1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge ENVIRONMENTAL MANAGEMENT PLAN E700 v 2 A. Background 1. Hrvatske autoceste d.o.o. () has signed a loan with the International Bank for Reconstruction and Development (IBRD) towards the cost of Rijeka Gateway Project and intends to finance specific rehabilitation works on the big arch of the Krk Bridge. The Krk Bridge located in the north part of Croatia (about 25 km from the principal Croatian harbour - Rijeka) connects the land with the largest Croatian island of Krk (via St. Mark islet). It is of an exceptional economic, particularly tourist, importance to the island of Krk, and also to the neighbouring islands of Cres and Lošinj. The bridge includes one large arch bridge (390 m long), which connects the land with the islet of St. Mark, and one small arch bridge (244 m long), which extends this connection to the island of Krk. The overall length of the bridge is 1310 m, which includes a 96 m road cutting on St. Mark islet. The sea salt in combination with wind and humidity has caused considerable damages to the entire bridge. The main cause of the bridge damage is the sea salt penetration under strong pressure of sea-word wind (famous for its north-eastern direction, called Bora) into concrete, causing chloride corrosion. 2. Regular controls and periodical tests performed on the Krk Bridge in the past revealed the urgency to carry out rehabilitation and protection works on the reinforced concrete bridge structure of the small as well as the big arch of the bridge due to the chloride penetration into the concrete of specific sections of these arches. The proposed works under the Contract entitled Rehabilitation works on the big arch of Krk Bridge include the following activities: (i) rehabilitation of the side cutting on St. Mark and both slopes of the cutting on Krk; (ii) asphalt surfacing and rehabilitation of deck slab; (iii) rehabilitation of the traffic barrier and protection works of all concrete surfaces and the pedestrian fence; and (iv) specific large arch bridge rehabilitation and protection works. 3. In accordance with the World Bank s safeguard policies and procedures, including OP/BP/GP 4.01 Environmental Assessment, the proposed Krk bridge rehabilitation and protection works are classified as a Category B for environmental assessment purposes. Environmental due diligence for Category B World Bank financed activities advises the Borrower to prepare the present document, called Environmental Management Plan (EMP), and to implement it in order to prevent, minimize or mitigate site-specific environmental impacts. The present EMP has been prepared by to ensure that bridge rehabilitation works protect the environment from risks such as improper waste disposal, noise, soil erosion on slopes, pollution of sea and other water sources, etc. 1
2 Summary of the likely impacts of the Project 4. The proposed bridge rehabilitation works will have some short-term adverse impacts on the environment during the construction period relating to: (i) the production and application of bituminous products and protective coatings; (ii) the works performed on rehabilitation of the side cutting on the islet of St. Marko and Krk; (iii) additional noise, dust, and possible traffic management alteration during the execution of works; (iv) removal of construction related waste materials; (v) alteration of drainage and increased pollution loads (e.g., suspension solids in run-off water) in the sea. However, the design of the project offers an opportunity to introduce mitigation actions, especially with regard to surface water quality- and solid waste-associated negative environmental impacts but also with regard to the way maintenance and construction activities are undertaken in this project and in the future in the operations of. Identified environmental impacts will relate only to civil works during the bridge rehabilitation activities, and could be managed through supervision of environmental aspects and use of adequate technical construction standards. Production and application of bituminous products and protective coatings. Specific valid environmental permits including condition and operations of asphalt products and protective coatings, proper storage and application of materials, and implementation of air pollution monitoring through constant emission testing are required during performance of works. s are obliged to provide copies of certificates of those plants that provide bituminous products and protective coating materials. These certificates will be kept on file at the. Construction related waste materials Technical specifications may require the collection and containment of all waste materials with bituminous content in specific landfills. The would be required to conform to environmental regulations and practice relating to proper disposal. The identification of the disposal site to be used and the appropriate quantities for each site should be included as part of the reporting documentation. Increased pollution loads into sea Water pollution may be caused by contamination of surface waters (e.g. sea) by accidental spills, pollution of the sea with organic materials used as migrating corrosion inhibitors and water repellant agents. Short-term impact from noise, dust, and traffic diversions during the execution of road work is inevitable. Additional dust pollution and noise in course of work activities could be generated by machinery performing transportation of waste materials (e.g. surface concrete, asphalt layers), works on bridge deck surfacing, rehabilitation of local defects and protection of external surfaces of the reinforced concrete bridge structure of the large arch, and other auxiliary works. This impact will be minimized under the project by (i) specifying in the contracts the responsibility of contractor to undertake appropriate work site mitigation actions as a part of their management of work sites, and (ii) the supervision of compliance of contractors by the Supervision Engineer. Mitigation measures may include use of sprinklers to wash specific areas and suppress dust emissions during 2
3 soil/materials transport; cover vehicles to prevent spills and transport borrow materials during daytime only; provide workers with ear plugs and helmets where necessary and generally preventing from prolonged exposure to high noise levels, etc. Environmental Impact Mitigation Plan 5. The present Environmental Management Plan (EMP) includes measures to address the potential impacts listed above that will be implemented during the 18-months project implementation. More specifically, contracts for the respective bridge rehabilitation works will include in the Technical Specifications contractual clauses on environmental protection (Annex 1a), and the Mitigation Plan (Annex 1b) as well as the Monitoring Plan (Annex 1c) will be attached to these Technical Specifications. The Employer () and the will monitor the implementation of the EMP. Overall potential environmental and safety impacts are readily avoidable and can be easily mitigated by adopting good engineering practices. The Employer will ensure that the contract document include the relevant environmental protection clauses. The that will perform the civil works will also follow the requirements of the current Croatian construction and environmental regulations. The will supervise the construction works. Compliance with the Croatian regulations and the terms of the present EMP will be monitored and verified in the monthly reports submitted to the by the Supervision Engineer, based on consultations with the and site visits. The Supervision Engineer will also look into any new critical issues that may come up during the civil works and suggest actions for various agencies. Annex 1b summarizes environmental impact mitigation and prevention measures during the bridge rehabilitation works. Environmental Monitoring and Supervision 6. All environmental measures will be monitored and enforced, together with health and safety measures (accident prevention, etc.) applied by the contractor for his workforce to cover all aspects of rehabilitation works, including control of pollution and wastes at work sites and camps. There will be day-to-day supervision of all activities and rehabilitation works to ensure there is sound environmental practice employed during the contract period. The will conduct a quarterly project audit of the EMP to: a) ensure it is up to date and relevant to the situation on the ground; b) to ensure that non-compliance and corrective actions are appropriately documented; c) to review implementation status; and, d) to evaluate corrective responses of the contractor. 7. Environmental monitoring and supervision will be integrated into the project management and reporting system. Relevant Government authorities will be involved in auditing project performance and will receive copies of monitoring reports. Annex 1c summarizes the proposed monitoring activities under the project and specifies the location of the monitoring sites, frequency and duration of monitoring. Overall, two types of monitoring reporting are suggested: (i) monitoring on work progress, and (ii) environmental compliance monitoring. 3
4 EMP Implementation Arrangement 8. The will implement this project and will maintain files including copies of all contracts and environmental permits. The has an already established environmental unit within the Maintenance Department. The will designate a liaison officer for environmental protection and mitigation for these rehabilitation activities and compliance with EMP requirements. 9. The s will have as a member of their teams a specialist in charge with environmental aspects during the construction phase. 10. The on the site will assist for monitoring the environmental aspects of the project during contract implementation. The Supervisory Engineer will explain to the contractors their responsibilities in meeting the mitigation plans included in the contract. The will play a major role in monitoring. He will be responsible for: (i) providing to the a monthly monitoring report of the implementation of the EMP till the completion of the work; and (ii) taking timely measures in case of non-compliance of suggested EMP measures including indication of any variances from the EMP and specific mitigation actions that have been taken or need to be taken. 11. The Monthly report submitted by the to will include the following aspects and supervision activities as stipulated in the EMP and according to the local laws: (i) Supervision on the potential environmental impacts during works including construction noise, air quality, water quality, etc.; (ii) Supervision on the compliance with contractor s performance of works without disruption of regular traffic; (iii) Verification of the contractor responsibility on data collection and measurements of air temperature, relative air humidity, wind speed at work place as well as overall maintenance of the construction site related to environmental protection measures; (iv) Existence of work safety plan on the site (during work performance) and valid environmental permits and related documents for proper implementation of works; (v) Supervision of proper removal of construction waste to the dump site according to local regulations; (vi) Monitoring of mitigation measures of environmental pollution impacts at the construction site (e.g., construction noise; brief assessment of short-term impacts during constructions on surface waters/sea). Table 1 below summarizes the institutional arrangements for the EMP implementation. 4
5 Table 1. Institutional responsibilities for EMP implementation Responsibilities for mitigation and monitoring As stipulated in the EMP Environmental information flow (reporting) (Engineer) to (monthly) to to Local Inspectorate of Environment and Water Decision making chain of command for environmental management (to take action, to authorize expenditures, to shut down, etc.) Responsibility Activities Monitoring the implementation of the Environmental Management Plan Institution or person, appointed person (liaison officer) from Regional Inspectorate of Environment and Water 12. Conclusions and recommended steps to ensure that the EMP is implemented are as follows: To ensure that contractors pay attention to environmental impact mitigation, the EMP will be included in the Technical Specifications of the contract; To ensure the contractors understand the actions to be taken and the cost implications of environmental management and to ensure that required actions and measures are priced in bid proposals (e.g., lump-sum costs affiliated with environmental protection as stipulated in the EMP included in the Bill of Quantities); Once the contract is signed, the will be briefed on environmental management by the Employer explaining impact prevention/mitigation, the EMP included in their contracts, and the environmental monitoring to be implemented. The should report monthly on performance and progress with regard to EMP compliance. 13. Public Disclosure Croatian and English versions of the EMP were disclosed on the website on June 5, After 2-week public disclosure, no comments have been received. 5
6 Mitigation Plan Phase Issue Mitigating measure Cost Construction site Institutional responsibility for Implementation Institutional responsibility for supervision Pre- Construction Site clearance Construction Noise disturbance including vibrations Dust/air quality Traffic disruption during works Water and soil pollution from improper material storage, management and usage Water and soil pollution from improper disposal of waste materials Clearing debris generated from previous rehabilitation works on the bridge (e.g., small arch) before the commencement of the construction activities shall be done in accordance with local regulations The construction equipment will strictly conform to Croatia noise standards; Workers shall be provided with earplugs where required. Water will be sprayed on earthworks to prevent dust generation; Vehicles delivering fine materials like fine aggregate shall be covered to reduce spills on roads or around the site; Maintain construction equipment to good standard, improper functioning machinery that causes excessive pollution will be banned from the construction site. Traffic management prescribed and performed in accordance with the local laws with appropriate measures and signaling systems (e.g., appropriate lighting, traffic safety signs, barriers and flag persons) that are easily seen or easy to follow At the site, organize and cover material storage areas; take appropriate provisions to assure that construction materials (e.g., concrete, asphalt, bitumen) may not enter into sea or channels nor may it be disposed of in ditches or any waste disposal site; the construction area must be effectively protected against spill Dispose waste material at appropriate location protected from washing out and specified by local authorities. 6
7 Construction Potential contamination of soil and water from improper usage of construction equipment Workers safety Worker s Construction Site Conditions Possible air, water and soil pollution dust, vehicle exhaust, fuel and lubricants spills, sanitary wastewater, storm water Proper handling of solvents by secured storage; ensure proper usage of construction equipment; collect all waste and dispose to permitted waste place. Provide workers with safety instructions and protective equipment as required by local laws Provide workers with safety instructions and appropriate personal protective gear such as protective clothing, safety boots, helmets, gloves, goggles, ear protection, etc. where necessary; assure good drainage at site during construction works to avoid stagnant water bodies which may become breeding sites for waterborne diseases; regular clearing of septic tanks from mobile toilets to prevent outbreak of diseases; provide clean potable water for all workers in compliance with the relevant national standards on drinking water quality. documents/b&q Minimal, included in BQ Local Inspectorate of Environment and water 7
8 Monitoring Plan Phase Construction Traffic disruption during construction activity What parameter is to be monitored? Construction site traffic patterns Where is the parameter to be monitored? At and near work site How is the parameter to be monitored?/ type of monitoring equipment inspection; observation; comparison with s method statement When is the parameter to be monitored? (frequency of measurement or continuous) once per month at peak and non peak periods N.A. Cost Institutional responsibility for monitoring ; Supervisory Engineer Constructions materials supply Drainage Surface water protection (e.g., pollution loads into sea) Waste Management (Hazardous materials) Staff safety Possession of official approval or valid operation license Execution of work according to design s compliance with his approved method statement related to surface water quality (e.g. SS, ph, BOD) proper transport, storage, and disposal of construction relatedwaste materials protective equipment; organization of work on the site All materials used during works inspection Before works begin N.A. ; Supervisory Engineer At work site Inspection During construction N.A. Supervisory Engineer runoff from bridge inspection; observation unannounced inspection Minimal; site; sea (around the during works (minimum once BQ bridge area) in 5 months) depository site; workers camp; work site Job site and worker s camp inspection; supervision once every 4 months during construction and on complaint to ensure regulatory compliance with local laws Inspection; comparison with the s method statement unannounced inspections during work and upon complaint Minimal; BQ N.A. ; ; Supervision Engineer, Regional Inspectorate of Environment and water, ; Supervision Engineer, Supervisory Engineer; Construction Worker s Construction Site Conditions Overall workers Cleanliness, solid waste On the camp site Unannounced According to the existing N.A. Supervision 8
9 construction site conditions handling and disposal facilities; drainage conditions; sanitation facilities during construction activities inspection during works regulations Engineer; Regional Inspectorate of Environment and water 9
10 10
MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES
MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation
More informationIN THE KYRGYZ REPUBLIC
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY
More information10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION
10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationFinal Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome
Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Ball Plant in Germiston A Report For: Scaw South Africa
More informationCAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)
More informationBosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT
Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina
More informationE767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives
Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,
More informationSAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI
More informationLivezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF
More informationYUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT
More informationAlberta Transportation The City of Edmonton The City of Calgary
Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for
More informationCORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the
More informationChapter 13 Management and Monitoring
Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2
More informationE3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management
More informationTERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT
TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT 1. Background The Asian Development Bank (ADB) has assisted the Kyrgyz Republic in the rehabilitation
More informationDRAFT FOR CONSULTATION OCTOBER 7, 2014
The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness
More informationAM-PR-003 Construction Environmental Management Plan (C-EMP)
OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been
More informationChapter 13 Management and Implementation
Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction
More informationE957 VOL. 5 ENVIRONMENTAL MANAGEMENT PLAN. IiOCSA Roads Department of the Ministry of Economic Development of Georgia
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Roads Department of the Ministry of Economic Development of Georgia Financial Manager:
More informationENVIRONMENTAL MANAGEMENT PLAN
Public Disclosure Authorized Public Disclosure Authorized Roads Department of the Ministry of Regional Development and Infrastructure of Georgia Financial Manager: Transport Reform and Rehabilitation Center
More informationMatrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments
District Capitals Water Supply Project (RRP TIM 44130-02) Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments PRE-CONSTRUCTION ACTIVITIES Safety at Work Accidents Include
More informationCOMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM
AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN
More informationEnvironment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007
E1467 v 25 Environment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007 1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure
More informationSFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure
More informationEnvironmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007
Environmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007 E1467 v 22 1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
More informationPublic Disclosure Authorized EXECUTIVE SUMMARY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting
More informationSubsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)
Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey
More informationCCSD#1 Stormwater Standards
SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless
More informationBi-annual Environmental Monitoring Report
Bi-annual Environmental Monitoring Report Bi annual Report September 2018 PAK: Flood Emergency Reconstruction and Resilience Project Punjab Communication and Works (C&W) Component Prepared by Punjab Communication
More informationENVIRONMENTAL MANAGEMENT PLAN. Developed for National Asphalt (Pty) Ltd. Generic Requirements
ENVIRONMENTAL MANAGEMENT PLAN Developed for National Asphalt (Pty) Ltd Generic Requirements November 2013 GENERIC ENVIRONMENTAL MANAGEMENT PLAN NATIONAL ASPHALT (Pty) Ltd PO Box 1657 Hillcrest 3650 Tel:
More informationIDA Credit 3938-GE. Contract no: SLRP/CW/ICB-13 Rehabilitation of the road Sh2 Sajavakho-Chokhatauri- Ozurgeti-Kobuleti (Km to Km )
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Roads Department of the Ministry of Economic Development of Georgia Financial Manager:
More informationEnvironmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review
Environmental Management Plan Introduction This Environmental Management Plan (EMP) has been prepared for SEF Energy Co. Ltd. for the purpose of providing a stand-alone plan for managing the potential
More informationEnvironmental Management Programme (EMP)
Appendix D Environmental Management Programme (EMP) Please note that although Construction and Operational Phase measures are included in this EMP they are relevant to the issued Waste Management Licence
More informationDust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation
Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission
More informationSECTORAL ENVIRONMENTAL ASSESSMENT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Regional and Roads Program Support Project SECTORAL ENVIRONMENTAL
More informationEnvironmental Guidelines for Construction Sites
Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building
More informationGUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08
CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Environmental Specialist Responsible Manager: Head of Environment Responsible Executive:
More informationMINISTRY OF EDUCATION YEMEN SECONDARY EDUCATION DEVELOPMENT AND GIRLS ACCESS PROGRAM (SEDGAP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) November 27, 2008.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF EDUCATION YEMEN SECONDARY EDUCATION DEVELOPMENT AND GIRLS ACCESS PROGRAM
More informationMining Environmental Impact Assessment Guidelines. May 2018
Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of
More informationHealth and safety norms of CPWD should be followed during construction.
Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"
More informationAsbestos Management System
Asbestos Management System PERSONNEL DIVISION AIM: To ensure that all reasonably practicable steps have been taken to prevent the risk of exposure of staff, students, contractors and lawful visitors to
More informationSITE DESIGN ENGINEER'S STATEMENT:
SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED
More informationReference No. RAMP/C/03-10/CQ
REPUBLIC OF CROATIA MINISTRY OF FINANCE TAX ADMINISTRATION REVENUE ADMINISTRATION MODERNIZATION PROJECT Reference No. RAMP/C/03-10/CQ Terms of Reference Technical Supervision of reconstruction and construction
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationENVIRONMENTAL MANAGEMENT PLAN (EMP)
ENVIRONMENTAL MANAGEMENT PLAN (EMP) For the Works on Mechanical Installations (Air Conditioning and Ventilation) at the State Geodetic Administration Central Archives in Glina INTRODUCTION The objective
More informationConstruction Environment Management Plan
Construction Environment Management Plan Guidance Material July 2013 ABSTRACT This CEMP guidance material has been prepared by MAC to assist the identification and management of environmental risks associated
More informationARMENIA: Access to Finance for Small and Medium Enterprises Environmental Safeguard Review Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E2058 ARMENIA: Access to Finance for Small and Medium Enterprises Environmental Safeguard
More informationAppendix H Mitigation Monitoring Plan
Appendix H Mitigation Monitoring Plan Appendix H No. Impact/Mitigation Measure Implementation & Monitoring 1. Traffic and Transportation Impacts All traffic control plans and mitigation measures, prepared
More informationQty (1) 1 Lot. 1 Lot. 1 Lot
Schedule No. 4c. Environmental, Social, Health And Safety () Cost Schedule Item Description Unit Price Total Price 1001 Air quality & dust Qty (1) a. The Contractor to protect stockpiles of friable material
More informationMunicipal solid / hazardous waste
(10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the
More informationLIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION
REPUBLIC OF ARMENIA MINISTRY OF TRANSPORT AND COMMUNICATION TRANSPORT SI LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION REHABILITATION OF THE
More informationINTERNAL AUDIT DIVISION REPORT 2018/127. Audit of waste management in the United Nations Interim Security Force for Abyei
INTERNAL AUDIT DIVISION REPORT 2018/127 Audit of waste management in the United Nations Interim Security Force for Abyei Despite the challenging environment and several initiatives launched, significant
More informationLao People s Democratic Republic Peace Independence Democracy Unity Prosperity
Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Agriculture and Forestry No 0538/MAF Vientiane, Date 09/02/2011 Agreement of the Minister on Good Agriculture
More information901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT
SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants
More informationManningham Works Code of Practice
Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au
More informationDraft Environmental and Social Action Plan (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs
Draft Action (ESAP) For M6-M60 Motorway, Sections between Szekszard-Boly, and Boly-Pecs No Action Risks, Project preparation, permits and licences I.1 Preparation of Organization for, including inter alia:
More informationPapua New Guinea LNG Project. Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV
Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 6: Spill Prevention and Response Plan PGGP-EH-SPENV-000018-008 LNG Project Page 2 of 14 CONTENTS 1.0
More informationAttachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)
TAILINGS DISPOSAL Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) Tailings must be disposed of in a manner that optimizes protection of human
More informationRed Tractor Farm Assurance Fresh Produce GLOBALG.A.P (Supplement) RT/GG Supplement 2016/17
Red Tractor Farm Assurance Fresh Produce GLOBALG.A.P (Supplement) GLOBALG.A.P. (Add-On) Standard Number Standard Compliance Criteria A.1 All producers requiring certification to the Red Tractor Farm Assurance
More informationWater Pollution Control for Work in Sensitive Areas
Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed
More informationCorporate Policy and Procedure
Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health
More informationENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)
ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) Disclaimer: The information contained in this communication document is intended solely for the use of guidance cannot be
More informationEXECUTIVE SUMMARY of the Environmental Impact Assessment Report
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction Additional Financing for Third East West Highway Improvement Project EXECUTIVE
More informationROADS: OPERATION AND MAINTENANCE
ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service
More informationEnvironmental Management Plan (EMP)
SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit
More informationAFGHANISTAN RING ROAD PROJECT Financed under Grant 0081: Road Network Development - Project 1, and Grant 0012: Qaisar-Bala Murghab Road Project
A. Introduction AFGHANISTAN RING ROAD PROJECT Financed under Grant 0081: Road Network Development - Project 1, and Grant 0012: Qaisar-Bala Murghab Road Project TERMS OF REFERENCE FOR PROJECT MANAGEMENT
More informationE1 687 Vol. 2 ENVIRONMENTAL ASSESSMENT FOR EXTENSITION OF RUNWAY FOR ZANZIBAR AIRPORT UNITED REPUBLIC OF TANZANIA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized UNITED REPUBLIC OF TANZANIA MINISTRY OF COMMUNICATION AND TRANSPORT (ZANZIBAR) ENVIRONMENTAL
More information8.11. Soil Erosion control Safety Compliance Summary Recommendation... 16
ENVIRONMENTAL IMPACT CONTROL REPORT FOR THE CONSTRUCTION OF TWO (2) 10km 132 KV POWERLINES FROM NGWEDI MTS TO THE EXISTING BAKUBUNG SUBSTATION AND NGWEDI MTS TO EXISTING STYLDRIFT SUBSTATION IN BONAJALA
More informationActivity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes
MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline
More informationMECC Draft EMP Approval Letter
Pacific Aviation Investment Program (PAIP) Environmental Management Plan - Lupepau u Airport (VAV) Final Draft Appendix B MECC Draft EMP Approval Letter Pacific Aviation Investment Program (PAIP) Environmental
More informationAPPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING
APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING
More informationEnvironmental and Social Monitoring Report. THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya
Environmental and Social Monitoring Report Annual Report Project Number: 45923-014 April 2014 to June 2015 THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya This environmental
More informationBosnia and Herzegovina Energy Efficiency in Public Buildings Project Environmental Management Framework. Republika Srpska
Bosnia and Herzegovina Energy Efficiency in Public Buildings Project Environmental Management Framework Republika Srpska November 2013 GENERAL INFORMATION The development objective of the Project is to
More informationEnvironmental Management Plan
Environmental Management Plan EMP for the Stage 1 Construction and Operation of the Trainers Allotment Area at the Pakenham Racecourse located at Nar Nar Goon / Longwarry Road, Tynong Pty Ltd abn: 44 706
More informationLIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776]
LIST OF CONDITIONS FOR PROPOSED EXTENSION OF THE EXISTING C PALMAR MAURITIUS HOTEL (EX LE GRAND SABLE HOTEL) BY LAGON DE REVE LTEE [ENV/DOE/EIA/1776] 1. Notwithstanding all the other permits and clearances
More informationOPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME
OPERA PHASE: ENVIRONMENTAL MANAGENT PROGRAMME 1. OBJECTIVE The overall goal for the Environmental Programme (O) is to ensure that the operation of the wind energy facility (WEF) does not have unforeseen
More informationRe: Erosion Control Report and Drawings Requirements Accompanying Document
Re: Erosion Control Report and Drawings Requirements Accompanying Document This document was created to help engineers and other design staff to better understand, meet and exceed the erosion control requirements
More informationGEORGIA URBAN ENERGY LTD
GEORGIA URBAN ENERGY LTD PARAVANI HYDROPOWER PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT REPORT ENVIRONMENTAL AND SOCIAL ACTION PLAN Prepared by SRF Gamma Tbilisi, 2011 Paravani Hydropower Project
More informationEurope and Central Asia Region Capacity Development Trust Fund
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Europe and Central Asia Region Capacity Development Trust Fund RP1439 Draft Terms of
More informationConcrete Waste Management
Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective
More informationSECTION CHEMICAL TERMITE CONTROL 11/14
SECTION 31 31 16.13 CHEMICAL TERMITE CONTROL 11/14 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred
More informationDoc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN
APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN Taking into account the findings of the ESDD, an Environmental and Social Plan (ESAP) has been developed
More informationDOCUMENT SPECIAL PROVISIONS
DOCUMENT 00813 SPECIAL PROVISIONS ADDENDUM NO. 1, DECEMBER 16, 2016 PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL FOR CONTRACTS BID ON OR AFTER APRIL 5, 2011 ENGLISH UNITS December 12, 2016
More informationBid Document Amendment Reference Number:
Bid Document Amendment Reference Number: KGN-BDD-10-2016 _Addendum 5 Tender for EPC+F of Modular Geothermal Power Plants at Olkaria The following should be amended on the Bid Document; Insert the following
More informationTable of Contents. Project Agreement Schedule 14
Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...
More informationAGSI Certification Pvt. Ltd. 208, Kartik Complex, New Link Road, Andheri (West), Mumbai
(Note: Quality policy awareness, Quality objectives, Control of documented information, Communication, Continual improvement, Responsibility and authority, Competency may be audited at each of the following
More informationPapua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV
Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other
More informationUzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP)
Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP) No Action Environmental Risks, Liability/ Benefits Legislative Requirement / EBRD Performance Requirement
More informationExhibit G. Construction Mitigation Plan
Exhibit G Construction Mitigation Plan Construction Period Mitigation 1. A construction period mitigation plan shall be prepared by the applicant for approval by the Public Works Department prior to issuance
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More informationENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors
1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction
More informationGUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08
CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date
More informationENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)
ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation
More informationHS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015
HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015 Client: John Smith TEST Site Address: Principal Designer: [Principal Designer] Principal
More informationThe overall objectives of the monitoring activities are to:
7 MONITORING PLAN 7.1 INTRODUCTION A detailed environmental and social monitoring plan will be developed for the Jubilee Phase 1 Development project and implemented by Tullow and its contractors. This
More informationKocaeli Hastane Yatırım ve Sağlık Hizmetleri A.Ş. (Kocaeli or SPV) Kocaeli Integrated Health Campus Project (KİP)
Kocaeli Hastane Yatırım ve Sağlık Hizmetleri A.Ş. (Kocaeli or SPV) Kocaeli Integrated Health Campus Project (KİP) DOCUMENT NUMBER: KİP--WWM-001 DOCUMENT TITLE: FINAL REV DATE PAGES DESCRIPTION PRPD CHKD
More informationDOORNVALLEI EXT 5 & 6
DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED
More informationRISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager
RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Bridge Inspection Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE: