The Changing Face of Quantity Surveying Practices in Construction Industry

Size: px
Start display at page:

Download "The Changing Face of Quantity Surveying Practices in Construction Industry"

Transcription

1 The Changing Face of Quantity Surveying Practices in Construction Industry YESHWANTH BABU REDDY School of Architecture and Building Deakin University

2 Table of Contents: 1.1 Background Introduction What is Quantity Surveying..? Who is called a Quantity Surveyor..? Services offered by a Quantity Surveyor... 3 Traditional Quantity Surveyor Services... 3 Modern Quantity Surveyor Services Roles of a Quantity Surveyor (QS) Quantity Surveying in Construction Phases Pre- Construction Phase Design Phase Tendering Phase Tender Selection & Appraisal Construction Phase Post Construction Phase The changing face of Construction Industry Modern Quantity Surveying- Adding values to Projects Prior Engagement of QS services by Clients Introduction of Information Technology (IT) in Design Aspects Transformation of Measurements from Manual to Computer Aided Design Transparency in preparation of BOQ Provision & Accessibility to Wide Range of Procurement Services Value Management Cost Management & Controlling Concepts Conception of Innovative developmental Approaches Conclusion... 8 References... 9 Page 1

3 1.1 Background: "Quantity surveying" can be dated back to the antiquated Egyptian civilization where they utilized dedicated personnel for the completion of estimations and costing for their great and magnificent structures. It formed into an occupation amid the 17 th century restoration of London after the Great Fire. In 1836it emerged as a new age profession when the new Houses of Parliament of Great Britain, designed by Sir Charles Barry, turned into the first public contract to be completely measured and tendered utilizing Bills of Quantities (BoQ s) of amounts for money related responsibility.(rics, 2005) 1.2 Introduction: The world is evolving quickly day by day. So are the requests and demands on the professions, and thus the roles of professional experts. All divisions in an organization with context to the economy are under expanding pressure to offer wide range of services that are innovative, value added and also to come up with solutions on how to survive and face the rapid changes and increasing competition in the world market. In short over the last few decades, the quantity surveying profession has experienced various transitions. The appearance of data innovation and the potential it offered, combined with the downturn in development movement in the UK and various different nations amid the mid-1980s and late 1990s. Thus these challenges called for change in the functionality of quantity surveying profession. Harun and Torrance (2006) proposes that quantity surveyors ought not to contain themselves inside the traditional limits of cost administration; they require developing new specialties, developing new information and break into new zones with a specific end goal to upgrade their competitiveness. 1.3 What is Quantity Surveying..? It can be characterized as, a profession which guarantees that the assets of the construction business are used to the best point of interest of society, by suggesting the most economical monetary administration for undertakings and an expense consultancy service to client, builder and planner amid the entire construction process. 1.4 Who is called a Quantity Surveyor..? The Quantity Surveyor (QS), otherwise called a Construction Economist or Cost Manager, is one among a group of expert counsellors to the construction industry. As consultants they gauge and screen construction costs, from the practicality/feasibility phase of a venture through the completion of the development period. After development they may be included with tax deterioration plans, swap cost estimation for protection purposes and, if essential, arbitration and mediation.(aiqs, 2015) Page 2

4 2.1 Services offered by a Quantity Surveyor: Traditional Quantity Surveyor Services: The principal services that are offered by any quantity surveyor or a Quantity Surveying firm across the globe are as follows: Preliminary Cost Advice Cost Planning Feasibility Estimates Advice on Selection of Consultants & Contractors Preparing of Tender Documents Advicing on Contractual Methods Evaluation of Construction Work Project Management Services Periodic Financial Reporting Tax Deduction Services Technical Auditing Feasibility Estimates Modern Quantity Surveyor Services: The modern services that are being offered in the recent past by few of the quantity surveyors or the Quantity Surveying firm across the globe are as follows: Asset Advisory Facilities Consultancy Building Surveying Risk Mitigation & Due Diligence Litigation Support Property Taxation Page 3

5 3.1 Roles of a Quantity Surveyor (QS): A qualified Quantity Surveyor has numerous options to gain employment, and involve in wide range of activities. Usually they are employed by Quantity surveying firms, construction companies, Property developers etc The quantity surveyors working for Consultant firms are held by the project clients to guarantee that whatever is being constructed is the thing that the client needs or could manage. The principal duty of the quantity surveyor working for a Contractor is to take care of the money related premiums of the contractor. He will be responsible for computing and recording of monetary/financial estimations of the works that are done and guarantees that the contractor is paid appropriately and on time. The key functions of a Quantity Surveyor is as shown in the table below: Table 1: Functions of a Quantity Surveyor Page 4

6 4.1 Quantity Surveying in Construction Phases: The QS is involved in almost all of the construction phases with a vivid and wide role to play in each of the phase. The following discusses the duties and responsibilities of QS in each of these stages as follows; Pre- Construction Phase: The QS examines the 'designers' and 'engineers' plans, distinguishes the expenses involved, and then sets a general assessed budget plan for each task in the project Design Phase: In this phase the QS involves with the design team and suggests practical solutions so that the project turns out to be economical within the allotted budget of the project, which in short is called as Value Engineering Tendering Phase: In this phase the QS advises on tendering and contractual plans considering the client's needs and other data accessible from the designers. He also advises on the insurances and liabilities with the client's insurance advisers. The detailed and final tender estimate is prepared by the QS, together with the project architect Tender Selection & Appraisal: At this stage the QS advises on short listing of tenders and look into the financial standing and experience of the tenderer. He also advices on errors and negotiates on offers. The final review of financial budget and recommends the best tender Construction Phase: Amid the construction phase the QS will, get ready with suggestions for payments to contractors, subcontractors and suppliers as per the agreement prerequisites. Also he evaluate expense impacts when there are changes happening in the project, i.e. like delays and variations with contractors and agencies. He also involves in resolving disputes between clients, designers, contractors, subcontractors and others related with the project Post Construction Phase: The QS prepares the statements for final accounts, which records the genuine expenses occurred in all areas of the employment in the project. Also the documents required for the technical auditing are made available. Tax deduction policies and laws are considered and applied wherever needed. Thus these are the various duties and responsibilities of a QS in each of the stages. Page 5

7 5.1 The changing face of Construction Industry: The rapidly changing scene of the construction industry additionally demands that present specialists and in addition future experts ought to be proactive to drive change rather than only adapting to improvements. Also Quantity surveying profession is experiencing a period of fast change. There was a time when the profession was thought to be confronting extinction, but now it has revitalized, and confronts an appeal for the services that are provided for the construction activities all across the globe. There is a new optimism about the future of quantity surveying as a profession and quantity surveyors are now seen as important players in the construction industry (Smith, 2004). 6.1 Modern Quantity Surveying- Adding values to Projects: The changes involved in the modern quantity surveying practices have and are resulting in adding great values to construction projects across different industries. The primary changes involved are as discussed below; Prior Engagement of QS services by Clients: Currently in construction industry every stakeholder has a multirole to be played considering his/her profession, i.e. these days, clients are mastering with the tasks involved in the construction work. The client needs to appoint the QS as early as possible in the project, preferably prior to the construction phase, in order to get the most out of a quantity surveyor. Therefore QS plays a vital role in meeting up clients, before lodging tenders, keeping in mind the end goal is to meet the client's requirements Introduction of Information Technology (IT) in Design Aspects: Involving IT concepts into the aspects of design, and the potential it offers has changed the way of stakeholders in performing their errand. At the same time it also has resulted in increase of quality and quantity of work Transformation of Measurements from Manual to Computer Aided Design: Since from the time CAD services were introduced, numerous theories are discussed about the use and impact of CAD services in QS profession. The beauty of using CAD software generated designs is that instantly the Bills of Quantity (BOQ) are generated. Since then it became important for QS in determining and learning of the innovative knowledge of the technology and its advancements of their partners in the industry. The introduction of IT and CAD generated designs are reducing the complexity involved in manual measurements and are yielding more economic results in terms of Quality & Accuracy Transparency in preparation of BOQ: A Bill of Quantities (BQ or BOQ) is prepared by QS to give a broad and organized trade list, including a description and quantity, of each of the components or items involved in a Page 6

8 construction project. i.e. It is a book containing long list of items involved in the project. In furthermore QS lives up to expectations of clients to create procurement strategies for the conveyance periods of undertakings. the QS has a full working knowledge of all types of contracting including Construction management, Alliancing, Design & construct, Lump sum, GMP and works closely with legal teams to secure the best advantage of clients Provision & Accessibility to Wide Range of Procurement Services: The modern times Quantity Surveyors Role has been changing day to day in the ever expanding construction market. The provision of wide range of procurement services available or offered play a vital part in any project. It consists of gigantic information about the general anticipated costs all together that would fulfil the necessity of the project. Thus the QS's are expanding their services i.e. services such as standard type of agreement and consultancy services, and database management services for, data, documentation, dispute resolution and other services Value Management: It is a known fact that QS is perceived to keep up and monitor the project costs amid and post construction. The entire measure of project is managed by QS to keep up adaptability in cash flow and progress the development work till its completion within estimated cost. This methodology is one of the powerful methods for amplifying value of a venture. Value management procedure proves advantageous in most of the undertakings at all phases of development, however is especially powerful when induced in the early stages of project. By embracing an orderly way to deal with project audit, through a progression of workshops and controlled interaction between primary stakeholders, specialists and information providers, the advantages obtained through the value management can be huge Cost Management & Controlling Concepts: To be beneficial, organizations should acquire incomes, as well as control expenses. On the off chance that expenses are too high, net revenues will be too low, making it troublesome for an organization to succeed against its rivals. To accomplish this the QS gives adaptable, creative and exceptionally proficient advice at all times throughout the development phase, and adds success through proactive, realistic and operational expenditure forecasting amid and at master planning phase of project. Then after the cost management is engaged through the outline/design development stage on completing the project within assessed budget, giving ideal worth to cash and performance Conception of Innovative developmental Approaches: As per a survey conducted by Building research innovation technology and environment, on innovation and technological aspects of a QS in construction industry, it highlights that the critical aspect of review is to recognize about Quantity surveyor's tendency in innovative data collection, innovative management and monitoring skills. Thus a Qs's innovative ideas and skills play a crucial role in the outcomes of any project. Page 7

9 7.1 Conclusion: Every industry comprises of stakeholders functioning as per a scheduled structure of course of actions. A Quantity surveyor is one such stakeholder in the construction industry who cannot function or carry out tasks as per a scheduled structure. The exact role of a QS cannot be defined in a confined way because, of day to day changing requirements in the construction industry. In order to satisfy the overall changes involving in a project, the QS seeks to play a vital role by involving in multi-disciplinary roles. Hence in short the new definition for Quantity surveyor can be formulated as an auditor, facilitator, leader, manager, Innovative and dynamic individual of the development process involved in a project, and the Quantity Surveying profession as multi- disciplinary practice, functioning to arrive at the best economic output for a project. Quantity Surveying Professionals have the potential to emerge as knowledge leaders in the construction industry by adding great values and economic outputs for the construction projects. Page 8

10 References: Ashworth, A. and Heath, B.C. 1983, Advanced Quantity Surveying, London: Butterworth s. Miller, m. h. (2000). Quantity surveyor role in innovation generation. George Ofori and Shamas-ur-Rehman Toor (Department of Building, National University of Singapore, Singapore) Peter Smith, , Trends in the Australian Quantity Surveying Profession Chichester, West Sussex, United Kingdom John Wiley & Sons Inc., New aspects of quantity surveying practice / Duncan Cartlidge, London : Spon, c Page 9

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project,

More information

Indian Institute of Quantity Surveyors (IIQS) Membership Guidelines

Indian Institute of Quantity Surveyors (IIQS) Membership Guidelines Quantity Surveying Profession The origins of quantity surveyors can be traced back to the ancient Egyptian civilization that used dedicated personnel to carry out estimates and costing for their magnificent

More information

Member level the optimum standard is given against each activity statement

Member level the optimum standard is given against each activity statement QUANTITY SURVEYING CORE COMPETENCIES 2018 The quantity surveying competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off

More information

METAMORPHOSIS OF QS PROFESSION : A REVOLUTIONARY JOURNEY IN MALAYSIA

METAMORPHOSIS OF QS PROFESSION : A REVOLUTIONARY JOURNEY IN MALAYSIA METAMORPHOSIS OF QS PROFESSION : A REVOLUTIONARY JOURNEY IN MALAYSIA SULAIMAN, MOHAMAD SHAZALI 1, ZOLKAFLI, UMI KALSUM 2, ZAKARIA, NORHANIM 3 and ABD KARIM, SAIPOL BARI 4 1 Associate, KA Associates Kuala

More information

Construction Financial Management

Construction Financial Management Unit 8: Construction Financial Management Unit code: K/504/4352 QCF level: 6 Credit value: 15 Aim This unit gives learners an understanding of the methods used to determine the price of a proposed. Learners

More information

Forms of Procurement. Traditional Form of Procurement

Forms of Procurement. Traditional Form of Procurement Forms of Procurement Chapter 1 of the Handbook refers to the importance of the form of procurement used by the client in determining the planning and scheduling outputs produced by the s planning team.

More information

ECI: Two-Stage Contracts

ECI: Two-Stage Contracts ECI: Two-Stage Contracts Client and Contractor Considerations Michael Creedon Special Counsel ECI in Infrastructure and Major Projects Summit 2010 Sydney, 17 June 2010 Sessions Outline Introduction /

More information

ICES Core Cost Engineering Competencies

ICES Core Cost Engineering Competencies COST ENGINEERING CORE COMPETENCIES 2018 The quantity surveying competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off

More information

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President September 1, 2009 1 Part One Agenda Why the Session? Audit Themes Increasing Your Value Establishing Objectives

More information

Commercial Planning Core Competencies PLANNING CORE COMPETENCIES 2018

Commercial Planning Core Competencies PLANNING CORE COMPETENCIES 2018 PLANNING CORE COMPETENCIES 2018 The competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off to a specific standard,

More information

Making capital work Unlocking cash through cross-collaboration

Making capital work Unlocking cash through cross-collaboration Attack the Flat : strategies to succeed in the challenging construction market Article 2 Making capital work Unlocking cash through cross-collaboration In today s challenging construction market, leading

More information

Procurement Options for NZ Construction Contracts

Procurement Options for NZ Construction Contracts 1 P a g e Tool Box Resource Procurement Options for NZ Construction Contracts A wide variety of contract arrangements have evolved in NZ for use on construction contracts. The following describes the most

More information

Estimating specialism core competencies

Estimating specialism core competencies CORE ESTIMATING COMPETENCIES 2015 The estimating competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off to a specific

More information

PROFESSIONS PRODUCTIVITY PACKAGE

PROFESSIONS PRODUCTIVITY PACKAGE www.contractsondemand.co.za PROFESSIONS PRODUCTIVITY PACKAGE This core Productivity Package has been developed to enable Professional Firms to gain access to Electronic Services / Applications and the

More information

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better (pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better ABOUT US Kreisson is a construction, engineering and property law firm based in Sydney. We act

More information

Unit 3: The Traditional Procurement Route

Unit 3: The Traditional Procurement Route Unit 3: The Traditional Procurement Route 3.1 Introduction This Unit briefly introduces the main features of the traditional procurement route as a widely used route that provides a good basis for examining

More information

ICES Core Cost Engineering Competencies

ICES Core Cost Engineering Competencies CM CORE 1 Cost Engineering Commercial Management Core Competency Cost Engineering Specialism COMPETENCIES AND ASSESSMENT Financial and commercial processes in civil engineering January 2015 Technical Member

More information

Chapter 2 Parties to the Contract

Chapter 2 Parties to the Contract Chapter 2 Parties to the Contract 2.1 Introduction Construction work may include building of a new structure, additions, alterations, expansion, replacement, dismantling, erection, commissioning, rehabilitation,

More information

SENIOR PROJECT MANAGER

SENIOR PROJECT MANAGER POSITION Reports To; Direct Reports; Key Relationships; SENIOR PROJECT MANAGER Regional Construction Manager Site Managers, other staff allocated to assigned projects Project Directors, Clients, Consultants,

More information

Quantity Surveying and Construction Assessment of Professional Competence

Quantity Surveying and Construction Assessment of Professional Competence Quantity Surveying and Construction Assessment of Professional Competence rics.org/pathwayguides Published by: RICS, Parliament Square, London SW1P 3AD All rights in this publication, including full copyright

More information

COMPANY PROFILE. -innovative engineering & project management solutions-

COMPANY PROFILE. -innovative engineering & project management solutions- COMPANY PROFILE -innovative engineering & project management solutions- CORPORATE VISION To provide customized, practical and cost-effective engineering, contract and project management solutions with

More information

OWNER S REPRESENTATIVE SELECTION RATING. Rate each firm on each item below according to the following scale:

OWNER S REPRESENTATIVE SELECTION RATING. Rate each firm on each item below according to the following scale: OWNER S REPRESENTATIVE SELECTION RATING Rate each firm on each item below according to the following scale: Superior = 5 Excellent = 4 Good = 3 Fair = 2 Poor = 1 1. Competence to Perform Required Services

More information

Job Description Director of Capital

Job Description Director of Capital Salary: 90,000-120,000 Responsible to: Chief Executive Officer About the Role REAch2 Academy Trust is seeking an exceptional Director of Capital to join the Trust to lead on the strategy and management

More information

BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413

BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413 BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413 1. PROGRAMME DESCRIPTION Quantity Surveyors are construction and cost managers for building and civil engineering projects. They are involved from

More information

3. BIDDERS QUALIFICATION CRITERIA

3. BIDDERS QUALIFICATION CRITERIA 3. BIDDERS QUALIFICATION CRITERIA Section VII Forms and Procedures Page 1 of 25 3. BIDDERS QUALIFICATION CRITERIA 1. QUALIFICATION CRITERIA 1.1 Prequalification will be based on meeting all the following

More information

Head of Kent & Essex Estate Main purpose of the role: management of the joint Essex Status:

Head of Kent & Essex Estate Main purpose of the role: management of the joint Essex Status: Job title: Head of Kent & Essex Estate Main purpose of the role: Services Grade: SPS 9 Lead and direct the strategic Role code: E40835 management of the joint Essex Status: Police Staff Police & Kent Police

More information

Project monitor services

Project monitor services Corporate Professional Local Project monitor services For use with the RICS Short form of consultant s appointment The mark of property professionalism worldwide www.rics.org Project Monitor Services For

More information

THE KEY ELEMENTS OF QUANTITY SURVEYING WORK

THE KEY ELEMENTS OF QUANTITY SURVEYING WORK THE KEY ELEMENTS OF QUANTITY SURVEYING WORK A Presentation to the Institution of Surveyors of Uganda by Tom Joseph Mukasa BSc, MSc, MRICS, ICIOB, AISU 2016 1. The following are key elements (divided into

More information

CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT

CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT CONTENTS OUR EXPERTISE 1 OUR SERVICES SCOPE 2 QUANTITY SURVEYING & CONSTRUCTION COST MANAGEMENT 3 THE DETAIL 6 INFRASTRUCTURE COST ENGINEERING

More information

HLB Kuwaiti Accountant Auditing

HLB Kuwaiti Accountant Auditing HLB Kuwaiti Accountant Auditing P.O. Box 26888 Safat.Ahmed Al Jaber Street,17A Warba Insurance Co complex 13129 Safat Kuwait,Kuwait. Telephone:+965 2449454 Fax:+965 2403205 Email: admin@hlbikuwait.com

More information

WESTERN AUSTRALIAN LOCAL GOVERNMENT ASSOCIATION POSITION DESCRIPTION

WESTERN AUSTRALIAN LOCAL GOVERNMENT ASSOCIATION POSITION DESCRIPTION WESTERN AUSTRALIAN LOCAL GOVERNMENT ASSOCIATION POSITION DESCRIPTION Position Title: Procurement Specialist Reports to: Procurement Manager Unit: Business Solutions Date Reviewed: September 2017 1 POSITION

More information

David Lucas: Cost Management in a Complex Contracting Environment

David Lucas: Cost Management in a Complex Contracting Environment David Lucas: Cost Management in a Complex Contracting Environment Contracting is a primary method that both Owners and Contractors utilize to allocate identified risks associated with a project. In today

More information

Delivering Infrastructure Projects by Local Government Getting It Right

Delivering Infrastructure Projects by Local Government Getting It Right Delivering Infrastructure Projects by Local Government Getting It Right Adam Wallwork Partner Goran Gelic Senior Associate 17 November 2016 Overview Statutory framework What effective procurement enables

More information

Capital Programmes Orchestrating Success

Capital Programmes Orchestrating Success Capital Programmes Orchestrating Success Capital Programmes Orchestrating Success Making a success of multi-billion pound projects that extend over several years is 50% competence and 50% confidence.

More information

Kingston Smith LLP transparency report Year ended 30 April 2014

Kingston Smith LLP transparency report Year ended 30 April 2014 Introduction from Sir Michael Snyder, Senior Partner I am pleased to present the Firm s transparency report for the year ended 30 April 2014, which has been prepared in accordance with the provisions of

More information

EYNSFORD PARISH COUNCIL

EYNSFORD PARISH COUNCIL EYNSFORD PARISH COUNCIL FINANCIAL REGULATIONS These Financial Regulations were adopted by the Council at its Meeting held on 20 September 2007, last amended on 20 th July 2017. 1. GENERAL 1.1 These financial

More information

Commercial Management in the Construction Industry

Commercial Management in the Construction Industry Unit 11: Commercial Management in the Construction Industry Unit code: A/504/4355 QCF level: 6 Credit value: 15 Aim This unit gives learners an understanding of the factors which determine the cost of

More information

MNP COMMERCIAL REAL ESTATE & CONSTRUCTION INDUSTRY SERVICES

MNP COMMERCIAL REAL ESTATE & CONSTRUCTION INDUSTRY SERVICES MNP COMMERCIAL REAL ESTATE & CONSTRUCTION INDUSTRY SERVICES The commercial real estate and construction industry is dynamic. Changes in the economy, fluctuating interest rates and shifts in demand can

More information

45. Feedlot construction delivery

45. Feedlot construction delivery Client Des i gn/ Builder Design Consultant Construction Sub-contractors and suppliers FEEDLOT DESIGN AND CONSTRUCTION 45. Feedlot construction delivery AUTHORS: Rod Davis and Ross Stafford Introduction

More information

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS CONSULTANT FEE SCHEDULE FOR LANDSCAPE ARCHITECTURAL CONSULTING SERVICES A GUIDELINE NOV 2008 TABLE OF CONTENTS Table Of Contents... 2 INTRODUCTION...

More information

Commercial QS Specialism (July 17) QUANTITY SURVEYING SPECIALIST COMPETENCIES 2017

Commercial QS Specialism (July 17) QUANTITY SURVEYING SPECIALIST COMPETENCIES 2017 QUANTITY SURVEYING SPECIALIST COMPETENCIES 2017 The quantity surveying competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must

More information

Fraud Investigation & Dispute Services. Forensic analysis and global experience: the intelligent connection

Fraud Investigation & Dispute Services. Forensic analysis and global experience: the intelligent connection Fraud Investigation & Dispute Services Forensic analysis and global experience: the intelligent connection Protect your company s reputation and reduce financial risk Businesses are always under scrutiny

More information

Quantity Surveying and Construction

Quantity Surveying and Construction Quantity Surveying and Construction August 2014 Pathway guide Published by: RICS, Parliament Square, London SW1P 3AD. All rights in this publication, including full copyright or publishing right, content

More information

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process www.provelio.com Summary This paper is an independent project manager s critique of two projects. One

More information

m b m c o n s u l t i n g

m b m c o n s u l t i n g P r o f i l e Finding a solution is not always easy... At MBM Consulting we realise that business is difficult enough so your consultants should be part of the solution not the problem. Since its formation

More information

Abstract. Keywords: Contracting Quantity Surveyor, Flow Activities, Lean Concepts, Sri Lankan construction industry. 1. Background

Abstract. Keywords: Contracting Quantity Surveyor, Flow Activities, Lean Concepts, Sri Lankan construction industry. 1. Background Acceptability of Lean Concepts to Functions of Quantity Surveyor in Sri Lanka Nissanka N.A.L.N., Department of Building Economics, University of Moratuwa (email: nimmiabc@yahoo.com ) Sepani Senarathne.,

More information

PROCOM COMPANY PROFILE

PROCOM COMPANY PROFILE We possess the expertise to undertake all professional construction consultancy services, for all nature of projects and commissions. ABOUT PROCOM PROFILE Procom has been providing construction consultancy

More information

A CONSTRUCTION SERVICES COMPANY

A CONSTRUCTION SERVICES COMPANY A CONSTRUCTION SERVICES COMPANY WHETHER YOU RE PLANNING A NEW HOME OR COMMERCIAL DEVELOPMENT, WE SAVE OUR CLIENTS TIME AND MONEY FROM START TO FINISH. INTRODUCTION Established in 2014, Project360 is an

More information

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services T: +27 21 462 4502 F: +27 21 462 4509 E: info@sahra.org.za South African Heritage Resources Agency - Head Office 111 Harrington Street Cape Town P.O. Box 4637 Cape Town 8001 ANNEXURE A SCOPE OF WORK FOR

More information

Quality Management in Construction Projects 6. Dr. Nabil El Sawalhi

Quality Management in Construction Projects 6. Dr. Nabil El Sawalhi Quality Management in Construction Projects 6 Dr. Nabil El Sawalhi 1 Integrated Quality Management A quality system is a framework for quality management. It embraces: The organizational structure, procedure,

More information

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS 1) THE LIFE CYCLE OF A CONSTR. PROJECT: 1.1:CONCEPT AND FEASIBILITY STUDIES: THE START Recognition of a need for a new facility conceptual analyses Technical

More information

Working better by working together

Working better by working together Working better by working together Deal Advisory We can help you Partner. kpmg.ch/dealadvisory A pragmatic approach to enhancing value through partnerships. / 1 Your vision. Our proven capabilities. Businesses

More information

APC Requirements and Competencies

APC Requirements and Competencies APC Requirements and Competencies August 2015 Published by: RICS, Parliament Square, London SW1P 3AD. All rights in this publication, including full copyright or publishing right, content and design, are

More information

INTERNAL FINANCIAL CONTROL POLICY

INTERNAL FINANCIAL CONTROL POLICY INTERNAL FINANCIAL CONTROL POLICY Legal Framework This policy has been formulated pursuant to Section 135 of the Companies Act, 2013, for ensuring the orderly and efficient conduct of the business of the

More information

CORPORATE PRESENTATION. Adding Value

CORPORATE PRESENTATION. Adding Value CORPORATE PRESENTATION Adding Value We offer legal services in most commercial law practice areas. Our client relationships are based on a long-term per spective and our clients are primarily owners of

More information

Working better by working together

Working better by working together Working better by working together Deal Advisory / Germany We can help you Partner. / 1 A pragmatic approach to enhancing value through partnerships. Your vision. Our proven capabilities. Businesses thrive

More information

construction solutions asia pacific

construction solutions asia pacific construction solutions asia pacific The outlook of the construction industry within the Asia Pacific region remains strong, however pressures to successfully deliver projects against a backdrop of finite

More information

Prescription of qualifications. ARB Criteria at Parts 1, 2 and 3

Prescription of qualifications. ARB Criteria at Parts 1, 2 and 3 Prescription of qualifications ARB Criteria at Parts 1, 2 and 3 Approved: January 2010 Effective From: 2011/2012 Introduction Under the Architects Act 1997, the Architects Registration Board (ARB) has

More information

The Development of Public Private Partnership Projects Impact on the In-House Counsel

The Development of Public Private Partnership Projects Impact on the In-House Counsel International In-house Counsel Journal Vol. 4, No. 13, Autumn 2010, 1 The Development of Public Private Partnership Projects Impact on the In-House Counsel OUAHIDA BENDJEDOU Legal Counsel, Bouygues Construction,

More information

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from

More information

Public Sector. Maximising the value of your assets

Public Sector. Maximising the value of your assets Public Sector PROPERTY Maximising the value of your assets Investment Agency Team of the Year. Property Week Awards 2012 knight frank has over 50YEArs experience working alongside the public sector KEY

More information

Deal Advisory / Australia WORKING BETTER BY WORKING TOGETHER. We can help you Partner.

Deal Advisory / Australia WORKING BETTER BY WORKING TOGETHER. We can help you Partner. Deal Advisory / Australia WORKING BETTER BY WORKING TOGETHER We can help you Partner. KPMG / Deal Advisory / Partner A PRAGMATIC APPROACH TO ENHANCING VALUE THROUGH PARTNERSHIPS. / 1 Your vision. Our proven

More information

Career opportunity. Job Descriptions

Career opportunity. Job Descriptions Career opportunity Job Descriptions Director/Finance DIRECTOR/FINANCE Job Summary: To manage, supervise and coordinate the Finance and Accounts function, advice Management on financial and corporate issues,

More information

Management Excluded Job Description

Management Excluded Job Description Management Excluded Job Description 1. Position Identification Position Number 993234 Position Title Department Reports to (title) Associate Director, Supply Management Purchasing Services Director, Purchasing

More information

Choosing Delivery Method

Choosing Delivery Method Page 1 of 12 Advancing Professional Construction and Program Management Worldwide home contact us site map Search Find-A-CM/PM My Account Sign In Bookstore Career Center Home Choosing Delivery Method Choosing

More information

The building contract a tool to minimise disputes and enhance productivity

The building contract a tool to minimise disputes and enhance productivity Page 1 of 2 + 8 Pages The building contract a tool to minimise disputes and enhance productivity INTRODUCTION Most Standard Building Contracts include a number of clauses to deal with a variety of situations

More information

Learn best practices with regard to contract administration and management; Identify the various phases of contract administration; Gain practical

Learn best practices with regard to contract administration and management; Identify the various phases of contract administration; Gain practical Learn best practices with regard to contract administration and management; Identify the various phases of contract administration; Gain practical experience in how to organize the contract administration

More information

Working better by working together

Working better by working together Working better by working together Deal Advisory / Global We can help you Partner. A pragmatic approach to enhancing value through partnerships. / 1 Your vision. Our proven capabilities. Businesses thrive

More information

Report on Effectiveness of the Construction Manager at Risk Project Delivery Method

Report on Effectiveness of the Construction Manager at Risk Project Delivery Method Report on Effectiveness of the Construction Manager at Risk Project Delivery Method The project management plans described below, establish several elements or criteria for university project staff to

More information

COSCCOMO12 - SQA Unit Code FM7D 04 Obtain tenders and appoint successful contractors in construction contracting operations management

COSCCOMO12 - SQA Unit Code FM7D 04 Obtain tenders and appoint successful contractors in construction contracting operations management Obtain tenders and appoint successful contractors in construction Overview This unit is about shortlisting and selecting appropriate tenderers. It is also the about the review and amendment of tender documents

More information

Together we are strongersm

Together we are strongersm Together we are strongersm 1 FG Audit Ltd - At a Glance The firm embraces a team of certified public accountants who take modern approaches to the creation of value and the effective functioning of business.

More information

Terms of Reference: Operations Manager Market Development Facility (MDF)

Terms of Reference: Operations Manager Market Development Facility (MDF) Position Title: Operations Manager Duration: 12 months Reports to: Team Leader Location: Lahore, Pakistan Terms of Reference: Operations Manager Market Development Facility (MDF) DFAT Adviser Remuneration

More information

Role Type Pay Band Location Duration Reports to:

Role Type Pay Band Location Duration Reports to: Role Title Finance Manager Zambia Accountability Programme (ZAP) Role Information Role Type Pay Band Location Duration Reports to: Advisory, Policy and Expertise 8/E (Locally engaged) Lusaka, Zambia 14

More information

- Anshuman Ghai of Iceberg Myanmar.

- Anshuman Ghai of Iceberg Myanmar. 2017 S A L A R Y G U I D E A liberalized economy and substantial inflows of foreign investment have created a demand for skilled as well as unskilled labor in the Myanmar workplace For a growing economy

More information

NTELLOGIC AFRICA. Your Business Strategic and Management Partner. Business Consulting. Accounting Tax Advisory

NTELLOGIC AFRICA. Your Business Strategic and Management Partner. Business Consulting. Accounting Tax Advisory Our Firm Intellogic Africa ( iabc ) is a firm of Chartered Accountants and Management Consultants with a wealth of experience in Accounting & Tax, Financial Advisory and Management Consulting. iabc specializes

More information

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General 1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document

More information

NHS ProCure21. Presented by Peter Woolliscroft

NHS ProCure21. Presented by Peter Woolliscroft NHS ProCure21 Presented by Peter Woolliscroft Programme for the day Set out how partnering was promoted in England How NHS ProCure21 was developed The successes and next Steps In the beginning!! Government

More information

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW Public management systems are the core systems that enable a government to function and to provide services to its citizens. Just as in the private sector, they ensure

More information

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods PROCUREMENT 5/21/13 Agenda Common Tendering Systems Procurement Methods 1 Agenda Common Tendering Systems Procurement Methods Common Tendering Systems Competitive / Open-bid: (Qualified) contractors are

More information

STAKEHOLDER Responsibilities ACCOUNTABLE TO...

STAKEHOLDER Responsibilities ACCOUNTABLE TO... Governance Trustees Trustees set the values and strategic direction and policies of the Trust. Trustees determine the governance structures for the Trust, approve the Scheme of Delegation and Risk Register.

More information

CHOOSE COMMERCIAL PROPERTY AS A CAREER! CAREER DAY GUIDE

CHOOSE COMMERCIAL PROPERTY AS A CAREER! CAREER DAY GUIDE CHOOSE COMMERCIAL PROPERTY AS A CAREER! CAREER DAY GUIDE CONTENTS SAPOA in Brief 3 Vision and Mission 4 Introduction 5 4 Step Career Planning Process 6-7 Property and Construction Qualifications 8 BSc.

More information

RSM gives me insightful perspectives on the opportunities and challenges facing aged care providers.

RSM gives me insightful perspectives on the opportunities and challenges facing aged care providers. RSM gives me insightful perspectives on the opportunities and challenges facing aged care providers. AGED CARE SERVICES Designed with you in mind. AGED CARE SERVICES As a client of RSM, you benefit from

More information

DESIGN IS GOOD BUSINESS

DESIGN IS GOOD BUSINESS PROJECT DELIVERY: AN INTRODUCTION A profound design process eventually makes the patron, the architect, and every occasional visitor in the building a slightly better human being. JUHANI PALLASMAA The

More information

SELECTING ERP FOR YOUR EPCI CONTRACTING BUSINESS

SELECTING ERP FOR YOUR EPCI CONTRACTING BUSINESS WHITE PAPER SELECTING ERP FOR YOUR EPCI CONTRACTING BUSINESS SELECTING AN ERP PACKAGE FOR YOUR EPCI CONTRACTING BUSINESS By Magne Halvorsen, EPCI Business Analyst, IFS Perhaps the single most important

More information

United Kingdom-London: Architectural, construction, engineering and inspection services 2016/S Contract notice.

United Kingdom-London: Architectural, construction, engineering and inspection services 2016/S Contract notice. 1 / 5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:163622-2016:text:en:html United Kingdom-London: Architectural, construction, engineering and inspection services 2016/S 091-163622

More information

Bachelor in Accounting and Finance

Bachelor in Accounting and Finance Bachelor in Accounting and Finance Course Descriptions Programme Compulsory Courses ACF 102 Principles of Accounting (II) E This course is a continuation of Principles of Accounting I. The topics covered

More information

BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE

BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE Issue Date: 12-08-07 Instructions to Tenderers Page 1 of 9 1. INTRODUCTION 1.1 Overview of BRL Ballymun

More information

STRUCTURAL ENGINEER S SERVICES SCOPE

STRUCTURAL ENGINEER S SERVICES SCOPE ROYAL BOROUGH OF GREENWICH STRUCTURAL ENGINEER S SERVICES SCOPE WOOLWICH CREATIVE DISTRICT PROJECT status: R1 purpose: For information version: 1.0 date: 07/03/2016 1 This version Authored by: name: Nick

More information

The Stock Exchange of Hong Kong Limited. Practice Note 21

The Stock Exchange of Hong Kong Limited. Practice Note 21 The Stock Exchange of Hong Kong Limited Practice Note 21 to the Rules Governing the Listing of Securities (the Exchange Listing Rules ) Issued pursuant to rule 1.06 of the Exchange Listing Rules DUE DILIGENCE

More information

AWE LIMITED ACN

AWE LIMITED ACN AWE LIMITED ACN 077 897 440 AUDIT AND GOVERNANCE COMMITTEE CHARTER Page No. 1. Introduction 2 2. Objectives of the Committee 2 3. Authority of the Committee 3 4. Committee Responsibilities 3 5. Committee

More information

CONSULTANTS FRAMEWORK AGREEMENTS: WALES AND MIDLANDS MAINTENANCE WORKS; EXISTING PROPERTIES. Essential Function Job Summary

CONSULTANTS FRAMEWORK AGREEMENTS: WALES AND MIDLANDS MAINTENANCE WORKS; EXISTING PROPERTIES. Essential Function Job Summary CONSULTANTS FRAMEWORK AGREEMENTS: WALES AND MIDLANDS MAINTENANCE WORKS; EXISTING PROPERTIES. Essential Function Job Summary The Landmark Trust have nearly 200 buildings across the country all maintained

More information

Suva. Structural Design Manager

Suva. Structural Design Manager JOB DESCRIPTION Position: Location of position: Reporting to: Structural Design Engineer Suva Structural Design Manager Objective The position is responsible for preparation and supervision of civil engineering

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

The National Standard of Competency for Architects (2015 edition)

The National Standard of Competency for Architects (2015 edition) The (2015 edition) The Architects Accreditation Council of Australia has maintained Standards for the purpose of assessment processes for registration as an architect in Australia since 1990 in collaboration

More information

It s the way we do things that sets us apart

It s the way we do things that sets us apart It s the way we do things that sets us apart Every service is incorporated with flexibility enabling them to evolve. This means that however you want to outsource services, we can design, develop and construct

More information

Partnership working. 1. Partnership assessment

Partnership working. 1. Partnership assessment Partnership working Partnership is an essential element to all of the work that Comic Relief funds. Where grant holders agree to work with organisations who will be responsible for managing a share of

More information

Detecting and responding to fraud: making the intelligent connection Fraud Investigation & Dispute Services

Detecting and responding to fraud: making the intelligent connection Fraud Investigation & Dispute Services Investigations Detecting and responding to fraud: making the intelligent connection Fraud Investigation & Dispute Services We make the connection between knowledge and insight Our dedicated global team

More information

MNP OILFIELD SERVICES. We Put Energy Into Knowing Your Business

MNP OILFIELD SERVICES. We Put Energy Into Knowing Your Business MNP OILFIELD SERVICES We Put Energy Into Knowing Your Business THE OILFIELD SERVICES SECTOR HAS CHANGED MORE IN THE LAST FIVE YEARS THAN THE PREVIOUS FIFTY. Jeremy Rondeau, National Oilfield Services Leader,

More information

ABERDEEN CITY COUNCIL

ABERDEEN CITY COUNCIL ABERDEEN CITY COUNCIL 1 Job Details Job Title: Chief Officer - Capital Job Profile No: Function: Resources Grade: CO SCP 34 Version Date: November 2017 Salary 81,504 2 Job Purpose This role is responsible

More information

What s the cost of control? Keeping control of your business when cash is king

What s the cost of control? Keeping control of your business when cash is king Get up to speed Building Better Finance Functions What s the cost of control? Keeping control of your business when cash is king whatwouldyouliketochange.com 2 PricewaterhouseCoopers LLP Contents Managing

More information