1 Limited Asbestos Inspection Report

2 LIMITED ASBESTOS INSPECTION DALLAS/FORT WORTH INTERNATIONAL AIRPORT DEPARTMENT OF ENVIRONMENTAL AFFAIRS PROJECT NAME DFW PROJECT ID NO. DFW PERMIT NO. DFWEAD A18-233B BUILDING NO. / ADDRESS / 2333 S. International Pkwy. REPORT DATE March 15, 2019 INITIAL WALK-THROUGH/SITE INVESTIGATION BUILDING USE: Terminal D is used for the processing of passengers and luggage. SUSPECT MATERIALS: Suspect materials include wallboard, joint compound and texture. INTRODUCTION The following report represents a Limited Asbestos Inspection (LAI) of suspect asbestos containing building materials (SACBM) located in Terminal D at DFW Airport, Texas. The subject building was constructed in 2005 and is located south of Terminal B. The subject inspection areas consist of various areas addressed by the construction drawings that may be disturbed during planned renovation activities. The building allows full public access. The scope of services for this inspection includes the identification, location, quantification and sampling of SACBM within the study area of the subject property. Sampling was conducted by Ms. Ashley Gonzalez (TDSHS License No ) and Mr. Gonzalo Correa (TDSHS License No ) under the guidance of Mr. Javier Araya of DFW Airport s Environmental Affairs Department (EAD). The analytical method used to determine the asbestos content of bulk samples collected for SACBM was polarized light microscopy (PLM) with dispersion staining, EPA Method 600. If bulk sample analysis was between 2% to 5% asbestos, the use of EPA Point Count Method 400/1000 was utilized to further determine if regulated asbestos contain material was present. Samples were analyzed through EAD s current contractual agreement with Cates Laboratories. The inspection represents a limited site investigation that complies with National Emission Standard for Hazardous Air Pollutants (NESHAP) and Texas Asbestos Health Protection Rules (TAHPR); however, as with most scientific studies, an asbestos inspection is subject to various limitations, including access and observation limitations.

3 Limited Asbestos Inspection Pg. 2 OBSERVATIONS AND FINDINGS Terminal D is used for the processing of passengers and luggage. The areas of interest were as follows: Terminal D Basement Level, Communication Rooms o Column J.2, Rows , Land-side Terminal D Ramp Level, Communication Rooms o Column G.1, Row 4.3, Land-side o Column E.1, Row 4.7, Land-side o Column J.5, Row 4.5, Secure-side o Column J.2, Row 4.0, Secure-side o Column K.5, Row 4.7, Secure-side Terminal D Arrival Level, Communication Rooms o Column J.2, Row 3.22, Secure-side o Column J.3, Row 4.0, Secure-side o Column L.2, Row 4.2, Secure-side o Column M.08, Row 3.6, Secure-side o Column L.4, Row 5.4, Secure-side o Column L.4, Row 6.4, Secure-side o Column L.4, Row 7.4, Secure-side Terminal D Concourse Level, Communication Rooms o Column D.5, Row 5.1, Secure-side o Column F.3, Row 4.1, Secure-side o Column H.1, Row 4.1, Land-side o Column J.5, Row 4.0, Land-side o Column K.2, Row 4.3, Secure-side o Column L.3, Row 5.1, Secure-side Terminal D INS Level, Communication Rooms o Column F.2, Row 3.7, Secure-side o Column F.4, Row 4.1, Secure-side o Column F.1, Row 4.1, Secure-side o Column C.39, Row 3.32, Secure-side o Column D.4, Row 5.5, Secure-side o Column H.4, Row 3.51, Secure-side o Column J.3, Row 4.0, Secure-side o Column K.5, Row 4.6, Secure-side o Column L.4, Row 5.5, Secure-side During the onsite inspection the following non-suspect materials were observed: Ceiling System: Not in scope of work Wall System: Concrete, Plywood, Metal Floor System: Not in scope of work Plumbing System: Not in scope of work HVAC System: Not in scope of work

4 Limited Asbestos Inspection Pg. 3 The LAI was performed on February 26, All sampling procedures were in accordance with federal and state protocols. During the inspection six (6) bulk samples of SACBM were collected and submitted for analysis. The Bulk Sample Analytical Results are summarized in a table in Appendix A and Sample Location Maps in Appendix B. During the on-site inspection, EAD observed the below listed suspect materials requiring sampling. Each building material was given a unique identification number represented with an alpha-numeric number (i.e. C01). Suspect materials requiring sampling included: Wall System o Wallboard W01, W02 w/ o Joint Compound T01, T03 o Smooth Texture T02, T04 Laboratory analysis of the samples collected during the inspection indicated non-detect for the presence of asbestos. The following photographs represent the types and conditions of the suspect materials observed at the time of the inspection. Wallboard, Joint Compound, Smooth Texture 12 x12 Floor Tile (Not in scope of work)

5

6 Limited Asbestos Inspection Appendix A Bulk Sample Analytical Results

7 Asbestos Tracker Terminal D Facility ID #: Sample # Floor Detailed Area Suspect Material Sample Date Lab Report # HA1 HA2 HA3 HA4 Descript Lyr 1 Smpl Rslt Lyr 1 Descript Lyr 2 Smpl Rslt Lyr 2 Descript Lyr 3 Smpl Rslt Lyr 3 Descript Lyr 4 Smpl Rslt Lyr D16A406 Comm. Room RRS (South) Wallboard, Joint Compound, Smooth Texture 2/26/2019 T02 Paint Texture T01 Joint Compound W01 Wallboard Material 02 4 D16A406 Comm. Room RRS (South) Wallboard, Joint Compound, Smooth Texture 2/26/2019 T02 Paint Texture T01 Joint Compound W01 Wallboard Material 03 4 D16A406 Comm. Room RRS (South) Wallboard, Joint Compound, Smooth Texture 2/26/2019 T02 Paint Texture T01 Joint Compound W01 Wallboard Material 04 4 Radio Room (North) Wallboard, Joint Compound, Smooth Texture 2/26/2019 T04 Paint Texture T03 Joint Compound W02 Wallboard Material 05 4 Radio Room (North) Wallboard, Joint Compound, Smooth Texture 2/26/2019 T04 Paint Texture T03 Joint Compound W02 Wallboard Material Friday, March 1, 2019 Page 1 of 2

8 Sample # Floor Detailed Area Suspect Material Sample Date Lab Report # HA1 HA2 HA3 HA4 Descript Lyr 1 Smpl Rslt Lyr 1 Descript Lyr 2 Smpl Rslt Lyr 2 Descript Lyr 3 Smpl Rslt Lyr 3 Descript Lyr 4 Smpl Rslt Lyr Radio Room (North) Wallboard, Joint Compound, Smooth Texture 2/26/2019 T04 Paint Texture T03 Joint Compound W02 Wallboard Material Friday, March 1, 2019 Page 2 of 2

9 PLM REPORT SUMMARY Cates Laboratories NVLAP Lab No Motor Circle TDSHS License No Dallas, Texas (214) Client: Dallas/Fort Worth International Airport Lab Job No.: PLM Project: Terminal D - UPS Replacements Set No.: Project No: DFWEAD Report Date: 3/1/2019 Identification: Asbestos, Bulk Sample Analysis Sample Date: 2/26/2019 Test Method: Polarized Light Microscopy/Dispersion Staining (PLM/DS) EPA Method 600/R-93/116 Page 1 of 2 On 2/28/2019, six (6) bulk samples were submitted by Ms. Ashley Gonzalez of Dallas/Fort Worth International Airport for asbestos analysis by PLM/DS. Copies of the lab data sheets are attached; additional information may be found therein. The results are summarized below: Lab Sample No. Client Field I.D. Sample Description/Location Asbestos Content CL W01, T01, T02 - Wallboard, Joint Compound, Smooth Texture - D16A406 Comm. Room RRS (south) CL W01, T01, T02 - Wallboard, Joint Compound, Smooth Texture - D16A406 Comm. Room RRS (south) CL W01, T01, T02 - Wallboard, Joint Compound, Smooth Texture - D16A406 Comm. Room RRS (south) CL W02, T03, T04 - Wallboard, Joint Compound, Smooth Texture - Radio Room (north) CL W02, T03, T04 - Wallboard, Joint Compound, Smooth Texture - Radio Room (north) CL W02, T03, T04 - Wallboard, Joint Compound, Smooth Texture - Radio Room (north) - Paint Texture - Joint Compound - Wallboard Material - Paint Texture - Joint Compound - Wallboard Material - Paint Texture - Joint Compound - Wallboard Material - Paint Texture - Joint Compound - Wallboard Material - Paint Texture - Joint Compound - Wallboard Material - Paint Texture - Joint Compound - Wallboard Material These samples were analyzed by layers. The overall percent asbestos for the sample is reported when relevant. The EPA considers a material to be asbestos containing only if it contains greater than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos Containing Materials (RACM) materials that are friable or may become friable be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. CatesLab utilizes CVAE on a routine basis and does not include point counting unless specifically requested by the client. The results may not be reproduced except in full.

10 PLM REPORT SUMMARY Cates Laboratories NVLAP Lab No Motor Circle TDSHS License No Dallas, Texas (214) Client: Dallas/Fort Worth International Airport Lab Job No.: PLM Project: Terminal D - UPS Replacements Set No.: Project No: DFWEAD Report Date: 3/1/2019 Identification: Asbestos, Bulk Sample Analysis Sample Date: 2/26/2019 Test Method: Polarized Light Microscopy/Dispersion Staining (PLM/DS) EPA Method 600/R-93/116 Page 2 of 2 On 2/28/2019, six (6) bulk samples were submitted by Ms. Ashley Gonzalez of Dallas/Fort Worth International Airport for asbestos analysis by PLM/DS. Copies of the lab data sheets are attached; additional information may be found therein. STATEMENT OF LABORATORY ACCREDITATION The samples were analyzed in general accordance with the procedures outlined in the Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116 or the U.S. Environmental Protection Agency method, under AHERA (EPA 600/M ), for the analysis of asbestos in building materials by polarized light microscopy. The results of each bulk sample relate only to the material tested and the results shall not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government. Specific questions concerning bulk sample results shall be directed to the Laboratory Director. Analyst: John R. Cates Laboratory Director: John R. Cates, P.G. Approved Signatory: NVLAP LAB CODE

11

12

13 Limited Asbestos Inspection Appendix B Inspection Area & Asbestos Sample Location Maps

14 Basement Level 0 North / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

15 Basement Level 0 - South / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

16 Level 1 - North / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

17 Level 1 - South / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

18 Level 2 - North / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

19 Level 2 - South / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

20 Level 3 - North / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

21 Level 3 - South / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Key Inspection Area Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019

22 Level 4 - North / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019 Key Inspection Area Sample Location

23 Level 4 - South / 2333 S. International Pkwy. DFW Project ID: DFWEAD / Permit No. A18-233B Inspection Location Map Inspected by: Ashley Gonzalez (TDSHS # ) & Gonzalo Correa (TDSHS No ) Date of Inspection: February 26, 2019 Key Inspection Area Sample Location