1 Michael Pacholok Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services June 10, 2016 ADDENDUM NO. 1 TENDER NO Posted on website: 8 Pages RE: WATER RESCUE SIMULATOR POOL-2016 AT 21 OLD EGLINGTON AVENUE, TORONTO. CLOSING DATE: 12:00 P.M. NOON (LOCAL TIME), June 14, 2016 Please refer to the above Tender Call document in your possession and be advised of the following: I. Revised Pricing Forms 1. Replace the Pricing Form on pages of the Tender document with the enclosed Revised Pricing Form dated June 10, 2016, enclosed with this Addendum. II. Questions and Answers Q1. Please provide as built drawing to obtain detail of existing concrete paver bases and steel bracing. A1. Available original drawing is attached. Also refer to attached photographs. Q2. What is the slope gradient of the pool embankment? A2. Refer to attached original drawing and verify on site. Q3. Under which pricing items reinstallation of geotextile fabric, geocell, fabric liner, ballast will be paid? A3. For ballast, include reinstatement costs in 2.3. For remainder, include reinstatement costs in 2.5. Q4. Please refer to Section 3-Pricing Form, Item 4.4 and advise what modification is required to connect new sprinkler system to existing water supply line? Is there adequate pressure at the existing water supply line? 1 of 8

2 A4. Review on site and confirm location of existing hose bib at main building. Assume pressure adequate at this location and provide cast, valved, dual outlet connection. Supply flexible connection to trenched piping serving sprinklers from this location. This will be base scope. Contractor responsible for pressure testing connection and any additional requirements to meet project requirements will be additional scope. Q5. Please refer to Section 3-Pricing Form, Item 4.5, and confirm that the exiting water supply system can used to fill the pool. Also confirm that new chemical required for the pool will be supplied by City Of Toronto. If we need to supply new chemical, we need quantity & type. Also, what type of report on water condition is required? A5. Per Section , Owner to pay for water consumed as part of scope. Connections required to get water to pool are Contractor responsibility. Chemical treatment of water is part of Contractor scope. Q7. Who is the manufacturer of rubber mats? A7. We have not specified a manufacturer. Contractor responsible for meeting requirements outlined in Drawings and Specifications. Q8. Who is the manufacturer of PVC pool liner? A8. Layfield Group of Companies Please note that the Deadline for Questions has passed. Should you have any questions regarding this Addendum, contact Angeline Ross, Corporate Buyer, at aross2@toronto.ca. Please attach this Addendum to your Request for Tender document and be governed accordingly. Bidders must acknowledge receipt of all Addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 8 - Addenda, of the Tender Call document. All other aspects of the Tender remain the same. Yours truly, Joanne Kehoe Manager, Construction Services Purchasing & Materials Management 2 of 8

3 Section 3 Tender Submission Package REVISED Pricing Form Itemized s dated June 10, 2016 Tender Call No Contract No. The Bidder must provide the rate and the amount for each Tender item, the total for each part / subsection, the grand total, HST amount and the total amount of Tender on the forms in the ensuing pages. Bidders that do not fully complete these forms (such as leaving lines blank), or have unclear answers (such as "n/a", "-", "tba" or "included" etc.) will be declared non-compliant. s that are intended to be zero cost/no charge to the city are to be submitted in the space provided in the price schedule as "$0.00" or "zero". All spaces for the aforementioned information must be completed in ink ensuring the printing is clear and legible. Where included, the Alternative s, and Supplementary List of s Required for Extra Work Forms must also be completed. The lowest Bidder will be determined solely from the Total Base Bid, subject to the City's reserved rights not to award to any Bidder. Water Rescue Simulator Pool-2016 at 21 Old Eglington Avenue, Toronto. Bidder Name: A) Base Bid : Item No. Est. Qty. Description 1.0-General Requirements (Division 01): Cleaning of the work area, hard and soft landscaping, fencing, fixtures, piping, etc., and the disposal of all waste products and/or debris generated by the construction activity, as well as any 1.1 material present in the work area prior to the commencement of the work. The areas requiring cleaning shall consist of all areas of the site affected by the work. All in accordance with the specifications, drawings and requirements of the contract documents. Unit of Measure Unit Extended $ 3 of 8

4 Section 3 Tender Submission Package REVISED Pricing Form Itemized s dated June 10, 2016 Tender Call No Contract No. Item No. Est. Qty. Description Unit of Measure 2.0-Selective Demolition (Division 02 and Drawings): Drain water rescue simulator pool to 2.1 facilitate the work, and maintain a drained state of the pool throughout the course of the work Removal and disposal of the existing aerator units from within the water rescue simulator. Existing wiring is to remain intact for re-use, unless connection of new aerators requires electrical upgrade per Shop Drawings. Concrete paver bases and steel bracings are to be stockpiled for re-use. Wholesale removal, stockpiling, and cleaning of the existing clear stone ballast from within the water rescue simulator. Removal and disposal of the existing geocell support tendons, clips, and associated fastener system. Wholesale removal and stockpiling of the existing fabric liner, geocells, and geotextile fabric to expose the PVC pool liner within the water rescue simulator. The geocells and geotextile fabric are not to be cut from the existing supports or damaged. Compress and fold out of the water rescue simulator to facilitate the review of the PVC liner. Unit Extended 3.0-Slope Protection System and PVC Geomembrane (Division 31 - Earthworks and Drawings): Localized removal and replacement of deteriorated geocell sheets, as directed by the Consultant. New geocell sheets are to be approximately 9 feet wide by 15 feet Per long, with cell depth of 4 inches. Size Sheet $ of geocell to match existing. Contractor to verify size on site. Contractor to provide shop drawings for installation of new geocell sheets. 3.2 Supply and install new geocell support tendons as outlined in the Specifications and required by the manufacturer. Contractor to submit shop drawings for layout and details of tendon installation. 4 of 8

5 Section 3 Tender Submission Package REVISED Pricing Form Itemized s dated June 10, 2016 Tender Call No Contract No. Item No. Est. Qty Description Supply and install new geocell ATRA Keys to bind geocell sheets. Contractor to submit manufacturer shop drawings for layout and details of ATRA Key installation. Localized repairs to the PVC pool liner, as directed by the Consultant. Contractor to submit manufacturer details for the repair of the PVC pool liner to Consultant for review. Unit of Measure Per Square Foot 4.0-Miscellaneous (Division 06 and Division 26 and Drawings): Supply, install, and commission new aerator units. to include all electrical work associated with.1 Pumps, model LE40 Series. Contractor to submit electrical shop drawings to Consultant for review. installing the new aerator units. Aerator units to be supplied by Liberty.2.3 Supply and install new rubber mats around the perimeter slope of the water rescue simulator, as indicated on the Drawings. Rubber mats to be 1830mm x 900mm in size, 12.5mm thick, and UV stable. to include all hardware, connection detailing required, and wooden ladder system installed on rubber mats, as indicated on the Drawings. Supply and install new floating dock, as indicated on the Drawings. to include all coordination, hardware, bracing equipment, connection to ramp, etc., and fabrication and installation of ramp to connect perimeter sidewalk to the new floating dock, as indicated on the Drawings. Contractor to submit shop drawings to Consultant for review. Unit $ Extended 5 of 8

6 Section 3 Tender Submission Package REVISED Pricing Form Itemized s dated June 10, 2016 Tender Call No Contract No. Item No. Est. Qty..4.5 Description Supply, install, and commission new motion-activated sprinkler-type pest (bird) control system as outlined on the Drawings. Motion-activated sprinkler to be manufactured by ConTech Inc. to include all required hardware, piping, connections and modifications to connections to connect the system to water supply. Piping to be PVC. Contractor to submit shop drawings to the Consultant for review. Fill pool with water to operating water levels and commisson water rescue simulator pool chemical feeder system, equipement and accessories to make the chemical feed system fully operational and functional. Provide report on water condition. Unit of Measure Unit Extended 5.0-Contingency Allowance: CONTINGNECY ALLOWENCE (H.S.T. excluded) is an allowance for unforeseen or discovered site and/or 5.1 work condition(s). Additional work and associated costs must be $20, reviewed and authorized in written form by the City prior to initiating additional work. TOTAL BASE BID PRICE (Item ) B) TOTAL BASE BID PRICE (exclusive of HST) (Item A) $ C) HST AMOUNT (13% of Item B) $ D) TOTAL AMOUNT OF TENDER CALL (Item B + C) Note: Please indicate this amount on the Tender Call Cover Page $ 6 of 8

7 7 of 8

8 8 of 8