1 PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at Adobe Acrobat reader is required to view this document. If you do not have this software you may download it free from Adobe. The document number to request will be the same as the project number indicated below. Project # Addendum # # of Pages Original Issue Date (including title page) March 3, 2017 Addendum Issued Date March 13, 2017 Project Number 3730 Addenda Number 2 Deadline 2:00 PM March 28, 2017 Project Title West Rocks Middle School Windows and Doors Replacement Project Phase I of II -State # EC This Addendum is a contract document modifying previously issued documents, which remain in full force except as specifically modified below. Quotations appearing on the Proposal are to reflect the provisions of this Addendum. Failure to acknowledge receipt of this Addendum in the space provided on the response sheet may subject candidate to disqualification.

2 ADDENDUM #2 WINDOW AND DOOR REPLACEMENT WEST ROCKS MIDDLE SCHOOL 81 WEST ROCKS ROAD NORWALK, CT STATE PROJECT NO EC S/P+A PROJECT NO DATE: March 13, 2017 The following changes to the Drawings and Project Specifications shall become a part of the Drawings and Project Specifications; superseding previously issued Drawings and Project Specifications to the extent modified by Addendum No. 2. General Information/Clarifications: All references to Phase I of II throughout the package shall be revised to read Phase I of I. Changes to the RFP: INVITATION TO BID: o Page 1: Last paragraph, add the following: In accordance with Connecticut General Statute Sections 4a-100 and 4b-91, a responsible bid must contain two (2) documents: The Contractor Prequalification Certificate and the Update (Bid) Statement. The classification GENERAL BUILDING CONSTRUCTION B or DOORS AND WINDOWS is required as a minimum. Preliminary construction schedule. Second paragraph, delete MANDATORY in its entirety. All interested parties may bid on the project. o Page 2, add to the end following: In accordance with Connecticut General Statute Secs. 4a-100 and 4b-91, a responsible bid that exceeds $500,000 for this vertical building project must contain two (2) documents: The Contractor Prequalification Certificate and the Update (Bid) Statement. These two (2) documents must be submitted with the bid form. Contact the DAS Contractor Prequalification Unit at for more information. The classification GENERAL BUILDING CONSTRUCTION B or DOORS AND WINDOWS is required as a minimum. RESPONSE FORM has been deleted in its entirety. A new RESPONSE FORM has been added and is attached as part of this addendum. (4) SECTION 1 RESPONSE INFORMATION, Bid Responses, revise seven to read eight. State Project No EC West Rocks Middle School Window and Door Replacement Norwalk Addendum #2-1

3 ADDENDUM #2 SECTION 3 GENERAL BIDDING INFORMATION FOR CONSTRUCTION, Article 3.11, third paragraph, revise (six copies) to read (eight (8) copies). The bid dates are unchanged by this addendum. The addendum consists of six (6) pages of 8½ x 11 text. End of Addendum 2 State Project No EC West Rocks Middle School Window and Door Replacement Norwalk Addendum #2-2

4 1.1 RESPONSE FORM Phase I of I Windows and Doors Replacement Project West Rocks Middle School (State # EC) Vendor Name - Address - Phone - Fax - - Manager - Fed ID# The undersigned hereby declares that he/she has or they have carefully examined the plans, specifications and project site and has satisfied himself as to all the quantities and conditions, and understands that in signing this proposal he waives all right to plead any misunderstanding regarding the same. The undersigned further understands and agrees that he will furnish and provide all of the necessary material, machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the work necessary under the aforesaid conditions, to carry out the contract and to accept in full compensation therefore the amount of the contract as agreed to by the Contractor and the City. The undersigned further agrees, in case of variations of quantities from those shown or specified, the following unit prices will be used in adjusting the contract price. If quantities are authorized by the City, the following amount will be added to the contract as required. Unless otherwise noted, each UNIT PRICE shall include all equipment, tools, labor, permits, fees, etc., incidental to the installation and completion of the work involved. It is further understood and agreed that all the information included in, and attached to, or required by the Request for Bid shall become public record upon delivery to the City. In the bid items that follow, Bidder shall include all applicable taxes, fees and other incidental costs. Bidder must bid on every item. Prices are to be written in words and figures. In case of discrepancy, the bid amount in words shall prevail. The following unit prices shall apply to this project: CONTINUED TO NEXT PAGE

5 PROJECT: VENDOR NAME: Phase I of I Windows and Doors Replacement Project West Rocks Middle School (State # EC) Total Lump Sum Price $ Total Lump Sum Price in Writing: UNIT PRICE SCHEDULE Unit Prices in accordance with the following schedule will apply to this Contract. Item No. 1: Small Containment Preparation Containment (Less than 160 square\260 linear feet of asbestos containing material) Pricing for containments with larger amounts of materials are to be INCLUDED in the unit prices themselves listed below. There is no separate unit price for containments with larger amounts. $ per containment Item No. 2: Floor Tile/Flooring Materials and Mastic (Includes All layers of wood, carpeting, multiple layers of floor tiles/ flooring materials/wood/ceramic/terazza/concrete/mastics, levelastics, contaminated materials, etc.) Removal and Disposal as ACM Item No. 3: Flooring Mastic (includes wood, carpet over floor tile, multiple layers of floor tiles/flooring materials/wood/ceramic/terazza/concrete etc.) Removal and Disposal as ACM Item No. 4: Mudded Pipe Fitting Insulation Removal and Disposal as ACM $ per fitting/joint Item No. 5: Glove Bag Removal and Disposal as ACM $ per bag Item No. 6: Pipe and Pipe Fitting Insulation Removal and Disposal as ACM Item No. 7: Door Insulation Removal and Disposal as ACM $ per door Item No. 8: Transite/Cement Board Including Contaminated Substrates/Adjacent Materials Removal and Disposal as ACM

6 Item No. 9: Stucco/Cement Panel/Hard Plaster Wall Panels Including Contaminated Substrates/Metal/Attached Materials Removal and Disposal as ACM Item No. 10: Wall Adhesives Including Contaminated Substrates Removal and Disposal as ACM Item No. 11: Window Sill Adhesives/Tars Including Contaminated Substrates Removal and Disposal as ACM Item No. 12: Door/Window Caulking Compound (including substrates) Removal and Disposal as ACM Item No. 13: Black Tars/Mastics/Damp-proofing Materials (including contaminated substrates interior and exterior behind walls, etc.) Removal and Disposal as ACM Item No. 14: Roof Flashing (includes multiple layers and substrates) Removal and Disposal as ACM Item No. 15: Caulking, Glazing and Sealant Compound and/or Adjacent Surfaces/Substrates (Includes window/door systems, wall systems, panels, glass, metal beams, brick, block, concrete, plaster, flooring, sheetrock, transite cement board) Removal and Disposal as ACM and PCB > 50 PPM (excluded bulk product waste) Item No. 16: Window/Wall Caulking Compound (including substrates) Removal and Disposal as ACM and <50 PPM EPA Excluded Bulk Product/CT DEEP Regulated Waste Item No. 17: Window/Wall Caulking Compound (including substrates) Removal and Disposal as <50 PPM EPA Excluded Bulk Product/CT DEEP Regulated Waste Item No. 18: Door Caulking Compound (including substrates) Removal and Disposal as ACM and <50 PPM EPA Excluded Bulk Product/CT DEEP Regulated Waste Item No. 19: Door Caulking Compound (including substrates) Removal and Disposal as <50 PPM EPA Excluded Bulk Product/CT DEEP Regulated Waste

7 Item No. 20: Adjacent Building Materials/Substrates Removal and Disposal as PCB Containing Materials >1 PPM Remediation Waste Item No. 21: 40 Yard Dumpster for PCB Containing Materials <50 PPM EPA Excluded Bulk Product/CT DEEP Regulated Waste Item No. 22: 40 Yard Dumpster for PCB Containing Materials >50 PPM EPA Bulk Product Waste Item No. 23: 40 Yard Dumpster for PCB Containing Materials >1 PPM Remediation Waste Item No. 24: 40 Yard Dumpster for Lead Hazardous Waste Bid Security in the form of a (check one) is attached. Bond Certified Check Cost for performance bond included in lump sum Insurance Agency Name - Agency Address - $ per thousand dollars Tel.- Submitted By - Authorized Agent of Company (name and title) Date The above signatory acknowledges receipt of the following addenda issued during the bidding period and understands that they are a part of the bidding documents (if applicable): Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated Addendum # Dated