Optional) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Backer Rod & Sealant Roof Structure StoGuard Air and Light Gauge Steel Stud Framing Mineral Wool Insulation Board, Pre-Wrapped (See Note 2) StoGuard Air and Moisture Barrier Joint Treatment Sto DrainScreen 10mm

44 Saddle Flashing at Lower/Higher Wall Abutment Detail No.: 56s.64-1 CAE Light Gauge Steel Stud Framing StoGuard Detail Component 1. Refer to StoTherm ci 2. Components not identified StoGuard Air and Step 1 - Air and

45 Saddle Flashing at Lower/Higher Wall Abutment Detail No.: 56s.64-2 CAE Saddle Flashing Components A C B 1. Refer to StoTherm ci 2. Components not identified StoGuard Air and Assembled Saddle Flashing StoGuard Air and Step 2 - Saddle Flashing

46 Saddle Flashing at Lower/Higher Wall Abutment Detail No.: 56s.64-3 CAE Light Gauge Steel Stud Framing StoGuard Detail Component StoGuard Air and Mineral Wool Insulation Board, Pre-Wrapped at Termination (See Note 3) Sto DrainScreen 10mm StoTherm ci Assembly Saddle Flashing Assembly Parapet Cap Flashing Assembly Extends to Perpendicular Wall 1. Provide minimum 2" (51 mm) gap between parapet cap flashing and StoTherm ci termination. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Backer Rod & Sealant Between StoTherm ci and Saddle Flashing Assembly StoGuard Transition Membrane Embedded in StoGuard Air and (or Compatible Roofing Membrane) Wood Blocking Step 3 - Cladding, Coping, and Sealant

47 Scupper Penetration Detail No.: 56s.65 CAE Light Gauge Steel Stud Framing StoGuard Air and Detail Component Wood Blocking Roof Membrane Roof Insulation Roof Structure Sto DrainScreen 10mm StoGuard Air and Sto Base Coat (with Sto Reinforcing Mesh Embedded) Sto Primer (Optional) 1. Scuppers have a dimension greater than 100mm in any direction will require the incorporation of diagonal mesh as used at window and other penetration corners. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Mineral Wool Insulation Board, Pre-Wrapped Around Scupper Penetration (See Note 3) Scupper Assembly Backer Rod & Sealant

48 Pipe Penetration - Precision Cut Detail No.: 56s.70A CAE Light Gauge Steel Stud Framing Mineral Wool Insulation Board, Pre-Wrapped Around Pipe Penetration (See Note 3) StoGuard Air and Moisture Barrier Detail Component Sto Base Coat (with Sto Reinforcing Mesh Embedded) Sto Primer (Optional) Pipe Backer Rod & Sealant 1. Refer to Sto Detail 56s.70B where sheathing is "rough cut" around pipe or where gap around pipe exceeds allowable gap dimension for StoGuard Air and Detail Component. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Sto DrainScreen 10mm StoGuard Air and

49 Pipe Penetration - Rough Cut Detail No.: 56s.70B CAE Light Gauge Steel Stud Framing Mineral Wool Insulation Board, Pre-Wrapped Around Pipe Penetration (See Note 3) Retrofit or Oversized Pipe Penetration Opening Spray Foam (to Fill Gaps, Shaved or Rasped Flush with Surface) StoGuard Air and Moisture Barrier Detail Component Sto Base Coat (with Embedded) Sto Primer (Optional) Pipe Backer Rod & Sealant 1. Appropriate spray foam is used to fill gaps in sheathing. Where sheathing fits snug around pipe refer to Sto Detail 56s.70A. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Sto DrainScreen 10mm StoGuard Air and

50 Sign Attachment Detail No.: 56s.71 CAE Sto DrainScreen 10mm Light Gauge Steel Stud Framing StoGuard Air and Mineral Wool Insulation Board (See Note 3) Sto Base Coat (with Embedded) Sto Reinforcing Mesh Sto Primer (Optional) Washer Behind Sign Set in Sealant Sign 1. Blocking not required where solid substrate or wood-based sheathing is capable of supporting the sign (or other attached object). Use appropriate fasteners for attachment. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified Wood Blocking Hole Drilled in EIFS and Lined with Sealant Neutral Cure Sealant PVC or Stainless Steel Sleeve (Sleeve Extends From Finish Through Blocking, Shown Partial Length for Clarity) Bolt w/ Washers at Each End

51 Fixture Attachment Detail No.: 56s.73 CAE Light Gauge Steel Stud Framing Blocking Mineral Wool Insulation Board, Pre-Wrapped Around Electric Box Penetration (See Note 3) StoGuard Air and Sto DrainScreen 10mm Sto Base Coat (with Embedded) Sto Primer (Optional) Exterior Electrical Box Fixture Attachment Backer Rod & Sealant 1. Attach fixture to blocking or solid substrate. Where attached to blocking seal the blocking with Sto Detail Component. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified StoGuard Air and Detail Component on Blocking; Extend onto 2" min.

52 Rainscreen Joint Configuration Detail No.: 56s.74 CAE Light Gauge Steel Stud Framing StoGuard Air and Sto Primer (Optional) Mineral Wool Insulation Board, Pre-Wrapped at Termination (See Note 3) Sto Base Coat (with Sto Reinforcing Mesh Embedded) Weeped Sealant and Backer Rod StoGuard Transition Membrane Sto Adhesive StoGuard Transition Membrane Embedded in StoGuard Air and Sealant and Backer Rod StoGuard Air and StoGuard Transition Membrane Embedded in StoGuard Air and Sto DrainScreen 10mm Sealant and Backer Rod 2 (51mm) min Drain opening 1 (25mm) min 1. Sto adhesive applied the full length of vertical terminations. Apply adhesive to the pre-wrapped insulation board and set in place while adhesive is wet. The Sto DrainScreen should be held back 1" (25mm) from termination point to allow space for adhesive. 2. Refer to StoTherm ci 3. Mechanical Fasteners not 4. Components not identified 2 (51mm) min Drain opening 1 (25mm) min