MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

Size: px
Start display at page:

Download "MERCED COUNTY CAMPUS PARKWAY SEGMENT 2"

Transcription

1 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item must include all of the bidder s costs and markup, including labor, materials, equipment, supplies, insurance, taxes, overhead and profit. In the far right column, provide the total amount for each item, calculated as the product of the unit price multiplied by the estimated quantity. Enter the sum of all unit total amounts as the total and enter that amount on the Bid Proposal form. PART A BID S (ON SR 140): TOTAL IN A CONSTRUCTION STAKING LUMP SUM LEAD COMPLIANCE PLAN LUMP SUM DEVELOP WATER SUPPLY LUMP SUM CONSTRUCTION AREA SIGNS LUMP SUM TRAFFIC CONTROL SYSTEM LUMP SUM TYPE III BARRICADE EA A TEMPORARY TIMBER BARRICADE LF TEMPORARY PAVEMENT MARKING (PAINT) SQFT TEMPORARY TRAFFIC STRIPE (PAINT) LF 43, CHANNELIZER (SURFACE MOUNTED) TRAFFIC PLASTIC DRUM 70 7

2 TOTAL IN PORTABLE CHANGEABLE MESSAGE SIGN LUMP SUM TEMPORARY RAILING (TYPE K) LF 4, A TEMPORARY ALTERNATIVE CRASH CUSHION EA JOB SITE MANAGEMENT LUMP SUM PREPARE STORM WATER POLLUTION PREVENTION PLAN LUMP SUM STORM WATER ANNUAL REPORT TEMPORARY DRAINAGE INLET PROTECTION EA TEMPORARY FIBER ROLL LF 6, TEMPORARY GRAVEL BAG BERM LF TEMPORARY CONSTRUCTION ENTRANCE EA STREET SWEEPING LUMP SUM A TEMPORARY CONCRETE WASHOUT FACILITY REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) LF 3, CONTRACTOR SUPPLIED BIOLOGIST () LUMP SUM NATURAL RESOURCE PROTECTION PLAN LUMP SUM CLEARING AND GRUBBING () LUMP SUM 8

3 TOTAL IN ROADWAY EXCAVATION CY 9, A DETENTION BASIN EXCAVATION CY 39, A SETTLEMENT PLATFORM EA A BIORETENTION SOIL MIX CY 2, HYDROMULCH SQFT 432, FIBER ROLL LF 16, STRAW SQFT 432, A HYDROSEED (TYPE 1) SQFT 432, B HYDROSEED (TYPE 2) SQFT 40, COMPOST CY 1, CLASS 3 AGGREGATE SUBBASE CY 5, CLASS 4 AGGREGATE SUBBASE CY 7, CLASS 2 AGGREGATE BASE CY 7, HOT MIX ASPHALT (TYPE A) TON 11, PLACE HOT MIX ASPHALT DIKE (TYPE E) PLACE HOT MIX ASPHALT (MISCELLANEOUS AREAS) LF 2,050 SQYD TACK COAT TON COLD PLANE ASPHALT CONCRETE PAVEMENT STRUCTURAL CONCRETE, DRAINAGE INLET SQYD 250 CY 77 9

4 TOTAL IN A UTILITY POLE PROTECTION EA A MINOR CONCRETE (CAP) CY " REINFORCED CONCRETE PIPE LF 2, " REINFORCED CONCRETE PIPE LF 1, " REINFORCED CONCRETE PIPE LF " CONCRETE FLARED END SECTION 36" CONCRETE FLARED END SECTION EA 3 EA A MODIFIED MANHOLE (TYPE 1) EA ABANDON REINFORCED CONCRETE BOX REMOVE CULVERT LF CULVERT SLURRY CEMENT BACKFILL ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) ROCK SLOPE PROTECTION FABRIC (CLASS 8) CY 72 CY 39 SQYD 2, CONCRETE (CONCRETE APRON) CY MINOR CONCRETE (CURB) CY MINOR CONCRETE (CURB AND GUTTER) CY MINOR CONCRETE (DRIVEWAY) CY MINOR CONCRETE (SIDEWALK) CY 23 10

5 TOTAL IN MINOR CONCRETE (TEXTURED PAVING) CY MINOR CONCRETE (CURB RAMP) CY MISCELLANEOUS IRON AND STEEL LB 7, A B C ADJUST WATER VALVE COVER TO GRADE ADJUST WATER METER BOX TO GRADE ADJUST SANITARY SEWER MANHOLE TO GRADE EA 3 EA 2 EA D EMERGENCY VEHICLE DETECTION SYSTEM LUMP SUM E ADJUST GAS VALVE COVER TO GRADE F LIGHTING (COUNTY STREET) LUMP SUM SURVEY MONUMENT (TYPE D) RELOCATE MAILBOX CHAIN LINK FENCE (TYPE CL 4) LF REMOVE CHAIN LINK FENCE LF REMOVE PAVEMENT MARKER PAVEMENT MARKER (RETROREFLECTIVE) EA OBJECT MARKER (TYPE N) EA OBJECT MARKER (TYPE P) EA OBJECT MARKER (TYPE K 1) EA 2 11

6 TOTAL IN RELOCATE ROADSIDE SIGN EA FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" UNFRAMED) SQFT ROADSIDE SIGN ONE POST EA INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA REMOVE GUARDRAIL LF THERMOPLASTIC TRAFFIC STRIPE LF 24, THERMOPLASTIC PAVEMENT MARKING REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 1,140 LF 7,480 SQFT SIGNAL AND LIGHTING SYSTEM LUMP SUM MOBILIZATION LUMP SUM TEMPORARY HYDRAULIC MULCH SQYD 52,500 94A A JACK AND BORE 18" RCP LF 24 TOTAL BID AMOUNT FOR PART A* *Total Bid Amount for Part A (Items 1 94 plus 94A) 12

7 PART B BID S (FROM CHILDS AVE TO CONNECTOR ROAD): TOTAL IN A CONSTRUCTION STAKING PROGRESS SCHEDULE (CRITICAL PATH METHOD) TIME RELATED OVERHEAD WDAYS A CONTRACTOR FURNISHED RESIDENT ENGINEER'S (RE) OFFICE DEVELOP WATER SUPPLY CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TYPE III BARRICADE A TIMBER BARRICADE LF CHANNELIZER (SURFACE MOUNTED) EA PORTABLE CHANGEABLE MESSAGE SIGNS TEMPORARY RAILING (TYPE K) LF A TEMPORARY ALTERNATIVE CRASH CUSHION JOB SITE MANAGEMENT PREPARE STORM WATER POLLUTION PREVENTION PLAN MOVE IN/MOVE OUT (TEMPORARY EROSION CONTROL) EA TEMPORARY FIBER ROLL LF 49,100 13

8 TOTAL IN A TEMPORARY GRAVEL BAG LF TEMPORARY SILT FENCE LF 13, A TEMPORARY CONCRETE WASHOUT FACILITY EA TEMPORARY CONSTRUCTION ENTRANCE EA TEMPORARY CHECK DAM LF 2, TEMPORARY DRAINAGE INLET PROTECTION EA STREET SWEEPING STORM WATER ANNUAL REPORT EA CONTRACTOR SUPPLIED BIOLOGIST () NATURAL RESOURCE PROTECTION PLAN CLEARING AND GRUBBING () ROADWAY EXCAVATION CY 15, A DETENTION BASIN EXCAVATION CY 33, [f] 126 [f] STRUCTURE EXCAVATION (BRIDGE) CY STRUCTURE BACKFILL (BRIDGE) CY IMPORTED BORROW CY 581, A SETTLEMENT PLATFORM 2 14

9 TOTAL IN SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B2 SQYD 3, A SOIL PREPARATION AND AMENDMENTS A BIORETENTION SOIL MIX CY 5, A COMMERCIAL FERTILIZER SQFT 50, B TACKIFIER SQFT 50, PLANT (GROUP K) EA PLANT (GROUP A) EA PLANT (GROUP B) PLANT (GROUP U) EA PLANT ESTABLISHMENT WORK DECOMPOSED GRANITE SQYD 4, A WOOD MULCH (3 INCHES DEEP) SQFT 35, A ELECTRIC REMOTE CONTROL VALVE ASSEMBLY EA B LOW VOLUME WITH HIGH FLOW CONTROL ZONE KIT A 1 1/2" REMOTE CONTROL MASTER VALVE A IRRIGATION CONTROLLER (24 STATION) /2" BACKFLOW PREVENTER ASSEMBLY 15

10 TOTAL IN BACKFLOW PREVENTER ASSEMBLY ENCLOSURE /2" FLOW SENSOR A SUBSURFACE DRIP, TECHLINE CV LF 9, B 3/4" QUICK COUPLER VALVE ASSEMBLY EA C TREE BUBBLERS /2" GATE VALVES EA A 1 1/2" MASTER VALVE A PLASTIC PIPE MAIN LINE (1 1/2") LF 1, B PLASTIC PIPE LATERAL LINES LF 1, " CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF 1, MOVE IN/MOVE OUT (EROSION CONTROL) EA IMPORTED TOPSOIL CY 1, A JUTE MESH SQFT 10, HYDROMULCH SQFT 1,250, FIBER ROLL LF 49, STRAW SQFT 1,250, A HYDROSEED (TYPE 1) SQFT 1,250, B HYDROSEED (TYPE 2) SQFT 85, COMPOST CY 3,860 16

11 TOTAL IN CLASS 3 AGGREGATE SUBBASE CY 10, CLASS 4 AGGREGATE SUBBASE CY 12, CLASS 2 AGGREGATE BASE (CY) CY 16, HOT MIX ASPHALT (TYPE A) TON 16, PLACE HOT MIX ASPHALT DIKE (TYPE C) LF PLACE HOT MIX ASPHALT DIKE (TYPE F) LF TACK COAT TON FURNISH PILING (CLASS 200) (ALTERNATIVE W) LF 9, DRIVE PILE (CLASS 200) (ALTERNATIVE W) PRESTRESSING CAST IN PLACE CONCRETE STRUCTURAL CONCRETE, BRIDGE FOOTING CY STRUCTURAL CONCRETE, BRIDGE CY 1, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) CY STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) CY 62 17

12 TOTAL IN STRUCTURAL CONCRETE, DRAINAGE INLET CY A ARCHITECTURAL TREATMENT (COBBLESTONE TEXTURE) SQFT 1, B ARCHITECTURAL TREATMENT (EXPOSED AGGREGATE FINISH) SQFT 10, JOINT SEAL ASSEMBLY (MR 2 1/2") LF BAR REINFORCING STEEL (BRIDGE) LB 641, HEADED BAR REINFORCEMENT " REINFORCED CONCRETE PIPE LF 4, " REINFORCED CONCRETE PIPE LF 1, " REINFORCED CONCRETE PIPE LF " CORRUGATED STEEL PIPE DOWNDRAIN (0.064" THICK) LF " WELDED STEEL PIPE CASING (BRIDGE) LF " CONCRETE FLARED END SECTION 24" CONCRETE FLARED END SECTION 30" CONCRETE FLARED END SECTION EA 5 EA 6 18

13 TOTAL IN " PRECAST CONCRETE PIPE INLET LF A STORM DRAIN MANHOLE EA B MODIFIED MANHOLE EA ROCK SLOPE PROTECTION (20LB, CLASS I, METHOD B) CY CONCRETE (CONCRETE APRON) CY SLOPE PAVING (CONCRETE) CY ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 8, MINOR CONCRETE (CURB) CY A MINOR CONCRETE (CURB AND GUTTER) MINOR CONCRETE (DEPRESSION APRON) CY 500 CY MINOR CONCRETE (DRIVEWAY) CY A MINOR CONCRETE (BIKE RAMP) CY A MINOR CONCRETE (TEXTURED PAVING) SQFT 5, MINOR CONCRETE (CURB RAMPS) CY A MINOR CONCRETE (MEDIAN OEPNING WALKWAY) CY MISCELLANEOUS IRON AND STEEL LB 9, MISCELLANEOUS METAL (BRIDGE) LB

14 TOTAL IN A 2" BLOWOFF VALVE B 1" WATER METER SERVICE C REMOVE 16" WATER LINE LF A SURVEY MONUMENTS EA PREPARE AND STAIN CONCRETE SQFT 1, A UTILITY POLE PROTECTION A 28' WIDE TUBE GATE REMOVE PAVEMENT MARKER EA REMOVE DELINEATOR A REMOVE CHANENELIZER DELINEATOR (CLASS 1) EA GUARD RAILING DELINEATOR EA PAVEMENT MARKER (RETROREFLECTIVE) EA OBJECT MARKER (TYPE P) EA OBJECT MARKER (TYPE K 1) EA OBJECT MARKER (TYPE L 1) EA A REMOVE BARRICADE EA FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" UNFRAMED) SQFT FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" FRAMED) SQFT 14 20

15 TOTAL IN ROADSIDE SIGN ONE POST ROADSIDE SIGN TWO POST EA INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF VEGETATION CONTROL (MINOR CONCRETE) SQYD A CHAIN LINK RAILING (TYPE 3) LF CHAIN LINK RAILING (TYPE 7) LF 1, A TUBULAR BICYCLE RAILING LF DOUBLE MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF TRANSITION RAILING (TYPE WB 31) EA RAIL TENSIONING ASSEMBLY ES END CAP (TYPE TC) EA ALTERNATIVE FLARED TERMINAL SYSTEM EA CRASH CUSHION EA CONCRETE BARRIER (TYPE 732 MOD) LF 1,730 21

16 TOTAL IN A CONCRETE BARRIER (TYPE 732B MOD) LF THERMOPLASTIC TRAFFIC STRIPE LF 35, THERMOPLASTIC PAVEMENT MARKING REMOVE THERMOPLASTIC TRAFFIC STRIPE SQFT 5,100 LF 3, A REMOVE PAVEMENT MARKING SQFT 1, A SIGNAL AND LIGHTING (FUTURE) (COUNTY) A LIGHTING SYSTEM LIGHTING (/COUNTY STREET) MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM DURING CONSTRUCTION MOBILIZATION TEMPORARY HYDRAULIC MULCH SQYD 148,000 TOTAL BID AMOUNT FOR PART B When an item of work is designated as or [P-F] in the Bid Items, the estimate quantity shall be the final pay quantity. 22

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No. ADDENDUM #3 STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No. 2016-003; Federal Project No. DEM10L-5209(008) November 9, 2017 Addendum for: AND IA STATE ROUTE 60 AT POTRERO

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00

More information

REPLACE BRIDGE FEDERAL AID ACBR-P199-(031)E NH-P199-(031)E

REPLACE BRIDGE FEDERAL AID ACBR-P199-(031)E NH-P199-(031)E STATE OF CALIFORNIA B I D S U M M A R Y DEPARTMENT OF TRANSPORTATION BID245 PAGE 1 BID OPENING DATE 04/18/07 IN DEL NORTE COUNTY NEAR GASQUET 04/19/07 CONTRACT NUMBER 01-293144 FROM 0.3 KM SOUTH HARDSCRABBLE

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT JUNE 22, B. This Addendum consists of 46 pages.

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT JUNE 22, B. This Addendum consists of 46 pages. ADDENDUM NO. 6 5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT 17-01 JUNE 22, 2017 OWNER City of Yuba City 1201 Civic Center Blvd Yuba City CA 95993 (530) 822-4626 (530) 822-4694 (Fax) GENERAL Scope A.

More information

August 19, 2016 CCTA Contract No. 427 Caltrans Contract No. 04-4H1604 Balfour Interchange Project

August 19, 2016 CCTA Contract No. 427 Caltrans Contract No. 04-4H1604 Balfour Interchange Project August 19, 2016 CCTA Contract No. 427 Caltrans Contract No. 04-4H1604 Balfour Interchange Project Addendum No. 2 Dear Contractor: This addendum is being issued to the contract for construction on State

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : 012777.00 PROJECTS ------------------------------ STP-1277(700)S COUNTY : ANDROSCOGGIN CONTRACT ID : 012777.00 MAINE

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2:00 pm DATE: October 8, 2000 PROJECT: RTHQUAKE RETROFIT PROJECT NOS. A2-0663 & A9-06, STPLNZP-96(03) STPLNZP-96(03) 2 3 6 7 8 9 0 2 3 6 7 8 9 9A 9B SCHEDULE "A" (RTHQUAKE RETROFIT) 9030 WORK

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall

More information

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 3690 NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Commissioners Kitsap County 614 Division Street Port

More information

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360

More information

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT JUNE 9, 2017

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT JUNE 9, 2017 ADDENDUM NO. 2 5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT 17-01 JUNE 9, 2017 OWNER City of Yuba City 1201 Civic Center Blvd Yuba City CA 95993 (530) 822-4626 (530) 822-4694 (Fax) GENERAL Scope A. This

More information

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS PAGE : 409-1 CONTRACT TIME : 02/28/13 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STATE ROUTE 45 ROADWAY DRAINAGE IMPROVEMENT CONTRACT DP 12409 BOROUGH OF WESTVILLE, GLOUCESTER COUNTY VENDOR

More information

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max: Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION

More information

Improvement Plan Cost Estimate

Improvement Plan Cost Estimate Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT JUNE 16, 2017

5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT JUNE 16, 2017 ADDENDUM NO. 3 5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT 17-01 JUNE 16, 2017 OWNER City of Yuba City 1201 Civic Center Blvd Yuba City CA 95993 (530) 822-4626 (530) 822-4694 (Fax) GENERAL Scope A.

More information

MAY 11, 2017 T-MC-107A & T-MC-107B1

MAY 11, 2017 T-MC-107A & T-MC-107B1 Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05

More information

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS Section Title Page 20.1 General... 20-1 20.2 Units and Costs... 20-1 20.2.1 Erosion Control...20-1 20.2.2 Street Improvements...20-1 20.2.3

More information

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS General Description: Date Prepared: November 1, 2017 (253) 604-6600 KHouse@Parametrix.com Bid Number: J2017-30 ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO

More information

Department of Transportation Mitchell Region Office

Department of Transportation Mitchell Region Office Connecting South Dakota and the Nation Department of Transportation Mitchell Region Office PO Box 1206 Mitchell, SD 57301-7206 605/995-8129 FAX: 605/995-8135 September 28, 2018 TO: Interested Bidders (pdf

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2018040 TRACS No. Project No. County District Gross

More information

CITY OF ROCKLIN STANDARD DRAWINGS

CITY OF ROCKLIN STANDARD DRAWINGS CITY OF ROCKLIN STANDARD DRAWINGS November 2016 Table of Contents Page # Section 1 Section 2 Section 3 General Notes and Review Boxes 01-01 Signature Blocks... 1 01-02 General Notes (Sheet 1 of 8)... 2

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,417,760.75 Scott Construction - Falmouth, ME $1,418,884.50 T Buck Construction - Auburn, ME $1,520,203.00 Page 1 of 16 CPM Constructors

More information

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40 PART A - ROADWAY - EOC 2461 201(A) CLEARING AND GRUBBING LSUM 1.00 $500,000.00 $500,000.00 202(A) UNCLASSIFIED EXCAVATION CY 651,706.00 $4.00 $2,606,824.00 202(D) UNCLASSIFIED BORROW CY 7,500.00 $8.00

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59 General Info Number: PROJECT NO. 43-19-07 Description: BRIDGE REHABILITATION AND 3RD LANE WIDENING OHIO TURNPIKE OVER AI CREEK M.P. 47.4, OHIO TURNPIKE OVER S.R. 64 (N. MAIN ST.) M.P. 47.5 MILEPOST 46.50

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

CITY OF ELKO BID TABULATION FOR Sports Complex

CITY OF ELKO BID TABULATION FOR Sports Complex CITY OF ELKO BID TABULATION FOR Sports Complex 2017-2018 NAME Granite Construction Great Basin Engineering Contractors Road & Highway Builders CLEARING EARTHWORK 1 33701200 Mobilization @ Per Lump Sum

More information

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION. Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North

More information

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2018026 TRACS No. Project No. County District Gross

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000.

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000. LAS VEGAS PAVING CORP. CONTRI CONSTRUCTION COMPANY AGGREGATE INDUSTRIES-SWR, INC. TAB CONTRACTORS, INC. ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance To: Project Name: Bidding Company Site Work Project Contact: Address: Various Phone: Fax: Bid Number: Project Location: Various, Anywhere, PA Bid Date: 7/16/2014 Clarifications: This takeoff does not include

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

Lump Sum L.S. (15") EA

Lump Sum L.S. (15) EA Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

(ENGLISH UNITS) FILE:

(ENGLISH UNITS) FILE: J u l i a R. B u e r e n, D i r e c t o r Deputy Directors Brian M. Balbas Stephen Kowalewski Steven Silveira Joe Yee Memo TO: Engineering Services Staff DATE: FROM: Warren Lai, Assistant Public Works

More information

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation 7/07/2015 Page 1 of 20 Group: A Roadway 005 201E11000 Clearing And Grubbing 008 202E20010 Headwall Removed 10.00 EA 010 202E23000 Pavement Removed, 88.00 SQYD Concrete 012 202E23010 Pavement Removed, Asphalt

More information

MONROE STREET CONTRACT NO DATE: 12/21/17

MONROE STREET CONTRACT NO DATE: 12/21/17 Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $100,000.00 $100,000.00 $48,300.00 $264,800.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 510.00 $15.00 $7,650.00 $10.00

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST

CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST Abbreviations AB 1-3 Section 11 Purpose and Definitions 11-1 Purpose PD 1 11-2 Construction Practice PD 1 11-3 Definitions PD 1 Section 12 Construction Area

More information

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6 SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO. 18-4501 SOLICITATION NO. CO-00198 ADDENDUM 6 (September 10, 2018) To Respondent of Record: This addendum, applicable to work referenced

More information

PUBLIC WORKS/ENGINEERING DEPARTMENT

PUBLIC WORKS/ENGINEERING DEPARTMENT PUBLIC WORKS/ENGINEERING DEPARTMENT ADDENDUM NO. 1 April 9, 016 TOWN OF MORAGA 016 Full Depth Reclamation Project CIP No. 08-106 TO: Prospective Bidders and Interested Parties This Addendum shall be considered

More information

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1 CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT- ENGINEERING DIVISION ADDENDUM DATE: 10/12/15 PROJECT: BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: 41506 BID DATE: 10/27/15 ADDENDUM

More information

City of Redding Construction Standards Index

City of Redding Construction Standards Index City of Redding Construction Standards Index A. Purpose and Reference Documents... A1 B. Modifications to the Standard Specifications for Public Works Construction (Greenbook)... B1 I. Streets Materials...

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 08/31/12 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-078-5(110) ROUTE I-78 RAMP C OVER BEAVER BROOK DECK REPLACEMENT AND RESURFACING CONTRACT NO.019113160

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON - April 24, 2017 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 25, 2017 in accordance

More information

Proposer shall make note of and/or incorporate all changes listed below into the requested

Proposer shall make note of and/or incorporate all changes listed below into the requested Request for Proposal (RFP) Bid No: 18-10-1940LE Addendum No. 4 Date: November 27, 2018 To: All Proposers Subject: Addendum No. 4 Consisting of nine (9) Pages RFP No.: Project Name: Owner: 18-10-1940LE

More information

BID TAB CONTRACTOR GRAND TOTAL ENGINEER ESTIMATE $ 2,119, CIVIL CONSTRUCTION, LOW BIDDER $ 2,059,244.21

BID TAB CONTRACTOR GRAND TOTAL ENGINEER ESTIMATE $ 2,119, CIVIL CONSTRUCTION, LOW BIDDER $ 2,059,244.21 GRAND TOTAL 2,119,096.58 DER 2,059,244.21 2,314,390.95 2,558,449.01 PRAIRIE S 2,827,648.76 Page 17 201-01-00100 202-01-00100 202-02-00010 202-02-12040 202-02-02000 CLEARING REMOVAL OF REMOVAL OF REMOVAL

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96 General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE

More information

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction

More information

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016

ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016 ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP #2017-01 NOTICE TO PROSPECTIVE BIDDERS June 7, 2016 Prospective bidders are hereby informed of the following corrections, additions, deletions, and/or modifications

More information

CONTRACT ID : COMPLETION DATE : 09/15/08 =========

CONTRACT ID : COMPLETION DATE : 09/15/08 ========= PAGE : 1 COMPLETION DATE : 09/15/08 PROJECT(S): ER-1453(310)X LOCATION(S): YORK, CULVERT REPLACEMENT MAINE STATE DEPARTMENT OF TRANSPORTATION A TRUE COPY : TITLE : ATTEST : CONTRACT DESCRIPTION : YORK,

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17 Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 6216-127 Contract ID: Contract Description: Contract Location: Recommendation: 170023 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

COST ESTIMATE STREET IMPROVEMENTS (Off Site) STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter

More information

04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20)

04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20) 04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DOT CONTRACT NUMBER: D261458 NYS PROJECT NUMBER: 1805.81.000 FISCAL SHARE: 01 ENGINEERING SHARE: 001 ENGINEERING SHARE TITLE: BRIDGE SHARE

More information

C. W. Matthews Contracting Co., Inc. (L)

C. W. Matthews Contracting Co., Inc. (L) BID TABULATION Page 1 of 5 E.R. Snell Contractor, 001 Photograph Documentation 8 MO $110.00 $880.00 $250.00 $2,000.00 $97.17 $777.36 $1,250.00 $10,000.00 002 Traffic Control Project No. F-1056 1 LS $192,000.00

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1 Department of Public Works Engineering Division November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION ADDENDUM NO. 1 Dear Bidder: The following amendments are hereby made to the subject

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

Kansas Department of Transportation DISTRICT TE / TA-T045 (501) Project(s): Min: Max:

Kansas Department of Transportation DISTRICT TE / TA-T045 (501) Project(s): Min: Max: Page 1 of 11 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025600 FIELD OFFICE AND LABORATORY (TYPE A) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 025200 REMOVAL OF EXISTING

More information

General Legend Details...100

General Legend Details...100 SECTION 1 - ROADWAYS TABLE OF CONTENTS General Legend Details......100 Details Roadway Section......... 110 Residential Street Intersection.........115 Waterway and Waterway Transition Detail........116

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Scott Construction Corporation - Portland, ME $918,886.00 CPM Constructors - Freeport, ME $1,059,738.71 Wyman & Simpson Inc. - Richmond, ME $1,084,545.00 Page 1 of 7 Scott

More information

3Bureau of Construction and Maintenance

3Bureau of Construction and Maintenance Promptly sign and date on the line below, then EMAIL IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) 296-0999. Any instructions not followed will result

More information

CITY OF CARLSBAD 101 N. HALAGUENO STREET CARLSBAD, NEW MEXICO

CITY OF CARLSBAD 101 N. HALAGUENO STREET CARLSBAD, NEW MEXICO I N D E X O F D R A W I N G S CITY OF CARLSBAD 101 N. HALAGUENO STREET CARLSBAD, NEW MEXICO MARCH 2016 Molzen Corbin Bohannan-Huston Bohannan-Huston PROJECT LOCATION VICINITY MAP 1155 Commerce Dr., Suite

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS

SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION ABSTRACT OF BIDS RECEIVED 06/06/2018 LETTING CONTENTS ITEM PROJECT NO. COUNTY TYPE OF WORK 1. P 0010(00)18 (PCN 04UV) Deuel, Faulk, Roberts, Spink Replace Bridge

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current

More information

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD Schedule 5 Page 1 GENERAL DETAILS G1 General Legend for Contract Drawings Deleted (Per City A-size Drawing Block) G2 Legend for Materials

More information

Minimum Sample and Test Requirements (MSTR)

Minimum Sample and Test Requirements (MSTR) South Dakota Department of Transportation Minimum Sample and Test Requirements (MSTR) Table of Contents Page 1. Asphalt Construction:... 1 1.1 Asphalt Concrete, Hot Mix... 3 A. Aggregate, Composite...

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information