2 K. SMART ASSOCIATES LIMITED CONSULTING ENGINEERS AND PLANNERS 8 McIntyre Drive Tel: (19) Kitchener ON N2R 1H6 Fax: (19) August, 2016 File No STRUCTURE INSPECTION APPRAISAL REPORT TOWNSHIP OF AMARANTH A. INTRODUCTION 1. Purpose The purpose of this study report is to summarize the information obtained during the inspection of 20 structures in the Township of Amaranth and to provide recommendations with related preliminary cost estimates for maintenance, improvements or replacement of deficient structures in accordance with the MTO Inventory Manual for Municipal Roads and Structures. 2. Location The location of all structures undertaken for this study is shown on the key plan. There are 20 structures inspected in total: There are 17 concrete structures There is 1 twin span concrete box culvert There is 1 multi-plate steel arch culvert There is 1 twin pipe steel culvert 3. Background Information Reference has been made to the existing appraisal sheets for the 20 structures inspected in this report. 4. References These appraisals, inspections and recommendations for improvement and preventative maintenance are made with reference to the following Manuals: 1. MTO Inventory Manual for Municipal Structures 2. MTO Structure Rehabilitation Manual 3. MTO Roadside Safety Manual 4. Ontario Structure Inspection Manual (OSIM). Canadian Highway Bridge Design Code (CHBDC)

3 Structure Inspection Page 2 Appraisal Report B. STRUCTURE INSPECTION 1. General A visual inspection of each structure was carried out on June 14, 2016 and July 19, 2016 in conformance with the Ontario Structure Inspection Manual. Each structure was photographed with close-ups of any defects or deteriorations. A Municipal Structure Inspection Form was completed for each structure. All visible deterioration was recorded. A complete set of the structural appraisal sheets is enclosed in Appendix C. 2. Observations and Recommendations We note that very few recommendations for repairs listed in the 2014 Inspection Report have been completed. Most of the recommendations in this report are carried over from the 2014 report. We note that without intervention, the list of recommendations and required work for the Township s s will continue to grow as will the costs to complete the repairs. In addition, there are several s in the Township nearing or at the ends of their useful lives. Should rehabilitations and replacements continue to be delayed, the affected structures may be recommended for closure in future inspections as an acceptable standard in terms of public safety, comfort, and convenience (Ontario Structure Inspection Manual, Section 1.2.1) will not be met. The general conditions of the 20 structures inspected are summarized below (in order of priority): a) Bridge should be closed immediately due to continued movement of the north abutment. This was recommended to be closed in the 2014 Report as well. Reference should be made to the Underwater Inspection Report prepared as part of this study which summarizes the findings of an underwater inspection carried out on July 19, b) Structures 2, 10, 12, 13 and 17 are identified as requiring replacement in 1-. Structure 17 should also have its inspection frequency increased to six (6) month intervals. It is understood that the Township wishes to proceed with the reconstruction of Bridge 17 in the immediate future. c) Structure 6 is recommended to undergo a major rehabilitation in 1- to prevent further damage to the substructure and to extend its useful life. A deck condition survey is recommended to determine the extent of deterioration occurring in the deck. The Township should strongly consider converting this structure to semi-integral abutment type to eliminate the expansion joints and extend the remaining lifespan of this. d) Structure 3 is recommended to undergo a major rehabilitation, such as a superstructure replacement, in 1-. Part of the work should include replacing the railing system as the current railing system does not meet the requirements of CHBDC.

4

5 Structure Inspection Page 4 Appraisal Report APPENDIX A INVENTORY MAP

6 LEGEND - Provincial Highway - County Road - Township Road - Structure Location

7 Structure Inspection Page Appraisal Report APPENDIX B STRUCTURE INVENTORY

8 TOWNSHIP OF AMARANTH 2016 STRUCTURE INVENTORY Approx. Roadway Current Recommended TIME OF IMPROVEMENT Struct MTO Year of Location Span Skew Width Load Limit Load Limit TYPE OF IMPROVEMENT (EST. COST IN THOUSANDS) REMARKS No. No. Const Con Lot (metres) (deg) (metres) (Tonnes) (Tonnes) Type of Bridge/Culvert Now 1 - yrs 6-10 yrs Sawcut approach slabs 0.2 Single span steel beam Replace missing end cap & Adjust railing Excellent Repair slopes and install rock protection ± 6 & Concrete railing beam Consider replacing hazard signs Install narrow structure and one lane signs Replace Bridge 40 Replace ± 7 & Single span reinforced concrete beam & Steel arch culvert & span prestressed concrete & & & & span prestressed beam Single span steel beam ± 6 & Concrete railing beam Chip and patch abutments Replace barrier Chip and patch beams Chip and patch deck and soffit Replace curbs Consider installing hazard signs Replace wood guide rail posts Re-install panels to lap with traffic flow Fill potholes at approaches 1 Replace missing end caps Consider installing steel beam guide rail Chip and patch concrete deck Consider waterproofing and paving Place fill/rock protection at NW quadrant Replace expansion joints Repair sidewalk & curbs Conduct deck condition survey Chip and patch abutments Consider installing steel beam guide rail Chip, patch, waterproof & pave deck Replace expansion joints Chip and patch curbs Replace barrier system Major rehabilitation in 1-9 Good Condition 3 Good Condition Minor rehabilitation in 1- Major rehabilitation in 1-. Replace steel beam guide rail 8 Good Condition Consider installing guide rail end treatments 12 Adjust approach guide rail mounting heights Consider installing guide rail end treatments Good Condition Repair eroded areas at Northeast quadrant 1 Chip and patch concrete at curbs Repair eroded area at end of Southwest Excellent retaining wall Consider replacing hazard signs Install narrow structure and one lane signs Replace ± Concrete railing beam Replace Re-install weight limit signs Install narrow structure and one lane signs 0.1 Replace 6-10 Replace \\server\data\2016\16-108\correspondence\2016 Structure Inventory

9 TOWNSHIP OF AMARANTH 2016 STRUCTURE INVENTORY Approx. Roadway Current Recommended TIME OF IMPROVEMENT Struct MTO Year of Location Span Skew Width Load Limit Load Limit TYPE OF IMPROVEMENT (EST. COST IN THOUSANDS) REMARKS No. No. Const Con Lot (metres) (deg) (metres) (Tonnes) (Tonnes) Type of Bridge/Culvert Now 1 - yrs 6-10 yrs Consider replacing hazard signs Install narrow structure and one lane signs Concrete bowstring arch Replace ± & ± & Concrete bowstring arch Replace Consider replacing hazard signs Install narrow structure and one lane signs Replace & Replace Consider installing steel beam guide rail Tighten loose handrail connections 20 Good ± 6 & Concrete railing beam Replace Close & Twin span box culvert Consider installing guide rail end treatments Plug headwall drain tubes and install perforated subdrain Reset fill in north cell 1 Good ± Concrete railing beam Fill potholes and seal cracks in asphalt 2. Increase inspection frequency to 6 month intervals. Replace Replace & ± 3 & x Steel culverts Install missing guiderail posts Repair erosion at ends of Consider installing hazard signs Consider installing steel beam guide rail Replace damaged bolts Place fill over culvert Excellent Good Good to fair Consider replacement in 6 to 10 Total Estimated Cost ($1,000's) , (Does not include alternative replacement costs) The costs in this chart are for budget and comparison purposes only. The cost do not include contingencies, engineering or contract administration fees (which could be estimated at 30% of the total). Consideration for placement of steel beam guiderails at all structures and approaches currently without guide rail should be given priority based on height/steepness of embankment, road width, road grade, records of previous accidents, traffic counts and hazard potential. Recommendations for Complete Replacement of Structures are not shown in the totals columns unless it is preferred alternative. Please refer to the OSIM Forms and Photos for Complete Condition Information and Recommendations. \\server\data\2016\16-108\correspondence\2016 Structure Inventory