1 RELIEF VALVE FLEXIBLE PIPE CONNECTION GR G LPG MPG TP SS SS GR COTG WCO CO V CW HW DOMESTIC HOT WATER (0 ) HWR G LPG MPG TRAP PRIMER DIRECTION OF FLOW INCREASER SEWER ABOVE FLOOR SEWER BELOW GRADE GREASE SEWER BELOW GRADE FLOOR OR YARD CLEANOUT WALL CLEANOUT CLEANOUT VENT DOMESTIC COLD WATER DOMESTIC HOT WATER RETURN GAS (7" WATER COLUMN) PROPANE GAS MEDIUM PRESSURE GAS OD CD COD D TP OD CD COD D TP PRV S.O.V. C.V. B.V. G.C. HB U. A.P. OVER FLOW DRAIN ABOVE FLR CONDENSATE DRAIN CONDENSATE OVERFLOW DRAIN DRAIN TRAP PRIMER PRESSURE REDUCING VALVE SHUT-OFF VALVE CHECK VALVE BALANCING VALVE GAS COCK MINI-BALL OR STOP VALVE HOSE BIBB UNION ACCESS PANEL P0. LEGEND & NOTES P0.2 SCHEDULES P0.3 DETAILS CD P2. OVERALL PLUMBING PLAN P2.2 PLUMBING ROOF PLAN P3. PLUMBING PLAN - FLOOR P3.2 PLUMBING PLAN - FLOOR P3.3 PLUMBING PLAN - FLOOR 2 P3.4 PLUMBING PLAN - CATWALK P3.5 ENLARGED PLANS LEGEND & NOTES

2 SCHEDULES

3 TRAP PRIMER DETAIL 4 NO SCALE PIPE HANGER SUPPORT DETAIL 3 NO SCALE WALL CLEAN-OUT DETAIL 2 NO SCALE PIPE - ROOF PENETRATION NO SCALE WATER HEATER DETAIL 7 NO SCALE ROOF DRAIN/OVERFLOW DRAIN INSTALLATION 6 NO SCALE FLOOR CLEAN-OUT DETAIL 5 NO SCALE SEWAGE LIFT STATION 9 NO SCALE ELEVATOR SUMP PUMP 8 NO SCALE DETAILS

4 (E)FIRE (E)CW PRIOR TO START OF WORK. SITE CONTAINS EXISTING PIPING STUBS AND UNDERGROUND LINES. COORDINATE THE INSTALLATION OF PIPING & EQUIPMENT WITH OTHER TRADES. 2. CALL BEFORE YOU DIG. CW P.O.C. FOR SS TO EXISTING SEWER LINE BELOW GRADE. FIELD VERIFY LOCATION AND I.E. EXISTING SS (PUMPED) TO SEPTIC SYSTEM. CIVIL PLANS. P3.4 (CATWALK) P3.3 (FLOOR 2) P3. (FLOOR ) P.O.C. FOR CW TO EXISTING DOMESTIC LINE IN THIS AREA. PROVIDE WITH SOV IN BOX. SEWAGE LIFT STATION (DUAL EJECTOR PUMPS AND CONCRETE TANK). REFER TO DETAILS. LIFT STATION CONTROL PANEL. LOCATE PER OWNER'S DIRECTION. CW 6"SS GCO GCO SE &2 GCO INVERT AT LIFT STATION: 25' x 2% = 2.5'IE 275' x % = 2.75' IE MIN. WASTE DEPTH =.5' TOTAL = 6.75' I.E. (REF FINISH FLOOR OF NEW ADDITION) SS (E)6"SS THIS AREA IS N.I.C. P3.2 (FLOOR ) PLUMBING- FLR

5 PRIOR TO START OF WORK. 2. SLOPE ALL DRAINS AND CONDENSATE DRAINS AT MIN. % SLOPE. 3. SLOPE ALL STORM DRAINS AT MIN. % DN. VTR, /P0.3. DROP 3 CD DN INTO CEILING SPACE. REF RTU PIPING DETAILS. ROOF DRAIN AND OVERFLOW DRAIN, 6/P0.3. EXISTING PRIMARY/OVERFLOW SCUPPERS THRU PARAPET. 2.5"x SCUPPERS RD- OD- AREA:,600 AREA:,600 RD- OD- (EXISTING ROOF AREA:7,800 SF) VTR RD- OD- AREA:2,800 SIZE: AREA:2,800 SIZE: RD- OD- RD- OD- AREA:,600 AREA:,600 RD- OD- RD- OD- AREA:,600 AREA:,600 RD- OD- THIS AREA IS N.I.C. TYPICAL RD- OD- AREA:2,900 SIZE: AREA:2,900 SIZE: RD- OD- RD- OD- AREA:,500 AREA:,500 RD- OD- (EXISTING ROOF AREA:7,400 SF) 2.5"x SCUPPERS PLUMBING - ROOF

6 PRIOR TO START OF WORK. SITE CONTAINS EXISTING PIPING STUBS AND UNDERGROUND LINES. COORDINATE THE INSTALLATION OF PIPING & EQUIPMENT WITH OTHER TRADES. GCO CW 6"SS 2. SLOPE ALL SANITARY SEWERS WITHIN THE BUILDING AT MIN. 2% SLOPE. 3. SLOPE ALL SANITARY VENT, STORM DRAINS, EQUIPMENT DRAINS, OVERFLOW DRAINS, AND CONDENSATE DRAINS AT MIN. % SLOPE. 4. REFER TO ELEVATOR SHOP DRAWINGS FROM MFR, FOR EXACT LOCATION OF SUMP PIT AND OTHER REQUIREMENTS. DROP STORM DRAINS DN TO ABV FF. TERMINATE THRU WALL WITH ELBOW TURNED DN. WATER LINES UP TO FLOOR 2. CW AND 6"SS TO SITE, P2.. ELEVATOR SUMP PUMP. ROUTE DISCHARGE LINE UP TO CEILING AND SLOPE TO EXTERIOR. REFER TO DETAILS. 6"SS GCO SS CW UP SP ELEVATOR PIT DRAIN AT AFF. DISCHARGE IN LANDSCAPED AREA, WITH SPLASHBLOCK. SS FROM ABV. DROP IN WALL AND ROUTE BELOW SLAB. "CW FROM ABOVE. DROP ON WALL TO HB. WALL-CLEANOUT, TYPICAL. DETAILS. FCO " 3 4 " T " 2 "HW 2 "HWR S- DROP C&HW DN IN WALL TO SINK. 2 " P3.5 2 P3.5 FOR WASTE & VENT FOR WATER FCO EWC HB- 6" " PLUMBING PLAN

7 PRIOR TO START OF WORK. SITE CONTAINS EXISTING PIPING STUBS AND UNDERGROUND LINES. COORDINATE THE INSTALLATION OF PIPING & EQUIPMENT WITH OTHER TRADES. 2. SLOPE ALL SANITARY SEWERS WITHIN THE BUILDING AT MIN. 2% SLOPE. 3. SLOPE ALL SANITARY VENT, STORM DRAINS, EQUIPMENT DRAINS, OVERFLOW DRAINS, AND CONDENSATE DRAINS AT MIN. % SLOPE. DROP STORM DRAINS DN TO ABV FF. TERMINATE THRU WALL WITH ELBOW TURNED DN. 3 4 "CD FROM RTU (ON ROOF). SLOPE IN CEILING AS SHOWN. RD/OD FROM ABOVE. SLOPE STORM DRAINS IN CEILING SPACE AS SHOWN. DROP CD LINE ON WALL TO AFF. TERMINATE THRU WALL OVER LANDSCAPED AREA WITH ELBOW TURNED DN. "CD "CD "CD "CD 6"RD 6"OD RD OD 6" PLUMBING PLAN

8 PRIOR TO START OF WORK. SITE CONTAINS EXISTING PIPING STUBS AND UNDERGROUND LINES. COORDINATE THE INSTALLATION OF PIPING & EQUIPMENT WITH OTHER TRADES. 2. SLOPE ALL SANITARY SEWERS WITHIN THE BUILDING AT MIN. 2% SLOPE. 3. SLOPE ALL SANITARY VENT, STORM DRAINS, EQUIPMENT DRAINS, OVERFLOW DRAINS, AND CONDENSATE DRAINS AT MIN. % SLOPE. SS DN, V UP. CD FROM ABV. DROP IN WALL AND TERMINATE OVER FLOOR SINK WTH ELBOW TURNED DN. VENT FROM BELOW, UP TO ROOF. WATER HEATER AND ACCESSORIES, REFER TO DETAILS. "CW DN ON WALL. 2 ~ VTR VTR "HW "CW 3 4 "HWR FR. BELOW 3 4 "TW DN FS- CP TS WH "CW AT HIGH ELEVATION "CW AT HIGH ELEVATION ( FLOOR PLAN ABOVE FOR STORM DRAINS) PLUMBING PLAN

9 PRIOR TO START OF WORK. SITE CONTAINS EXISTING PIPING STUBS AND UNDERGROUND LINES. COORDINATE THE INSTALLATION OF PIPING & EQUIPMENT WITH OTHER TRADES. 2. SLOPE ALL SANITARY SEWERS WITHIN THE BUILDING AT MIN. 2% SLOPE. 3. SLOPE ALL SANITARY VENT, STORM DRAINS, EQUIPMENT DRAINS, OVERFLOW DRAINS, AND CONDENSATE DRAINS AT MIN. % SLOPE. RD/OD FROM ABV. SLOPE IN CEILING AND DROP ON WALL. 3 4 "CD FROM RTU (ON ROOF). SLOPE IN CEILING AS SHOWN. VENT-THRU-ROOF (VTR) REF DETAILS. DROP CD DN IN WALL TO FLOOR BELOW. V FR. BELOW DROP ROOF DRAIN/OVERFLOW DN ON WALL TO BELOW. V V FR. BELOW V FR. BELOW VTR CD 3 4 "CD "CD 3 4 "CD CD 3 4 "CD 6"RD 6"OD RD OD 6" 6"RD 6"OD PLUMBING PLAN

10 PRIOR TO START OF WORK. SITE CONTAINS EXISTING PIPING STUBS AND UNDERGROUND LINES. COORDINATE THE INSTALLATION OF PIPING & EQUIPMENT WITH OTHER TRADES. 2. SLOPE ALL SANITARY SEWERS WITHIN THE BUILDING AT MIN. 2% SLOPE. 3. SLOPE ALL SANITARY VENT, STORM DRAINS, EQUIPMENT DRAINS, OVERFLOW DRAINS, AND CONDENSATE DRAINS AT MIN. % SLOPE. WATER HAMMER ARRESTOR ON CW LINE WITH ISOLATION VALVE AND CEILING A.P. 2 "CW TO TRAP PRIMER IN WALl WITH ACCESS PANEL. WALL CLEAN-OUT, REF. DETAILS. V UP V UP P3. FCO L- FD- SH- WC- SH- L- SH- WC- WC- FD- FD- L- SH- L- WC- FD- WC- SH- FD- L- P3. HT TP TP P3. " " 2 "TYP SH- L- A.P. L- WC- WC- SH- L- WC- WC- 3 " " 4 " 2 " " 2 " T 3 4 " 2 " T 2 " 3 T 4 " FD- FD- FD- 2 " FD- 2 " FD- SH- L- SH- L- WC- " " " " " SH- 2 " 3 4 " P3. ENLARGED PLANS