1 - Contract Schedule MILESTONES DESIGN / PRECONSTRUCTION PROCUREMENT Construction Procurement CONSTRUCTION Hardscape / Landscape Hall Of Fame Building Sitework Earthwork A1060 Mobilize 5 18-Feb-13 A 22-Feb-13 A A1070 Erosion Control 5 18-Feb-13 A 22-Feb-13 A A1080 Demo existing parking lot 5 25-Feb-13 A 01-Mar-13 A A2070 Haul-in / Compact Fill Soils (8000cy) Mar-13 A 29-Mar-13 A A2750 Grading at Baker Street Extension 5 18-Mar-13 A 22-Mar-13 A A2840 Demo at Foundry Street 2 13-May May-13, Demo 14-May-13 at Foundry Street A2290 Fill at Foundry 5 12-Jun Jun-13 Utilities A1900 GA Power to install 3 new poles for Traffic & CSX power feed Dec-12 A 31-Dec-12 A A1910 Relocate AT&T Ductbank & Manholes (NIC) Dec-12 A 31-Dec-12 A A2690 Relocate Traffic Signal Wiring at Baker/Marietta Street Jan-13 A 29-Jan-13 A A2810 Relocate AT&T Wires to new Baker/Marietta Street Traffic Pole Jan-13 A 29-Jan-13 A A1920 Relocate Power & Traffic Cable at Foundry Street (West side) Jan-13 A 15-Feb-13 A A2820 GA Power to remove existing gear at Baker/Marietta Street 5 18-Feb-13 A 22-Feb-13 A A2830 GA Power to remove wire in U/G Ductbank & Overhead Wire in Foundry St Feb-13 A 22-Feb-13 A A2390 Install 120 LF of new Sanitary Sewer Line - Phase 1 (West Half) Mar-13 A 05-Apr-13 A A1930 Install Electrical and AT&T Ductbanks Apr-13 A 24-Apr-13 A A2270 Install Storm Line Under Baker Ext. (370 LF) Apr-13 A 26-Apr-13 A A1090 Install Rest of San. Sewer Line (120 LF)/Remove Fndry San. Line - Phase Jun-13 A 11-Jun-13 Detention Vault Site Improvements Foundations Piles 12-Jun Jun-13 A, Piles 14-Jun-13, Construction Procurement 18-Jun-13, Sitework 18-Jun-13, Earthwork 18-Jun-13, Fill at Foundry 11-Jun-13, Utilities 11-Jun-13, Install Rest of San. Sewer Line (120 LF)/Remove Fndry San. Line - Phase 2 (East Half) 11-Jun-13, Foundations 23-Jul-13, DESIGN / PRECONST, PROCU Critical

2 A2080 Test Piles Feb-13 A 15-Mar-13 A A2700 Phase 1 Piles 62ea (Detention Vault) 7 18-Mar-13 A 26-Mar-13 A A1940 Phase 2 Piles /dy (Baker Street) 7 25-Mar-13 A 02-Apr-13 A A2220 Phase 3 Piles 16/dy (S of Foundry) 9 03-Apr-13 A 15-Apr-13 A A2210 Phase 4 Piles 15/dy (Bldg East, ChFA) 7 16-Apr-13 A 24-May May-13 A A, Phase 4 Piles 15/dy (Bldg East, ChFA) A2320 Phase 6 Piles 51 15/dy (Foundry) 4 28-May-13 A 01-Jun-13 A 01-Jun-13 A, Phase 6 Piles 51 15/dy (Foundry) Pile Caps & FTGS 20-May-13, Pile Caps & FTGS A3630 Pile Baker St. Extension (23 4/dy) 6 03-Apr-13 A 10-Apr-13 A A3690 Install South Crane Foundations 5 11-Apr-13 A 17-Apr-13 A A3640 Phase 3 Pile Caps 10-May-13, 8 18-Apr-13 Phase A3 Pile 10-May-13 Caps A3800 Phase 6 Pile Caps (13 ea) 3 06-May May-13 A3710 Phase 4 Pile Caps 4/dy) 6 13-May May-13, Phase 4 Pile Caps 4/dy) Walls / Columns 11-Jun-13, Walls / Columns A4160 Install Columns at Baker Street (24ea) 6 11-Apr-13 A 18-Apr-13 A A3680 Install Walls at Baker Street (400lf) 07-May-13 A, 19-Apr-13 Install Walls A at 07-May-13 Baker Street A (400lf) A4150 Form / Pour Walls Phase 3 30/dy) Apr-13 A 20-May-13, Form / Pour Walls Phase 3 30/dy) A5200 Form / Pour Columns Phase 3 (31ea) 8 30-Apr May-13, A 17-May-13 Form / Pour Columns Phase 3 (31ea) A5190 Form / Pour Walls Phase 4 30/dy) May Jun Jun-13, Form / Pour Walls Phase 4 30/dy) A5210 Form / Pour Columns Phase 4 (24ea) 6 21-May May May-13, Form / Pour Columns Phase 4 (24ea) A4250 Backfill Walls - Phase May May May-13, Backfill Walls - Phase 3 A5220 Backfill Walls - Phase Jun Jun Jun Jun-13, Backfill Walls - Phase 4 Structure Level 1 29-May May-13 A3890 Underground Rough-In - Phase May Jun-13 A3920 Underground Rough-in - Phase Jun Jun-13 A3900 Underground Rough-in - Phase Jun Jul-13 A3930 SOG - 1 (Rotunda) 5 19-Jun Jun-13 A3940 SOG - 2 ( Museum East) 5 02-Jul-13 A3950 SOG - 3 (Museum North) 5 03-Jul Jul-13 A3960 SOG - 4 (Museum West) 5 11-Jul Jul-13 A3970 SOG - 5 (Museum West) 5 18-Jul Jul-13 A3990 Lobby SOG 5 25-Jul Jul-13 A3980 Field SOG 5 07-Aug-13 A4010 Connector SOG 5 07-Aug-13 Level 2 18-Jun-13, Underground Rough-In - Phase 3 12-Jun Jun-13, Underground Rough-in - Phase 6 19-Jun Jul-13, Underground Rough-in - Phase 4 19-Jun Jun-13, SOG - 1 (Rotunda) 02-Jul-13, SOG - 2 ( Museum East) 03-Jul Jul-13, SOG - 3 (Museum North) 11-Jul Jul-13, SOG - 4 (Museum West) 18-Jul Jul-13, SOG - 5 (Museum W 25-Jul-13 Critical

3 A5660 Form 1 Rotunda 6 03-Jul-13 A5670 Rebar 1 Rotunda 5 05-Jul Jul-13 A5680 Form 2 Museum 6 05-Jul Jul-13 A5690 Pour 1 Rotunda 1 12-Jul Jul-13 A5700 Rebar 2 Museum 2 15-Jul Jul-13 A5710 Form 3 Museum 5 15-Jul Jul-13 A5720 Pour 2 Museum 1 17-Jul Jul-13 A5730 Rebar 3 Museum 2 22-Jul Jul-13 A5740 Form 4 Museum 3 22-Jul Jul-13 A5750 Pour 3 Museum 1 24-Jul Jul-13 A5760 Rebar 4 Museum 2 25-Jul Jul-13 A6310 Form 5 Museum 3 25-Jul Jul-13 A5770 Pour 4 Museum 1 29-Jul Jul-13 A6320 Rebar 5 Museum 2 31-Jul-13 A6330 Pour 5 Museum 1 Level 3 A5370 Erect Level Sep Sep-13 A5380 Deck / Detail Level Sep Oct-13 A5780 Form 6 Museum 5 05-Aug-13 A5790 Rebar 6 Museum 2 07-Aug-13 A5800 Pour 6 Museum 1 08-Aug Aug-13 Roof A5390 Erect Low Roof 8 02-Oct Oct-13 A5400 Deck / Detail Low Roof 8 14-Oct Oct-13 A5410 Erect Rotunda Roof 5 14-Oct Oct-13 A5420 Deck / Detail Roof 5 24-Oct Oct-13 A5430 Prep / Pour SOD 5 31-Oct Nov-13 A5440 Erect Field Trusses Oct Nov-13 A5810 Form 7 Museum 7 14-Aug-13 A5820 Rebar 7 Museum 2 15-Aug Aug-13 A5830 Form 8 Museum 5 15-Aug Aug Jul-13, Form 1 Rotunda 05-Jul Jul-13, Rebar 1 Rotunda 05-Jul Jul-13, Form 2 Museum 12-Jul Jul-13, Pour 1 Rotunda 15-Jul Jul-13, Rebar 2 Museum 15-Jul Jul-13, Form 3 Museum 17-Jul Jul-13, Pour 2 Museum 22-Jul Jul-13, Rebar 3 Museum 22-Jul Jul-13, Form 4 Museum 24-Jul Jul-13, Pour 3 Museum 25-Jul Jul-13, Rebar 4 Museum 25-Jul Jul-13, Form 5 Mu 29-Jul Jul-13, Pour 4 Mu Critical

4 A5840 Pour 7 Museum 1 19-Aug Aug-13 A5850 Rebar 8 Museum 2 22-Aug Aug-13 A6340 Form 9 Museum 5 22-Aug Aug-13 A5860 Pour 8 Museum 1 26-Aug Aug-13 A6270 Form Chick-Fila 3 29-Aug Sep-13 A6350 Rebar 9 Museum 2 29-Aug Aug-13 A6360 Pour 9 Museum 1 03-Sep Sep-13 A6280 Rebar Chick-Fila 2 04-Sep Sep-13 A6290 Pour Chick-Fila 1 06-Sep Sep-13 Skin Interiors Basement Level 1 Level 2 Level 3 Elevators Punch / Closeout Exhibit Testing GWCC Connnector Parking Deck Foundations Walls Structure A2730 Underground MEP Rough-in 10-May-13, 5 06-May-13 Underground 10-May-13 MEP Rough-in A2740 Form / Pour Ramp (4500sf) 10-May-13, 5 06-May-13 Form / Pour 10-May-13 Ramp (4500sf) A2720 Prep / Pour SOG at Electrical 3 27-May-13 A 30-May-13 A A2010 Form / Pour vertical 1st Floor (27 ea) 5 25-Jun Jul-13 A2020 Prep / Pour SOG (20,800sf) Sep-13* 02-Oct-13 Parking Garage Level P1 A5870 Electrical Room Roof Form 2 10-Jun-13* 11-Jun-13 A5880 Electrical Room Roof Rebar 1 12-Jun Jun-13 A5890 Electrical Room Roof Pour 1 13-Jun Jun-13 A5900 Form 1 Parking 5 14-Jun Jun-13 A5910 Rebar 1 Parking 2 21-Jun Jun May-13 A, Prep / Pour SOG at Electrical 25-Jun Jun Jun-13, Level P1 10-Jun-13* 11-Jun-13, Electrical Room Roof Form 12-Jun Jun-13, Electrical Room Roof Rebar 13-Jun Jun-13, Electrical Room Roof Pour 14-Jun Jun-13, Form 1 Parking 21-Jun Jun-13, Rebar 1 Parking 01-Jul-13, Form / Pour vertical 1st Floor (27 ea) Critical

5 A5920 Pour 1 Parking 1 25-Jun Jun-13 Level P2 Level P3 Level P4 Level P5 MEP System Skin Interiors Elevators Punch / Closeout June July st 25-Jun Jun-13, Pour 1 Parking Critical