1 496 Nevada Mesa View Colorado Springs, CO Phone: Fax: Subcontractor Schedule Update C-18J April 03, 2019 To: Trade Partners Attention: Project Managers GHP Project: Mt San Rafael Hospital-Addition and Renovation Subject: MSRH - Update Attached is the current schedule for the above referenced project. Please review the dates indicated for your trade and notify us in writing no later than April 05, 2019 if you are unable to meet the schedule requirements of the project. If we do not receive a written response from you by this time, you are acknowledging that you are in agreement with the dates and durations indicated in the attached schedule, and the same will become part of your Purchase Order/Subcontract Agreement. Ensure your submittals are approved, necessary materials are obtained and ready for delivery to the project, and the proper crew is available to meet the indicated start and finish dates. Any specific coordination should be conducted with the Project Superintendent. Contact me at or Dan.Lane@ghphipps.com if you have any questions or require additional information. Sincerely, Dan Lane GH Phipps Construction Co.

2 aforce Main Schedule Data Date : 27-Mar-19 Run Date: 02-Apr Nov-18 A 17-Sep-20 2 PROCUREMENT Jan-19 A 20-Mar-20 3 DIVISION 03 - CONCRETE May Jun-19 4 REBAR May Jun-19 5 P Fabrication - rebar May-19* 03-Jun-19 6 DIVISION 05 - METALS Feb-19 A 10-Jun-19 7 STRUCTURAL STEEL Feb-19 A 10-Jun-19 8 P b10 Revise & Resubmit -- Structural Steel Feb-19 A 12-Apr-19 9 P c A/E Review --Structural Steel Apr Apr P d Fabrication -- Structural Steel Apr Jun P e Ship -- Structural Steel 5 04-Jun-19* 10-Jun MISC METALS / EMBEDS Mar May P a20 Fabrication -- Anchor Bolts / Embeds Mar-19* 25-Apr P a30 Ship -- Anchor Bolts / Embeds 5 26-Apr May STAIRS Feb-19 A 24-May EAST Mar May A1090 Submittals / Shop Drawings - East Stairs Mar-19* 11-Apr A1080 A/E Review - East Stairs 4 12-Apr Apr A1100 Fabrication - East Stairs Apr May A1110 Ship - East Stairs 5 16-May May WEST Feb-19 A 24-May A1150 Submittals / Shop Drawings - West Stairs Feb-19 A 12-Apr A1120 A/E Review - West Stairs 5 15-Apr Apr A1130 Fabrication - West Stairs Apr May A1140 Ship - West Stairs 5 20-May May DIVISION 07 - THERMAL AND MOISTURE PROTECTION Jan-19 A 20-Mar EPDM Jan-19 A 16-Jul P A/E Review --EPDM 3 07-Jan-19 A 29-Mar P Fabrication -- EPDM Jun-19* 09-Jul P Ship -- EPDM 5 10-Jul Jul METAL PANELS Feb-19 A 20-Mar P c20 GHP Submittal Review 3 15-Feb-19 A 29-Mar P c A/E Review --Metal Panels Apr Apr P d Fabrication -- Metal Panels Apr Jul P e Ship -- Metal Panels Jul Jul P ca Field Measure -- Metal Panels 5 27-Jan Jan A1040 Fabrication -- Metal Panels - Corner / Remainng Pieces Feb Mar A1050 Ship -- Metal Panels - Corner / Remainng Pieces 5 16-Mar Mar DIVISION 08 - OPENINGS Feb-19 A 25-Oct CURTAIN WALL Mar-19 A 21-Oct P GHP Submittal Review R1 -- Curtain Wall 3 06-Mar-19 A 29-Mar P A/E Review --Curtain Wall Apr Apr P Fabrication -- Curtain Wall Aug-19* 14-Oct P Ship -- Curtain Wall 5 15-Oct Oct HOLLOW METAL FRAMES Mar Jul P b10 Revise & Resubmit -- HM Frames 5 27-Mar-19* 02-Apr P c A/E Review --HM Frames Apr Apr P d Fabrication -- HM Frames Jun-19* 16-Jul-19 Fabrication - rebar Revise & Resubmit -- Structural Steel A/E Review --Structural Steel Fabrication -- Structural Steel Ship -- Structural Steel Fabrication -- Anchor Bolts / Embeds Ship -- Anchor Bolts / Embeds Submittals / Shop Drawings - East Stairs A/E Review - East Stairs Fabrication - East Stairs Ship - East Stairs Submittals / Shop Drawings - West Stairs A/E Review - West Stairs A/E Review --EPDM GHP Submittal Review Fabrication - West Stairs Ship - West Stairs A/E Review --Metal Panels Fabrication -- EPDM Ship -- EPDM GHP Submittal Review R1 -- Curtain Wall A/E Review --Curtain Wall Revise & Resubmit -- HM Frames A/E Review --HM Frames Fabrication -- Metal Panels Ship -- Metal Panels Fabrication -- HM Frames Fabrication -- Curtain Wall Ship -- Curtain Wall Field Measure -- Metal Panels Fabrication -- Metal Panels - Corner / Remainng Pieces Ship -- Metal Panels - Corner / Remainng Pieces Critical Page 1 of 13

3 49 P e Ship -- HM Frames 5 17-Jul Jul HOLLOW METAL DOORS Mar Oct P b10 Revise & Resubmit -- Doors / Hdw 5 27-Mar-19* 02-Apr P c A/E Review --Doors / Hdw Apr Apr P d Fabrication -- Doors / Hdw Sep-19* 18-Oct P e Ship -- Doors / Hdw 5 21-Oct Oct EXTERIOR HM FRAMES 6 25-Feb-19 A 03-Apr P d10 Fabrication -- Exterior HM Frames 1 25-Feb-19 A 27-Mar P e10 Ship -- Exterior HM Frames 5 28-Mar Apr DIVISION 13 - SPECIAL CONSTRUCTION Apr Oct RF SHIELDING Apr Oct P Submittals / Shops -- RF Shielding 5 16-Apr Apr P GHP Submittal Review -- RF Shielding 5 23-Apr Apr P A/E Review --RF Shielding Apr May P Fabrication -- RF Shielding Aug-19* 30-Sep P Ship -- RF Shielding 5 01-Oct Oct DIVISION 14 - CONVEYING EQUIPMENT Jan-19 A 06-Nov ELEVATOR Jan-19 A 06-Nov P A/E Review --Elevator 3 31-Jan-19 A 29-Mar P Fabrication -- Elevator Jun-19* 23-Oct P Ship -- Elevator Oct Nov DIVISION 23 - HVAC May Aug AHU's May Aug P d Fabrication -- AHUs May-19* 21-Aug P e Ship -- AHUs 5 22-Aug Aug ATU's May Jul P d Fabrication -- ATUs May-19* 10-Jul P e Ship -- ATUs 5 11-Jul Jul DIVISION 26 - ELECTRICAL Apr Oct GENERATOR Apr Oct P Final Approval Apr May P Fabrication -- Generator Jun Oct P Ship -- Generator 5 11-Oct Oct SWITCH GEAR Jun Sep P Fabrication -- Switch Gear Jun Aug P Ship -- Switch Gear 5 29-Aug Sep ELECTRICAL DISTRIBUTION PANELS Apr Jul P Revise & Resubmit Apr Apr P Fabrication -- Panels Jun Jul P Ship -- Panels 5 18-Jul Jul LIGHT FIXTURES Jul Sep P Fabrication -- Light Fixtures Jul-19* 16-Sep P Ship -- Light Fixtures 5 17-Sep Sep MILESTONES May Sep ML.1010 Building Demo Complete 0 06-May ML.1020 Foundation Start 0 11-Jun ML.1070 Slab on Grade Pour 0 08-Oct ML.1090 Steel Start 0 09-Oct ML.1040 Steel Complete 0 19-Nov ML.1050 Slab on Deck Complete 0 25-Nov-19 Ship -- HM Frames Revise & Resubmit -- Doors / Hdw A/E Review --Doors / Hdw Fabrication -- Exterior HM Frames Ship -- Exterior HM Frames Submittals / Shops -- RF Shielding GHP Submittal Review -- RF Shielding A/E Review --Elevator A/E Review --RF Shielding Final Approval Revise & Resubmit Building Demo Complete Foundation Start Fabrication -- ATUs Ship -- ATUs Fabrication -- AHUs Ship -- AHUs Fabrication -- Panels Ship -- Panels Fabrication -- Doors / Hdw Ship -- Doors / Hdw Fabrication -- RF Shielding Ship -- RF Shielding Fabrication -- Elevator Ship -- Elevator Fabrication -- Generator Ship -- Generator Fabrication -- Switch Gear Ship -- Switch Gear Fabrication -- Light Fixtures Ship -- Light Fixtures Slab on Grade Pour Steel Start Steel Complete Slab on Deck Complete Critical Page 2 of 13

4 99 ML.1100 Exterior Framing Start 0 11-Dec ML.1120 Roof Start 0 20-Jan ML.1140 Interior Framing Start 0 05-Feb ML.1110 Roof Complete 0 21-Feb ML.1150 Drywall Start 0 05-Mar ML.1130 Windows Complete 0 20-Mar ML.1160 Prime / 1st Coat Start 0 02-Apr ML.1170 Acoustical Grid Start 0 10-Apr ML.1180 Balance of Ceiling Tile Complete 0 19-Jun ML.1190 Flooring Complete 0 06-Jul ML.1200 Test & Balance / Commissioning Start 0 21-Jul ML.1210 Substantial Completion 0 02-Sep ML.1220 Project Completion 0 02-Sep CONSTRUCTION Nov-18 A 17-Sep C Phase 2A Construction Nov-18 A 24-Feb C OVERALL PHASE 2 Construction Nov-18 A 02-Sep C Phase 2B Construction May Sep C Phase 2A Completion 0 24-Feb C Phase 2B Completion 0 02-Sep-20* 118 C OVERALL PROJECT COMPLETE 0 02-Sep-20* 119 PC.PH OWNER - FF&E Installation / Staff and Stock Sep Sep PC.PH OWNER Beneficial Occupancy / First Patient 0 17-Sep PHASE 2 CONSTRUCTION Jan-19 A 02-Sep PH2.C Demo of Existing East Patient Wing May May IMPACTS Jan-19 A 17-Oct Update Jan-19 A 15-Apr IMPACT Jan-19 A 15-Apr IMP IMPACT RECAP - MRI Equipment Change Jan-19 A 15-Apr IMP PR03 Issued Mar-19 A 15-Apr Update Jan-19 A 03-May IMPACT Jan-19 A 03-May IMP IMPACT RECAP - Abatement of Existing Fire Proofing in Dem Jan-19 A 03-May IMP Abatement East Wing Mar-19 A 26-Apr IMP Demo Report 5 29-Apr May Update Mar-19 A 17-Oct IMPACT Mar-19 A 17-Oct IMP IMPACT RECAP - PR02 Elec Changes Mar-19 A 17-Oct IMP PR01 Approval 8 12-Mar-19 A 05-Apr IMP PR02 Approval 5 08-Apr Apr IMP Prepare Submittals Apr Apr IMP A/E Review & Approve Apr May IMP Overcurrent Study May Jun IMP Fabrication - Switchboard, ATS, Gen Jun Oct IMP Delivery 5 11-Oct Oct AREA D - PHASE 1 NEW IT ROOM Nov Feb IR.2A Temp Partitions 3 13-Nov Nov IR.2A Demo 3 18-Nov Nov IR.2A Conduits from MDF to New IDF Nov Dec IR.2A Framing 2 21-Nov Nov IR.2A Set HM Frame 1 21-Nov Nov-19 Exterior Framing Start Demo of Existing East Patient Wing IMPACT RECAP - MRI Equipment Change PR03 Issued IMPACT RECAP - Abatement of Existing Fire Proofing in Demo Wing Abatement East Wing Demo Report PR01 Approval PR02 Approval Prepare Submittals A/E Review & Approve Overcurrent Study Roof Start IMPACT RECAP - PR02 Elec Changes Fabrication - Switchboard, ATS, Gen Delivery Temp Partitions Demo Interior Framing Start Conduits from MDF to New IDF Framing Set HM Frame Roof Complete Drywall Start Windows Complete Prime / 1st Coat Start Phase 2A Construction Phase 2A Completion Acoustical Grid Start Balance of Ceiling Tile Complete Flooring Complete Test & Balance / Commissioning Start Substantial Completion Project Completion OVERALL PHASE 2 Construction Phase 2B Construction Phase 2B Completion OVERALL PROJECT COMPLETE OWNER - FF&E Installation / Staff a OWNER Beneficial Occupancy / Firs Critical Page 3 of 13

5 149 IR.2A Hang Sheet Rock Outside Walls 1 25-Nov Nov IR.2A Sawcut / Core Drill 3 25-Nov Nov IR.2A Tape & / Prime & 1st Coat - Outside Walls 2 26-Nov Nov IR.2A Hang Door / Hdw 1 27-Nov Nov IR.2A Electrical / Tele Data In Wall Rough 5 02-Dec Dec IR.2A Mech Rough / Split System 5 02-Dec Dec IR.2A Remove Temp Partitions 2 02-Dec Dec IR.2A In Wall Rough Inspection 1 09-Dec Dec IR.2A Hang Sheet Rock Inside Walls 1 10-Dec Dec IR.2A Tape & / Prime & 1st Coat 2 11-Dec Dec IR.2A Flooring 2 13-Dec Dec IR.2A Cable Tray 5 17-Dec Dec IR.2A Pull Cable / Term Dec Jan IR.2A Set Racks 5 24-Jan Jan IR.2A Final Connections Jan Feb IR.2A IT Room Closeout 7 14-Feb Feb AREA D - CORRIDOR & MEP UPGRADES Nov Apr PART Nov Feb IR.2B Temp Partitions 2 13-Nov Nov IR.2B Demo 4 15-Nov Nov IR.2B Upgrade Partitions - Rock/T&F/ Paint 5 21-Nov Nov IR.2B ACT Grid 4 02-Dec Dec IR.2B Light Fix Dec Dec IR.2B GRDs 3 11-Dec Dec IR.2B Above Ceiling Inspections 1 16-Dec Dec IR.2B Balance of Ceiling Tile 2 17-Dec Dec IR.2B Flooring 5 19-Dec Dec IR.2B Final Paint 3 30-Dec Jan IR.2B Remove Partition 1 25-Feb Feb PART Feb Apr IR.2B Temp Partitions 2 26-Feb Feb IR.2B Demo 3 28-Feb Mar IR.2B Upgrade Partitions - Rock/T&F/ Paint 3 04-Mar Mar IR.2B ACT Grid 3 09-Mar Mar IR.2B Light Fix Mar Mar IR.2B GRDs 3 17-Mar Mar IR.2B Above Ceiling Inspections 1 20-Mar Mar IR.2B Balance of Ceiling Tile 1 23-Mar Mar IR.2B Flooring 3 24-Mar Mar IR.2B Final Paint 2 27-Mar Mar IR.2B Remove Partition 1 31-Mar Mar IR.2B Corridor Upgrade Closeout 5 01-Apr Apr LEVEL 1 & 2 - WINDOWS & INFILL May Jun IR.2A Temp Partition 3 06-May May IR.2A Erect Scaffolding 3 09-May May IR.2A Demo Windows 5 14-May May IR.2A Infill 5 21-May May IR.2A es 5 29-May Jun IR.2A Remove Partitions 3 05-Jun Jun IR.2A Window & Infill Closeout 5 10-Jun Jun-19 Hang Sheet Rock Outside Walls Temp Partition Erect Scaffolding Demo Windows Infill es Remove Partitions Window & Infill Closeout Sawcut / Core Drill Tape & / Prime & 1st Coat - Outside Walls Hang Door / Hdw Electrical / Tele Data In Wall Rough Mech Rough / Split System Remove Temp Partitions In Wall Rough Inspection Hang Sheet Rock Inside Walls Tape & / Prime & 1st Coat Flooring Temp Partitions Demo Cable Tray Pull Cable / Term Set Racks Final Connections IT Room Closeout Upgrade Partitions - Rock/T&F/ Paint ACT Grid Light Fix. GRDs Above Ceiling Inspections Balance of Ceiling Tile Flooring Final Paint Remove Partition Temp Partitions Demo Upgrade Partitions - Rock/T&F/ Paint ACT Grid Light Fix. GRDs Above Ceiling Inspections Balance of Ceiling Tile Flooring Final Paint Remove Partition Corridor Upgrade Closeout Critical Page 4 of 13

6 199 TEMP AC Mar May AC Cut Hole in Penthouse Roof 1 02-Mar-20* 02-Mar AC Install Curb & Roof-in 1 02-Mar Mar AC Install Temp Duct 2 03-Mar Mar AC Install Elec to Temp unit 4 03-Mar Mar AC Crane pick Temp Unit 1 09-Mar Mar AC Pre Startup Temp Unit 2 10-Mar Mar AC Shut Down for Tie--n (2-3 hrs) 1 12-Mar Mar AC Demo Existing Duct 1 12-Mar Mar AC Install Temp Duct 1 12-Mar Mar AC Turn on Temp Unit 1 12-Mar Mar AC Shut Down Existing AC Mar Mar AC Demo Existing AC Apr-20* 06-Apr AC Demo Existing Louver 1 07-Apr Apr AC Crane Pick Existing AC Apr Apr AC Install New Pad 3 09-Apr Apr AC Crane Pick New AC Apr Apr AC Reinstall Existing Louver 1 15-Apr Apr AC Install Elec to AC Apr Apr AC Install New Sections 4 16-Apr Apr AC Install Duct up to Temp Duct 2 22-Apr Apr AC Pre Startup on New AC Apr Apr AC Shut Down /Temp Unit 1 29-Apr Apr AC Install Duct up to Existing Duct 1 29-Apr Apr AC Startup New AC Apr Apr AC Demo Temp Duct up thru Roof 1 30-Apr Apr AC Cap Curb on Penthouse 1 01-May May AC Crane Pick Temp Unit off Penthouse 1 01-May May PHASE 2B May Sep SITEWORK May Jul SW Site Clearing / Mass Excavation May Jun SW Hardscapes May Jun SW Landscapes May Jul A1030 Patch Hardscapes (exterior skin) 7 23-Jun Jul FOUNDATION May Oct BASEMENT May Jul FO Basement Excavation May Jun FO Earth Retention / Micro Piles at Existing Building May Jun FO ' Overex 3 06-Jun Jun FO Lower Elev Ftg / Walls 7 11-Jun Jun FO Spread Footing & Walls under Existing x10 Beam 7 11-Jun Jun FO Damproofing at Elev Pit 1 20-Jun Jun FO Backfill at Elev Pit 1 21-Jun Jun FO " Mat Foundation 7 24-Jun Jul FO Basement Walls Jul Jul FO Waterproofing 3 19-Jul Jul FO Perimeter Drain 3 24-Jul Jul FO Backfill 3 25-Jul Jul st FLOOR Jun Oct FO East Stair Foundation Jun Jun-19 Site Clearing / Mass Excavation Basement Excavation Earth Retention / Micro Piles at Existing Building 3' Overex Lower Elev Ftg / Walls Spread Footing & Walls under Existing x10 Beam Damproofing at Elev Pit Backfill at Elev Pit 18" Mat Foundation Basement Walls Waterproofing Perimeter Drain Backfill East Stair Foundation Cut Hole in Penthouse Roof Install Curb & Roof-in Install Temp Duct Install Elec to Temp unit Crane pick Temp Unit Pre Startup Temp Unit Shut Down for Tie--n (2-3 hrs) Demo Existing Duct Install Temp Duct Turn on Temp Unit Shut Down Existing AC-1 Demo Existing AC-1 Demo Existing Louver Crane Pick Existing AC-1 Install New Pad Crane Pick New AC-1 Reinstall Existing Louver Install Elec to AC-1 Install New Sections Install Duct up to Temp Duct Pre Startup on New AC-1 Shut Down /Temp Unit Install Duct up to Existing Duct Startup New AC-1 Demo Temp Duct up thru Roof Cap Curb on Penthouse Crane Pick Temp Unit off Penthouse Hardscapes Landscapes Patch Hardscapes (exterior skin) Critical Page 5 of 13

7 249 FO CUP Foundation Jun Jul FO Over Ex / Struc Fill 5 29-Jul Aug FO Form / Pour Spread / Pad Footings & walls Aug Aug FO UG Plumbing Aug Aug FO UG Electrical Aug Aug FO Backfill Footings / Walls 2 26-Aug Aug FO Form / Pour Beams Sep Sep FO Vapor Barrier 5 17-Sep Sep FO Backfill & Fine Grade 6 18-Sep Sep FO Form / Rebar / Pour Stuctural Slab Sep Oct STRUCTURE Jun Mar ST CMU Core Walls - East Stair 1st Lift 5 25-Jun Jul ST CMU Core Walls - East Stair - Ring Beam 5 02-Jul Jul ST CMU Walls CUP Jul Aug ST CMU Core Walls / Partial Ring Beam- East Stair 2nd Lift 7 11-Jul Jul ST CMU Core Walls - Elev & West Stair - Up to 2nd Flr Aug Aug FO CMU Walls at Elev Pit 3 15-Aug Aug ST CMU Core Walls - Elev & West Stair - Bond Beam 2nd Flr Aug Aug ST CMU Core Walls - Elev & West Stair - 2nd Floor 5 29-Aug Sep ST CMU Core Walls - Elev & West Stair - Bond Beam at Roof 5 06-Sep Sep ST East Stair Erection / Steel Sep-19* 24-Sep ST CMU Core Walls - Elev & West Stair - Top Out 3 13-Sep Sep ST Erect West Stairs / Landings 5 25-Sep Oct ST Install Divider Beams / Deck at Elev Core 5 02-Oct Oct ST Erect Structural Steel Oct Oct ST Metal Deck & Detail Oct Nov ST MEP Sleeves (Box outs / Depressions) 5 12-Nov Nov ST Erect Canopy 5 13-Nov Nov ST Form / Pour SOD 5 18-Nov Nov ST MEP Equipment Pads 5 25-Nov Dec ST Clips / Hangers / Struc Steel 5 25-Nov Dec ST Spray Fireproofing Perimeter Steel Dec Dec ST Spray Fireproofing Level Dec Jan ST Spray Fireproofing Level Feb Feb ST Erect Roof Screen Wall 4 25-Feb Mar ENCLOSURE Dec May ROOF Jan Feb EN.R Spray Foam Insulation 5 06-Jan Jan EN.R Roof Blocking Jan Jan EN.R Dens Deck at Parapet 5 13-Jan Jan EN.R Roof System Jan Feb EN.R Demo Existing Roof x9-x Jan Jan EN.R Parapets at x9-x Jan Jan EN.R Roofing at x9-x Feb Feb EXTERIOR SKIN Dec May EN Exterior Framing Dec Jan EN Sheathing Dec Jan EN Fluid Applied / Vapor Barrier Jan Feb EN Z Furring / Rigid Insulation Feb Feb EN Storefront Feb Mar-20 CUP Foundation Over Ex / Struc Fill Form / Pour Spread / Pad Footings & walls UG Plumbing UG Electrical Backfill Footings / Walls Form / Pour Beams Vapor Barrier CMU Core Walls - East Stair 1st Lift Backfill & Fine Grade CMU Core Walls - East Stair - Ring Beam CMU Walls CUP Form / Rebar / Pour Stuctural Slab CMU Core Walls / Partial Ring Beam- East Stair 2nd Lift CMU Core Walls - Elev & West Stair - Up to 2nd Flr. CMU Walls at Elev Pit CMU Core Walls - Elev & West Stair - Bond Beam 2nd Flr. CMU Core Walls - Elev & West Stair - 2nd Floor CMU Core Walls - Elev & West Stair - Bond Beam at Roof East Stair Erection / Steel CMU Core Walls - Elev & West Stair - Top Out Erect West Stairs / Landings Install Divider Beams / Deck at Elev Core Erect Structural Steel Metal Deck & Detail MEP Sleeves (Box outs / Depressions) Erect Canopy Form / Pour SOD MEP Equipment Pads Clips / Hangers / Struc Steel Spray Fireproofing Perimeter Steel Spray Fireproofing Level 1 Spray Foam Insulation Roof Blocking Dens Deck at Parapet Spray Fireproofing Level 2 Erect Roof Screen Wall Roof System Demo Existing Roof x9-x10 Parapets at x9-x10 Roofing at x9-x10 Exterior Framing Sheathing Fluid Applied / Vapor Barrier Z Furring / Rigid Insulation Storefront Critical Page 6 of 13

8 299 EN Curtain Wall Feb Feb EN Stone Veneer Feb Apr EN Metal Panels Mar Apr EN Stucco Mar May EN Sunshades Apr May EN Metal Panels - Corners / Remaining Apr Apr LEVEL 1 AREA A & B - ED Nov Aug ROUGH INS Nov Apr RO.ED Layout / Hangers / Top Track 8 25-Nov Dec RO.ED Med Eqpt Supports 5 25-Nov Dec RO.ED Hang ATU's / FCUs / FTRs Jan Jan RO.ED OH Waste / Vent Rough 8 13-Jan Jan RO.ED Hang Ductwork / Branch Jan Feb RO.ED Set HM Frames 5 29-Jan Feb RO.ED OH Electrical Rough Jan Feb RO.ED Frame Walls Feb Feb RO.ED OH HVAC Piping Rough Feb Feb RO.ED OH DCW / DHW Rough Feb Feb RO.ED OH Fire Prot Main Rough 8 05-Feb Feb RO.ED OH Med Gas Rough Feb Feb RO.ED OH Fire Prot Branch Piping Rough 5 17-Feb Feb RO.ED Electrical Rough Inspection 1 19-Feb Feb RO.ED Test / Inspect HVAC Piping 2 19-Feb Feb RO.ED Final Conn - ATU's (HVAC, ELEC, TC) 5 19-Feb Feb RO.ED Plumbing Rough Walls Feb Mar RO.ED Wall Backing 5 19-Feb Feb RO.ED Sound Insulation Walls 5 19-Feb Feb RO.ED Electrical In Wall Rough Feb Mar RO.ED In Wall Med Gas Rough 8 19-Feb Feb RO.ED Insul HVAC Piping 5 21-Feb Feb RO.ED Frame D.W. Ceiling & Soffits 5 24-Feb Feb RO.ED Rough Elec to D.W. Clgs 5 02-Mar Mar RO.ED Rough GRD's to D.W. Clgs 5 02-Mar Mar RO.ED Adjust Fire Protect Heads to D.W. Clgs 5 02-Mar Mar RO.ED Med Gas Certification 2 02-Mar Mar RO.ED Rough Wall Inspections 1 04-Mar Mar RO.ED Hang Sheet Rock Mar Mar RO.ED Above Clg Rough Inspections 1 09-Mar Mar RO.ED Hang Sheet Rock Clgs / Soffits 5 26-Mar Apr FINISHES Mar Jul IN.ED Tape & Mar Apr IN.ED Prime & 1st Coat Apr Apr RO.ED OH Tele / Data / Security / Fire Alarm Rough 8 02-Apr Apr IN.ED ACT Celing Grid Apr Apr IN.ED Tile and Grout Floor & Walls Apr May IN.ED Wood Panel Ceiling Apr Apr IN.ED ICU / CCU Doors 5 16-Apr Apr IN.ED Install Curtain Track 5 24-Apr Apr IN.ED Lights at Grid 8 01-May May IN.ED GRD's at Grid 8 01-May May-20 Curtain Wall Layout / Hangers / Top Track Med Eqpt Supports Hang ATU's / FCUs / FTRs OH Waste / Vent Rough Hang Ductwork / Branch Set HM Frames OH Electrical Rough Frame Walls Stone Veneer Metal Panels OH HVAC Piping Rough OH DCW / DHW Rough OH Fire Prot Main Rough OH Med Gas Rough Stucco Sunshades OH Fire Prot Branch Piping Rough Electrical Rough Inspection Test / Inspect HVAC Piping Metal Panels - Corners / Remaining Final Conn - ATU's (HVAC, ELEC, TC) Plumbing Rough Walls Wall Backing Sound Insulation Walls Electrical In Wall Rough In Wall Med Gas Rough Insul HVAC Piping Frame D.W. Ceiling & Soffits Rough Elec to D.W. Clgs Rough GRD's to D.W. Clgs Adjust Fire Protect Heads to D.W. Clgs Med Gas Certification Rough Wall Inspections Hang Sheet Rock Above Clg Rough Inspections Hang Sheet Rock Clgs / Soffits Tape & Prime & 1st Coat OH Tele / Data / Security / Fire Alarm Rough ACT Celing Grid Tile and Grout Floor & Walls Wood Panel Ceiling ICU / CCU Doors Install Curtain Track Lights at Grid GRD's at Grid Critical Page 7 of 13

9 349 IN.ED Adj. Fire Sprinkler Heads at Grid 5 01-May May IN.ED Above Ceiling Inspection 1 13-May May IN.ED Elec / Tele Data Trim 5 13-May May IN.ED Intital Install Ceiling Tile May May IN.ED Casework / Millwork May Jun IN.ED Lockers 5 22-May May IN.ED LVT 2 29-May Jun IN.ED Sheet Vinyl - Rooms Jun Jun IN.ED Carpet 3 02-Jun Jun IN.ED Hang Doors / Hdw Jun Jun IN.ED Plumbing Fixtures & Final Trim Jun Jun IN.ED Interior Glazing 5 17-Jun Jun IN.ED Sheet Vinyl - Corridors 5 22-Jun Jun IN.ED Toilet Acc Jun Jun IN.ED Final Paint 5 29-Jun Jul IN.ED Wall & Corner Guards 5 29-Jun Jul IN.ED Interior Signage 5 07-Jul Jul IN.ED Window Curtains / Blinds 5 07-Jul Jul IN.ED Install Curtain 2 07-Jul Jul IN.ED GHP Pre Punch / Clean up 5 14-Jul Jul IN.ED Balance of Ceiling Tile 5 14-Jul Jul EMERGENCY CLOSEOUT Jul Aug PC.ED TAB 5 21-Jul Jul PC.ED A/E Punch 2 21-Jul Jul PC.ED Fix Punchlist Jul Aug PC.ED Final Inpsections 5 28-Jul Aug PC.ED Weather Days Aug Aug PC.ED ED Completion 0 27-Aug LEVEL 1 AREA C - IMAGING DEPT Dec Sep MAJOR MECHANICAL Mar Mar MM.IM Set & Hook up Exhaust Fans Mar Mar ROUGH INS Dec Apr RO.IM Layout / Hangers / Top Track 8 09-Dec Dec RO.IM Med Eqpt Supports 5 09-Dec Dec RO.IM OH Waste / Vent Rough 5 23-Jan Jan RO.IM Hang ATU's / FCUs / FTRs 5 27-Jan Jan RO.IM Hang Ductwork / Branch 8 03-Feb Feb RO.IM Set HM Frames 5 06-Feb Feb RO.IM OH Electrical Rough Feb Feb RO.IM OH HVAC Piping Rough 8 13-Feb Feb RO.IM OH DCW / DHW Rough 8 13-Feb Feb RO.IM OH Fire Prot Main Rough 8 13-Feb Feb RO.IM Frame Walls Feb Mar RO.IM OH Med Gas Rough 8 19-Feb Feb RO.IM Electrical Rough Inspection 1 24-Feb Feb RO.IM Test / Inspect HVAC Piping 2 25-Feb Feb RO.IM Final Conn - ATU's (HVAC, ELEC, TC) 5 25-Feb Mar RO.IM OH Fire Prot Branch Piping Rough 5 25-Feb Mar RO.IM Insul HVAC Piping 5 27-Feb Mar RO.IM In Wall Med Gas Rough 8 02-Mar Mar-20 Adj. Fire Sprinkler Heads at Grid Layout / Hangers / Top Track Med Eqpt Supports OH Waste / Vent Rough Above Ceiling Inspection Elec / Tele Data Trim Intital Install Ceiling Tile Casework / Millwork Lockers LVT Sheet Vinyl - Rooms Carpet Set & Hook up Exhaust Fans Hang ATU's / FCUs / FTRs Hang Ductwork / Branch Set HM Frames OH Electrical Rough OH HVAC Piping Rough OH DCW / DHW Rough OH Fire Prot Main Rough Frame Walls OH Med Gas Rough Electrical Rough Inspection Test / Inspect HVAC Piping Final Conn - ATU's (HVAC, ELEC, TC) OH Fire Prot Branch Piping Rough Insul HVAC Piping In Wall Med Gas Rough Hang Doors / Hdw Plumbing Fixtures & Final Trim Interior Glazing Sheet Vinyl - Corridors Toilet Acc. Final Paint Wall & Corner Guards Interior Signage Window Curtains / Blinds Install Curtain GHP Pre Punch / Clean up Balance of Ceiling Tile TAB A/E Punch Fix Punchlist Final Inpsections Weather Days ED Completion Critical Page 8 of 13

10 399 RO.IM Frame D.W. Ceiling & Soffits 5 04-Mar Mar RO.IM Plumbing Rough Walls 8 04-Mar Mar RO.IM Wall Backing 5 04-Mar Mar RO.IM Sound Insulation Walls 5 04-Mar Mar RO.IM Electrical In Wall Rough 8 04-Mar Mar RO.IM Rough Elec to D.W. Clgs 5 11-Mar Mar RO.IM Rough GRD's to D.W. Clgs 5 11-Mar Mar RO.IM Adjust Fire Protect Heads to D.W. Clgs 5 11-Mar Mar RO.IM Med Gas Certification 2 12-Mar Mar RO.IM Rough Wall Inspections 1 16-Mar Mar RO.IM Above Clg Rough Inspections 1 18-Mar Mar RO.IM Hang Sheet Rock Mar Apr RO.IM Hang Sheet Rock Clgs / Soffits 5 09-Apr Apr FINISHES Apr Jul IN.IM Tape & Apr Apr IN.IM Prime & 1st Coat Apr Apr IN.IM OH Tele / Data / Security / Fire Alarm Rough 8 16-Apr Apr IN.IM ACT Celing Grid Apr May IN.IM Install Curtain Track 5 01-May May IN.IM Tile and Grout Floor & Walls 8 07-May May IN.IM Lights at Grid 8 08-May May IN.IM GRD's at Grid 8 08-May May IN.IM Adj. Fire Sprinkler Heads at Grid 5 08-May May IN.IM Above Ceiling Inspection 1 20-May May IN.IM Elec / Tele Data Trim 5 20-May May IN.IM Intital Install Ceiling Tile May Jun IN.IM Casework / Millwork Jun Jun IN.IM Carpet 5 05-Jun Jun IN.IM Sheet Vinyl - Rooms Jun Jun IN.IM Hang Doors / Hdw 8 15-Jun Jun IN.IM Plumbing Fixtures & Final Trim 8 15-Jun Jun IN.IM Interior Glazing 5 22-Jun Jun IN.IM Sheet Vinyl - Corridors 5 24-Jun Jun IN.IM Toilet Acc Jun Jul IN.IM Final Paint 5 01-Jul Jul IN.IM Wall & Corner Guards 5 01-Jul Jul IN.IM Balance of Ceiling Tile 5 08-Jul Jul IN.IM Interior Signage 5 08-Jul Jul IN.IM Window Curtains / Blinds 5 08-Jul Jul IN.IM Install Curtain 2 09-Jul Jul IN.IM GHP Pre Punch / Clean up 5 15-Jul Jul RADIOLOGY / NUC MED Mar May IM.XR Interior Framing 2 04-Mar Mar IM.XR OH MEP Rough 4 04-Mar Mar IM.XR In Wall Rough Ins 4 06-Mar Mar IM.XR Soffit / Ceiling Framing 2 10-Mar Mar IM.XR Hang Lead Lined Sheet Rock 8 12-Mar Mar IM.XR Lead Lined Test / Inspect 2 24-Mar Mar IM.XR Tape & 8 26-Mar Apr IM.XR Prime & 1st Coat 5 07-Apr Apr-20 Frame D.W. Ceiling & Soffits Plumbing Rough Walls Wall Backing Sound Insulation Walls Electrical In Wall Rough Rough Elec to D.W. Clgs Rough GRD's to D.W. Clgs Adjust Fire Protect Heads to D.W. Clgs Med Gas Certification Rough Wall Inspections Above Clg Rough Inspections Interior Framing OH MEP Rough Hang Sheet Rock In Wall Rough Ins Hang Sheet Rock Clgs / Soffits Tape & Soffit / Ceiling Framing Prime & 1st Coat OH Tele / Data / Security / Fire Alarm Rough ACT Celing Grid Install Curtain Track Tile and Grout Floor & Walls Lights at Grid GRD's at Grid Adj. Fire Sprinkler Heads at Grid Above Ceiling Inspection Elec / Tele Data Trim Intital Install Ceiling Tile Casework / Millwork Carpet Hang Lead Lined Sheet Rock Lead Lined Test / Inspect Tape & Prime & 1st Coat Sheet Vinyl - Rooms Hang Doors / Hdw Plumbing Fixtures & Final Trim Interior Glazing Sheet Vinyl - Corridors Toilet Acc. Final Paint Wall & Corner Guards Balance of Ceiling Tile Interior Signage Window Curtains / Blinds Install Curtain GHP Pre Punch / Clean up Critical Page 9 of 13

11 449 IM.XR Flooring 4 14-Apr Apr IM.XR Casework / Millwork 4 14-Apr Apr IM.XR Install XRAY 1 20-Apr Apr IM.XR Install Control Equipment 8 21-Apr Apr IM.XR Final Connections 5 01-May May MRI Mar May IM.MRI RF Shielding Mar Mar IM.MRI RF Shield Testing 2 18-Mar Mar IM.MRI Interior Framing 5 20-Mar Mar IM.MRI OH MEP Rough / Cooling Piping 3 20-Mar Mar IM.MRI In Wall Rough Ins 3 27-Mar Mar IM.MRI Soffit / Ceiling Framing 2 27-Mar Mar IM.MRI Luminous Ceiling 2 27-Mar Mar IM.MRI Hang Sheet Rock 4 01-Apr Apr IM.MRI Prime & 1st Coat 2 07-Apr Apr IM.MRI Casework / Millwork 4 09-Apr Apr IM.MRI Access Floor 5 09-Apr Apr IM.MRI Flooring 4 16-Apr Apr IM.MRI Remove Knock Out Panels 5 22-Apr Apr IM.MRI Install MRI 1 29-Apr Apr IM.MRI Install MRI Equipment Apr May IM.MRI Install Control Equipment Apr May IM.MRI Reinstall Knock Out Panels 5 30-Apr May IM.MRI Final Connections 5 14-May May IMAGING CLOSEOUT Jul Sep PC.IM TAB Jul Jul PC.IM A/E Punch 5 22-Jul Jul PC.IM Final Inpsections Jul Aug PC.IM Fix Punchlist Jul Aug PC.IM Weather Days Aug Sep PC.IM Imaging Completion 0 02-Sep LEVEL 2 AREA A & B - PCU Dec Sep MAJOR MECH Dec Jul MM.PCU Roof Curbs 5 04-Dec Dec MM.PCU Set RTUs 5 24-Feb Feb MM.PCU Final Connections Mar Mar MM.PCU Confirm Power to Units & Eqpt Mar Apr MM.PCU Control Tie Ins Mar Apr MM.PCU Factory Startup & Testing 5 27-Apr May MM.PCU Point to Point Connections 5 07-Jul Jul ROUGHINS Dec May RO.PCU Layout / Hangers / Top Track 8 19-Dec Jan RO.PCU Med Eqpt Supports 5 19-Dec Dec RO.PCU Hang ATU's / FCUs / FTRs Mar Mar RO.PCU OH Waste / Vent Rough 8 02-Mar Mar RO.PCU Hang Ductwork / Branch Mar Mar RO.PCU Set HM Frames 5 16-Mar Mar RO.PCU OH Electrical Rough Mar Mar RO.PCU OH Med Gas Rough Mar Apr RO.PCU Frame Walls Mar Apr-20 Flooring Roof Curbs Set RTUs RF Shielding Layout / Hangers / Top Track Med Eqpt Supports Casework / Millwork Install XRAY RF Shield Testing Interior Framing Install Control Equipment Final Connections OH MEP Rough / Cooling Piping In Wall Rough Ins Soffit / Ceiling Framing Luminous Ceiling Hang Sheet Rock Prime & 1st Coat Casework / Millwork Access Floor Flooring Remove Knock Out Panels Install MRI Final Connections Install MRI Equipment Install Control Equipment Reinstall Knock Out Panels Final Connections Confirm Power to Units & Eqpt. Control Tie Ins Hang ATU's / FCUs / FTRs OH Waste / Vent Rough Hang Ductwork / Branch Set HM Frames Factory Startup & Testing OH Electrical Rough OH Med Gas Rough Frame Walls TAB A/E Punch Final Inpsections Fix Punchlist Weather Days Imaging Completion Point to Point Connections Critical Page 10 of 13

12 499 RO.PCU OH HVAC Piping Rough Mar Apr RO.PCU OH DCW / DHW Rough Mar Apr RO.PCU OH Fire Prot Main Rough 8 23-Mar Apr RO.PCU Electrical Rough Inspection 1 01-Apr Apr RO.PCU Plumbing Rough Walls Apr Apr RO.PCU Electrical In Wall Rough Apr Apr RO.PCU OH Fire Prot Branch Piping Rough 5 02-Apr Apr RO.PCU In Wall Med Gas Rough 8 02-Apr Apr RO.PCU Test / Inspect HVAC Piping 2 06-Apr Apr RO.PCU Final Conn - ATU's (HVAC, ELEC, TC) 5 06-Apr Apr RO.PCU Wall Backing 5 06-Apr Apr RO.PCU Sound Insulation Walls 5 06-Apr Apr RO.PCU Insul HVAC Piping 5 08-Apr Apr RO.PCU Frame D.W. Ceiling & Soffits 5 09-Apr Apr RO.PCU Med Gas Certification 2 14-Apr Apr RO.PCU Rough Wall Inspections 1 15-Apr Apr RO.PCU Hang Sheet Rock Apr May RO.PCU Rough Elec to D.W. Clgs 5 16-Apr Apr RO.PCU Rough GRD's to D.W. Clgs 5 16-Apr Apr RO.PCU Adjust Fire Protect Heads to D.W. Clgs 5 16-Apr Apr RO.PCU Above Clg Rough Inspections 1 23-Apr Apr RO.PCU Hang Sheet Rock Clgs / Soffits 5 27-Apr May RO.PCU OH Tele / Data / Security / Fire Alarm Rough 8 05-May May FINISHES Apr Jul IN.PCU Tape & Apr May IN.PCU Prime & 1st Coat May May IN.PCU ACT Celing Grid May May IN.PCU Tile and Grout Floor & Walls (Shower bases) May Jun IN.PCU Wood Panel Ceiling May Jun IN.PCU ICU / CCU Doors 5 19-May May IN.PCU Install Curtain Track 5 21-May May IN.PCU Lights at Grid 8 27-May Jun IN.PCU GRD's at Grid 8 27-May Jun IN.PCU Adj. Fire Sprinkler Heads at Grid 5 29-May Jun IN.PCU Above Ceiling Inspection 1 08-Jun Jun IN.PCU Intital Install Ceiling Tile Jun Jun IN.PCU Elec / Tele Data Trim 5 08-Jun Jun IN.PCU Casework / Millwork Jun Jun IN.PCU Lockers 5 15-Jun Jun IN.PCU LVT 2 19-Jun Jun IN.PCU Sheet Vinyl - Rooms Jun Jul IN.PCU Carpet 3 23-Jun Jun IN.PCU Hang Doors / Hdw Jun Jul IN.PCU Plumbing Fixtures & Final Trim Jun Jul IN.PCU Interior Glazing 5 09-Jul Jul IN.PCU Sheet Vinyl - Corridors 5 10-Jul Jul IN.PCU Toilet Acc Jul Jul IN.PCU Final Paint 5 16-Jul Jul IN.PCU Window Curtains / Blinds 5 16-Jul Jul IN.PCU Wall & Corner Guards 5 17-Jul Jul-20 OH HVAC Piping Rough OH DCW / DHW Rough OH Fire Prot Main Rough Electrical Rough Inspection Plumbing Rough Walls Electrical In Wall Rough OH Fire Prot Branch Piping Rough In Wall Med Gas Rough Test / Inspect HVAC Piping Final Conn - ATU's (HVAC, ELEC, TC) Wall Backing Sound Insulation Walls Insul HVAC Piping Frame D.W. Ceiling & Soffits Med Gas Certification Rough Wall Inspections Hang Sheet Rock Rough Elec to D.W. Clgs Rough GRD's to D.W. Clgs Adjust Fire Protect Heads to D.W. Clgs Above Clg Rough Inspections Hang Sheet Rock Clgs / Soffits OH Tele / Data / Security / Fire Alarm Rough Tape & Prime & 1st Coat ACT Celing Grid Tile and Grout Floor & Walls (Shower bases) Wood Panel Ceiling ICU / CCU Doors Install Curtain Track Lights at Grid GRD's at Grid Adj. Fire Sprinkler Heads at Grid Above Ceiling Inspection Intital Install Ceiling Tile Elec / Tele Data Trim Casework / Millwork Lockers LVT Sheet Vinyl - Rooms Carpet Hang Doors / Hdw Plumbing Fixtures & Final Trim Interior Glazing Sheet Vinyl - Corridors Toilet Acc. Final Paint Window Curtains / Blinds Wall & Corner Guards Critical Page 11 of 13

13 549 IN.PCU Balance of Ceiling Tile 5 22-Jul Jul IN.PCU Interior Signage 5 23-Jul Jul IN.PCU Install Curtain 2 23-Jul Jul IN.PCU GHP Pre Punch / Clean up 5 24-Jul Jul ELEVATOR Feb Apr SP.PCU Install Elevator - Rails, Entrances, Infill Feb Apr SP.PCU Elevator Adjustment & Inspections 5 20-Apr Apr PCU CLOSEOUT Jul Sep PC.PCU TAB 5 29-Jul Aug PC.PCU A/E Punch 2 31-Jul Aug PC.PCU Fix Punchlist 5 04-Aug Aug PC.PCU Final Inpsections 5 05-Aug Aug PC.PCU Weather Days Aug Sep PC.PCU PCU Completion 0 02-Sep CUP Feb Jun ROUGHINS Feb May RO.CUP Layout / Top Track / Hangers 5 17-Feb Feb RO.CUP Form + Pour Equipment Pads 4 24-Feb Feb RO.CUP Waste / Vent rough 5 24-Feb Feb RO.CUP Set Boilers 3 28-Feb Mar RO.CUP Set Panels 5 04-Mar Mar RO.CUP Set Pumps 2 04-Mar Mar RO.CUP HVAC Piping Mar Mar RO.CUP Plumbing Rough Mar Mar RO.CUP Natural Gas Rough Mar Mar RO.CUP Medical Air Piping Rough Mar Mar RO.CUP Set Tanks & Misc Eqpt Mar Mar RO.CUP Elec Rough - Equipment Mar Mar RO.CUP Pull Wire / Term Mar Apr RO.CUP Temp Control Rough Mar Apr RO.CUP Fire Protection Apr Apr RO.CUP Final Connections Apr Apr RO.CUP Factory Startup & Testing 6 29-Apr May RO.CUP Point to Point 5 07-May May FINISHES Mar Apr IN.CUP Light Fixtures / Trim 5 20-Mar Mar IN.CUP Casework / Millwork 5 22-Apr Apr CUP CLOSEOUT Apr Jun PC.CUP A/E Punch 5 29-Apr May PC.CUP Fix Punchlist May May PC.CUP TAB May May PC.CUP Final Inpsections 5 29-May Jun PC.CUP Weather Days Jun Jun PC.CUP CUP Completion 0 26-Jun BASEMENT RENOVATION Aug Dec ELECTRICAL ROOM Aug Dec IR.2B Demo 3 15-Aug Aug IR.2B Masonry Walls 5 20-Aug Aug IR.2B Install Transformer - BY OWNER Aug-19* 23-Sep IR.2B Metal Stud Framing 3 27-Aug Aug-19 Balance of Ceiling Tile Demo Masonry Walls Install Transformer - BY OWNER Metal Stud Framing Layout / Top Track / Hangers Interior Signage Install Curtain Install Elevator - Rails, Entrances, Infill Form + Pour Equipment Pads Waste / Vent rough Set Boilers Set Panels Set Pumps HVAC Piping Elevator Adjustment & Inspections Plumbing Rough Natural Gas Rough Medical Air Piping Rough Set Tanks & Misc Eqpt. Elec Rough - Equipment Pull Wire / Term Temp Control Rough Fire Protection Final Connections Light Fixtures / Trim Factory Startup & Testing Point to Point Casework / Millwork A/E Punch Fix Punchlist TAB Final Inpsections GHP Pre Punch / Clean up TAB Weather Days A/E Punch CUP Completion Fix Punchlist Final Inpsections Weather Days PCU Completion Critical Page 12 of 13

14 599 IR.2B Hang Sheet Rock 3 30-Aug Sep IR.2B Tape & 3 05-Sep Sep IR.2B Prime & 1st Coat 3 10-Sep Sep IR.2B Electrical Switch Gear Oct Nov IR.2B Install Generator Oct Nov IR.2B Switchover Nov Dec IR.2B CX Dec Dec NEW ROOF / KNEE WALL Jan Jan IR.2B Demo 3 08-Jan Jan IR.2B Knee Wall 5 13-Jan Jan IR.2B Sheathing 4 20-Jan Jan IR.2B Roof System 5 24-Jan Jan AREA C - CT SCAN Dec Jan SEQUENCE A 9 09-Dec Dec IR.R Temp Partition 2 09-Dec Dec IR.R Remove Existing Casework & Sink 2 11-Dec Dec IR.R Set HM Frame 1 13-Dec Dec IR.R Hang Door & Hdw 2 16-Dec Dec IR.R Remove Partition 2 18-Dec Dec SEQUENCE B Dec Jan IR.R Temp Partition 2 20-Dec Dec IR.R Set HM Frame 1 26-Dec Dec IR.R Frame Walls 2 27-Dec Dec IR.R Plumbing Rough 3 31-Dec Jan IR.R Rock / Tape & 3 06-Jan Jan IR.R Hang Door & Hdw 2 09-Jan Jan IR.R Paint 1 13-Jan Jan IR.R Radiology Closeout 3 14-Jan Jan-20 Hang Sheet Rock Tape & Prime & 1st Coat Electrical Switch Gear Install Generator Switchover CX Demo Temp Partition Knee Wall Sheathing Roof System Remove Existing Casework & Sink Set HM Frame Hang Door & Hdw Remove Partition Temp Partition Set HM Frame Frame Walls Plumbing Rough Rock / Tape & Hang Door & Hdw Paint Radiology Closeout Critical Page 13 of 13