1 Wisconsin DOT: Adopting a Model-Based Approach to Roadway Design and Construction Eric Arneson P.E. Methods Development Engineer Wisconsin Department of Transportation Rick Larson P.E. Applications Engineer, Transportation - Autodesk, Inc.

2 Presenters Eric Arneson P.E. Methods Development Engineer at Wisconsin Department of Transportation (WisDOT) Eric is part of a team currently implementing, customizing, and supporting Autodesk Civil 3D at WisDOT. He also provides support, training, customizations, and technical standards for the existing engineering software from survey to construction. He has 16 years of experience with the department in design, construction, and supporting engineering software. Rick Larson P.E. Applications Engineer, Transportation at Autodesk Rick.Larson@autodesk.com Rick has been an Applications Engineer at Autodesk since June Prior to this Rick was a Methods Development Engineer at WisDOT. Rick had 24 years of experience with the department in design, construction, and supporting engineering software.

3 Summary With the implementation of AutoCAD Civil 3D, the Wisconsin Department of Transportation has developed a model-based approach to designing transportation projects as part of our goal to make construction-ready Automated Machine Guidance Roadway Models a deliverable of the design process. In 2011, WisDOT saw its first highway projects completed using the new design system and, through a pilot effort, has shared these models with prospective bidders. How did WisDOT designers benefit by using a model-based approach to highway design? How did WisDOT contractors benefit by having the models available to help prepare bids? Does the model-based approach lead to construction efficiencies? What has Wisconsin DOT learned from their Roadway Model Sharing Pilot effort, and where are we going from here?

4 Learning Objectives At the end of this class, you will be able to Explain WisDOT s move to model-based Design Why? How? Demonstrate model-based Design approach Explain WisDOT Providing the Automated Machine Guidance (AMG) Roadway Models to Contractors Background What the AMG Roadway Models consist of How the AMG Roadway Models are certified and shared Demonstrate 3D Model problems and fixes

5 Learning Objectives (continued) At the end of this class, you will be able to Explain findings from Pilot Projects Explain Lessons Learned by Design and Construction Explain WisDOT s Future 3D Technology plans

6 Wisconsin DOT s move to model-based Design

7 Wisconsin DOT s move to model-based Design Why? Produce existing plan faster and cheaper with fewer mistakes All model-based products come from the same data construction details plan/profile sheets cross-section sheets One model update impacts all model-based products in a live environment.

8 Wisconsin DOT s move to model-based Design How? Design workflow developed with goal to take advantage of 3D data technologies Develop accurate proposed roadway surface models Construction-ready model output Recognition that 3D roadway models support for AMG were part of a bigger puzzle

9 Demonstrate - model-based Design approach 9

10 Providing the Automated Machine Guidance Roadway Models to Contractors

11 Providing the Automated Machine Guidance Roadway Models to Contractors Background : Development and Piloting of Automated Machine Guidance (AMG) Specification for Sub-Grade Construction Advisory Group, Stakeholder Workshop, Two Construction Seasons with Five Pilots 3D Roadway Model Data Development and Exchange a Major Issue

12 Providing the Automated Machine Guidance Roadway Models to Contractors Proposed surfaces ready for Automated Machine Guidance usage Four surfaces for each construction stage Exist Top Base Course Datum Data density of surface model is design speed dependent Construction staking tolerances determine density Roadway alignments

13 Finished Ground Surface Model With Breaklines 13

14 Providing the Automated Machine Guidance Roadway Models to Contractors Step 1: Roadway Model Certification Civil 3D implementation team inspects roadway model for consistency Civil 3D implementation team and highway designer review inspection comments Design model is modified, as needed

15 Providing the Automated Machine Guidance Roadway Models to Contractors Step 2: Roadway Model Distribution Data Format Surface file format = AutoCAD DWG file containing 3D faces Alignment file format = LandXML v1.2 Data Delivery Posted to ftp site Model availability notification in project advertisement and project special provisions List of bidders who request model maintained

16 Demonstrate - 3D Model review 16

17 Findings from Pilot Projects

18 Findings from Pilot Projects What the contractors said 3D models convey design intent much better than 2D plan Reduces uncertainty and risk taking in bidding Availability of 3D models frees contractor staff from development More time for preparation of multiple bids Results in greater competition and more bids submitted to WisDOT Enhanced identification and design of cost reduction incentives Better information for planning project earthwork activities 3D model checking much easier than plan checking

19 Findings from Pilot Projects All earthwork and HMA base course by AMG Prime contractor and project engineer use same control for site calibration Contractor provides final models to engineer (contractor ensures that models conform to plans) Very little staking Slope stakes, string lines for concrete base course and for paving

20 Findings from Pilot Projects Unanticipated findings Utility of existing surface is extensive Visualization of the existing surface beyond the R/W reduces uncertainty in project planning Identification of candidate areas for borrow and waste AND compute volumes Eliminates need for preliminary site survey by contractor

21 Findings from Pilot Projects Model content WisDOT will add Longitudinal breaklines to Roadway Model Content Requirements. Breaklines will be as visual clues to equipment operators, not for surface construction in AMG software

22 Lessons Learned

23 Lessons Learned Project timelines were not impacted Able to do things that could not be done before Model-based design excels in complex areas such as intersections, crossovers, cul-de-sacs, and gore areas Project 2: Horizontal geometry to cross sections 1 month

24 Lessons Learned DESIGN FOR THE MODEL - The Roadway Model is your design output, just as critical as Plan output Develop Model Surfaces during the initial stages of corridor design Watch Model Surfaces Develop Throughout the Iterative Processes of Design Development Level of Detail More detail is better

25 WisDOT s Future 3D Technology Plans MANAGE PLAN BUILD DESIGN

26 WisDOT s Future 3D Technology plans Plan has 2-5 Year Planning Horizon with Five Active Initiatives Statewide Real-Time Kinematic GPS Network DTM Data Collection 3D Design Automated Machine Guidance Field Technology and Inspection

27 WisDOT s Future 3D Technology plans WisCORS (Wisconsin s real-time GPS network) being adopted for rovers AND for AMG construction equipment No local base station required Contractors expressed desire for project control pre-bid WisDOT will search for a mechanism to do this Contractors and project engineers expressed need for all players to use same project control WisDOT will look for method of utilizing existing resources to ensure this

28 WisDOT s Future 3D Technology plans Technology adoption described here is a component of a broader WisDOT 3D technologies implementation plan Plan has a two-year short-term horizon and is currently being updated Findings of the work we have described here should provide significant substance for the updated plan Reports for WisDOT Implementation Plan: 3D Technologies for Design and Construction and Final Report - Implementation of GPS Controlled Highway Construction Equipment Are found here -

29 Learning Objectives met? Explain WisDOT s move to model-based Design - Why? How? Demo Explain WisDOT Providing the Automated Machine Guidance (AMG) Roadway Models to Contractors Background. AM Explain findings from Pilot Projects Explain Lessons Learned by Design and Construction Explain WisDOT s Future 3D Technology plans G Models and their certification. Demo

30 Questions? Autodesk, AutoCAD* [*if/when mentioned in the pertinent material, followed by an alphabetical list of all other trademarks mentioned in the material] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document., Inc. All rights reserved.

31 Thank YOU! Autodesk, AutoCAD* [*if/when mentioned in the pertinent material, followed by an alphabetical list of all other trademarks mentioned in the material] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document., Inc. All rights reserved.

3D Engineered Models for Construction. AGC-ODOT Annual Meeting February 18, 2014

3D Engineered Models for Construction. AGC-ODOT Annual Meeting February 18, 2014 3D Engineered Models for Construction AGC-ODOT Annual Meeting February 18, 2014 National Discussion on 3D Design Steve Cooley ODOT Contract Administration Engineer What is 3D Design for Construction? 1.

More information

CIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM

CIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM CIVIL ENGINEERING BENEFITS OF BIM Helping Civil Engineers do more with BIM CIVIL ENGINEERING BENEFITS OF BIM WHAT S INSIDE: 1 BENEFITS Keep constructability top-of-mind Improve project margins Make better

More information

GPS-Guided Machine Control Using Autodesk Land Desktop By: Harry Ward, PE - Of: OutSource Inc.

GPS-Guided Machine Control Using Autodesk Land Desktop By: Harry Ward, PE - Of: OutSource Inc. December 2-5, 2003 MGM Grand Hotel Las Vegas GPS-Guided Machine Control Using Autodesk Land Desktop By: Harry Ward, PE - Of: OutSource Inc. Code CV23-1 Class Description: Harry Ward, PE Harry Ward, PE,

More information

What s new in Support for AnyCAD and DWG underlay. Brand new interface for improved productivity. Manage item release the same as files

What s new in Support for AnyCAD and DWG underlay. Brand new interface for improved productivity. Manage item release the same as files What s new in 2016 Support for AnyCAD and DWG underlay Brand new interface for improved productivity Manage item release the same as files More flexibility for raw material workflows Extend Vault to the

More information

Questions and Answers

Questions and Answers Autodesk Infrastructure Design Suite 2012 Questions and Answers Autodesk Infrastructure Design Suite 2012 is a comprehensive solution that combines the tools needed to plan, design, build, and manage transportation,

More information

Executive Summary Determining Productivity Improvement... 3

Executive Summary Determining Productivity Improvement... 3 Autodesk Civil 3D 2006 Return on Investment This Return on Investment paper is a follow-up to a previous paper based on Autodesk Civil 3D 2004. That paper, which was based on the analysis of a hypothetical

More information

BIM for Contractors: Kickin It Off the Right Way

BIM for Contractors: Kickin It Off the Right Way BIM for Contractors: Kickin It Off the Right Way David Epps Manager Building Information Modeling Holder Construction Company John Mack VDC / BIM Dept. Manager Herrero Contractors, Inc. John Mack VDC /

More information

FROM AUTOCAD TO ADVANCE STEEL 1 MOVE FROM 2D TO 3D WITH ADVANCE STEEL BASED ON AUTOCAD

FROM AUTOCAD TO ADVANCE STEEL 1 MOVE FROM 2D TO 3D WITH ADVANCE STEEL BASED ON AUTOCAD FROM AUTOCAD TO ADVANCE STEEL 1 MOVE FROM 2D TO 3D WITH ADVANCE STEEL BASED ON AUTOCAD FROM AUTOCAD TO ADVANCE STEEL 2 CONTENTS 1 2 3 LEVERAGE YOUR AUTOCAD INVESTMENT WITH DEDICATED TOOLS FOR STRUCTURAL

More information

Signed and Sealed 3D Engineering Models

Signed and Sealed 3D Engineering Models 2018 Annual Conference Signed and Sealed 3D Engineering Models September 26, 2019 Presented By Will Sharp, PE, PTOE National Director of Highways John Reese Digital Implementation Services INDUSTRY DRIVERS

More information

Electronic Files as the Controlling Document

Electronic Files as the Controlling Document Electronic Files as the Controlling Document MAASHTO August 12, 2015 Michael J. Kennerly P.E. Director of the Office of Design Iowa Department of Transportation Overview Why Some of The Issues Our approach

More information

Stepping into Variable Height Retaining Walls

Stepping into Variable Height Retaining Walls Stepping into Variable Height Retaining Walls Eric Cylwik Sundt Construction, Inc. CR 2499 - Mechanically-stabilized earth (MSE) walls are inherently complex shapes; smoothly curving in all 3 dimensions

More information

PCCP Pavement Structures, 3D Modeling and Machine Control

PCCP Pavement Structures, 3D Modeling and Machine Control PCCP Pavement Structures, 3D Modeling and Machine Control Design-Build P3 Project Contracting Entity: Infrastructure Development Partners Contract Value: $95.03 M Contract Completion Date: December 2015

More information

11/13/2011. Better Together: Best Collaboration Practices for Architects and Structural Engineers Using Autodesk Revit.

11/13/2011. Better Together: Best Collaboration Practices for Architects and Structural Engineers Using Autodesk Revit. Better Together: Best Collaboration Practices for Architects and Structural Engineers Using Autodesk Revit Irina Wong BIM Coordinator, Senior CAD/BIM Specialist Degenkolb Engineers Sam Schafer Architectural

More information

Project January 2008

Project January 2008 IMPLEMENTATION OF GPS CONTROLLED HIGHWAY CONSTRUCTION EQUIPMENT PHASE II Project 02-12 January 2008 National Center for Freight & Infrastructure Research & Education College of Engineering Department of

More information

Automated Machine Guidance

Automated Machine Guidance House Select Committee on Strategic Planning and Long Term Funding Solutions October 24, 2016 Automated Machine Guidance Lamar Sylvester, PE State Construction Engineer Automated Machine Guidance (AMG)

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

Shawn Herring Civil Applications ProSoft, Inc

Shawn Herring Civil Applications ProSoft, Inc SSA for Highway Design Using Autodesk Storm and Sanitary Analysis for Simple or Complex Roads Shawn Herring Civil Applications Engineer @ ProSoft, Inc Win a Civil 3D Book!!! A Practical Guide to AutoCAD

More information

2017 ACEC/WisDOT Transportation Improvement Conference February 2017

2017 ACEC/WisDOT Transportation Improvement Conference February 2017 2017 ACEC/WisDOT Transportation Improvement Conference February 2017 Scott Lawry, P.E., WisDOT Bureau Project Development Fred Schunke, P.E., WisDOT Bureau Project Development Cheryl Simon, P.E., WisDOT

More information

Getting Started on your Structural Project

Getting Started on your Structural Project BIM Pilot Guide Getting Started on your Structural Project What is BIM? Framework for implementing a BIM pilot project BIM vision Driven BIM leadership Getting started with your BIM pilot project Moving

More information

Top 50 BIM Bugs and Things to Avoid

Top 50 BIM Bugs and Things to Avoid Top 50 BIM Bugs and Things to Avoid Nicholas M Kramer HMC Architects Class Summary Whether you are new to building information modeling (BIM) or you are a seasoned BIM pro, this class is for you. BIM is

More information

Autodesk MEP Engineering Solutions. Engineer for energy efficiency.

Autodesk MEP Engineering Solutions. Engineer for energy efficiency. Autodesk MEP Engineering Solutions Engineer for energy efficiency. Deliver Sustainable Building Systems More Quickly and Economically Autodesk MEP Engineering Solutions help MEP engineers, designers, and

More information

PRODUCTION STUDY. Rogier Tonies

PRODUCTION STUDY. Rogier Tonies Rogier Tonies Introduction In November 2006, Caterpillar conducted a production study comparing a conventional road construction project guided by grade stakes, string lines and grade checkers with the

More information

Project Planning and Development Process

Project Planning and Development Process Project Planning and Development Process The project development process (PDP) involves hundreds of tasks. Many of these are internal agency activities that help an agency follow a methodical process of

More information

BIM with GIS: making a difference globally

BIM with GIS: making a difference globally BIM with GIS: making a difference globally Marek Suchocki Infrastructure Sales Development EMEA GeoBIM Amsterdam November 2014 2014 Autodesk Pressure for Change Population Growth and Urbanisation Source:

More information

Materials and Surfacing - Organization and Functions

Materials and Surfacing - Organization and Functions Materials and Surfacing - Organization and Functions Organization & Functions Page 1 Materials and Surfacing. Organization: Chief Materials and Surfacing Engineer 1. Materials 2. Pavement Design 3. Surfacing

More information

THE KEY PERFORMANCE INDICATORS OF CONSTRUCTION

THE KEY PERFORMANCE INDICATORS OF CONSTRUCTION THE KEY PERFORMANCE INDICATORS OF CONSTRUCTION See Ahead Think Ahead Stay Ahead Research conducted in collaboration with Dodge Data & Analytics Introduction 7 KPIs of Construction 1. Problems Discovered

More information

Autodesk Vehicle Tracking Overview

Autodesk Vehicle Tracking Overview Autodesk Vehicle Tracking Overview Mike Hutt Infrastructure Product Sales Specialist - Autodesk What Vehicle Tracking offers Swept path analysis of steered, wheeled vehicles Parking layout and design to

More information

Trimble Alignment Planning Solutions. Between vision and viability there are important decisions to make

Trimble Alignment Planning Solutions. Between vision and viability there are important decisions to make Trimble Alignment Planning Solutions Between vision and viability there are important decisions to make Trimble applies technology to make businesses and government significantly more productive. Solutions

More information

Building Tomorrow Today: Spotlight on Autodesk Navisworks & BIM 360 Glue

Building Tomorrow Today: Spotlight on Autodesk Navisworks & BIM 360 Glue Building Tomorrow Today: Spotlight on Autodesk Navisworks & BIM 360 Glue Deepak Maini Technical Head Manufacturing Solutions Cadgroup Australia Join us on Twitter: #AU2014 Quick Introduction Technical

More information

Asset Management in a Water Utility and our vision for 2020

Asset Management in a Water Utility and our vision for 2020 Asset Management in a Water Utility and our vision for 2020 Graeme Anthonsen Manager Asset Information, City West Water Class Summary This lecture is designed for the Asset Manager who is struggling to

More information

CONSTRUCTION STAKING GUIDELINES

CONSTRUCTION STAKING GUIDELINES CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING SURVEY DIVISION CONSTRUCTION STAKING GUIDELINES Gary Lee Moore, P.E., City Engineer Tony Pratt, Chief Surveyor TABLE OF CONTENTS Dec.

More information

Schematic Design in Revit Structure: Leveraging the Value of BIM for Early Design Decisions

Schematic Design in Revit Structure: Leveraging the Value of BIM for Early Design Decisions Schematic Design in Revit Structure: Leveraging the Value of BIM for Early Design Decisions David J. Odeh, PE, SECB Principal, Odeh Engineers, Inc Class Summary In this class we will explore ways to use

More information

Autodesk Vault Family of Products. Manage your entire design.

Autodesk Vault Family of Products. Manage your entire design. Autodesk Vault Family of Products Manage your entire design. Stay In Control Imagine finding design data in seconds. Sharing digital prototyping information securely with team members across the world.

More information

Solutions - for Non-Users Site. Tams Mullins Spectra Measuring Systems 6/10/09

Solutions - for Non-Users Site. Tams Mullins Spectra Measuring Systems 6/10/09 An Introduction to Heavy Highway Solutions - for Non-Users Site Positioning Tams Mullins Spectra Measuring Systems 6/10/09 SMS Company Summary Over 50 years of experience in the surveying and construction

More information

Table of Contents Local Agency Guidelines Section B August 2011

Table of Contents Local Agency Guidelines Section B August 2011 Table of Contents SECTION B NON-CERTIFIED AGENCY 2 Chapter 10 Design Approval... 2 A. OVERVIEW... 2 B. DESIGN ACCEPTANCE PACKAGE (30 PERCENT)... 2 1. Traffic Data... 3 2. Right of Way... 3 3. Horizontal-

More information

Pete Kaz Regional Representative. Construction Technology Overview

Pete Kaz Regional Representative. Construction Technology Overview Pete Kaz Regional Representative 2016 Construction Technology Overview Construct with Confidence Trimble Corporate Overview A world leader in transforming how work is done across multiple industries and

More information

How Munilla Construction Management Paves With Accuracy And Efficiency

How Munilla Construction Management Paves With Accuracy And Efficiency How Munilla Construction Management Paves With Accuracy And Efficiency Munilla Construction Management proves the value of machine controlled paving in the Love Field Modernization Program. Love Field

More information

ALTERNATE TECHNICAL CONCEPTS Missouri Department of Transportation

ALTERNATE TECHNICAL CONCEPTS Missouri Department of Transportation Missouri Department of Transportation INNOVATIVE CONTRACTING PROCESS Table of Contents Introduction... 1 Description... 2 General Conditions... 3 Submittal Process... 5 Evaluation Procedure... 7 Design

More information

THE FUTURE OF BRIDGE DESIGN

THE FUTURE OF BRIDGE DESIGN THE FUTURE OF BRIDGE DESIGN A Bentley White Paper Barbara H. Day, P.E. Bridge Director Americas Operating Unit Published: February 2016 www.bentley.com INTRODUCTION With intelligent as-designed models

More information

BIM Pilot Getting Started Guide. next

BIM Pilot Getting Started Guide. next BIM Pilot Getting Started Guide What is BIM? Framework for implementing a BIM pilot project Driven BIM leadership Getting started with your BIM pilot project Moving to BIM can seem like a daunting task.

More information

3D Engineered Models at Florida Department of Transportation

3D Engineered Models at Florida Department of Transportation 3D Engineered Models at Florida Department of Transportation Vern Danforth, PE Production Support Office State CADD Engineer 3D Integrated Modeling future 1 Session Summary: Brief FDOT CADD/Industry History

More information

Building Concrete Overlays on Two Lane Roads Under Traffic U.S /2 PCC Unbonded Chickasaw / Fayette County, Iowa

Building Concrete Overlays on Two Lane Roads Under Traffic U.S /2 PCC Unbonded Chickasaw / Fayette County, Iowa Building Concrete Overlays on Two Lane Roads Under Traffic U.S. 18 4 1/2 PCC Unbonded Chickasaw / Fayette County, Iowa Partnerships for Progress in Transportation Louisiana Transportation Conference February

More information

BIM guide for members of the Institution of Mechanical Engineers

BIM guide for members of the Institution of Mechanical Engineers BIM guide for members of the Institution of Mechanical Engineers Background Autodesk has prepared this guide for members of the Institution of Mechanical Engineers to: Explain what Building Information

More information

Project February 2009

Project February 2009 IMPLEMENTATION OF GPS CONTROLLED HIGHWAY CONSTRUCTION EQUIPMENT PHASE III Project 02-13 February 2009 National Center for Freight & Infrastructure Research & Education College of Engineering Department

More information

EBOOK BIM ASSESSMENT GUIDE TAKE THE FIRST STEP TOWARDS CRAFTING A BIM IMPLEMENTATION PLAN

EBOOK BIM ASSESSMENT GUIDE TAKE THE FIRST STEP TOWARDS CRAFTING A BIM IMPLEMENTATION PLAN EBOOK BIM ASSESSMENT GUIDE TAKE THE FIRST STEP TOWARDS CRAFTING A BIM IMPLEMENTATION PLAN Better understand your current conditions and business objectives THE IMPLEMENTATION OF BIM FOR INFRASTRUCTURE

More information

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL TECHNICAL SUPPORTIVE SERVICES IN IDOT DISTRICTS 2 & 3 FOR CERTIFIED

More information

The Impact of BIM and VDC on Company Business Processes

The Impact of BIM and VDC on Company Business Processes By Terry D. Bennett, LS LPF MRICS LEED AP Senior Industry Manager, Civil Engineering and Heavy Construction Autodesk, Inc. Paper prepared for presentation at the Geometric Design Lessons Learned: Case

More information

Autodesk Improving quality and client satisfaction

Autodesk Improving quality and client satisfaction Autodesk Improving quality and client satisfaction Mike Keane UK & I Construction 2013 Autodesk Objectives Objectives To demonstrate how Autodesk can help you deliver a better product, faster, and with

More information

Highway / Utility Guide

Highway / Utility Guide Oregon Department of Transportation Highway Division Right of Way Section Highway / Utility Guide Railroad & Utilities Unit Right of Way Section STATEMENT OF PURPOSE It is important to understand that

More information

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?

More information

CHAPTER 8 RESPONSIBILITIES OF CONTRACTOR AND INSPECTOR Contract and Specifications

CHAPTER 8 RESPONSIBILITIES OF CONTRACTOR AND INSPECTOR Contract and Specifications CHAPTER 8 RESPONSIBILITIES OF CONTRACTOR AND INSPECTOR Contract and Specifications Road and highway construction in Virginia is performed under contract. The contract is a written agreement between the

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Projekt pod kontrolą. Kamil Cejpek. Solutions Engineer MFG, Autodesk Autodesk

Projekt pod kontrolą. Kamil Cejpek. Solutions Engineer MFG, Autodesk Autodesk Projekt pod kontrolą Kamil Cejpek Solutions Engineer MFG, Autodesk Reducing costs New markets Market demand Capacity for innovation 15%-20% New products Increased product/project complexity The most common

More information

Dirk Ditschke Technical Specialist Simulation - EMEA

Dirk Ditschke Technical Specialist Simulation - EMEA FoMT - Katowice Simulation Powering the Future of Making Things Dirk Ditschke Technical Specialist Simulation - EMEA 2015 Autodesk Building Successful Products: Harder Than Ever how to use FoMT to make

More information

REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN

REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN FOR CITY OF SIDNEY SIDNEY, OHIO PROPOSALS TO BE RECEIVED AT THE OFFICE OF THE PUBLIC WORKS DIRECTOR 201 WEST POPLAR

More information

TOPCON WORKPLACE DIGITAL CONSTRUCTION WORKFLOW TOOLS

TOPCON WORKPLACE DIGITAL CONSTRUCTION WORKFLOW TOOLS TOPCON WORKPLACE DIGITAL CONSTRUCTION WORKFLOW TOOLS TOPCON WORKPLACE Digital tools for your industry and applications The Intersection of Infrastructure and Technology Many companies are at the crossroads

More information

Improving Jobsite Transparency Using Custom Reports and BIM 360 Field APIs

Improving Jobsite Transparency Using Custom Reports and BIM 360 Field APIs Improving Jobsite Transparency Using Custom Reports and BIM 360 Field APIs Ryan Moret Field Solution Manager, McCarthy Building Companies @McCarthyBuild Join the conversation #AU2016 McCarthy Building

More information

Building Information Modeling (BIM) for Surveyors February 8 th, 2013

Building Information Modeling (BIM) for Surveyors February 8 th, 2013 Building Information Modeling (BIM) for Surveyors February 8 th, 2013 Jerry Bartels LEED Green Associate Autodesk Civil Technical Specialist Introduction Jerry Bartels Autodesk Civil Technical Specialist

More information

Introduction to Autodesk Utilities Design: Integrating the Network Design Process

Introduction to Autodesk Utilities Design: Integrating the Network Design Process Introduction to Autodesk Utilities Design: Integrating the Network Design Process Introduction Electric, water, and gas utilities share a number of similarities. They depend on distribution networks to

More information

ASSOCIATED ENGINEERING CONSULTANTS, INC. Corporate Philosophy

ASSOCIATED ENGINEERING CONSULTANTS, INC. Corporate Philosophy Across the Nation Associated Engineering Consultants, Inc. (AEC) is a diverse civil engineering consulting firm specializing in urban and municipal site development, pavement engineering, pavement management

More information

SUMMIT Project Management

SUMMIT Project Management SUMMIT Management DATA SHEET SUMMIT, Symphony SUMMIT, the Symphony SUMMIT logo, and all other Symphony SUMMIT product, brand or service names are registered trademarks or trademarks of Symphony SUMMIT,

More information

106 CONTROL OF MATERIALS SECTION 106 CONTROL OF MATERIALS

106 CONTROL OF MATERIALS SECTION 106 CONTROL OF MATERIALS SECTION 106 CONTROL OF MATERIALS 106.1 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS a. Sources of Supply. (1) Use sources of supply that will generate materials that meet quality requirements. Sources of

More information

MONTEZUMA COUNTY COLORADO ROAD AND BRIDGE STANDARD SPECIFICATIONS

MONTEZUMA COUNTY COLORADO ROAD AND BRIDGE STANDARD SPECIFICATIONS MONTEZUMA COUNTY COLORADO ROAD AND BRIDGE STANDARD SPECIFICATIONS The following Standard Specifications for Road and Bridge Construction in Montezuma County, Colorado have been amended this 22 nd, day

More information

County Engineer - Adams County

County Engineer - Adams County County Engineer - Adams County April 19, 2018 Adams County, Iowa, is seeking qualified applicants for the position of County Engineer. Position requires a Professional Engineer in the State of Iowa. Registration

More information

Dan Grasser, PE DTSD Administrator December 2, 2014

Dan Grasser, PE DTSD Administrator December 2, 2014 Dan Grasser, PE DTSD Administrator December 2, 2014 2 } Partnering } Construction Season Feedback } WAPA / WisDOT Initiatives } Our Role in the Budget Process } WisDOT Staffing 3 Executive Team WisDOT

More information

Answers for industry. Tecnomatix digital manufacturing. Digital manufacturing solutions for the automotive industry. siemens.

Answers for industry. Tecnomatix digital manufacturing. Digital manufacturing solutions for the automotive industry. siemens. Answers for industry. Tecnomatix digital manufacturing Digital manufacturing solutions for the automotive industry. siemens.com/plm Automotive digital manufacturing An essential part of a complete PLM

More information

Professional Surveying and Engineering Services

Professional Surveying and Engineering Services Professional Surveying and Engineering Services Survey, Site Design, Right-of-Way, Permitting, Project Management The Best Choice! Right-of-Way and Permitting Right-of-Way Acquisition Team Fishel is proficient

More information

Step 1: Determination of Base Figure for Relative Availability of DBEs

Step 1: Determination of Base Figure for Relative Availability of DBEs MassDOT calculated the Transit Division goal utilizing a preliminary budget to identify federalaid service and supply contracts on USDOT-assisted projects to be performed. To determine the relative availability

More information

May 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table...

May 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table... APPENDIX A Construction Forms SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Construction Forms A-i Section Table of Contents Page APPENDIX A CONSTRUCTION FORMS... A-1 SCDOT Construction

More information

Exhibit A Mn/DOT Contract No

Exhibit A Mn/DOT Contract No Exhibit A Mn/DOT Contract No. 98142 SCOPE OF WORK AND DELIVERABLES Preliminary Design Red Wing US 63 Bridge and Approach Roadways State Project (SP) 2515-21 SCOPE OVERVIEW... 2 SCHEDULE... 2 PROJECT TASK

More information

Automated Tools for Reducing Earthwork Costs

Automated Tools for Reducing Earthwork Costs Automated Tools for Reducing Earthwork Costs Engineering problems are under-defined, there are many solutions, good, bad and indifferent. The art is to arrive at a good solution. This is a creative activity,

More information

Building Information Modeling to Facilities Information Management and Beyond

Building Information Modeling to Facilities Information Management and Beyond Building Information Modeling to Facilities Information Management and Beyond Meghan Ruffo, Thomas Koltoniak, & Geoffrey Coon Carolinas HealthCare System Join the conversation #AU2016 Class summary Carolinas

More information

Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract

Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Presentation to FHWA EDC 3 Systemic Safety Implementation Peer Exchange, Nashville, TN September

More information

Comprehensive Transportation Study for Glencoe, MN

Comprehensive Transportation Study for Glencoe, MN Comprehensive Transportation Study for Glencoe, MN Introduction and Project Information Introduction There have been a number of planning and preliminary engineering studies completed in the Glencoe area

More information

Highway 12 SP , Willmar Wye Soils Borings, Soils Tests, and Reporting

Highway 12 SP , Willmar Wye Soils Borings, Soils Tests, and Reporting Highway 12 SP 3403-74, Willmar Wye Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003246 General Project Overview This work is located along Trunk Highway (TH) 12, on the west side of Willmar.

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

WebCenter 18. What is new? WebCenter Team Jijo Dominic 17 April 2018

WebCenter 18. What is new? WebCenter Team Jijo Dominic 17 April 2018 WebCenter 18 What is new? WebCenter Team Jijo Dominic 17 April 2018 Disclaimer This presentation presents Esko s intention for innovation in future versions of WebCenter. The goal of this presentation

More information

MnDOT Contract No Exhibit A Scope of Work

MnDOT Contract No Exhibit A Scope of Work GENERAL DESCRIPTION OF THE PROJECT In accordance with the National Bridge Inspection Standards (NBIS), the Minnesota Department of Transportation Bridge and Structure Inspection Program Manual (BSIPM)

More information

Tekla Structures for Precast Concrete Industry TRANSFORMING THE WAY THE WORLD WORKS

Tekla Structures for Precast Concrete Industry TRANSFORMING THE WAY THE WORLD WORKS Tekla Structures for Precast Concrete Industry Model, Fabricate and Erect all Precast Structures Faster and with Better Quality Working with the constructible Tekla models minimizes costly surprises and

More information

2006 RPUG Changing from PI to IRI. Colorado DOT Experience Eric Prieve

2006 RPUG Changing from PI to IRI. Colorado DOT Experience Eric Prieve 2006 RPUG Changing from PI to IRI Colorado DOT Experience Eric Prieve Current Specification Since 1999 CDOT has used the profilograph for pavement smoothness quality Incentives based on the average PI

More information

Driveway Permits Following Guidelines PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT LAND USE CONTROLS ECONOMIC DEVELOPMENT

Driveway Permits Following Guidelines PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT LAND USE CONTROLS ECONOMIC DEVELOPMENT CHAPTER 5 Access Management PASSIVE Driveway Permits Following Guidelines Comprehensive Access Management PLANNING REQUIREMENTS Access Restrictions CAPABILITIES Process ASSISTANCE ACCESS MANAGEMENT LAND

More information

Organization. Project Management Institute, Olympia Chapter Date Nov. 20, 2012

Organization. Project Management Institute, Olympia Chapter Date Nov. 20, 2012 Organization Project Management Institute, Olympia Chapter Date Nov. 20, 2012 Program Overview The Alaskan Way Viaduct Replacement Program includes projects led by the Washington State Department of Transportation,

More information

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overview of the Project Development Process Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overall Project Development Process The time it takes to produce a project varies significantly

More information

BIM s value proposition for building owners

BIM s value proposition for building owners BIM BUSINESS BRIEFS 03 BIM S VALUE PROPOSITION FOR BUILDING OWNERS BIM s value proposition for building owners How service providers can prepare their clients for BIM BIM AND BUILDING OWNERS The use of

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION 90P-260-R5 Sheet 1 of 7 NOTE: This special provision is generally written in the imperative mood. The

More information

Design -- geometric and structural design of roadways and bridges, and preparation of detailed plans and specifications for individual projects;

Design -- geometric and structural design of roadways and bridges, and preparation of detailed plans and specifications for individual projects; WELCOME Welcome to the Estimates Chapter One Lesson. This Final Estimates training course covers the preparation of final estimates by field personnel. In this first chapter, you will become familiar with

More information

BlueCielo Meridian What s New

BlueCielo Meridian What s New BlueCielo Meridian 2016 - What s New Table of Contents 01 Introduction 04 Meridian Plus Tag Extraction for DGN files 16 SAP certified integration 17 02 Meridian Base Enhanced Web client 06 Application

More information

150/ G Versus 150/ H Contractor Quality Control Program

150/ G Versus 150/ H Contractor Quality Control Program AC 150/5370-10G AC 150/5370-10H 1 Part 1 of General Provisions Part 2 of General Construction Items 2 Section 100 Item C-100 3 Quality Control Program (CQCP) 4 100-01 General. When the specification requires

More information

APPENDIX K APPENDIX K RECORDS MANAGEMENT BY CONSULTANTS ON PROJECTS

APPENDIX K APPENDIX K RECORDS MANAGEMENT BY CONSULTANTS ON PROJECTS APPENDIX K RECORDS MANAGEMENT BY CONSULTANTS ON PROJECTS May 7, 2002 This page left blank intentionally. May 7, 2002 RECORDS MANAGEMENT BY CONSULTANTS ON PROJECTS To ensure that sufficiently detailed records

More information

The Connected Future - How Technology is Accelerating Change

The Connected Future - How Technology is Accelerating Change The Connected Future - How Technology is Accelerating Change Kathleen Maher Vice President, Jon Peddie Research kathleen@jonpeddie.com Who cares what you think? Who we are We track graphics hardware and

More information

DEPARTMENT OF MUNICIPAL AFFAIRS AND ENVIRONMENT MUNICIPAL INFRASTRUCTURE PROJECT GUIDELINES

DEPARTMENT OF MUNICIPAL AFFAIRS AND ENVIRONMENT MUNICIPAL INFRASTRUCTURE PROJECT GUIDELINES DEPARTMENT OF MUNICIPAL AFFAIRS AND ENVIRONMENT MUNICIPAL INFRASTRUCTURE PROJECT GUIDELINES It is essential for the municipality and also the municipal engineer or prime consultant to comply with the following

More information

MnDOT Contract Exhibit A - Scope of Services

MnDOT Contract Exhibit A - Scope of Services Project Development for Pavement Rehabilitation and Pedestrian Access -Improvements on TH 22 in Glencoe, MN from US 212 to Cedar Ave. (R.P. 106+00.650 to 108+00.141) -Improvements on TH 71 in Olivia, MN

More information

AUTODESK INVESTOR DAY MARCH 28, Closing Remarks. Andrew Anagnost. President & 2018 Autodesk

AUTODESK INVESTOR DAY MARCH 28, Closing Remarks. Andrew Anagnost. President & 2018 Autodesk Safe Harbor 1 Each of the presentations today will contain forward-looking statements about our strategies, products, future results, performance or achievements, financial, operational and otherwise,

More information

Public Rights of Way Assessment Process (PROW-AP)

Public Rights of Way Assessment Process (PROW-AP) Public Rights of Way Assessment Process (PROW-AP) Peter Axelson and Jeremy Vlcan Barton Cline and Chris Lynskey Beneficial Designs, Inc. Minden, Nevada Reasons for Assessment of Sidewalks Assess existing

More information

Tarbutton Road Interchange and I-20 Frontage Roads. Estimating and Planning Group

Tarbutton Road Interchange and I-20 Frontage Roads. Estimating and Planning Group Tarbutton Road Interchange and I-20 Frontage Roads Dr. N. Wasiuddin Braden Smith Jared Taylor John Harrison Sarah Wells Samantha Tatro Ryan Ross Instructor Project Manager Transportation Group Geotechnical

More information

MAGNET Mobile Exchange is a free utility that connects to MAGNET Enterprise. Exchange any kind of file with the office.

MAGNET Mobile Exchange is a free utility that connects to MAGNET Enterprise. Exchange any kind of file with the office. MAGNET Field is a powerful and intuitive field application software that enables users to collect survey mapping data and perform construction and road layout using total stations, levels, and GPS. MAGNET

More information

CONFORMAL COOLING IN ACTION

CONFORMAL COOLING IN ACTION CONFORMAL COOLING IN ACTION New manufacturing techniques set the stage for more efficient cooling systems that reduce cycle time, warpage, and visual defects. The right idea for higher efficiency The faster

More information

Barry Paye P.E. Bureau of Technical Services. WCPA 2018 Concrete Pavement Conference

Barry Paye P.E. Bureau of Technical Services. WCPA 2018 Concrete Pavement Conference Barry Paye P.E. Bureau of Technical Services WCPA 2018 Concrete Pavement Conference Specification Updates WHRP Updates Performance Engineered Mixes HTCP Program Updates Innovations Flexural Strength MIT

More information

CITY OF MEQUON. STANDARD SPECIFICATIONS for LAND DEVELOPMENT ENGINEERING. Tenth Edition October 2015

CITY OF MEQUON. STANDARD SPECIFICATIONS for LAND DEVELOPMENT ENGINEERING. Tenth Edition October 2015 CITY OF MEQUON STANDARD SPECIFICATIONS for LAND DEVELOPMENT Tenth Edition October 2015 ENGINEERING 11333 N. CEDARBURG ROAD MEQUON, WI 53092-1930 (262) 236-2934 TABLE OF CONTENTS SECTION... PAGE CHAPTER

More information

Drainage District(s):

Drainage District(s): APPLICANT: APPLICATION FOR APPROVAL OF CONSTRUCTION ACROSS ESTABLISHED SAC COUNTY DRAINAGE DISTRICTS AND ESTABLISHED MULTI-COUNTY DRAINAGE DISTRICTS Name of Individual or Company Street Address or P. O.

More information