BRE RdSAP v9.91 software QSAP v9.0.0 April 2012

Size: px
Start display at page:

Download "BRE RdSAP v9.91 software QSAP v9.0.0 April 2012"

Transcription

1 BRE RdSAP v9.91 software QSAP v9.0.0 April 2012 BREC Accreditation Scheme Part of the BRE Trust

2 Q-SAP software & EPC changes Data Entry New data items Option for U-value entry Recommendations Reduced text Additional recommendations Alternative recommendations New single tier hierarchy Amendments to calculations New format EPC Revised layout Different graphics New Green Deal section

3 Q-SAP software data changes Walls Hard to treat cavity walls Roof insulation Partially insulated roof rooms Floors Draught proofing Doors Windows Flue Gas Heat Recovery Systems (FGHRS) Waste Water Heat Recovery Systems (WWHRS) Solar water heating Wind turbines

4 RdSAP v9.91 Changes April 2012 SAP 2009, v9.91 January 2012 Appendix A Main and Secondary heating Appendix S RdSAP data requirements Appendix T EPC recommendations RdSAP Conventions v5 (Jan. 2012) RdSAP Addenda v3.1

5 BRE Updated manuals and forms BRE RdSAP Manual v8.0 (April 2012) Heating Codes (April 2012) QSAP v9.0.0 (April. 2012) Quest/BRE field sheets (April 2012) Main site notes Additional extensions Measure windows Available via the Members Area of the BRE scheme websites:

6 RdSAP changes April 2012 New data collection External Walls: Thickness, dry-lining, additional cavity wall insulation, insulation thickness, hard-to-treat cavities, expanded alternative wall(s) Partially insulated roof rooms: Floor insulation thickness Draught proofing Window orientation - measured option only Doors - external or to unheated corridors/stairwells Flue Gas Heat Recovery System (FGHRS) Waste Water Heat Recovery System (WWHRS) Photovoltaics (PV) Solar water heating details Wind turbine details

7 RdSAP changes 2012 U-values Entry of U-values for construction elements All constructional elements to show default U-value Energy Assessor will be able to over-ride the default values based on explicit documentary evidence U-values can be applied to: External Walls Roofs (other than rooms-in-roof) Floors Doors (external and any to unheated corridors and stairwells) Windows (U-value and g-value)

8 RdSAP changes 2012 U-values U-values basic principles Thermal performance of building elements Thermal transmittance from warm to colder surfaces Greater insulation = Lower U-values = Lower heat demand Unit of measure: W/m²K Btu per hour through 1 m 2 for a 1 o C temperature difference. Domestic Energy Assessors are not expected to calculate or estimate U-values: this option is only to be used when documentary evidence is available specifying what the U-values are (RdSAP Convention 9.02). The source of this evidence must be recorded and a copy retained.

9 RdSAP changes April Recommendations New Recommendations for: Flat roof insulation. Room-in-roof insulation. Floor insulation. Insulated doors. Waste Water Heat Recovery System (WWHRS). Flue Gas Heat Recovery System (FGHRS). Alternative Recommendations covering: Air or ground source heat pump (inc. underfloor) Micro-CHP (Combined Heat & Power) Biomass boiler External insulation with cavity wall insulation

10 QSAP v9.0.0 DEA Reminders Only over-write default U-values when documentary evidence is available must retain a copy for audit purposes (RdSAP Convention 2.22) Always measure the thickness of each external wall, including any alternative/sheltered walls (RdSAP Convention 3.08) When using the measured windows option, the orientation of each window must be recorded (see Appendix S) Must record the number of external doors doors to outside or unheated spaces (RdSAP Convention 3.09) Examine draught proofing for all doors and at least two windows per building part (RdSAP Convention 3.11) Software now automatically includes portable electric heaters with night storage heaters, unless fixed secondary heating is entered A Flue Gas Heat Recovery System (FGHRS) can only be entered if found in the database (RdSAP Convention 9.06)

11 QSAP v9.0.0 from 1 st April 2012

12 QSAP v9.0.0 New Layout New Print button New view PDF button Revised header tabs Familiar data entry screens with updated data fields New Sub-tabs

13 Inspection Inspection Details First data entry screen entry via keyboard or mouse Start with the Inspection date, then select country * Denotes a mandatory data entry field

14 Inspection Overview Alternative data entry for some numerical fields: new mouse slider or keyboard number

15 Inspection Flat and Maisonette Details

16 Inspection Reporting Details Related Party disclosure: enter value or use lookup button New tick boxes replace most Yes/No fields

17 Inspection Reporting Details Use mouse or arrow key pad to select choice

18 Inspection Inspector Details Enter name and Reg. number, then select lookup button

19 Inspection Inspector Details Use mouse or arrow key pad to select choice

20 Inspection Retrieved Inspector Details Your details will then automatically fill the Retrieved Inspector Details screen

21 Inspection Insurance and Certification Scheme Details

22 Main Dwelling Build Dates The Main dwelling details (and each extension) become visible once you have entered/selected the Age band

23 Main Dwelling Roof New fields to show default U-value and allow default to be over-written if documentary evidence is available

24 Main Dwelling Wall New wall internal lining, wall insulation thickness and wall thickness measured fields New alternative wall box for each part, Main and any extensions

25 Main Dwelling Alternative Wall New sheltered wall box (for Main part only) Enhanced alternative wall details revealed when box ticked

26 Main Dwelling Floor

27 Main Dwelling - Measurements Standard measurements data entry, with same short-cut Copy above buttons

28 Main Dwelling Room in Roof Details Section is revealed when age band entered in top tab Additional section is revealed once ticked Optional section to edit default areas and U-values

29 Extensions 1 to 4

30 Heating Main Heating (System 1) Select main heating as normal from either the Boiler Database or from the Lookup Heating generic code list If a FGHRS is integrated select from the main Boiler Database, if separate select from the FGHRS Database

31 Heating Main Heating (System 1): Select Boiler

32 Heating Main Heating (System 1): Select fuel

33 Heating Main Heating (System 1): Select controls

34 Heating Main Heating (System 1): Select FGHRS

35 Heating Main Heating (System 2) Section remains greyed out until a Heating fraction % is entered

36 Heating Secondary Heating

37 Heating Secondary Heating: Select type

38 Heating Secondary Heating: Select fuel

39 Heating Water Heating New set of questions for rooms with bath and/or shower

40 Heating Water Heating: Select type

41 Heating Water Heating: Select fuel

42 Heating Water Heating: Waste Water Heat Recovery System (WWHRS) New WWHRS fields

43 Heating Water Heating: WWHRS Index

44 Heating Hot Water Cylinder

45 Windows Doors + Windows Total glazing area: new options for Double, known data Triple, known data

46 Windows Doors + Windows: Measured Windows Orientation now required for all measured windows

47 Windows Conservatory Full details required when Not separated selected

48 Other Data Utilities Electricity type: New Dual (24-hour) option for use in parts of Northumbria

49 Other Data Photovoltaic Cells PV present options: None Percentage of roof area enter %, or PV array details (1/2/3) see next screen

50 Other Data Photovoltaic Cells (Arrays) Details of up to 3 PV arrays can be entered

51 Other Data Solar Water Heating New set of questions for Solar Water heating details

52 Other Data Wind Turbines Details of up to 3 wind turbines can be entered

53 Other Data Miscellaneous

54 Other Data Addenda

55 Other Data Addenda: Select / Remove

56 Results Ratings and Usage

57 Results Ratings and Usage: View & Select Measures

58 Results Low and Zero Carbon Related Sources

59 Results Summary of Performance Related Features

60 Results Measures

61 Results Alternative Measures

62 Results Green Deal Items Measures with Green Deal ticks or

63 Information SAP CTRL Report status screen automatically filled

64 Information Errors Any errors will be displayed here

65 Results Review PDF and then Complete The PDF of the EPC can be viewed or printed from any screen after the initial Calculate DRAFT prior to being lodged (Complete) or Audit Copy Not For Issue version once lodged.

66 New EPC PDF Pages 1 & 2 (England & Wales only)

67 New EPC PDF Pages 3 & 4 (England & Wales only)

68 QSAP v9.0.0 from 1 st April 2012

69 Landmark Register Update Updated FAQs

70 More information provided via Members Area Technical Updates

71 Latest Conventions: web-links RdSAP Conventions v5.0 page.jsp?id=2016 SAP

72 RdSAP Changes April 2012 For more details from BRE Assessor enquiries: T: E: