11 SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates shall include but not limited to all necessary equipments, tools, and workmanship needed to setout the new rooms in accordance to the bill of quantities and Engineer instructions Provide all necessary tools, equipments and workmanship and setout the new facilities as per drawings. Lump Sum 1 Excavation for foundation and inside of building are classified in all kinds of soil from the actual surface of soil to the grades shown on drawing and net size required by the concrete dimension and Rates shall include but are not limited to the following Furnishing all material and installing, shoring and * bracing necessary to protect existing building, street,.walk ways, utilities and other Improvement and excavation against loss of ground or.caring embankment. Necessary dewatering. If required Excavation for the whole site and remove the top soil 15cm depth M Excavation for isolated foundations as per structural drawings M.L Backfilling : provide selected material approved by the engineer 50 cm depth in layers not exceeding 10 cm,compacted to a minimum of 95% Modified Proctor Test, as per drawings & specifications Provide all materials and backfill for foundation M Provide all materials and backfill for floor leveling M Concrete Works Rates shall include but are not limited to the following furnishing concrete, all equipment necessary for transferring, depositing and discharging concrete, all types of forms as required to complete with all tests, structs,bracing scaffolding or staging and accessories, form oits tapes, reinforcing steel beams, tying wire, spacer, bolsters, joint sealants, water stops, curing compound and sleeves for embedded articles Provide all materials and lay in position plain concrete for Foundation M Provide all materials and lay in position RC concrete for Floor areas (slab on grade) M

12 Provide all materials and lay in position concrete for Foundation 1:2:4 mix, with strength not less than 25 N/mm2 M Provide all materials and lay in position concrete for Short Columns 1:2:4 mix, with strength not less than 25 N/mm3 M Provide all materials and lay in position concrete for grade beams 1:2:4 mix, with strength not less than 25 N/mm2 M Provide all materials and lay in position concrete for Ground Floor Columns 1:2:4 mix, with strength not less than 25 N/mm3 M Provide all materials and lay in position concrete lintels for doors and windows M Provide all materials and lay in position concrete for Roof beams 1:2:4 mix, with strength not less than 25 N/mm2 M Provide all materials and lay in position concrete for Ground Floor Slab 1:2:4 mix, with strength not less than 25 N/mm2. M Provide all materials and lay in position concrete for Staircase :2:4 mix, with strength not less than 25 N/mm2. Job Masonry works Rates shall include but not limited to all necessary formworks, equipments materials cutting around scarps, Provide all materials and build 1 brick wall with 1:6 C/S mortar around the building M2 101 Provide all materials and build 1 brick wall with 1:6 C/S mortar.for walls M Provide all materials and build 1 brick wall with 1:6 C/S mortar.for Parapet walls including coping detail as per drawings. M Provide all materials and build Interlocking M Provide all materials and build Curbstone M.L Metal works Rates shall include but not limited to providing all material,fabrications finishing painting and workmanship as directed by the Engineer provide and fix in position steel handrail as specified in the drawings for entrance steps M.L provide and fix in position metal grills for windows M.L Wood & Plastic Works Thermal & Moisture Protection Rates shall include but not limited to providing all material, finishing painting and workmanship as directed by the Engineer Provide all materials and install in position dam proofing course (3 coats of bituminous material) for kitchen and toilets M2 87.5

13 07011 Provide all materials and install in position dam proofing course (3 coats of bituminous material) and application of khafji including down spouts as in the drawings M Doors & Windows Rates shall include but not limited to providing all material,fabrications finishing painting and workmanship as directed by the Engineer Provide all materials and install in position heavy fire resistant doors Type D1 as per drawings and specs. M Provide all materials and install in position heavy fire resistant doors Type D2 as per drawings and specs. M Provide all materials and install in position heavy fire resistant doors Type D3as per drawings and specs. M Provide all materials and install in position heavy duty aluminum widows type W1 M Provide all materials and install in position heavy duty aluminum widows type W2 M Provide all materials and install in position heavy duty aluminum widows type HLW1 M Finishes Works Rates shall include but not limited to providing all material,fabrications finishing painting and workmanship as directed by the Engineer Provide all materials and lay in position min.2cm plaster layer for external walls with 1:8 C/S mortar M Provide all materials and lay in position min.2cm plaster layer for narrow widths with 1:6 C/S mortar M.L Provide all materials and lay in position min.2cm plaster layer for roofs with 1:6 C/S mortar M Provide all materials and lay in position 2 layers of under coat (Talia) and 3 finishing coats (one emulsion water based coats and two oil based coats) for internal walls finish M Provide all materials and lay in position 2 layers of under coat (Talia) and 2 finishing coats (emulsion water based coat) for external walls M Provide all materials and lay in position 2 layers of under coat (Talia) and 2 finishing coats (emulsion water based coat) for ROOF M Provide all materials and lay in position \acoustical false ceiling. M2 204 Provide all materials and lay in position Ceramic Tiles 30*30 cm for floors M Provide all materials and lay in position Ceramic Tiles 30*30 cm walls M Provide all materials and lay in position Skirting of 10*30 cm Ceramic tiles M.L 124

14 10000 Specialties Rates shall include but not limited to providing all material,fabrications finishing painting and workmanship as directed by the Engineer Provide and install in position10000 Liter water tank No Provide and lay in position 5Kg CO2 Fire extinguishers No Equipments Furnishing Special Constructions Conveying Systems Mechanical Works Rates shall include but not limited to providing all material,fabrications finishing painting and workmanship as directed by the Engineer Provide all materials and build in position Discharge well as per drawings and directions of engineer (contractor to have sufficient information regarding the depth of water table and levels in the area prior Costing) Each Provide all materials and build in position 200*3500*2200 depth Septic Tank as per the Engineer directions Each 1 Provide all materials and lay in position 45*45 manholes as per the Engineer directions Each 4 Provide all materials and lay in position 30*30 cm gully traps as per the Engineer directions Each 3 Provide all materials and lay in position Hand washing basin with all accessories Each 4 Provide all materials and lay in position Western Type Toilet Seats with all accessories Each Provide and fix AC Split Unit 18000Btu, Mitsubishi, General or equivalent. Gas piping & Electric wiring in 500x500mm PVC trucking between indoor & outdoor units. A pair of Iron Brackets will also be provided for installation of outdoor Unit, with all accessories & fittings complete in all respects, The waste pipe shall have a slope of 150mm/m with the length to cover all as per drawings & specifications Each Provide all accessories and install Q1 inch PPR Water Supply Pipes M.L Provide all accessories and install Q2 inch PVC 6 Bars Water Drain Pipes M.L Provide all accessories and install Q4 inch PVC 6 Bars Water Drain Pipes M.L Electrical Works Rates shall include but not limited to supply of all materials,equipments tools, testing commissioning and the installation workmanship as per the drawings and specifications and directions of the Engineer

15 Supply and install and operate Main Distribution Board English made or equivalent, complete installation, including for all connections, earthing, painting, testing and similar of One Three phase main panel board with connections from the mains including meter, cut off fuse, the capacitors measuring meters (Voltmeter and Ammeter) indicating lamps, the protection required for the measuring meters, various bus bars, terminal blocks and all accessories required One Electricity Meter The size of the board is suitable for all components and accessories with spare space of30%. Sample is to be provided for Engineer s approval. Each 1 Supply & install distribution panel.100a, including Erection, Testing & Commissioning, compartmentalized 18 way MCBDB Double door type, IP 42 powder coated comprising of "C" curve MCB's for LIGHTING / cum POWER DB. Including support clamps & angles frames as required. as per drawings & specifications Each 1 Provide all materials and lay in position 4 feats fluorescent lamps Each Provide all materials and lay in position ceiling lamps Each Provide all materials and lay in position 13 Amps Sockets Each Provide all materials and lay in position 150cm Ceiling Fan Each Provide all materials and lay in position 12 inches exhaust fan Each 8