1 TRB Summer Conference June 15-18, 2008 Baltimore, Maryland DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT Rodney Concienne, P.G. Terry Dempsey, P.G. Pollution Prevention & Abatement Branch Texas Department of Transportation 1

2 DOT Practices for the Identification and Abatement of Asbestos in Bridges TxDOT Overview Problem Discovery Addressing the Issues Programmatic Approaches Process Developed Where Asbestos is Found 2

3 DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT Problem Discovery Fall 2005, DSHS notified TxDOT of noncompliance with NESHAP asbestos requirements for a scheduled bridge demolition project. DSHS -Texas Department of State Health Services (DSHS) administers the Texas Asbestos Health Protection Rules (TAHPR). TAHPR adopts EPA Asbestos NESHAP by reference. 3

4 DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT Addressing the Issues Dec 2005, TxDOT issued an interim asbestos guidance for bridge work. Jan Dec 2006, TxDOT & DSHS negotiations and guidance development. Jan 2007, TxDOT issued final comprehensive asbestos guidance for construction projects. 4

5 DOT Practices for the Identification and Abatement of Asbestos in Bridges TxDOT Programmatic Approaches NESHAP does not offer much flexibility. Approved programmatic approaches Include multiple bridges with no Asbestos Containing Materials (ACM) on one notification. Flexibility with start dates for multiple bridge demolition projects with no ACM. Certain activities were exempt from NESHAP. 5

6 DOT Practices for the Identification and Abatement of Asbestos in Bridges TxDOT Programmatic Approaches Activities Generally Exempted: Work on culverts or pipes constructed entirely of concrete or metal do not require formal inspection or notification. Excluded Some Routine Maintenance Activities: Asphalt overlays or seal coats for pavement on a bridge. Repair/change-out of guardrail, barrier walls, or fencing consisting of uncoated concrete, steel or wood. Addition of conduits/piping and lighting. Sealing of cracks. Small deck repairs affecting only concrete, asphalt, or steel. Modification of drainage openings. Change-outs of reflectors or signs. 6

7 DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT General Process Developed Identify activities that might disturb potential ACM. Inspect and test to determine whether ACM are present. Notify DSHS for projects that include demolition, or that disturb ACM above asbestos thresholds. Abate (remove) confirmed ACM using trained asbestos contractors. 7

8 Asbestos and Bridge Maintenance Identify Activities Activities that might disturb potential ACM: Demolition activities - bridge replacements and other projects that would remove a significant portion of the structure (most common). Renovation activities - work that could disturb potential ACM. 8

9 Asbestos Procedures for Bridges Inspection Have the structure inspected for potential ACM prior to the project. Generally use licensed asbestos inspector to perform the inspection, sample and analyze suspect materials, estimate extent of ACM, and provide report. TxDOT may use in-house personnel for initial inspection if properly trained in identifying ACM. Verify with Point Count Method for samples w/ 5% or less ACM. 9

10 Asbestos Procedures for Bridges Notification DSHS notification is required for all demolition projects and some renovations Must use the official DSHS Demolition/ Renovation Notification Form. Notification must be postmarked at least 10 working days prior to demolition start date (cannot be faxed or ed). Amend the notification when project start/stop dates change. 10

11 Asbestos Procedures for Bridges Notification - Demolition Demolition - submit DSHS Notification Form for all bridge demolitions, even when asbestos is not present. For construction projects requiring demolition of multiple bridges, and asbestos is not present, a single notification may be filed for the entire project. May use project start/stop dates rather than start/stop dates for individual bridges within the project. 11

12 Asbestos Procedures for Bridges Notification Renovation/Abatement Renovation DSHS notification required only when the activity will disturb ACM above NESHAP thresholds. NESHAP Threshold Quantities RACM equals or exceeds: 260 linear feet for pipes, 160 sq feet for other components (such as coatings). 35 cu. feet of removed material which could not be measured previously 12

13 Asbestos and Bridge Maintenance When is abatement required? Abate when ACM might be disturbed by project activities: Abate using a licensed abatement contractor prior to project activities whenever possible. Perform abatement separately from the prime contract when possible, if can t abate prior. For work disturbing ACM, use an asbestos consultant to provide project management and guidance. 13

14 Asbestos Procedures for Bridges DSHS Fee Payments DSHS will invoice TxDOT an asbestos notification fee, based on the amount of asbestos involved. TxDOT finance division sent instructions to district accounting staff explaining payment procedures (designate single point of contact). 14

15 Asbestos Procedures for Bridges TxDOT NESHAP Activity January 2006 April 2008: 86 Projects required DSHS notification. 55 of 86 demolition only. 12 of 86 ACM abatement. 19 of 86 ACM abatement and demolition. 15

16 DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT Where Asbestos is Found ACM on TxDOT Structures Approximately 12% of materials tested had ACM. Occurrences from 451 bridge inspections: Concrete Coatings 47/193 Mastics/Caulks/Adhesives 9/118 Utility Attachments/Pipes 5/8 Roofing Felt 4/86 Paint on Timber 2/5 16

17 Asbestos and Bridge Maintenance Asbestos-Containing Materials Frequency from 451 bridge inspections (continued): Exp Joint Filler / Asphalt Board 2/44 Coatings on Steel Girders 2/58 Pads under Rail Posts 1/5 Coatings on Steel Rail 1/36 Joint Sealant 1/52 Neoprene Bearings 0/36 17

18 Examples: Utility Attachment / Pipes 5/8 ACM 18

19 Asphaltic roofing felt or fiberboard bearing material 4/86 acm 19

20 Roofing felt pile cap on timber bridge 4/86 ACM 20

21 Isolator Pad on Bridge Rail 1/5 ACM 21

22 Coatings on steel rail 1/36 ACM 22

23 Coating on timber bridge 2/5 ACM 23

24 Mastic used to adhere flashing 9/118 ACM 24

25 Coating on Concrete 47/193 ACM 25

26 Abatement for coating on concrete walls / rails 26

27 DOT Practices for the Identification and Abatement of Asbestos in Bridges TxDOT Questions Rodney Concienne, P.G. Manager, Pollution Prevention & Abatement Branch; Texas Department of Transportation Ph: (512) TRB Summer Conference June 15-18, 2008 Baltimore, Maryland 27

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN 56-5.1 Asbestos Survey Requirements for Building/Structure Demolition, Renovation, Remodeling and Repair (a) (b) Asbestos Survey Required. An

More information

COMPLIANCE ASSISTANCE BULLETIN July Revised July ASBESTOS REQUIREMENTS for DEMOLITION and RENOVATIONS SUMMARY

COMPLIANCE ASSISTANCE BULLETIN July Revised July ASBESTOS REQUIREMENTS for DEMOLITION and RENOVATIONS SUMMARY COMPLIANCE ASSISTANCE BULLETIN July 2006 - Revised July 2015 ASBESTOS REQUIREMENTS for DEMOLITION and RENOVATIONS The San Joaquin Valley Air Pollution Control District (District) Rule 4002 requires compliance

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES

NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES Navajo Nation Environmental Protection Agency Air Quality Control Program Asbestos NESHAP PO Box 529 Telephone: (928)

More information

NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES

NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES NAVAJO NATION ASBESTOS NESHAP NOTIFICATION FORMS RENOVATION AND DEMOLITION ACTIVITIES Navajo Nation Environmental Protection Agency Air Quality Control Program Asbestos NESHAP Telephone: (928) 729-4246

More information

ASBESTOS DISPOSAL INFORMATION (Revised 07/15/18)

ASBESTOS DISPOSAL INFORMATION (Revised 07/15/18) Fairbanks North Star Borough Division 455 Sanduri Street Fairbanks, Alaska 99701 (907) 459-1482 FAX 459-1017 ASBESTOS DISPOSAL INFORMATION (Revised 07/15/18) The FNSB Division accepts asbestos on a scheduled

More information

Idaho Solid Waste Association

Idaho Solid Waste Association Idaho Solid Waste Association Idaho Snow: Debris from Collapsed Buildings EPA Asbestos Requirements for Demolishing a Building John Pavitt U.S. Environmental Protection Agency Region 10, Alaska Operations

More information

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference SS 1122 David L. Seago, P.E. Assistant Director of Construction Dallas District Guidance Document (SS 1122) Lists some of the main differences between previous specifications used and newly implemented

More information

Demolition Information Packet

Demolition Information Packet Table of Contents I. Demolition Process Checklist II. III. IV. Approval for Demolition Demolition Permit Utility Disconnections V. Other Important Issues Asbestos and Lead VI. VII. Demolition Standards,

More information

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin MISSOURI DEPARTMENT OF NATURAL RESOURCES Requirements for Asbestos and Lead Paint Abatement at Voluntary Cleanup Program Sites Technical Bulletin 7/2001 Division of Environmental Quality Hazardous Waste

More information

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION The asbestos NESHAP, 40 CFR, Part 61, Subpart M, requires written notification of demolition or renovation operations under Section

More information

In general, the management plan development process consisted of:

In general, the management plan development process consisted of: NWASCO SCHOOL DISTRICT #21 ASBESTOS MANAGEMENT PLAN PART I: GENERAL PROVISIONS OF THE MANAGEMENT PLAN 1.0 INTRODUCTION This Asbestos Management Plan was developed in accordance with the United States Department

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

Hazardous Building Materials in Your Community. John Pavitt, EPA Jon Jones, EPA

Hazardous Building Materials in Your Community. John Pavitt, EPA Jon Jones, EPA Hazardous Building Materials in Your Community John Pavitt, EPA Jon Jones, EPA How is Waste Regulated? Federal or State Laws can be regulated under more than one law RCRA Hazardous Waste NESHAP Asbestos

More information

Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites

Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites Asbestos and Lead-Based Paint Abatement Requirements at Brownfields/Voluntary Cleanup Program Sites Hazardous Waste Program Fact Sheet Asbestos-containing materials and lead-based paint have the potential

More information

Asbestos Removal, Renovation, and Demolition. Rule 1206

Asbestos Removal, Renovation, and Demolition. Rule 1206 1 Asbestos Removal, Renovation, and Demolition 9/13/2018 Rule 1206 2 Why is Asbestos Harmful? 3 Where Asbestos is Found? 4 Common until 1980 s Still found in many buildings Current Asbestos Use 5 Examples

More information

Asbestos Survey 415 South St. Crestline, OH 44827

Asbestos Survey 415 South St. Crestline, OH 44827 2699 East CR 50 Tiffin. OH 44883 Tiffin Office: 419-618-3072 Fax: 419-443-0539 Huntsville Office: 937-539-0094 Fax 937-843-3079 hhenvironmental@yahoo.com Asbestos Survey 415 South St. Crestline, OH 44827

More information

Asbestos in Roads. what is required before work begins. Jeremy Brown. Michigan Department of Environmental Quality. Air Quality Division

Asbestos in Roads. what is required before work begins. Jeremy Brown. Michigan Department of Environmental Quality. Air Quality Division Asbestos in Roads what is required before work begins Jeremy Brown Michigan Department of Environmental Quality Air Quality Division Technical Programs Unit Demolition & Asbestos Regulations Affected

More information

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION

ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION ASBESTOS DEMOLITION/RENOVATION NOTIFICATION FORM GENERAL INFORMATION The asbestos NESHAP, 40 CFR, Part 61, Subpart M, requires written notification of demolition or renovation operations under Section

More information

Think Asbestos Before Renovation and Demolition

Think Asbestos Before Renovation and Demolition Think Asbestos Before Renovation and Demolition Ideal Environmental Engineering, Inc. 2904 Tractor Lane Bloomington Illinois 61704 (800)535-0964 or (309)828-4259 www.idealenvironmental.com Welcome and

More information

APPLICATION FOR DEMOLITION PERMIT

APPLICATION FOR DEMOLITION PERMIT APPLICATION FOR DEMOLITION PERMIT GROWTH MANAGEMENT DEPARTMENT DEVELOPMENT SERVICES 201 SE 3 rd Street, Second Floor Ocala, FL 34471 (352) 629-8421; FAX (352) 629-8264 Florida Statute 556, Underground

More information

US-29 (E. Cherokee St.) Bridge over I-85 (Exit 106) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report

US-29 (E. Cherokee St.) Bridge over I-85 (Exit 106) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report US-29 (E. Cherokee St.) Bridge over I-85 (Exit 106) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report ARM Project #16-314-15 March 8, 2017 Prepared For: HDR-ICA 1122 Lady Street,

More information

Asbestos Survey 391 W. Atwood St. Galion, OH 44833

Asbestos Survey 391 W. Atwood St. Galion, OH 44833 2699 East CR 50 Tiffin. OH 44883 Tiffin Office: 419-618-3072 Fax: 419-443-0539 Huntsville Office: 937-539-0094 Fax 937-843-3079 hhenvironmental@yahoo.com Asbestos Survey 391 W. Atwood St. Galion, OH 44833

More information

Demolition Permit Requirements

Demolition Permit Requirements Demolition Permit Requirements Prior to Issuance of a Demolition Permit, the following is required: 1 - Planning Department Requirements/Approvals: Confirmation that there are no active Land Use Entitlement

More information

CmDv Demolition Services Bid Packet #1804

CmDv Demolition Services Bid Packet #1804 CmDv Demolition Services Bid Packet #1804 #1804.02 CDBG Demolition Addendum #2 published 5/22/18 The following are errors / clarifications in the original bid packet to be edited: 1. Contractor questions

More information

OHIO DEPARTMENT OF TRANSPORTATION ASBESTOS GUIDANCE DOCUMENT

OHIO DEPARTMENT OF TRANSPORTATION ASBESTOS GUIDANCE DOCUMENT OHIO DEPARTMENT OF TRANSPORTATION ASBESTOS GUIDANCE DOCUMENT Prepared by: ODOT Office of Environmental Services April 1, 2018 Table of Contents 1.0 Introduction... 1 2.0 Federal and State Regulations...

More information

April 12, 2011 (revised July 19, 2011) Project Number

April 12, 2011 (revised July 19, 2011) Project Number Environmental Consultants 1360 Truxtun Avenue 843 746-8525 and Contractors Suite 100 FAX 843 746-8865 North Charleston, SC 29405 www.scsengineers.com April 12, 2011 (revised July 19, 2011) Project Number

More information

ASBESTOS AND REGULATED WASTE SURVEY REPORT

ASBESTOS AND REGULATED WASTE SURVEY REPORT ASBESTOS AND REGULATED WASTE SURVEY REPORT CONSULTANTS ENVIRONMENTAL GEOTECHNICAL MATERIALS FORENSICS Bridge No.: 90480 CSAH 19 over Lake Minnetonka Channel Orono, Minnesota AET Project No. 03-04195 Prepared

More information

S (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised

S (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised S-11-83 (Blacksburg Hwy) Bridge over I-85 (Exit 100) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report - Revised ARM Project # 16-314-15 April 17, 2017 Prepared For: HDR-ICA 1122

More information

Memphis-Shelby County Airport Authority Project # Tchulahoma Warehouse Asbestos Survey Report

Memphis-Shelby County Airport Authority Project # Tchulahoma Warehouse Asbestos Survey Report Memphis-Shelby County Airport Authority Project # 14-1379-21 3130 Tchulahoma Warehouse Asbestos Survey Report The Memphis International Airport Facility located at 3130 Tchulahoma Road in Memphis, Shelby

More information

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT

More information

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 Issued 6/1/95 Revised 11/08/2004; 3/6/06 Please direct any questions or comments about the applicability of this document to Luigi

More information

S (Tribal Road) Bridge over I-85 (Exit 104) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report

S (Tribal Road) Bridge over I-85 (Exit 104) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report S-11-99 (Tribal Road) Bridge over I-85 (Exit 104) Cherokee County, South Carolina Asbestos and Lead-Based Paint Survey Report Structure # 117009900100 ARM Project #16-314-15 March 8, 2017 Prepared For:

More information

COMMERCIAL RE-ROOF BUILDING PERMIT GUIDE

COMMERCIAL RE-ROOF BUILDING PERMIT GUIDE Nampa Building Safety Department COMMERCIAL RE-ROOF BUILDING PERMIT GUIDE 411 3 rd Street S. Nampa, Idaho 83651 208-468-5435 Fax#: 208-468-5439 www.cityofnampa.us Patrick Sullivan C.B.O Building Safety

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

DATE OF DECLARATION PROPERTY OWNER(S) ASSESSOR PARCEL NUMBER

DATE OF DECLARATION PROPERTY OWNER(S) ASSESSOR PARCEL NUMBER COUNTY OF SISKIYOU PUBLIC HEALTH & COMMUNITY DEVELOPMENT DEPARTMENT Building Environmental Health Office of Emergency Services Personal Health Planning 806 South Main Street Yreka, California 96097 Phone:

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Recording and Tracking Bridge Maintenance Work SPECIFIC SUBJECT: DIVISION

More information

The following are some of the most commonly asked questions about the Asbestos NESHAP for demolitions and renovations.

The following are some of the most commonly asked questions about the Asbestos NESHAP for demolitions and renovations. Common Questions about the Asbestos NESHAP Introduction The Clean Air Act (CAA) requires the U. S. Environmental Protection Agency (EPA) to develop and enforce regulations to protect the general public

More information

REVISED ASBESTOS AND LEAD-BASED PAINT SURVEY MOUNT VERNON AVENUE BRIDGE SAN BERNARDINO, CALIFORNIA

REVISED ASBESTOS AND LEAD-BASED PAINT SURVEY MOUNT VERNON AVENUE BRIDGE SAN BERNARDINO, CALIFORNIA REVISED ASBESTOS AND LEAD-BASED PAINT SURVEY MOUNT VERNON AVENUE BRIDGE SAN BERNARDINO, CALIFORNIA PREPARED FOR: IFC Jones & Stokes 9775 Businesspark Avenue San Diego, California 92131 PREPARED BY: Ninyo

More information

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995. April 2012, rev. 00 02 8213 Asbestos Abatement 1. General 1.01 Summary of Work A. Contractor 1.02 Definitions 1. The Contractor shall provide removal and proper disposal of asbestos containing materials.

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Scope of Work. Containing Material); therefore the following requirements must be met:

Scope of Work. Containing Material); therefore the following requirements must be met: Scope of Work 1) This project consists of DEMO/Excavation of Twenty-Five (25) Apartments and one (1) Mailbox Shed located at Cherokee Heights Apartments (#01) Pryor, Oklahoma. The contractor shall bid

More information

DECK INFORMATION SHEET

DECK INFORMATION SHEET Community Development Department 925 Burlington Avenue Lisle, Illinois 60532 630-271-4150 DECK INFORMATION SHEET The Village of Lisle requires a permit to build, repair or replace a deck. Decks are permitted

More information

Standard for notification prior to demolition or renovation.

Standard for notification prior to demolition or renovation. 3745-20-03 Standard for notification prior to demolition or renovation. (A) Each owner or operator to whom this rule applies shall perform the following: (1) Provide the director a notice of intention

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION

More information

Pillsbury Mills Community Meeting

Pillsbury Mills Community Meeting Pillsbury Mills Community Meeting Illinois Environmental Protection Agency Illinois Attorney General January 26, 2016 Presentation Overview 1. Asbestos legal framework 2. Pillsbury Mills demolition 3.

More information

Exterior Stucco and Siding Installation

Exterior Stucco and Siding Installation Exterior Stucco and Siding Installation CITY OF NEWARK, CALIFORNIA BUILDING INSPECTION DIVISION 37101 Newark Boulevard, Newark, CA 94560-3796 510-578-4261 Fax 510-578-4307 e-mail: building.inspection@newark.org

More information

National Asbestos Meeting Denver, CO June 23 & 24, 2011

National Asbestos Meeting Denver, CO June 23 & 24, 2011 National Asbestos Meeting Denver, CO June 23 & 24, 2011 Everett Bishop Office of Enforcement and Compliance Assurance Office of Compliance U.S. EPA 7/19/2011 1 U.S. Environmental Protection Agency Asbestos

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE 1) PAVEMENT 1.1 Ride quality All roadways have a smooth surface course (including bridge deck approaches, covers, gratings, frames and boxes). 24 hours 28 days 6 months a. Measurement of International

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3 Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-3 Form 2448 IH 35E Managed Lanes Project Book 2 - Technical Provisions Attachment 4-3 Show Form

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

Work Type Definition

Work Type Definition Work Type Definition Page 1-6 details the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 7-8. I. Description A. Work

More information

Module 3: Asbestos. 15 th Annual OSC Readiness Training Program.

Module 3: Asbestos. 15 th Annual OSC Readiness Training Program. Module 3: Asbestos 15 th Annual OSC Readiness Training Program www.oscreadiness.org Module Overview Asbestos Overview of asbestos Federal and State laws regulating asbestos Building Demolition Abatement

More information

BRANT - NORFOLK TOWNLINE ROAD

BRANT - NORFOLK TOWNLINE ROAD Municipal Structure Inspection Form NORFOLK COUNTY TOWNLINE BRIDGE Site Number 010057 BRANT - NORFOLK TOWNLINE ROAD 0.3 km W of County Road 5 Inventory Structure Name Townline Bridge On Crossing Rail Road

More information

UW ASBESTOS MANAGEMENT PLAN MARCH 21, Scope: 2. Purpose. 3. Definitions / Acronyms

UW ASBESTOS MANAGEMENT PLAN MARCH 21, Scope: 2. Purpose. 3. Definitions / Acronyms UW ASBESTOS MANAGEMENT PLAN MARCH 21, 2016 1. Scope: This Asbestos Management Plan applies to all locations as outlined in Administrative Policy Statement (APS) 12.1, Managing Asbestos and Other Regulated

More information

5/13/2015 1

5/13/2015 1 1 2 3 4 5 6 7 In pipeline system design, the standard: NACE SP0169 clearly states that coatings are the primary corrosion protective system. Coating PIPE 8 9 What are my options? 10 11 UV/Photo-degradation

More information

A trained attendant will meet with you to assess your load and help you through this process.

A trained attendant will meet with you to assess your load and help you through this process. Office: 1726 SE Hwy 101, Lincoln City Or 541-994-5555 Public Transfer Station Location: 367 S Anderson Ck Rd, Lincoln City, Or Asbestos Information for Schooner Creek Public Transfer Station (SCT) Why

More information

THE SUSSEX COUNTY MUNICIPAL UTILITIES AUTHORITY ASBESTOS DISPOSAL APPLICATION AND FORMS

THE SUSSEX COUNTY MUNICIPAL UTILITIES AUTHORITY ASBESTOS DISPOSAL APPLICATION AND FORMS THE SUSSEX COUNTY MUNICIPAL UTILITIES AUTHORITY ASBESTOS DISPOSAL APPLICATION AND FORMS Revised 2/13/19 Dear Applicant: The Sussex County Municipal Utilities Authority provides for the proper disposal

More information

Bear Valley USD. Administrative Regulation. Environmental Safety AR Business and Noninstructional Operations

Bear Valley USD. Administrative Regulation. Environmental Safety AR Business and Noninstructional Operations Bear Valley USD Administrative Regulation Environmental Safety AR 3514 Business and Noninstructional Operations The Superintendent may designate one or more employees to oversee and coordinate the district's

More information

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116

Investigation Remediation Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Investigation Remediation 10448 Citation Drive, Suite 100 Compliance Restoration Brighton, MI 48116 Mailing Address: P.O. Box 2160 Brighton, MI 48116-2160 800 395-ASTI Fax: 810.225.3800 www.asti-env.com

More information

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant Quick Facts PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S. making

More information

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following: MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements

More information

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan July 13, 2011 TTL Project No. 7615.02 Ms. Paula Boase Downriver Community Conference Brownfield Consortium 15100 Northline Road Southgate, Michigan 48195 Dear Ms. Boase: NESHAP Asbestos and Limited Hazardous

More information

SPECIAL SPECIFICATION 7550 Asbestos Abatement, LP 340

SPECIAL SPECIFICATION 7550 Asbestos Abatement, LP 340 2004 Specifications CSJ 6211-36-001 See attachment on.pdf version. SPECIAL SPECIFICATION 7550 Asbestos Abatement, LP 340 1. Description. Abate and remove asbestos containing materials (ACM) at indicated

More information

Asbestos Management Program Manual

Asbestos Management Program Manual Asbestos Management Program Manual Environmental Health, Safety and Risk Management Department Box 6113, SFA Station Nacogdoches, Texas 75962-6113 Original February 2018 Table of Contents I. Introduction...

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY: ASBESTOS SURVEY Old Detective s Building Wadesboro, NC PREPARED FOR: Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Date of Inspection September 28, 2016 Date of Report October

More information

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town

More information

Michigan State University

Michigan State University Michigan State University ASBESTOS BUILDING INSPECTION REPORT Botany Field Lab (Plant Pathology) Building Number 452 Inspection conducted by Zach Hansmann Office of Environmental Health and Safety 150

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM

NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM TO: FROM: All Engineering & Support Staff Structural Evaluation James Lane, Manager Structural Evaluation DATE: January 2, 2008 PHONE: 530-3572 SUBJECT:

More information

SFUSD 2011 PROPOSITION A BOND PROGRAM 135 Van Ness Avenue San Francisco, California 94102 Tel (415) 241-6152 Fax (415) 241-6148 YICK WO ELEMENTARY SCHOOL 2245 JONES STREET SAN FRANCISCO, CA 94133 2200

More information

QUEEN ALEXANDRA COMMUNITY CENTRE

QUEEN ALEXANDRA COMMUNITY CENTRE BRICK REPOINTING AND NEW BARRIER FREE RAMP 180 BARNARDO AVENUE PETERBOROUGH, ON. ARCHITECTURAL A1 A1 A2 SITE PLAN AND DEMOLITION NOTATION NEW CONSTRUCTION DETAIL PLANS AND SECTIONS NEW CONSTRUCTION SECTION

More information

Effective 9/1/2018 all construction and demolition loads will need to be accompanied by a Construction and Demolition Acceptance Form.

Effective 9/1/2018 all construction and demolition loads will need to be accompanied by a Construction and Demolition Acceptance Form. Office: 1726 SE Hwy 101, Lincoln City Or 541-994-5555 Public Transfer Station Location: 367 S Anderson Ck Rd, Lincoln City, Or Asbestos Information for Schooner Creek Public Transfer Station (SCT) Why

More information

DATE: January 22, 2016 PBS Project No.: Eugene School District 4J ITB No.:

DATE: January 22, 2016 PBS Project No.: Eugene School District 4J ITB No.: Addendum #1 Roosevelt Middle School Roosevelt Middle School Abatement Hazardous Building Materials Abatement ISSUED BY: Jeff Heeren PBS Engineering and Environmental Inc. 645 Willamette Street, Suite A

More information

ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON

ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON ASBESTOS REINSPECTION SURVEY REPORT GENERAL SERVICES ADMINISTRATION AUBURN ADMINISTRATION BUILDING BUILDING WA0811KA AUBURN, WASHINGTON May 23, 2007 Prepared for: Mr. Ron Smith GSA 400-15 th Street SW

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

3. Asbestos Handling Program

3. Asbestos Handling Program 1.0 Introduction 3. Asbestos Handling Program This program will establish guidelines and procedures in the operations and maintenance of asbestos containing materials at PLU to protect all employees, contractors,

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA 106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard

More information

Washington University Asbestos Operations and Maintenance Plan

Washington University Asbestos Operations and Maintenance Plan 1. Purpose 2. Asbestos Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to

More information

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 2 Definitions 2 Responsibilities 3 Hazard

More information

INVITATION FOR DEMOLITION BIDS IFB- CRA (DEMO of Structures, Asbestos Removal and Lot Clearing of 1.5 Acre Property)

INVITATION FOR DEMOLITION BIDS IFB- CRA (DEMO of Structures, Asbestos Removal and Lot Clearing of 1.5 Acre Property) INVITATION FOR DEMOLITION BIDS IFB- CRA 03-17-18 (DEMO of Structures, Asbestos Removal and Lot Clearing of 1.5 Acre Property) The Lake Worth CRA, is seeking bids/quotes for the complete demolition of the

More information

Proud of its Heritage, Preparing for its Future

Proud of its Heritage, Preparing for its Future TUSTIN Proud of its Heritage, Preparing for its Future USER GUIDE FOR THE REROOFING OF BUILDINGS Revised August 2013 PURPOSE This user guide describes the City of Tustin s requirements regarding reroofing

More information

General Info. Number: PROJECT NO

General Info. Number: PROJECT NO General Info Number: PROJECT NO. 43-16-04 Description: BRIDGE DECK REPLACEMENT AND REHABILITATION, RAKER-BARDEN ROAD (CR. 7-2) OVER OHIO TURNPIKE M.P. 41.9, DELTA-SANTEE ROAD (CR. 7) OVER OHIO TURNPIKE

More information

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL 69 Bridge Street Dedham, MA 02026 Phone 781.251.0040 Fax 781.251.0901 40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT for INDIAN HEAD ELEMENTARY SCHOOL 726 Indian Head Street Hanson,

More information

Internal Audit Follow-Up Report

Internal Audit Follow-Up Report Internal Audit Follow-Up Report Construction Inspection Program TxDOT Internal Audit Division Objective To assess the status of corrective actions for high-risk Management Action Plans (MAPs) previously

More information

KENTUCKY TRANSPORTATION CENTER

KENTUCKY TRANSPORTATION CENTER Research Report KTC-08-20/FR155-06-1F KENTUCKY TRANSPORTATION CENTER EXPERIMENTAL CONCRETE COATING APPLICATION ON THE MEDIAN BARRIER OF I-65 IN LOUISVILLE OUR MISSION We provide services to the transportation

More information

2010 FDOT/FTBA CONSTRUCTION CONFERENCE FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE

2010 FDOT/FTBA CONSTRUCTION CONFERENCE FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Structures Construction Updates FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Critical Structures Construction Issues Self Study Course This course is mandatory for all Structures res

More information

CONDITION ASSESSMENT OF TIMBER BRIDGES IN SEVERE AND HIGH DECAY HAZARD ZONES

CONDITION ASSESSMENT OF TIMBER BRIDGES IN SEVERE AND HIGH DECAY HAZARD ZONES CONDITION ASSESSMENT OF TIMBER BRIDGES IN SEVERE AND HIGH DECAY HAZARD ZONES By Vijaya (VJ) Gopu, Ph.D., P.E Associate Director External Programs, LTRC Endowed Professor of Civil Engineering, University

More information

Commercial Warehousing Program

Commercial Warehousing Program Commercial Warehousing Program Revised December 2007 by Texas Department of Transportation (512) 416-2055 all rights reserved Manual Notice 2007-1 From: Manual: Thomas R. Bohuslav, P. E., Director, Construction

More information

Roseville OFFICE* 1911 Douglas Blvd, ste * Roseville, CA Phone (916) * Fax (916) *

Roseville OFFICE* 1911 Douglas Blvd, ste * Roseville, CA Phone (916) * Fax (916) * Roseville OFFICE* 1911 Douglas Blvd, ste 85-349* Roseville, CA 95661 Phone (916) 628-0050 * Fax (916) 781-6837 * www.hazmanage.com Camino Union Elementary School District Maintenance Building Demolition

More information

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments.

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments. February 12, 2014 INVITATION TO BID The City of Coffeyville, Kansas, is accepting sealed bids for the demolition and removal of certain structures located within the City. The proposed work will be on

More information

Warranty Program in Michigan to Present

Warranty Program in Michigan to Present Warranty Program in Michigan 1996 to Present AASHTO Committee on Construction, August 2018 Why Warranties? Public Act 79 of 1997 (effective July 28, 1997) states: Of the amounts appropriated for state

More information

Demolition Process Flow

Demolition Process Flow Demolition A to Z Demolition Demolition Process Flow Property identified for demolition Asbestos Survey Does the property need asbestos abatement? If, yes Asbestos abatement contractor selected Work order

More information

Asbestos Survey Proposed Roosevelt Development Roosevelt Way NE Seattle, King County, Washington

Asbestos Survey Proposed Roosevelt Development Roosevelt Way NE Seattle, King County, Washington Asbestos Survey Proposed Roosevelt Development 6814-6820 Roosevelt Way NE Seattle, King County, Washington June 19, 2015 Terracon Project No. 81157083 Prepared for: Seattle, Washington Prepared by: Terracon

More information

Hazardous Materials G

Hazardous Materials G Hazardous Materials G Needham Public Schools- Mitchell and Hillside HAZARDOUS MATERIALS HAZARDOUS MATERIALS Introduction: Universal Environmental Consultants (UEC) has been providing comprehensive asbestos

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

HART ENVIRONMENTAL RESOURCES

HART ENVIRONMENTAL RESOURCES HART ENVIRONMENTAL RESOURCES 262 Hedge Dr. Springfield, OH 45504 (937) 325-8777 (937) 324-0288 FAX ASBESTOS INSPECTION REPORT 143 N. Marion St. Dayton, OH 45417 PREPARED FOR: Mr. Dennis Zimmer Montgomery

More information

Ensure policy is adhered to by all employees. Follow policy requirements.

Ensure policy is adhered to by all employees. Follow policy requirements. 1.0 Scope and Application This policy as been developed to minimize the potential health risk to County employees and the public resulting from the presence of Asbestos Containing Materials (ACM) or Presumed

More information