BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40

Size: px
Start display at page:

Download "BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40"

Transcription

1 Updated on April 28, 2014 BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For milling, resurfacing, shoulder repair, drainage and other miscellaneous construction, all within a length of 36,137 Linear Feet (6.85 Miles) as indicated on the approved drawings included in the Bid Package for Group in BEAVER COUNTY, CITY OF BEAVER FALLS, WHITE, NEW SEWICKLEY, ROCHESTER and CHIPPEWA TOWNSHIPS, OHIOVILLE and BRIDGEWATER BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: SR 168, Section B17 (Salem Church Road) - From SR 4047 (Tuscarawas Road) at Segment 370 offset 0 (Station 0+00) to SR 4022 (Lisbon Road) Segment 420 Offset 0 (Station ). SR 588, Section B17 (Steffin Hill Road) From Twelfth Avenue at Segment 50 offset 3175 (Station 0+00) to SR 18 (Seventh Avenue) at Segment 60 Offset 1746 (Station 21+72). SR 1024, Section B01 (Deer Lane Extension) From SR 68 (Virginia Avenue) at Segment 10 Offset 0 (Station 0+00) to a point approximately 293 south of SR 1028 (Big Knob Road) at Segment 60 offset 3372 (Station ). SR 4017, Section B03 (Shenango Road) From Crosswynds Estates Drive at Segment 20 Offset 0535 (Station 1+00) to a point approximately 370 north of Church Lane at Segment 20 offset 1785 (Station 13+50). SR 4030, Section B02 (Leopard Lane) From Sharon Road at Segment 10 Offset 0 (Station 0+00) to SR 0051 (Constitution Boulevard) at Segment 10 Offset 1107 (Station 10+91). Various State Routes and Facilities throughout Beaver County for unforeseen repair and/or resurfacing, as directed. DBE 0%, Anticipated Notice to Proceed , Required Completion JEFFERSON COUNTY SR 0000 # PROPOSAL:$10.44 PLANS:$ X18:$ X36:$39.00 The description and location of the project is as follows: For the repair of joints, including mill and fill of centerline and other longitudinal joints and other miscellaneous construction, as indicated on the approved drawings included in the bid package for I-80, SECTION JNT, Jefferson COUNTY Pine Creek and Washington TOWNSHIPS from approximately 120 feet east of the I-80structure over Mill Creek at EB segment 0834 offset 2417 and WB segment 0835 offset 2342 to approximately 2100 feet west of the I-80/SR 1005 overpass at EB segment 0884 offset 0300 and WB segment 0885 offset DBE 0%, Anticipated Notice to Proceed , Required Completion BUTLER COUNTY SR 0000 # PROPOSAL:$10.32 PLANS:$ X18:$ X36:$46.80 The description and location of the project is as follows: For the repair including mill and fill of centerline and other longitudinal joints and other miscellaneous construction, as indicated on the approved drawings included in the bid package for I-79, SECTION JNT, in Butler COUNTY Harmony BOROUGH Cranberry, Jackson, Lancaster, and Muddy Creek TOWNSHIPS from approximately the Allegheny/Butler county line at NB segment 0776 offset 0000 and SB segment 0777 offset 0000 to approximately the Butler/Lawrence county line at NB segment 1044 offset 2688 and SB segment 1045 offset DBE 0%, Anticipated Notice to Proceed , Required Completion BUTLER COUNTY SR 0000 #99485 PROPOSAL:$11.64 PLANS:$7.92 The description and location of the project is as follows: This work involves the replacement and new installation of raised and recessed reflective pavement markers and other miscellaneous construction, as indicated on the approved drawings included in the bid package for various routes in Armstrong, Butler, Clarion, Jefferson, and Indiana COUNTIES various municipalities. DBE 0%, Anticipated Notice to Proceed , Required Completion

2 Updated on April 21, 2014 ARMSTRONG COUNTY SR 0000 #96044 PROPOSAL:$10.32 PLANS:$12.36 The description and location of the project is as follows: For the repair of guiderail on various routes as needed, and placement of guiderail at Department Force Bridge sites, Districtwide. DBE 0%, Anticipated Notice to Proceed , Required Completion Updated on April 15, 2014 ALLEGHENY COUNTY SR 376(A55) #97983 PROPOSAL:$31.80 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$58.50 The description and location of the project is as follows: For the milling, shoulder reconstruction and new shoulder, drainage, guide rail, signing, sign lighting, pavement marking, new ground mounted sound barrier walls, overhead sign structure replacement, ITS relocation, and other miscellaneous construction, all within a length of linear feet (0.754 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0376, SECTION A55 (Penn Lincoln Parkway), in ALLEGHENY COUNTY, ROSSLYN FARMS BOROUGH, ROBINSON TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From the I-79 Interchange at Segment 0635/0634 Offset 1422/1434 (Station ) to the Rosslyn Farms Interchange at Segment 0645/0644 Offset 0258/0257 (Station ). DBE 6%, Anticipated Notice to Proceed , Required Completion Updated on April 10, 2014 DAUPHIN COUNTY SR 1014(012) #87651 PROPOSAL:$17.52 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$54.60 EXSTRUCT:$ X18:$ X36:$31.20 This project involves the rehabilitation of two bridges, Specktown Road (SR 1014) over a Tributary to Wiconisco Creek, and Powell s Valley Road (SR 4013) over Rattling Creek, along with roadway approach improvements, guide rail upgrades, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 1014, SECTION 012, in DAUPHIN COUNTY, LYKENS TOWNSHIP, from Segment 0020 Offset 2367 to Segment 0030 Offset 0149, a length of linear feet (0.048 mile), and for STATE ROUTE 4013, SECTION 009, in DAUPHIN COUNTY, LYKENS BOROUGH, from Segment 0330 Offset 2300 to Segment 0340 Offset 0409, a length of ft. (0.123 mile). Overall project length is linear feet (0.171 mile). DBE 0%, Anticipated Notice to Proceed , Required Completion ARMSTRONG COUNTY SR 128(192) #99529 PROPOSAL:$10.92 PLANS:$ X18:$ X36:$74.10 The description and location of the project is as follows: For the highway resurfacing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 128, SECTION 192, in Armstrong COUNTY Ford City BOROUGH and Manor TOWNSHIP from approximately 1000 east of the SR 128 Bridge over the Allegheny River at segment 0250 offset 2090 to approximately the SR 128/SR 66 (Main Street) intersection at segment 0311 offset DBE 0%, Anticipated Notice to Proceed , Required Completion

3 DAUPHIN COUNTY SR 0000 # PROPOSAL:$10.44 "The description and location of the project is as follows: For the cleaning, relamping, and testing of high intensity discharge fixtures, replacement of existing service enclosure and components, traffic signal service, repair and emergency repair 24/7/365 of existing lighting systems and traffic signal system, pole knockdown service, the furnishing and installation of cable, conduit, and luminaries, and miscellaneous electrical repairs and replacements as indicated for VARIOUS STATE ROUTES, in ADAMS, CUMBERLAND, FRANKLIN, YORK, DAUPHIN, LANCASTER, LEBANON and PERRY COUNTIES, VARIOUS MUNICIPALITIES, Commonwealth of Pennsylvania. This project being situated as follows: At various locations throughout DISTRICT 8. See attachment ""Major Locations""." DBE 0%, Anticipated Notice to Proceed , Required Completion BEDFORD COUNTY SR 56(23M) #48045 PROPOSAL:$20.16 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: This project is for the realignment of the intersection of SR 56 and SR 4009 in Bedford County. SR 4009 will be relocated to provide adequate sight distance for all movements at the intersection. Additionally, a left turn lane on SR 56 will be constructed for traffic turning left from SR 56 on to SR Drainage will be upgraded throughout the project limits and one string of guiderail will be reset at the structure over I-99 (approximately 100 feet). and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0056, SECTION 23M in BEDFORD COUNTY, BEDFORD TOWNSHIP at the following locations: SR 0056, Section 23M STATION to STATION SEGMENT 0320, OFFSET 0656 to SEGMENT 0310, OFFSET 1234 SR 4009, Section 19M STATION to STATION SEGMENT 0250, OFFSET 2212 to SEGMENT 0250, OFFSET DBE 6%, Anticipated Notice to Proceed , Required Completion Updated on April 8, 2014 FRANKLIN COUNTY SR 11(080) #88979 PROPOSAL:$26.16 PLANS:$ X18:$ X36:$ Construction consists of milling and resurfacing the existing roadway with Superpave WMA scratch and wearing courses; minor drainage improvements; base replacement; pavement markings; and other miscellaneous items, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0011, SECTION 080, in FRANKLIN COUNTY, CHAMBERSBURG BOROUGH, from Eisenhower Drive at Segment 0310 Offset 1152 north to South Penn Hall Drive at Segment 0370 Offset 2692, a length of 20, linear feet (3.83 miles); and for STATE ROUTE 4015, SECTION 007, in FRANKLIN COUNTY, CHAMBERSBURG BOROUGH, from US 11 at Segment 0010 Offset 0000 to 400' north of Hamilton Drive at Segment 0020 Offset 1469, a length of 4, linear feet (0.79 mile). Overall project length is 24, linear feet (4.61 miles). DBE 8%, Anticipated Notice to Proceed , Required Completion HUNTINGDON COUNTY SR 305(009) #96571 PROPOSAL:$16.08 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This project is for the resurfacing of approximately miles of bituminous roadway and drainage upgrades on SR's 0305 & 1029 in Huntingdon County and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 0305, SECTION 009, in HUNTINGDON COUNTY, JACKSON, WEST & BARREE TOWNSHIPS at the approximate locations: SR 0305 Segment 0470, Offset 0000 to Segment 0600, Offset 1652 SR 1029 Segment 0010, Offset 0000 to Segment 0160, Offset DBE 9%, Anticipated Notice to Proceed , Required Completion

4 HUNTINGDON COUNTY SR 3019(002) #96589 PROPOSAL:$14.04 PLANS:$ X18:$ X36:$39.00 The description and location of the project is as follows: This project is for the resurfacing of approximately miles of bituminous roadway and includes guide rail & drainage upgrades and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 3019, SECTION 002, in HUNTIGDON COUNTY, TODD & CASS TOWNSHIPS, CASSVILLE BOROUGH at the following locations: Segment 0060, Offset 1443 to Segment 0240, Offset DBE 0%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated on April 4, 2014 UNION COUNTY SR 80(134) #97565 PROPOSAL:$12.48 PLANS:$2.16 The description and location of the project is as follows: Microsurfacing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 80, SECTION 134, in UNION COUNTY, LEWIS TOWNSHIP from approximately 2.5 miles east of the SR 2002 interchange at segment 1945 offset 0000 to the SR 4001 interchange at Mile Run at segment 1991 offset 1337, AND for STATE ROUTE 80, SECTION 114, in NORTHUMBERLAND COUNTY, TURBOT TOWNSHIP from approximately 2.0 miles east of the SR 180 interchange at segment 2140 offset 0000 to approximately 1.5 miles east of the SR 254 interchange at segment 2160 offset 2060, AND for STATE ROUTE 80, SECTION 114, in MONTOUR COUNTY, LIBERTY TOWNSHIP from segment 2164 offset 0000 to segment 2164 offset DBE 0%, Anticipated Notice to Proceed , Required Completion MERCER COUNTY SR 718(B02) #1828 PROPOSAL:$17.64 PLANS:$ X18:$ X18:$ X-SEC:$ X18:$ X36:$35.10 For the construction or improvement of a certain sections of STATE HIGHWAY in MERCER COUNTY, HERMITAGE TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 718, SECTION B02. This project is situated as follows: From approximately 0.4 miles north from the intersection with SR at Segment 0160 Offset 1986 (Station ) then north to approximately 0.4 miles south of the intersection with SR. 846 at Segment 0170 Offset 0286 (Station ). For portion of bridge structure replacement with a 1-Span Prestressed Composite Spread Box Beam Bridge over Big Run having an overall length of 79'-00" feet; Also includes removal of portion of existing structure, drainage, guiderail, concrete bridge approach slabs, bituminous roadway approaches with Warm Mix Asphalt designs, plain cement concrete curb, and pavement markings all within a project length of feet (0.066 mile) as indicated on the approved drawings. DBE 0%, Anticipated Notice to Proceed , Required Completion

5 WAYNE COUNTY SR 6(607) #62912 PROPOSAL:$19.68 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ This is a Design/ Build Project. For the rehabilitation and improvement of a certain section of STATE HIGHWAY in WAYNE COUNTY, TEXAS TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0006, SECTION 607. The project being situated as follows: From a point near the intersection with SR 2009 at Segment 0330/ Offset 0000 (Station ) to a point approximately ½ mile Northwest of the intersection with SR 2003 at Segment 0350/ Offset 0100 (Station ), along SR 0006 for a total length of Ft. (0.550 Mi.). This is a Design-Build Project that consists of roadway widening (full depth construction), milling and overlay, concrete curbing, storm water system, driveway and side road adjustments, guiderail, signing and pavement markings. Other work includes excavation, landscaping, paved shoulders, cement concrete sidewalks, temporary excavation & support, utility relocation, temporary traffic control and other miscellaneous construction as indicated on the approved plans included in the bid package. DBE 7%, Anticipated Notice to Proceed , Required Completion FRANKLIN COUNTY SR 997(024) #87443 PROPOSAL:$54.48 PLANS:$ X18:$ X36:$62.40 X-SEC:$ X18:$ X36:$54.60 EXSTRUCT:$ X18:$ X36:$15.60 This project is a Design/Build of a two-lane and two-span bridge replacement, approach roadway reconstruction & approach guiderail updates, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0997, SECTION 024, in FRANKLIN COUNTY, LETTERKENNY & LURGAN TOWNSHIPS, from Segment 0600 Offset 2782 to Segment 0610 Offset 0526, for an overall project length of linear feet (0.185 mile). DBE 4%, Anticipated Notice to Proceed , Required Completion LYCOMING COUNTY SR 220(M19) #92849 PROPOSAL:$36.60 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Milling and Resurfacing, Traffic Signal Video Detection, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 220, SECTION M19, in LYCOMING COUNTY, MUNCY TOWNSHIP from the intersection of SR 2036 (Lycoming Mall Drive) and SR 180 at segment 0320 offset 0000 to approximately 2.2 miles west of the intersection of SR 220 and SR 405 at segment 0380 offset 0000; for STATE ROUTE 220, SECTION 21M, in LYCOMING COUNTY, WOLF TOWNSHIP, MUNCY TOWNSHIP AND HUGHESVILLE BOROUGH from approximately 2.7 miles east of the interchange at SR 180 and SR 220 at segment 0380 offset 0000 to the intersection of SR 220 and SR 405 at segment 0420 offset 2635; for STATE ROUTE 2014, SECTION 87M, in LYCOMING COUNTY, MUNCY TOWNSHIP from approximately 3.4 miles east of Montoursville at segment 0380 offset 1625 to approximately 2.9 miles northwest of the intersection of SR 2014 and SR 405 at segment 0404 offset 0600; and for STATE ROUTE 2036, SECTION 03M, in LYCOMING COUNTY, MUNCY TOWNSHIP from the intersection of SR 2036 and SR 2014 at segment 0012 offset 0000 to the interchange of SR 180 and 220 at segment 0020 offset DBE 0%, Anticipated Notice to Proceed , Required Completion MCKEAN COUNTY SR 321(529) #93007 PROPOSAL:$20.16 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the construction of a certain section of STATE HIGHWAY in MCKEAN COUNTY, HAMILTON and CORYDON TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 0321, SECTION 529 This project being situated as follows: On SR 0321 from Segment 0440 Offset 2250 to Segment 0470 Offset 3479, for a length of approximately feet (1.979 miles). For the rehabilitation of a CM Plate Arch Culvert and roadway bituminous paving. Construction includes Superpave Asphalt Mixture Designs for the base, binder, and wearing courses, guide rail, inlets, and drainage piping, pavement markings, and miscellaneous construction as indicated on the approved construction drawings. DBE 3%, Anticipated Notice to Proceed , Required Completion

6 MCKEAN COUNTY SR 321(ST5) # PROPOSAL:$18.60 PLANS:$ X18:$ X36:$93.60 EXSTRUCT:$ X18:$ X36:$27.30 The description and location of the project is as follows: For the improvements of certain sections of STATE HIGHWAYS in MCKEAN COUNTY, WETMORE and HAMILTON TOWNSHIPS and KANE BOROUGH, Commonwealth of Pennsylvania, Group 2-14-ST52. For the improvements to SR 0321 having a construction length of approximately 86,155 feet (16.3 miles), involving various combinations of milling, binder leveling and resurfacing, using various Superpave Asphalt Mixture Designs for binder and wearing courses, full depth reclamation, bridge deck repairs, guide rail, pavement markings, and miscellaneous construction as indicated on the approved construction drawings. DBE 0%, Anticipated Notice to Proceed , Required Completion BUCKS COUNTY SR 213(NCB) #13762 PROPOSAL:$33.96 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$27.30 The description and location of the project is as follows: Bridge replacement on West Maple Avenue over the Neshaminy Creek, the replacement of a signalized intersection with a roundabout at the intersection of Maple Avenue and Bridgetown Pike, design and construction of stairs and catwalk to the USGS station and other miscellaneous construction, all as indicated on the approved drawings for STATE ROUTE 0213, SECTION NCB, in Bucks County in Lower Southampton, Middletown and Northampton Townships. Project limits along SR 0213 are from approximately: Sta (Segment 0060 Offset 0450) to approximately Sta (Segment 0060 Offset 1350) Sta (Segment 0040 Offset 1468) to Sta (Segment 0050 Offset 0459) Project limits along SR 2010 are from approximately: Sta (Segment 0010 Offset 0564) to Sta (Segment 0010 Offset 0000). DBE 0%, Anticipated Notice to Proceed , Required Completion Updated on April 3, 2014 BLAIR COUNTY SR 2008(02B) #21959 PROPOSAL:$19.80 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$74.10 The description and location of the project is as follows: This project is for the rehabiltation of the single span reinforced concrete bridge which carries SR 2008 over Plum Creek in Blair County. This project also includes minor roadway approach work, drainage upgrades, signing updates, guide rail installation and realignment of the intersections with SR 0164 and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2008, SECTION 02B, in BLAIR COUNTY, TAYLOR TOWNSHIP at the following locations: SR 2008, Section 02B STATION to STATION SEGMENT 0090, OFFSET 2367 to SEGMENT 0100, OFFSET 2180 SR 62008, Section 02B STATION to STATION SEGMENT 0094, OFFSET 0000 to SEGMENT 0094, OFFSET 0686 SR 0164, Section 011 STATION to STATION SEGMENT 0260, OFFSET 1420 to SEGMENT 0270, OFFSET DBE 10%, Anticipated Notice to Proceed , Required Completion PIKE COUNTY SR 6(0) #91426 PROPOSAL:$14.88 PLANS:$0.12 The description and location of the project is as follows: Pike County Guide Rail Maintenance Group 4-14-GRM3 - The project includes the repair, replacement and maintenance of guiderail, end treatments, bridge railing, right-of-way fence, and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout PIKE COUNTY, in the COMMONWEALTH OF PENNSYLVANIA, as indicated in the bid package. DBE 0%, Anticipated Notice to Proceed , Required Completion

7 WAYNE COUNTY SR 6(0) #91428 PROPOSAL:$15.00 PLANS:$0.12 The description and location of the project is as follows: Wayne County Guide Rail Maintenance Group 4-14-GRM5 - The project includes the repair, replacement and maintenance of guiderail, end treatments, bridge railing, right-of-way fence, and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout WAYNE COUNTY, in the COMMONWEALTH OF PENNSYLVANIA, as indicated in the bid package. DBE 0%, Anticipated Notice to Proceed , Required Completion UNION COUNTY SR 80(M31) #93481 PROPOSAL:$22.20 PLANS:$ X18:$ X36:$85.80 The description and location of the project are as follows: The work is for resurfacing including Superpave Asphalt Mixture scratch course, Stone Matrix Asphalt Mixture wearing course, milling, shoulder patching, pavement markings, rumble strips, and other miscellaneous construction within an overall length of 24,523 linear feet (4.64 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 80, SECTION M31 from approximately 2.42 miles east of the intersection with SR 2002 at Segment 1940 Offset 3407 in GREENE TOWNSHIP, CLINTON COUNTY and approximately 0.00 miles west of the intersection with State Route 4001 at Segment 1990 Offset 1545, in WEST BUFFALO TOWNSHIP, UNION COUNTY. DBE 0%, Anticipated Notice to Proceed , Required Completion CUMBERLAND COUNTY SR 2021(003) #82425 PROPOSAL:$20.52 PLANS:$ X18:$ X36:$ This project consists of milling and resurfacing the existing bituminous roadway section, shoulder replacement, patching & diamond grinding of the existing concrete section, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 2021, SECTION 003, in CUMBERLAND COUNTY, LOWER ALLEN & HAMPDEN TOWNSHIPS, from the intersection with Colonial Road at Segment 0030 Offset 0089 to the intersection with SR 0641 (Trindle Road) at Segment 0070 Offset 1524, for an overall project length of 11,685 linear feet (2.21 Miles). Also included is the installation of 1/10 mile marker signs along SR in CUMBERLAND, YORK, and ADAMS COUNTIES. DBE 9%, Anticipated Notice to Proceed , Required Completion LEHIGH COUNTY SR 0000 #98129 PROPOSAL:$32.52 The description and location of the project is as follows: For the repair of and/or parts replacement for existing highway lighting and appurtenant electrical systems on an as-needed basis at the following: 1. Nine interchanges on State Route 78 - State Route 309 North, Hamilton Boulevard (State Route 222), Cedar Crest Boulevard (State Route 29), Lehigh Street (State Route 2005), Emmaus Avenue (State Route 2002), Summit Lawn (State Route 145), State Route 309 South, Hellertown (State Route 412), and State Route 33 North; and at the following intersection on State Route 309 Center Valley Parkway (State Route 2044) and Saucon Valley Road (State Route 2036) in LEHIGH AND NORTHAMPTON COUNTIES; CITY OF ALLENTOWN, AND LOWER MACUNGIE, SOUTH WHITEHALL, SALISBURY, AND UPPER SAUCON TOWNSHIPS IN LEHIGH COUNTY; and CITY OF BETHLEHEM, BOROUGH OF HELLERTOWN, AND LOWER SAUCON TOWNSHIP IN NORTHAMPTON COUNTY; Commonwealth of Pennsylvania. 2. State Route 22 from Segment 230 Offset 0000 to Segment 250 Offset 501 and from Segment 231 Offset 0000 to Segment 251 Offset 492 (approximately 5379 linear feet) in CITY OF EASTON IN NORTHAMPTON COUNTY; Commonwealth Of Pennsylvania. 3. Seven interchanges on State Route 78 Frystown (State Route 645), Bethel (State Route 501), Midway (State Route 4041), Schubert (State Route 419), Strausstown (State Route 183), Shartlesville (State Route 4011), and Hamburg (N. 4th Street) and at the following interchange on State Route 176 Morgantown (State Route 10) in BERKS COUNTY; BETHEL, CAERNARVON, UPPER BERN, AND UPPER TULPEHOCKEN TOWNSHIPS, and HAMBURG BOROUGH; STATE ROUTES 78 AND 176; and the truck weight station flashing lights on State Route 222 in LANCASTER COUNTY: BRECKNOCK TOWNSHIP; Commonwealth of Pennsylvania. For the repair of and/or parts replacement for existing lot lighting and appurtenant electrical items on an as-needed basis at the following: 1. Five park-and-ride facilities - Kressler Road (T-479) in LOWER MACUNGIE TOWNSHIP, LEHIGH COUNTY; Silvex Road (City) in CITY OF BETHLEHEM, NORTHAMPTON COUNTY; William Penn Highway (State Route 2020) in BETHLEHEM TOWNSHIP, NORTHAMPTON COUNTY; Broad Street (State Route 2028) in SMITHFIELD TOWNSHIP, MONROE COUNTY; and Oak Grove Drive (T-530) in MIDDLE SMITHFIELD TOWNSHIP, MONROE COUNTY; Commonwealth of Pennsylvania. 2. Two rest area and welcome center facilities - Broad Street (State Route 2028) in SMITHFIELD TOWNSHIP, MONROE COUNTY; and I- 7

8 80 EB (State Route 80) in POCONO TOWNSHIP, MONROE COUNTY; Commonwealth of Pennsylvania. For the maintenance, repair of and/or parts replacement of existing highway sign lighting and appurtenant electrical items on an as-needed basis on various State Routes in BERKS, LEHIGH, MONROE, NORTHAMPTON AND SCHUYLKILL COUNTIES; COMMONWEALTH OF PENNSYLVANIA. DBE 0%, Anticipated Notice to Proceed , Required Completion ECMS PROJECTS - ADVANCED INFORMATION LETTING MAY 8, 1014 Updated on April 1, 2014 ARMSTRONG COUNTY SR 28(14D) #99316 PROPOSAL:$14.16 PLANS:$5.52 The description and location of the project is as follows: For the Resurfacing to include milling of existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses and minor drainage and guiderail upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 28, SECTION 14D, in Armstrong County, South Bethlehem Borough and Mahoning, Wayne, Redbank and Boggs Townships from approximately SR 1035 at segment 0390 offset 1770 to approximately SR 1027 at segment 0440 offset DBE 0%, Anticipated Notice to Proceed , Required Completion PHILADELPHIA COUNTY SR 0 #70014 PROPOSAL:$84.12 PLANS:$ X18:$ X36:$ The project is for the modernization of the traffic signal equipment at 17 intersections, installation of new incident management cameras, traffic signs and pavement markings. In addition approximately LF will be trenched and conduit installed to carry new fiber-optic interconnect and non-compliant ADA curb ramps at signalized intersections will also be reconstructed. This and other miscellaneous construction as indicated on the approved drawings is to be performed in an area generally bounded by Spring Garden Street to the north, Market Street to the south, 2nd Street to the east and Broad Street to the west. DBE 12%, Anticipated Notice to Proceed , Required Completion NORTHUMBERLAND COUNTY SR 147(88M) #97481 PROPOSAL:$17.52 PLANS:$ X18:$ X36:$46.80 The description and location of the project are as follows: The work is for resurfacing including Superpave Asphalt Mixture scratch and wearing courses, base repairs, joint repairs, milling, pavement markings, and other miscellaneous construction within an overall length of 6,846 linear feet (1.30 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 147, SECTION 88M from approximately 0.86 miles north of the intersection with SR 4018 at Segment 0510 Offset 0846 and approximately 0.06 miles south of the intersection with State Route 61 at Segment 0540 Offset 3230, in CITY OF SUNBURY, NORTHUMBERLAND COUNTY. DBE 0%, Anticipated Notice to Proceed , Anticipated Notice to Proceed , Required Completion BRADFORD COUNTY SR 0000 #96022 PROPOSAL:$23.64 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Upgrades to guide rail on VARIOUS ROUTES, in VARIOUS TOWNSHIPS, BRADFORD COUNTY, LYCOMING COUNTY, SULLIVAN COUNTY and TIOGA COUNTY. DBE 0%, Anticipated Notice to Proceed , Required Completion COLUMBIA COUNTY SR 42(068) #93505 PROPOSAL:$15.00 PLANS:$ X18:$ X36:$42.90 EXSTRUCT:$ X18:$ X36:$39.00 The description and location of the project are as follows: For the rehabilitation of the existing structure over US 11 including removal of portion of existing bridge, asphaltic plug joints, repair deteriorated concrete, and other related work within an overall length of 427 linear feet (0.08 mile) all as indicated on the approved drawings included in the bid package for STATE ROUTE 42, SECTION 068 from approximately 0.5 miles southeast of the intersection with State Route 4004 at Segment 0450, Offset 0100 and Segment 0451 Offset 0100 in the town of BLOOMSBURG, COLUMBIA COUNTY. DBE 2%, Anticipated Notice to Proceed , Required Completion

9 ECMS PROJECTS - ADVANCED INFORMATION LETTING MAY 8, 1014 Updated on March 27, 2014 ARMSTRONG COUNTY SR 28(14D) #99316 PROPOSAL:$14.16 PLANS:$5.52 The description and location of the project is as follows: For the Resurfacing to include milling of existing bituminous wearing courses, bituminous patching, paving, leveling, binder and wearing courses and minor drainage and guiderail upgrades and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 28, SECTION 14D, in Armstrong County, South Bethlehem Borough and Mahoning, Wayne, Redbank and Boggs Townships from approximately SR 1035 at segment 0390 offset 1770 to approximately SR 1027 at segment 0440 offset DBE 0%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 9