Ontario ENGINEERING STANDARD SPECIFICATION 1/7 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA CLARABELLE MILL NI-HARD TYPE 1 LINERS

Size: px
Start display at page:

Download "Ontario ENGINEERING STANDARD SPECIFICATION 1/7 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA CLARABELLE MILL NI-HARD TYPE 1 LINERS"

Transcription

1 1/7 Rev Description Approved by Reviewed by Issue Date YYYY/MM/DD 1 Document format and number changed. Previous number QA PB 011/1/4 PB 011/1/4 01/04/19 SPEC Reviewed 016 Regional Approvals removed, no other changes P.Belzile A.Nadeau 016/1/15

2 /7 1.0 PURPOSE This specification describes the minimum requirements for the supply of Ni-Hard Type 1 Liners for the Clarabelle Mill..0 APPLICATION This specification, applies at any Vale locations indicated with approval on the cover page, with the following exceptions:.1 EXCEPTIONS None. 3.0 REFERENCE DOCUMENTATION The following documents were used in the development of this document or have instructions and procedures applicable to it. They shall be used in their most recent revision. None. 4.0 DEFINITIONS Owner shall mean Vale and its authorized representatives with responsibility for the work being performed. Supplier shall mean the company, directly under contract with the Owner, which will supply the parts described in the Scope above. Manufacturer shall mean the foundry directly producing the parts. Inspector shall mean an inspector retained or employed by Vale with the mandate to perform site visits and witness the fabrication and testing of the parts.

3 3/7 4.1 CONFLICTING REQUIREMENTS In the event of conflict between this specification, the purchase order, the engineering drawings or the Manufacturer specification, the Supplier/manufacturer shall notify the Owner in writing of the basis of the conflict and justification for any deviations from this specification. This shall not delay in any way the delivery date agreed. This specification is provided to supplement the Manufacturer s own internal fabrication and design specifications. If the Manufacturer s specifications are more stringent and/or more complete for any of the sections of the present document or if any of the requirements of the present document are judged to be detrimental to the performance of the part, the Manufacturer shall notify the Owner, in writing, as to which sections of the present document should not be used and the technical/economical advantage of using the Manufacturer s specifications instead. 5.0 GENERAL REQUIREMENTS 5.1 SUPPLIER S REQUIREMENTS It is the responsibility of the Supplier to ensure that the requirements of this specification and of its own specifications are met and to perform all inspections necessary to ensure compliance prior to the inspections by the Owner. In addition to the Supplier s inspections, the Owner or its Inspector may perform any inspections necessary to verify compliance with this specification. Inspection may include any and all work, equipment, inspection equipment, materials, procedures and may be conducted at any time the Owner chooses. The Manufacturer shall provide accessibility to all fabrication and inspection work. The Manufacturer shall prepare an inspection and test plan (ITP) for the manufacture of the liners. This shall be submitted to the Owner prior to commencement of fabrication. The Owner reserves the right to insert Review, Witness and Hold points at critical steps of the manufacture. 5. CODES, STANDARDS AND REGULATIONS Supply shall be performed in accordance with the following standards: Standard Specification for Abrasion-Resistant Cast Irons ASTM A 53

4 4/7 5.3 PERSONNEL QUALIFICATIONS Non-destructive Evaluation (NDE) personnel performing the evaluation shall be certified in the appropriate method. 6.0 QUALITY ASSURANCE 6.1 MATERIALS Cast iron per ASTM A53 Class 1 type A (Ni-Hard Type 1). A complete chemical analysis of each heat produced shall be supplied for review. 6. HEAT TREATMENT AND STRESS RELIEVING The liner shall be tempered to achieve the required mechanical properties. The temper procedure shall be submitted to the owner for review with the bid. Supplier shall provide copies of heat treatment reports and furnace chart recordings. 6.3 MECHANICAL PROPERTIES The mechanical properties of the liners shall meet the following requirements: Surface Hardness: > 550 HB The surface hardness shall be tested and reported for a representative sample of each type of liners produced. 6.4 DIMENSIONAL The liner dimensions shall meet the requirements and tolerances specified on the engineering drawings. The bolt pattern shall be checked on 0% of the parts produced with a go-no-go gauge to ensure compliance with the tolerances of the engineering drawings. 6.5 NON-DESTRUCTIVE TESTING Each liner produced shall be submitted to the following inspection after final heat treatment: 100% visual inspection. No Cracks are allowed.

5 5/7 No rounded indications greater than 0% of the thickness. In addition, ASTM A80 shall be used for the acceptance standards of the following: adhering sand B5 scale/scab E4 cold shuts D3 All Hot tears NCR to be submitted to owner for review and acceptance. 6.6 DEFECTS/REPAIRS When defects, which would prevent the piece from meeting the Owner s requirements, are found, a non-conformance report (NCR) shall be issued. In the case of cracks, the following applies: Cracks less than ½ depth = Blend grind Cracks between ½ to 1 depth = Scrap piece Cracks more than 1 depth = Scrap piece No repairs should be done on any castings without the prior written consent of the Owner. 7.0 DOCUMENTATION The following documentation shall be provided: 7.1 PRIOR TO THE START OF CASTING: Supplier s Specifications Heat Treatment Procedure Inspection and Test Plan 7. PRIOR TO DELIVERY Final inspection report including, but not limited to: Chemical analysis test report. Mechanical properties test reports. Visual inspection report. Dimensional inspection records. Heat treatment reports and furnace chart recordings. Non-conformance reports. Final QA document package. The final inspection report shall be supplied as one hard copy and one electronic copy in Acrobat format

6 6/7 8.0 APPENDICES Appendix A: Revision and Transition Notes Appendix B: Keywords

7 7/7 Appendix A: Revision and Transition Notes (Revisions are listed in reverse chronological order with most recent revision at the top. Revision notes describe: what was changed, why it was changed, and the plan to implement the change, including whether changes are retroactive) Revision SPEC Reviewed 016 Regional Approvals removed, no other changes Revision 1 Document format and number changed due to Vale Engineering Document Program changes in 011. Previous Standard number was QA-015 Rev 00. QA-015 Appendix B: Keywords

Ontario ENGINEERING STANDARD SPECIFICATION 1/8 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA CLARABELLE MILL CAST Q & T STEEL LINERS

Ontario ENGINEERING STANDARD SPECIFICATION 1/8 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA CLARABELLE MILL CAST Q & T STEEL LINERS 1/8 Rev Description Approved by Reviewed by Issue Date YYYY/MM/DD 1 Document format and number changed. Previous number QA - 016 PB 011/1/4 PB 011/1/4 01/04/19 SPEC Reviewed 016 Regional Approvals removed,

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1/8 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA COPPER CLIFF SMELTER FLUID BED DRYER TUYERES

Ontario ENGINEERING STANDARD SPECIFICATION 1/8 REV. SPECIALTY ENGINEERING MATERIALS ENGINEERING QA COPPER CLIFF SMELTER FLUID BED DRYER TUYERES SPEC-8048 1/8 Rev Description Approved by Reviewed by Issue Date YYYY/MM/DD 1 Document format and number changed. Previous number QA-017 PB 2011/12/24 PB 2011/12/24 2012/04/19 2 Modified sections 6 and

More information

North Atlantic ENGINEERING STANDARD SPECIFICATION 1/7 REV. QUALITY SLAG BOWL WELDING AND QUALITY REQUIREMENTS. Approved by.

North Atlantic ENGINEERING STANDARD SPECIFICATION 1/7 REV. QUALITY SLAG BOWL WELDING AND QUALITY REQUIREMENTS. Approved by. 1/7 Rev Description Revision by Approved by Issue Date YYYY/MM/DD 1 Update from Job 497-01 KLR 015/04/01 Updated 1.0 and 4.3 PB 016/03/09 KLR 015/04/01 PB 016/03/09 015/04/01 016/03/09 Sud = Sudbury, Ontario,

More information

REVISIONS. App Sud. App PC. App Thom 2011/12/31 AA 2011/12/31 NK 2012/08/09 N/A AA 2015/07/20

REVISIONS. App Sud. App PC. App Thom 2011/12/31 AA 2011/12/31 NK 2012/08/09 N/A AA 2015/07/20 1/5 REVISIONS Rev 1 2 Description Document format and number changed. Previous number 1402-00.01.811 roved for use in Thompson No Changes Rev n by KC 2011/12/1 KC 2011/12/1 Sud 2011/12/1 2011/12/1 PC Thom

More information

This specification covers the guidelines for the non-destructive evaluation to be followed for the Copper Cliff Smelter ladles only.

This specification covers the guidelines for the non-destructive evaluation to be followed for the Copper Cliff Smelter ladles only. 1/6 1.0 PURPOSE This specification describes the minimum required technical information to conduct the smelter ladles lifting attachment non-destructive evaluation in accordance with established Vale practices.

More information

SPECIFICATION FOR TITANIUM AND TITANIUM ALLOY CASTINGS

SPECIFICATION FOR TITANIUM AND TITANIUM ALLOY CASTINGS TECHNICAL LITERATURE: ASME SB-367 [ASTM B367] Company Website: www.metalspiping.com Your Reliable Supplier of Titanium & Nickel Alloys SB-367 SPECIFICATION FOR TITANIUM AND TITANIUM ALLOY CASTINGS SB-367

More information

MATERIAL REQUISITION FOR BOLTS AND NUTS

MATERIAL REQUISITION FOR BOLTS AND NUTS Title: MATERIAL REQUISITION FOR BOLTS AND NUTS Page: 1 of 12 MATERIAL REQUISITION FOR BOLTS AND NUTS 6 5 4 3 2 1 0 08-JUN-2013 ISSUED FOR APPROVAL M. KAMALOU A.MOHAMADIZADE A.MOHAMADIZADE REV. DATE STATUS

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

Standard Specification for Titanium and Titanium Alloy Castings 1

Standard Specification for Titanium and Titanium Alloy Castings 1 Designation: B 367 06 Standard Specification for Titanium and Titanium Alloy Castings 1 This standard is issued under the fixed designation B 367; the number immediately following the designation indicates

More information

Specification for Pipe Fittings

Specification for Pipe Fittings Specification for Pipe Fittings Specification for Pipe Fittings Page 1 of 11 Table of Contents 1.0 SCOPE...3 2.0 DEFINITIONS...3 3.0 REFERENCES, CODES AND STANDARDS...3 4.0 CONTRACTOR'S RESPONSIBILITIES...4

More information

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004)

Cast Steel Propellers W27. (May 2000) (Rev.1 May 2004) (May 2000) (Rev.1 May 2004) Cast Steel Propellers 1. Scope 1.1 These unified requirements are applicable to the manufacture of cast steel propellers, blades and bosses. 1.2 Where the use of alternative

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspecting services

More information

SQS Supplement C. Galvanizers. MnDOT Supplier Qualification Standard

SQS Supplement C. Galvanizers. MnDOT Supplier Qualification Standard SQS Supplement C MnDOT Supplier Qualification Standard Galvanizers Standard supports the Department's Approved Supplier Program for Structural Metals Suppliers as described in the current Standard Specification

More information

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL 1.1 GENERAL When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and maintain an effective Quality Control Program that details the methods and

More information

ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS

ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS ACCREDITATION OF MANUFACTURERS OF BOILERS & PRESURE VESSELS [Not applicable to ASME Sec. IV, Cast Iron and Aluminum Boilers, ASME Sec. VIII Div 1, UG-90 (c) (2) and Graphite Vessels, ASME Sec. VIII, Div.

More information

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided. 1/5 1.0 PURPOSE This specification describes the minimum requirements for design, material and construction requirements for air receivers. Ensure the design and fabrication of equipment and associated

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

There is an inspection report prepared after the Digester cleaning was carried out.

There is an inspection report prepared after the Digester cleaning was carried out. TERMS OF REFERENCE FOR CONSTRUCTION MANAGEMENT AND INSPECTION FOR THE REPAIRS AND GASPROOFING OF DIGESTER NO.2 AT THE GUELPH WASTEWATER TREATMENT PLANT BACKGROUND The work generally consists of Repairs

More information

QUALITY REQUIREMENTS

QUALITY REQUIREMENTS SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

CONCRETE REINFORCEMENT. 1. Supplementary Conditions, General Conditions, General Requirements, shall govern Work of this Section.

CONCRETE REINFORCEMENT. 1. Supplementary Conditions, General Conditions, General Requirements, shall govern Work of this Section. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03200-1 PART 1 GENERAL 1.1 General Requirements 1. Supplementary Conditions, General Conditions, General Requirements, shall govern Work of this Section.

More information

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,

More information

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided. 1/5 1.0 PURPOSE This specification describes the minimum requirements for design, material and construction requirements for Expansion tanks. Ensure the design and fabrication of equipment and associated

More information

2004 NBIC Interpretations

2004 NBIC Interpretations 2004 NBIC Interpretations INTERPRETATION 04-23 Subject: Part RC 1110, RC-2050(c), RC-3030(c), RC-3031(e) Question 1: Does RC-1110 specifically require acceptance of the jurisdiction for alternative NDE

More information

TECHNICAL REQUIREMENTS FOR PRECIPITATION HARDENING (SS 17-4 PH and PH 13-8 MO) STAINLESS STEEL BARS

TECHNICAL REQUIREMENTS FOR PRECIPITATION HARDENING (SS 17-4 PH and PH 13-8 MO) STAINLESS STEEL BARS TECHNICAL REQUIREMENTS FOR PRECIPITATION HARDENING (SS 17-4 PH and PH 13-8 MO) STAINLESS STEEL BARS 1.0 SCOPE This Specification establishes the requirements for manufacture, inspection, testing and supply

More information

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements

Document Rev: 18 State: RELEASED see Smarteam for approval authorities TASK REQUIREMENTS. Supplier Quality Requirements Document 0000000000000045 Rev: State: RELEASED see Smarteam for approval authorities This document is applicable only to suppliers of Production Items as defined below and their sub-tier suppliers. Non-

More information

QUALITY ASSURANCE PROTOCOL (QAP)

QUALITY ASSURANCE PROTOCOL (QAP) PREFACE This Standard details the level of documentation that PVT.LTD (IET) will provide during a contract for fabricating tank(s) or portable equipment s. Extensive documentation is required for this

More information

Trident Precision Manufacturing

Trident Precision Manufacturing Trident Precision Manufacturing QASQC Rev. A 6/7/06 Title: Supplier Quality Clauses Author: April V. Lusk Director of Quality General Suppliers are responsible for compliance to all stated Quality Clauses

More information

Guide for the preparation of quality programs for licensing of companies performing BPE regulated work.

Guide for the preparation of quality programs for licensing of companies performing BPE regulated work. Labour and Advanced Education Guide for the preparation of quality programs for licensing of companies performing BPE regulated work. Company Name: QC Program issue#: Revision# Overview: 1. This guideline

More information

This specification is based on recognized manufacturer s specifications and guidelines for prefinished steel wall systems.

This specification is based on recognized manufacturer s specifications and guidelines for prefinished steel wall systems. 016/09/13 1/5 1.0 PURPOSE This specification describes the minimum requirements for the supply and installation of prefinished steel wall siding complete with all accessories conforming to the wall system

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL PLAN FOR WELDING FOUNDATION PILING SPLICES

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL PLAN FOR WELDING FOUNDATION PILING SPLICES MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL PLAN FOR WELDING FOUNDATION PILING SPLICES BFS:MJC 1 of 5 APPR:MJF:POJ:10-25-12 FHWA:APPR:11-30-12 a. Description. This work

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 05 23.16.16 (May 2014) ----------------------------- Preparing Activity: USACE Superseding UFGS-05 05 23 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 05 23.16.16 (May 2014) ----------------------------- Preparing Activity: USACE Superseding UFGS-05 05 23 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

OIL TECH SERVICES, INC.

OIL TECH SERVICES, INC. OIL TECH SERVICES, INC. 800 Wilcrest, Suite 100 Houston, TX 77042-1359 (310)-527-2695 (713) 789-5144 E Mail: mlombard@itmreps.com Website: www.itmreps.com WELDING Weld Procedure Specifications (WPS): Welding

More information

Standard Operating Practice S.O.P. No

Standard Operating Practice S.O.P. No Page 1 of 6 NONCONFORMING MATERIAL - AT SUPPLIERS SUPPLIER REQUEST FOR MATERIAL REVIEW BOARD ACTION 1.0 The "Supplier Request for Material Review Board Action" Form (ARG-916) shall be initiated by a supplier

More information

TASK REQUIREMENTS. Supplier Quality Requirements

TASK REQUIREMENTS. Supplier Quality Requirements This document is applicable only to suppliers of Production Items as defined below and their subtier suppliers. Non-Production Item suppliers are not subject to this document. This document specifies the

More information

PIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing

PIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing EDITORIAL REVISION March 2013 Process Industry Practices Refractory PIP RFTF1000 Ceramic Fiber Refractory Installation Qualification, Inspection, and Testing PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

BS EN Hollow bars for machining Technical delivery conditions Non alloy and alloy steels

BS EN Hollow bars for machining Technical delivery conditions Non alloy and alloy steels BS EN 10294 1. Hollow bars for machining Technical delivery conditions Non alloy and alloy steels 1 Scope This part of EN 10294 specifies the technical delivery conditions for seamless steel hollow bars

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries

Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries API SPECIFICATION 20F FIRST EDITION, XXX 201X 1 1. Scope 1.1 Purpose This API specification specifies requirements for the

More information

DIRECTIVE Use of ASME Code Case 2596 in Alberta

DIRECTIVE Use of ASME Code Case 2596 in Alberta Information Bulletin No. IB13-008 July 26, 2013 DIRECTIVE Use of ASME Code Case 2596 in Alberta Background ASME Code Case 2596 provides the requirements for design and construction of coldstretching austenitic

More information

Quality Management System

Quality Management System Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material

More information

The qualified person performing the inspection is responsible that all requirements in this specification have been met.

The qualified person performing the inspection is responsible that all requirements in this specification have been met. 1/6 1.0 PURPOSE This specification describes the minimum requirements for procedural and technical information for inspecting mine hoists. This specification is to cover the inspection of in service mine

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Work Instruction Standard Locknut, LLC Supplier Quality Manual Doc. No. SQM-01 Page 1 of 11 Initial Date 11/1/2009 Rev. 4 Prepared By Dwight Beaty Revised By Shannon Smith Rev. Date 9/12/12 Approvals Purchasing

More information

TABLE OF CONTENTS. 1.0 INTRODUCTION Page SCOPE Page REFERENCES Page REQUIREMENTS Page QUALITY ASSURANCE Page 8

TABLE OF CONTENTS. 1.0 INTRODUCTION Page SCOPE Page REFERENCES Page REQUIREMENTS Page QUALITY ASSURANCE Page 8 TABLE OF CONTENTS 1.0 INTRODUCTION Page 3 2.0 SCOPE Page 3 3.0 REFERENCES Page 4 4.0 REQUIREMENTS Page 5 5.0 QUALITY ASSURANCE Page 8 6.0 SUBMITTALS Page 9 7.0 PREPARATION FOR SHIPMENT Page 10 Page 2 of

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

QUALITY CONTROL INSTRUCTION

QUALITY CONTROL INSTRUCTION QUALITY CONTROL INSTRUCTION NUMBER QCI 103 REVISION N TITLE: Servotronics Inc. Quality Clauses PURPOSE: To establish a system to implement Servotronics & Customer flow down Quality Requirements to Servotronics

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 05 23.16.16 (May 2014) ----------------------------- Preparing Activity: USACE Superseding UFGS-05 05 23 (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5. SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,

More information

Note: This specification was written for Clarabelle Mill's flotation cells but may have other applications.

Note: This specification was written for Clarabelle Mill's flotation cells but may have other applications. 017/03/3 1/7 1.0 PURPOSE This specification describes the minimum application and performance requirements for a field-applied, elastomer spray coating either polyurethane or polyurea type. Note: This

More information

Page 1 / 11. Version 0 June 2014

Page 1 / 11. Version 0 June 2014 Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning

More information

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 05500-1 PART 1 GENERAL 1.1 Description of Work.1 General Conditions and Division 1 shall govern Work of this section. 1.2 Quality Assurance.1 Personnel:.1

More information

AMENDMENTS TO OPSS 1802 (JAN 95) MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE SUPPLY, STORAGE, AND DELIVERY OF WELDED STEEL PIPE

AMENDMENTS TO OPSS 1802 (JAN 95) MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE SUPPLY, STORAGE, AND DELIVERY OF WELDED STEEL PIPE Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 1802 June 2001 AMENDMENTS TO OPSS 1802 (JAN 95) MATERIAL SPECIFICATION FOR SMOOTH WALLED

More information

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018 1.0 SCOPE This document establishes the quality program requirements for an organization providing engineering

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

METALLIC MATERIAL SPECIFICATION

METALLIC MATERIAL SPECIFICATION 1. Scope: Page: 1 of 5 1.1. This specification shall be utilized in procurement of AISI 8630 modified steel (UNS G86300) in quenched and tempered condition to 22 HRc maximum hardness. 1.2. These materials

More information

D. All distributors shall be reviewed and approved as per company procedure.

D. All distributors shall be reviewed and approved as per company procedure. PROCEDURE Number: QM-251 Purchase Order (QAP) Quality Assurance Provisions Department: Quality Assurance Revision: 5 Publish Date: 2015-11-18 Prepared by: Quality Manager Authorised by: Director of Operations

More information

CAG 9000 QUALITY REQIRMENTS FOR SUPPLIERS TYPE 12 & 13.

CAG 9000 QUALITY REQIRMENTS FOR SUPPLIERS TYPE 12 & 13. CAG 9000 QUALITY REQIRMENTS FOR SUPPLIERS TYPE 12 & 13. REVISION NO. : 9 DATE : 21.6.06 APPROVED BY : B. FRUMKES - QM -DIRECTOR Doc. No.: CAG 9000 Page 1 of 12 Pages CONTENTS AND PARAGRAPH INDEX PARAGRAPH

More information

NB-435 Rev. 1 Page 2 of 5

NB-435 Rev. 1 Page 2 of 5 The National Board has developed this Body of Knowledge to outline duties and responsibilities for individuals performing inspections during the construction phase of nuclear components, parts, and appurtenances

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 630 APRIL 2004 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 630.01 SCOPE 630.02 REFERENCES

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 032 TITLE: SQS PLAN AND SURVEILLANCE PROCESS

More information

INSPECTION AND TEST. PROCEDURE Total Page 13

INSPECTION AND TEST. PROCEDURE Total Page 13 PROCEDURE Total Page 13 Client : Project Name: P/O No. : Item No. : 3 2 1 0 FOR APPROVAL Rev Description Date Prepared By Checked By Approved By PROCEDURE Page 1 of 8 1. General 1.1 Scope This specification

More information

Rev Description Revision by Approved by

Rev Description Revision by Approved by 1/5 Rev Description Revision by Approved by Issue Date YYYY/MM/DD 1 New Specification 2 See Appendix A Inspection Port requirement changed-see Appendix A 2016/02/01 2016/02/01 2018/02/01 Sud = Sudbury,

More information

Conformity Assessment. Dan Cheetham BPV Requirements 4/12/16

Conformity Assessment. Dan Cheetham BPV Requirements 4/12/16 Conformity Assessment Dan Cheetham BPV Requirements 4/12/16 BPV Requirements Boiler and Pressure Vessel Requirements (Quality Control Programs, Materials, Examination & Inspection, etc.) Quality Control

More information

Florida Department of Transportation Office of Freight, Logistics and Passenger Operations Part 4 QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP

Florida Department of Transportation Office of Freight, Logistics and Passenger Operations Part 4 QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP 4.1.0 CONTRACTORS IN-PLANT QUALITY ASSURANCE REQUIREMENTS 4.1.1 QUALITY ASSURANCE ORGANIZATION Manufacturer shall establish and maintain an effective in-plant

More information

REVISION CONTROL SHEET DOCUMENT TYPE : TECHNICAL SPECIFICATION TITLE : TECHNICAL SPECIFICATION FOR AUSTENITIC STAINLESS STEEL PIPES

REVISION CONTROL SHEET DOCUMENT TYPE : TECHNICAL SPECIFICATION TITLE : TECHNICAL SPECIFICATION FOR AUSTENITIC STAINLESS STEEL PIPES REVISION CONTROL SHEET DOCUMENT TYPE : TECHNICAL SPECIFICATION NO. : PC-M-308 TITLE : AUSTENITIC STAINLESS STEEL PIPES REV. NO. & DATE DESCRIPTION OF REVISION PREPARED BY CHECKED BY REVIEWED BY APPROVED

More information

2

2 Quality Control Manual 2008 1 2 Table of Contents Introduction... 5 Major Factors in Quality Control... 6 General Requirements... 7 Plant Quality Control Procedures... 7 Steps to integrating a full quality

More information

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES

MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 2471 November 2016 MATERIAL SPECIFICATION FOR SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 2471.01 SCOPE 2471.02 REFERENCES 2471.03

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENT FENCE CERTIFICATION PROGRAM July 17, 2009

STATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENT FENCE CERTIFICATION PROGRAM July 17, 2009 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1067 607 FENCE CERTIFICATION PROGRAM July 17, 2009 1067.01 Scope 1067.02 General Program Requirements 1067.03 Certification 1067.04 Producer/Supplier

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

A. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the Drawings and specified herein.

A. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the Drawings and specified herein. PAGE 321216-1 SECTION 321216 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

A. This Section includes administrative and procedural requirements for quality assurance and quality control. SECTION 01400 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SPECIFICATION FOR PIPE BENDS FLOWLINE BUNDLE

SPECIFICATION FOR PIPE BENDS FLOWLINE BUNDLE SPECIFICATION FOR PIPE BENDS FLOWLINE BUNDLE TABLE OF CONTENTS 1. SCOPE...2 2. DEFINITIONS...2 3. REFERENCES...2 4. MANUFACTURER'S RESPONSIBILITIES...3 5. GENERAL SPECIFICATIONS...4 6. MANUFACTURING AND

More information

PS850110E ACCEPTANCE TESTING OF INCOMING AEROSPACE FASTENERS

PS850110E ACCEPTANCE TESTING OF INCOMING AEROSPACE FASTENERS SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT ENGINEERING DIVISION / ENGINEERING & DEVELOPMENT GROUP PREPARED BY: A.

More information

DOCUMENT CONTROL INFORMATION

DOCUMENT CONTROL INFORMATION DOCUMENT CONTROL INFORMATION System: Document Title: Document Status: Quality Manual Approved 5 11/5/2014 Current Document Revision Details Formal review. Added section 2, 3. Revised section 5.5.2, 6.2,

More information

PART 6: Visual and Optical Inspector Level 1, 2 and 3

PART 6: Visual and Optical Inspector Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL DOCUMENT No. CSWIP-ISO-NDT-11/93-R Requirements for the Certification of Personnel Engaged in Non- Destructive Testing in accordance with the requirements of BS EN ISO

More information

ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS

ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West

More information

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:

More information

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS REVISION DATE SPECIFICATION # F-S-304_

More information

Technical Specification for Fabrication, Testing & Supply of Back plate assembly mock-up

Technical Specification for Fabrication, Testing & Supply of Back plate assembly mock-up INSTITUTE FOR PLASMA RESEARCH (An Autonomous Institute of Department of Atomic Energy, Government of India) Near Indira Bridge; Bhat; Gandhinagar-382428; India PART-I (B) Technical Specification for Fabrication,

More information

SPECIFICATION FOR ZIRCONIUM AND ZIRCONIUM ALLOY BAR AND WIRE

SPECIFICATION FOR ZIRCONIUM AND ZIRCONIUM ALLOY BAR AND WIRE Company Website: www.metalspiping.com Your Reliable Supplier of Special Alloys! SPECIFICATION FOR ZIRCONIUM AND ZIRCONIUM ALLOY BAR AND WIRE SB-550/SB-550M (Identical with ASTM Specification B550/B550M-07(R2).)

More information

REVISIONS. App Sud. App PC. App Thom AA 2014/10/28 AA 2014/11/24 AA 2015/06/24

REVISIONS. App Sud. App PC. App Thom AA 2014/10/28 AA 2014/11/24 AA 2015/06/24 1/5 REVISIONS Rev Description Rev n by Sud PC Thom VB LH Clyd Act Issue Date YYYY/MM/DD 1 New Specification 2014/10/28 2014/10/28 N/A N/A N/A N/A N/A N/A 2014/11/12 2 Drawing Revised See endix A 2014/11/24

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements Supplier Quality Assurance Requirements Supplier Quality Assurance Requirements ARQM 005.3 Issue Date: 17/12/2013 1 1 Table of Contents 1. Table of Contents...2 2. Purpose.3 3. General Requirements 3 4.

More information

TURBO MACH A DIVISION OF VT SAA

TURBO MACH A DIVISION OF VT SAA TERMS AND CONDITIONS PAGE: 1 OF 5 1. PURPOSE To define specific terms and conditions for the purchase of product, materials and services. 2. SCOPE All products, materials and services purchased for use

More information

Custom Polishing Systems

Custom Polishing Systems Custom Polishing Systems VitraFlor by Bomanite Guideline Specification Standard Application PART 1 GENERAL SECTION 033000 CAST-IN-PLACE CONCRETE 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

Quality Control and Quality Assurance for Installation of Steel Deck

Quality Control and Quality Assurance for Installation of Steel Deck s American National standards institute/ steel deck institute QA/QC - 2011 Standard for Quality Control and Quality Assurance for Installation of Steel Deck copyright 2012 steel deck institute 1. General

More information

Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement

Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement July 25, 2011 2011 by Texas Department of Transportation (512) 416-2055 All Rights Reserved TABLE

More information

SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HMA MIXTURE (WITH SAMPLING BEHIND THE PAVER)

SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HMA MIXTURE (WITH SAMPLING BEHIND THE PAVER) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HMA MIXTURE (WITH SAMPLING BEHIND THE PAVER) C&T:JWB 1 of 10 C&T APPR:KPK:CJB:08-02-06 FHWA:APPR:08-21-06 a.

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 630 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 630.01 SCOPE 630.02 REFERENCES

More information

Mechanical & Electrical Product Workmanship Standards Procedure

Mechanical & Electrical Product Workmanship Standards Procedure Workmanship Standards Page: 1 of 14 Mechanical & Electrical Product Workmanship Standards Procedure Workmanship Standards Page: 2 of 14 1.0 PURPOSE AND SCOPE 1.1 Purpose 1.1.1 The purpose of this procedure

More information

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Status: Latest Revision Date Revision Orig Abstract: This document describes the tailored quality management system for the build

More information

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4

1.0 INTRODUCTION GENERAL SUPPLIER S RESPONSIBILITY CODES AND STANDARDS... 4 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1 GENERAL... 3 1.2 SUPPLIER S RESPONSIBILITY... 3 2.0 CODES AND STANDARDS... 4 2.1 CODES, STANDARDS AND REGULATIONS... 4 2.2 NEPTUNE ENERGY NETHERLANDS B.V. SPECIFICATIONS...

More information

Supplier Quality Requirements Revision B Dated November 21, 2017

Supplier Quality Requirements Revision B Dated November 21, 2017 Page 1 of 12 1. APPLICABILITY The Supplemental Quality Requirements in this document pertain to ETE designed product purchase orders. Suppliers shall ensure that their employees are aware of: Their contribution

More information

ALUMINIUM ALLOY SAND AND CHILL CASTINGS Gr M

ALUMINIUM ALLOY SAND AND CHILL CASTINGS Gr M ALUMINIUM ALLOY SAND AND CHILL CASTINGS Gr. 4635 M FOR INTERNAL USE ONLY REMOVE THIS PREFACE BEFORE ISSUE TO SUPPLIERS Comparable Standards: 1. INDIAN : IS: 617-1994 Grade-4635 M 2. GERMAN : DIN 1725-1983,

More information

Ontario ENGINEERING STANDARD GUIDELINE 1.0 PURPOSE 2.0 THERMITE WELDING 2.1 WELD PROCEDURE

Ontario ENGINEERING STANDARD GUIDELINE 1.0 PURPOSE 2.0 THERMITE WELDING 2.1 WELD PROCEDURE /7.0 PURPOSE The following guideline addresses the minimum requirements to successfully thermite weld. This is not meant to supersede the thermite kit manufacturer s procedure / methodology. 2.0 THERMITE

More information

Pressure Equipment Repair and Alteration Requirements

Pressure Equipment Repair and Alteration Requirements the pressure equipment safety authority Pressure Equipment Repair and Alteration Requirements AB-513 Edition 3, Revision 0 - Issued 2018-01-30 Table of Contents FOREWORD... iii 1.0 INTRODUCTION... 1 2.0

More information

CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS

CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS DS Temple 13.1 SCOPE This section covers the inspection of mechanically stabilized earth walls and other patented earth

More information

COMPANY HISTORY. MG Castings Profile Rev 2_ Feb 2019 ~ 1 ~

COMPANY HISTORY. MG Castings Profile Rev 2_ Feb 2019 ~ 1 ~ COMPANY HISTORY The company was established in 1986 by founder and then Managing Director Mr. M.G. Booyens. The emphasis of M.G. Castings has always been, providing excellent and personalized service and

More information

Introduction: NAV 30 - FORGING PROCESS. State, Zip: Type of company ownership: Business ownership/relationship with other organizations:

Introduction: NAV 30 - FORGING PROCESS. State, Zip: Type of company ownership: Business ownership/relationship with other organizations: NAV 30 - FORGING PROCESS FORGING PROCESS AUDIT CHECKLIST Company: Address: City: State, Zip: Supplier I.D.: CAGE Code: Date: Type of company ownership: Business ownership/relationship with other organizations:

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 01 40 00 QUALITY REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Quality control and control of installation. Tolerances. References. Labeling. Mock-up requirements. Testing and inspection

More information