Building Information Modelling

Size: px
Start display at page:

Download "Building Information Modelling"

Transcription

1 Building Information Modelling What s in it for the Client?

2 Why Draw in 3D? (Thanks to John McCarthy AO) Reduce Clashes Reduce Cannibalisation Reduce Materials Reduce Labour Improve Productivity Reduce Construction Cost Reduce Time Reduce Interest

3

4 Architecture

5 1 Bligh was Designed and Documented Entirely in BIM! BIM Throughout! Design Development Sustainability Analysis BIM in Construction Facilities Management With BIM

6 1 Bligh was Designed and Documented Entirely in BIM! BIM by Everyone! Strong commitment by DEXUS to BIM Entire consultant team used BIM All subcontractors in BIM Head Contractor in BIM 32 parties in combined model

7 Construction Stage Appoint BIM Manager Head Contractor implements BIM All subcontractors expected to use BIM BIM Execution Plan developed Training and secondment programs to BIM thus enabling project team Information requirements, standards, protocols and publication cycle defined

8 A Strategic Approach to Implementation and Management Not a project team of geniuses No specialist software or hardware: Revit and Navisworks as the main platforms Standard PC workstations Single BIM Manager Identify the desired outcomes Identify required tasks and information Find ways to deal with the issues

9 Schedule Plan Elevation/Section Central Building Information Model 3D study Detail

10

11 Image by Arup

12

13

14

15

16

17

18

19

20 The BIM Process On-site clashes have been dramatically reduced, leading to higher quality work, improved coordination between tradesmen and time savings. Over 10,000 clashes have been detected prior to site works through the delivery of the project. The Bligh Street BIM model now accommodates over 30 individual discipline models Bruce Jones, Grocon We reduced waste, we saved time, we increased quality Tony Gulliver, Development Manager, Dexus Property Group

21 The BIM Process sections of this complex geometry have been set out by surveyors in 3D with information generated directly from the BIM model in doing so, the correctness and precision of construction has been improved. We saw accelerated coordination of disciplines and trades. Many of the most complex areas of Bligh Street such as basements, plant rooms and the roof structure, simply could not have been designed or constructed without the use of BIM. Bruce Jones, Grocon

22 So what did DEXUS get? Reduced clashes Reduced cannibalisation Reduced materials Reduced labour Improved productivity Reduced tolerances Higher quality finishes 1 st CBD High rise 6 Star Green Star Integrated building and tenant model Integrated building management system Lower ongoing operating costs 1 BLIGH

23 1 BLIGH ESD 40% recycled concrete 90% steel with 50% recycled content FSC certified timber Recycled timber Solar cooling Tri-generation Black water treatment Rainwater harvesting Sewer mining Naturally ventilated atrium Double skin facade BIM MEP AUS Innovation Form 2014

24 So what of the future? Build on past achievements Embrace Technological Change Benchmark and specify BIM-MEP AUS Integrate BIM Systems for Portfolios Educate Owners and Facility Managers

25 Victor P. Hoog Antink with thanks to