14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00

Size: px
Start display at page:

Download "14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00"

Transcription

1 Updated January 14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00 For the construction or Improvement of a certain section of STATE HIGHWAY in MERCER COUNTY, WOLF, WORTH, FRENCH CREEK TOWNSHIPS, NEW LEBANON AND STONE BORO BOROUGHS, Commonwealth of Pennsylvania, STATE ROUTE 0173 SECTION 491. This project being situated as follows, SR From approximately 360 feet north of the intersection with Gilmore Rd. (T-481) at Segment 0200 Offset 0360 then north to approximately 31 feet north of the intersection with SR at Segment 0300 Offset SR From approximately 1547 feet north of the intersection with SR (Carlton Rd.) at Segment 0490 Offset 0913 then north to the intersection with SR (County Line Rd.) at Segment 0580 Offset SR From approximately 900 feet south of the intersection with Linden St. at Segment 0030 Offset 0900 then south to approximately 957 feet north of the intersection with SR (District Rd.) at Segment 0030 Offset For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 22" to 34' in width, also for drainage, guiderail, and pavement markings all within a project length of 9.93 miles as indicated on the approved drawings. BERKS COUNTY SR 0000(RSA) # PROPOSAL:$15.60 PLANS:$ X18:$ X36:$54.60 Installation of ADA ramps at 18 intersections and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0000, SECTION RSA, in Berks County, Birdsboro Borough along West First Street, Jefferson Street, Apple Alley, West Second Street, Pear Alley, West Third Street, Peach Alley, West Fourth Street, and West Sixth Street. LAWRENCE COUNTY SR 7205(LOC) #88425 PROPOSAL:$39.72 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$42.90 The description and location of the project is as follows: For the culvert replacement, bituminous approach roadway reconstruction and minor realignment, drainage, guide rail, and other miscellaneous construction, all within a length of linear feet (0.100 miles) as indicated on the approved drawings included in the bid package for TOWNSHIP ROAD T-710 (Clover Lane), in LAWRENCE COUNTY, NESHANNOCK TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 0.3 miles Northwest of the intersection of SR 0018 and Clover Lane at Station to a point approximately 0.5 miles South of the intersection of Clover Lane and Mitchell Road at Station LEHIGH COUNTY SR 0000(JG2) # PROPOSAL:$18.00 PLANS:$ X18:$ X36:$ This project is the continuation of the Jordan Creek Greenway trail and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0000, SECTION JG2, in Lehigh COUNTY South Whitehall TOWNSHIP from approximately the end of trail segment 48 east of the PA Turnpike overpass at station to approximately the SR 0309 overpass at station (total length 2111 ft.,.40 mi.). 1

2 Updated January 8, 2019 YORK COUNTY SR 392(006) #87692 PROPOSAL:$26.40 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$31.20 This project consists of a bridge replacement with a prestressed concrete spread box beam with integral precast concrete deck superstructure supported on integral abutments, approximately 300-ft of relocation of the UNT to Fishing Creek including drainage improvements, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0392, SECTIONS 006 & 007, in YORK COUNTY, NEWBERRY TOWNSHIP, from Segment 0040 Offset 1650 to Segment 0050 Offset SNYDER COUNTY SR 11(133) # PROPOSAL:$10.56 PLANS 8.5x11:$7.80 The description and location of the project is as follows: Microsurfacing, rumble strips, pavement markings, epoxy based surface treatment for bridge decks, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 11, SECTION 133 from approximately 0.32 miles northeast of the intersection with State Route 61 at Segment 0410 Offset 1336 to approximately 0.70 miles southwest of the intersection with State Route 147 at Segment 0010 Offset 0100 in MONROE TOWNSHIP, SNYDER COUNTY and UNION TOWNSHIP, UNION COUNTY, STATE ROUTE 11, SECTION 132 from 1.70 miles northeast of the intersection with State Route 15 at Segment 0490 Offset 0632 to approximately 0.43 miles southwest of the intersection with State Route 147 at Segment 0010 Offset 0100 in MONROE TOWNSHIP, SNYDER COUNTY and NORTHUMBERLAND BOROUGH, NORTHUMBERLAND COUNTY, STATE ROUTE 15, SECTION 189 from 0.20 miles north of the intersection with State Route304 at Segment 0060 Offset 1686 to approximately 2.12 miles southeast of the intersection with State Route 45 at Segment 0110 Offset 0100 in EAST BUFFALO TOWNSHIP and BUFFALO TOWNSHIP, UNION COUNTY, STATE ROUTE 15, SECTION 190 from 0.20 miles north of the intersection with State Route 304 at Segment 0061 Offset 1686 to approximately 0.00 miles south of the intersection with State Route 2004 at Segment 0091 Offset 1173 in EAST BUFFALO TOWNSHIP, UNION COUNTY, and STATE ROUTE 1005, SECTION 028 from 0.06 miles northeast of the intersection with State Route 416 at Segment 0010 Offset 0082 to approximately 1.46 miles southeast of the intersection with State Route 1002 at Segment 0040 Offset 0100 in KELLY TOWNSHIP, UNION COUNTY. SOMERSET COUNTY SR 4004(01B) #74493 PROPOSAL:$10.68 PLANS:$ X18:$ X36:$54.60 The scope of work for this project is for the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert. All structure work to be completed as indicated on the approved drawings included in the bid package for STATE ROUTE 4004, SECTION 01B, in SOMERSET COUNTY, LINCOLN TOWNSHIP at the following location: SR 4004, Section 01B (Lincoln Township, Somerset County) Station to Station Segment 0036, Offset 0000 to Segment 0036, Offset 0015 BLAIR COUNTY SR 2005(02B) # PROPOSAL:$8.88 PLANS:$ X18:$ X36:$58.50 The scope of work for this project is for the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert. All structure work to be completed as indicated on the approved drawings included in the bid package for STATE ROUTE 2005, SECTION 02B, in BLAIR COUNTY, NORTH WOODBURY TOWNSHIP at the following location: SR 2005, Section 02B (North Woodbury Township, Blair County) Station to Station Segment 0020, Offset 1511 to Segment 0030, Offset 0098 FULTON COUNTY SR 2005(01B) # PROPOSAL:$9.00 PLANS:$ X18:$ X36:$50.70 The scope of work for this project is for the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert. All structure work to be completed as indicated on the approved drawings included in the bid package for STATE ROUTE 2005, SECTION 01B, in FULTON COUNTY, BELFAST TOWNSHIP at the following location: SR 2005, Section 01B (Belfast Township, Fulton County) Station to Station Segment 0270, Offset 2084 to Segment 0270, Offset

3 ALLEGHENY COUNTY SR 1024(A02) # PROPOSAL:$39.48 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: For construction and reestablishment of existing slopes, construction of soil nailed slope stabilization, bituminous pavement, drainage, guiderail, pavement marking, and other miscellaneous construction, all within a length of 1,283 linear feet (0.243 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 1024 SECTION A02 (Mountain View Road) and STATE ROUTE 3096 SECTION A02 (Harper Road), in ALLEGHENY COUNTY, WEST DEER and CRESCENT TOWNSHIPS, and STATE ROUTE 1026 SECTION B04 (Reno Street) in BEAVER COUNTY, FRANKLIN TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 3,480 feet east of SR 910 at Segment 0010 Offset 3409 (Station 33+25) to a point approximately 1,650 feet west of Bryson Road at Segment 0010 Offset 3774 (Station 36+90). From a point approximately 230 feet east of Glen Hays Drive at Segment 0010 Offset 2806 (Station 31+84) to a point approximately 100 feet west of Daisy Lane at Segment 0020 Offset 0473 (Station 37+97). From a point approximately 1,080 feet east of Highland Road at Segment 0020 Offset 1084 (Station 32+75) to a point approximately 1,700 feet west of Porter Lane at Segment 0020 Offset 1684 (Station 38+75). ALLEGHENY COUNTY SR 51(04A) # PROPOSAL:$21.96 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Concrete curb ramps For the milling and resurfacing, concrete pavement rehabilitation, drainage, guide rail, curb and sidewalk, signing and pavement marking, signals, and other miscellaneous construction, all within a length of 7,362 linear feet (1.39 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0051, SECTION 04A and STATE ROUTE 0019 (Saw Mill Run Boulevard) in ALLEGHENY COUNTY, CITY OF PITTSBURGH, Commonwealth of Pennsylvania. This project being situated as follows: From a point on SR 0051 approximately 1,500 feet south of the Liberty Tunnel at Segments 0386/0387 Offsets 0327/0322 (Station 40+39) to a point on SR 0019 at the dual bridge structures over SR 0376 at Segments 0230/0231 Offsets 0100/0100 (Stations /656+98). BRADFORD COUNTY SR 14(111) #98964 PROPOSAL:$17.28 PLANS:$ X18:$ X36:$58.50 Resurfacing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 14, SECTION 111, in BRADFORD COUNTY, TROY AND COLUMBIA TOWNSHIPS from the intersection with SR 6 at segment 0372 offset 0000 to approximately 0.7 miles south of the intersection with SR 4014(Springfield Rd.) at segment 0420 offset NORTHUMBERLAND COUNTY SR 54(091) # PROPOSAL:$7.68 PLANS 8.5x11:$2.88 The description and location of the project is as follows: Microsurfacing, rumble strips, pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 54, SECTION 091 from approximately 1.87 miles southeast of the intersection with State Route 1005 at Segment 0120 Offset 0961 to approximately 0.00 miles northwest of the intersection with State Route 44 at Segment 0180 Offset 2403 in DELAWARE TOWNSHIP and LEWIS TOWNSHIP, NORTHUMBERLAND COUNTY, STATE ROUTE 1025, SECTION 014 from 0.00 miles northwest of the intersection with State Route 11 at Segment 0010 Offset 0000 to approximately 0.23 miles southwest of the intersection with State Route 1029 at Segment 0030 Offset 3396 in BERWICK BOROUGH, COLUMBIA COUNTY, and STATE ROUTE 4051, SECTION 002 from 0.00 miles northeast of the intersection with State Route 42 at Segment 0012 Offset 0000 to approximately 0.45 miles southwest of the intersection with Township Road 360 (Creek Road) at Segment 0012 Offset 1501 in HEMLOCK TOWNSHIP, COLUMBIA COUNTY. BEDFORD COUNTY SR 1015(02B) #21466 PROPOSAL:$8.88 PLANS:$ X18:$ X36:$54.60 The scope of work for this project is for the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert. All structure work to be completed as indicated on the approved drawings included in the bid package for STATE ROUTE 1015, SECTION 02B, in BEDFORD COUNTY, SOUTH WOODBURY TOWNSHIP at the following location: SR 1015, Section 02B (Southwoodbury Township, Bedford County) Station to Station Segment 0070, Offset 1358 to Segment 0070, Offset

4 LANCASTER COUNTY SR 7413(BRG) #19828 PROPOSAL:$24.36 PLANS:$ X18:$ X36:$46.80 This project consists of a bridge removal over the Amtrak corridor and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for South Jacob Street, MOUNT JOY BOROUGH, LANCASTER COUNTY, from Station to Station , for an overall project length of linear feet (0.032 mile). CAMBRIA COUNTY SR 2007(01B) # PROPOSAL:$11.52 PLANS:$ X18:$ X36:$54.60 The scope of work for this project is for the furnishing and setting-in-place of a Precast Reinforced Concrete Box Culvert. All structure work to be completed as indicated on the approved drawings included in the bid package for STATE ROUTE 2007, SECTION 01B, in CAMBRIA COUNTY, SUMMERHILL TOWNSHIP at the following location: SR 2007, Section 01B (Summerhill Township, Cambria County) Station to Station Segment 0030, Offset 3653 to Segment 0040, Offset 0164 CRAWFORD COUNTY SR 0000(---) # PROPOSAL:$20.88 PLANS:$ X18:$ X36:$62.40 need to change description Updated January 2, 2019 LYCOMING COUNTY SR 180(118) #97554 PROPOSAL:$24.12 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ The description and location of the project is as follows: Microsurfacing, Superpave Asphalt Mixture Design WMA wearing courses, milling, guide rail, rumble strips, highway lighting, pavement markings, neoprene strip seal dam, concrete bridge deck repair, asphaltic plug expansion dam system, epoxy based surface treatment for bridge decks, pedestrian walkway enclosure, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 180, SECTION 118 from approximately 0.00 miles east of the intersection with State Route 15 at Segment 0310 Offset 0000/Segment 0311 Offset 0000 to approximately 3.32 miles west of the intersection with State Route 2049 at Segment 0400 Offset 0000/Segment 0401 Offset 0000 in CITY OF WILLIAMSPORT, LOYALSOCK TOWNSHIP, MONTOURSVILLE BOROUGH and FAIRFIELD TOWNSHIP, LYCOMING COUNTY and STATE ROUTE 220, SECTION 216 from 0.81 miles east of the intersection with State Route 3034 (Reach Road) at Segment 0290 Offset 2263/Segment 0301 Offset 0982 to approximately 0.00 miles west of the intersection with State Route 15 at Segment 0300 Offset 1803/Segment 0301 Offset 1793 in CITY OF WILLIAMSPORT, LYCOMING COUNTY. LAWRENCE COUNTY SR 4012(L02) # PROPOSAL:$19.08 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: Roadway reconstruction, crack and seat, bituminous overlay, drainage, signing and pavement marking, and other miscellaneous construction, all within a length of linear feet (0.926 miles) as indicated on the approved drawings for STATE ROUTE 4012, SECTION L02 (Mitchell Road), in LAWRENCE COUNTY, NESHANNOCK TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From a point 80 feet east of the SR 376 Ramps at Segment 0020 Offset 0109 (Station 49+00) to a point just west of the SR 4012/SR 0018 intersection at Segment 0030 Offset 2154 (Station ). 4

5 JEFFERSON COUNTY SR 36(502) # PROPOSAL:$10.44 PLANS:$ X18:$ X36:$ For the milling, patching, overlay, drainage and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTES 36, 3007, and 3003 SECTIONS 502 and 501, in Jefferson COUNTY Brookville and Summerville BOROUGHS, Beaver, Clover, Eldred, and Rose TOWNSHIPS (SR 36) from approximately 0.3 miles north of Brookville at segment 0720 offset 3137 to approximately 350 feet north of the SR 36/SR 949 intersection at segment 0890 offset 0350; (SR 3007) from approximately the SR 3007/SR 3005 intersection at segment 0010 offset 0000 to approximately 230 feet north of the SR 3007/Penn Street intersection at segment 0130 offset 0230; (SR 3003) from approximately the SR 3003/SR 3007 intersection at segment 0230 offset 1350 to approximately the SR 3003/SR 3007 intersection at segment 0230 offset JUNIATA COUNTY SR 3002(A01) #4196 PROPOSAL:$18.60 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$46.80 The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in JUNIATA COUNTY, FERMANAGH TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 3002, SECTION A01. The project being situated as follows: On State Route 3002 from Segment 0010/Offset 1896 to Segment 0020/Offset 0683, approximately 2.20 miles West of the Borough of Mifflintown. For the removal of the existing Single Span Reinforced Concrete T-Beam bridge and construction of its replacement Single Span Prestressed Concrete Bulb-Tee Beam Bridge, approach work consisting of superpave asphalt mixture designs for the base, binder and wearing course, guide rail, pavement markings, and miscellaneous construction for a construction length of approximately 683 feet (0.129 miles) as indicated on the approved drawings. JEFFERSON COUNTY SR 4005(501) #99902 PROPOSAL:$8.40 PLANS:$ X18:$ X36:$62.40 For the bituminous patching, binder overlay, guiderail and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4005, SECTION 501, in Jefferson COUNTY Brookville BOROUGH, Pine Creek and Warsaw TOWNSHIPS from approximately the SR 4005/SR 322 intersection at segment 0010 offset 0000 to approximately 1.08 miles north of the SR 4005/T400 Davis Road intersection at segment 0080 offset McKEAN COUNTY SR 321(A02) #85230 PROPOSAL:$12.96 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$19.50 The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in MCKEAN COUNTY, WETMORE TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0321, SECTION A02. The project being situated as follows: On State Route 0321 from Segment 0180/Offset 0437 to Segment 0180/Offset For the removal of the existing Corrugated Metal Pipe Arch and construction of its replacement Precast Reinforced Concrete Box Culvert, approach work consisting of superpave asphalt mixture designs for the base, binder and wearing course, guide rail, pavement markings, and miscellaneous construction for a construction length of approximately 325 feet (0.062 miles) as indicated on the approved drawings. WESTMORELAND COUNTY SR 0000(WCE) # PROPOSAL:$12.00 PLANS:$ X18:$ X36:$78.00 The project will consist of extending the current Tredway Trail north along the Allegheny River to the Freeport Bridge for approximately 1.5 miles. The existing land was historically used as a railroad line, which will now be converted into a multi-use greenway trail providing public recreation for pedestrians and bicyclists. This work will include trail surfacing, minor paving for trail parking, trail landscaping, signage, shared use paint lines, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for Wynn Clara Tredway Extensiton, Section WCE, in Westmoreland County Allegheny Township from approximately the end of the current Tredway Trail section to approximately the Freeport Bridge SR 0356 overpass. 5

6 ARMSTRONG COUNTY SR 0000(---) # PROPOSAL:$14.64 PLANS 8.5X11:$3.72 Safety improvements as indicated on the approved drawings included in the bid package for various state routes and municipalities Districtwide. DAUPHIN COUNTY SR 0000(MGS) # PROPOSAL:$6.72 This project is for the installation and maintenance of major guide signs along various routes in District 8-0 and other miscellaneous construction, all as indicated in the Bid Package for VARIOUS STATE ROUTES, VARIOUS SECTIONS, in Adams, Cumberland, Dauphin, Franklin, Lancaster, Lebanon, Perry, & York Counties. Updated December 26, 2018 CENTRE COUNTY SR 26(RAR) # PROPOSAL:$7.20 PLANS:$ X18:$ X36:$23.40 The description and location of the project is as follows: For the improvement of certain sections of STATE HIGHWAY in CENTRE & CLINTON COUNTIES, VARIOUS BOROUGHS AND TOWNSHIPS, Commonwealth of Pennsylvania, Group 2-19-RAR1. For repair or replacement of damaged guide rail and guide rail components on various state routes in CENTRE & CLINTON COUNTY. LUZERNE COUNTY SR 2045(350) #67449 PROPOSAL:$15.48 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 For the improvement of a certain section of highway in LUZERNE COUNTY, WRIGHT TOWNSHIP, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 2045, SECTION 350. The project being situated as follows: From a point approximately 0.16 mile south of the intersection with SR 2042 (Nuangola Road) at segment 0140 offset 3136 (station ) to a point approximately 0.05 mile south of the intersection with SR 2042 (Nuangola Road) at segment 0150 offset 0292 (station ) along SR The project consists of the replacement of an aluminum arch culvert with a new one. Other work includes minimal approach work and guiderail replacement, all work contained within an overall project length of linear feet (0.069 mile) as indicated on the approved drawings included in the bid package. YORK COUNTY SR 83(074) #89917 PROPOSAL:$44.40 PLANS:$ X18:$ X36:$2, X-SEC:$ X18:$ X36:$1, Ex St:$ x18:$ x36:$50.70 This project consists of improving and reconfiguring the I-83 Exit 4 Interchange into a diverging diamond interchange (DDI). The project replaces the I-83 bridges over SR 851 with two span and wider bridges allowing SR 851 to be widened to four lanes and be realigned into the DDI configuration. The project will also lengthen and reconfigure the ramps, replace the culvert carrying Deer Creek beneath the interchange, and modify or add traffic signals, drainage, signage, sidewalks, storm water management, highway lighting, landscaping, aesthetics, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0083, SECTION 074, in YORK COUNTY, SHREWSBURY BOROUGH and SHREWSBURY & HOPEWELL TOWNSHIPS, from Segment 0030/0031 Offset 0190/0192 to Segment 0040/0041 Offset 0270/0289, for an overall project length of 5, linear feet (0.977 mile). Also included is STATE ROUTE 0851, SECTION 020, from Segment 0230 Offset 1880 to Segment 0250 Offset 1489, a length of 3, linear feet (0.583 mile). 6

7 JUNIATA COUNTY SR 11(RAR) # PROPOSAL:$7.20 PLANS:$ X18:$ X36:$23.40 The description and location of the project is as follows: For the improvement of certain sections of STATE HIGHWAY in JUNIATA & MIFFLIN COUNTIES, VARIOUS BOROUGHS AND TOWNSHIPS, Commonwealth of Pennsylvania, Group 2-19-RAR4. For repair or replacement of damaged guide rail and guide rail components on various state routes in JUNIATA & MIFFLIN COUNTIES. BUCKS COUNTY SR 313(HBM) # PROPOSAL:$35.76 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$19.50 The description and location of the project is as follows: This project is for the replacement of five (5)structures in Newlin Township and Westtown Township, Chester County, and Hilltown Township and New Britain Township, Bucks County. Typical work includes a new pre-cast box culvert, guiderail updates, milling and paving of roadway approaches, traffic detours, traffic signal modifications, and other miscellaneous construction, as indicated on the approved drawings included in the bid package STATE ROUTE 313, SECTION HBM. LANCASTER COUNTY SR 625(006) # PROPOSAL:$16.92 PLANS:$ X18:$ X36:$50.70 Ex St:$ x18:$ x36:$54.60 This project consists of bridge preservation including deck repairs & overlay, minor superstructure & substructure repairs. Traffic control methods will consist of road closure with a detour. The project also includes minor approach work and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0625, SECTION 006, in LANCASTER COUNTY, EAST EARL TOWNSHIP, from Segment 0040 Offset 1853 to Segment 0050 Offset 0200, for an overall project length of linear feet (0.032 mile). LACKAWANNA COUNTY SR 81(249) # PROPOSAL:$48.00 PLANS:$ X18:$ X36:$1, X-SEC:$ X18:$ X36:$70.20 Ex St:$ x18:$ x36:$ For the improvement of a certain section of highway in LACKAWANNA COUNTY in Moosic Borough, SR 0081, Section 249. The project being situated as follows: LACKAWANNA COUNTY SR 0081 NB- from Segment 1784 Offset 1505 to Segment 1850 Offset 0520 along SR 0081 NB. LACKAWANNA COUNTY SR 0081 SB- from Segment 1785 Offset 1446 to Segment 1845 offset 1566 along SR 0081 SB. LACKAWANNA COUNTY SR 8001 (all Ramps) LACKAWANNA COUNTY SR 8003 (all Ramps) LACKAWANNA COUNTY SR 8039 (all Ramps) LACKAWANNA COUNTY SR 8005 (Ramps C, Segment 0250 and Ramp F, Segment 0270) This project consists of milling and resurfacing of an existing bituminous interstate roadways and ramps and concrete bridge repairs. Other work includes guiderail, impact attenuating devices, temporary traffic control (day and night work), full depth shoulders to shift traffic at bridge work, temporary concrete barrier, excavation, delineators, signing, pavement markings, removal of portion of bridge, concrete bridge deck repair and miscellaneous construction all contained within an overall length of 33,021 linear feet (6.29 miles) as indicated on the approved drawings included in the bid package. 7

8 ALLEGHENY COUNTY SR 837(A42) # Moved to 1/31/19 from 12/13/18 PROPOSAL:$33.48 PLANS:$ X18:$ X36:$1, This is a partial Design Build roadway project. Design activities are limited to: Concrete curb ramps, utility coordination. For the milling and resurfacing, concrete pavement patching, drainage, guide rail, detectable warning surface, curb and sidewalk, signing and pavement markings, signals, and other miscellaneous construction, all within a length of 13,460 linear feet (2.549 miles) as indicated on the drawings approved drawings included in the bid package for STATE ROUTE 0837, SECTION A42 (East Carson Street), in ALLEGHENY COUNTY, CITY OF PITTSBURGH, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 235 feet west of the Smithfield Street Bridge at Segment 0570/571 Offset 0052 (Station ) to a point approximately 240 feet east of South 33rd Street at Segment 0500 Offset 1513 (Station ). TIOGA COUNTY SR 3009(017) #99377 PROPOSAL:$11.40 PLANS:$ X18:$ X36:$ Furnish, deliver, install a Pre-stressed Concrete Adjacent Box Beams, Tree Removal, and other miscellaneous construction at a Department prepared site, as indicated on the approved drawings included in the bid package for STATE ROUTE 3009, SECTION 017, in TIOGA COUNTY, CHARLESTON TOWNSHIP from approximately 7.6 miles north of the intersection with SR 3012 (Main Street, Antrim) at segment 0180 offset 3067 to approximately 1.1 miles south of the intersection with SR 6 at segment 0190 offset WASHINGTON COUNTY SR 0000(CSW) # PROPOSAL:$13.44 PLANS:$ X18:$ X36:$46.80 The description and location of the project is as follows, Slip lining of existing sewer line and other miscellaneous construction, as indicated on the approved drawings included in the bid package for Charleroi Stormwater Project. The project begins approximately at Station and ends approximately at Station on McKean Avenue and begins approximately at Station and ends approximately at Station on Lincoln/Fallowfield Avenue in Charleroi Borough, Washington County. The total length is approximately 1.21 miles long. 8