2 A BRIEF HISTORY The Howe Hotel was one of the most important hotels built on Central Avenue during the 1920 s. Built by William Howe in 1926, the hotel was designed by Theo Sanders and Frank Ginocchio, the same architects that worked on the Majestic Hotel in Both men worked in Hot Springs from the early 1900 s into the 30 s. In 1914, they designed the original Leo N. Levi Hospital on Whittington Avenue. In 1915, Sanders worked alone on the Como Hotel at Central and Ouachita Avenues. Both men worked together on the Bledin Hotel at 225 Central Avenue in the early twenties, which is now the location of the Arlington Hotel parking lot. In 1927, Sanders and Ginocchio joined with Charles Thompson on the design for the Wade Clinic, the Park Hotel and the Riviera Hotel, which were all built in They were very significant architects of this time period. Many of their buildings (including the Como, Bledin, and Riviera hotels) have been demolished. In 1946, the Howe Hotel was purchased by Mr. And Mrs. John Asimos and renamed the DeSoto Hotel. It is currently owned by Norman Clifton and is again being called the Howe Hotel.

3 STANDARD COMMERCIAL 20TH CENTURY DESIGN

4 BUILT IN 1926

5 BUILDING DETAILS Type II Construction (non combustible concrete and steel) Promoted as a FIREPROOF hotel 8 Stories 1st and 2nd Floors (Bathhouse/Retail) 3rd through 7th Floors (Hotel Rooms) 8th Floor (Private Penthouse)

6 SINGLE STAIRWELL

7 BUILDING ELEMENTS Red brick exterior with white glazed terra cotta decorative panels Double hung windows of varying sizes Interior walls/ceiling coverings consist of plaster over lathe

8 BUILDING ELEMENTS, CONTINUED Poured concrete on steel floor/ceiling assemblies separate and provide a high degree of fire separation between floors. This type of construction maintains a high degree of structural integrity over its life span as verified during this evaluation.

9 CURRENT STATUS Exterior The exterior is in decent shape. A new roof has been installed within the last five years. The brick facade has minor erosion consistent with its age. No structural hazards were noted during this evaluation.

10 South Elevation

11 East Elevation This section of this building is where an addition has been torn down. However unappealing, this area has been secured and currently presents no hazards.

12 West Elevation

13 Northeast Elevation

14 Interior The interior of the structure has not fared as well as the exterior. Major roof leaks over the years have lead to significant damage throughout. Vandalism, theft, and fire damage also have contributed to the interior s poor condition. However, the first and second floors have had recent upgrades and are in good condition. A retail shop currently is located on the first floor. Salvaged flooring from the penthouse

15 Fire damage from decades past

16 Second floor mezzanine area open to retail space below

17 All corridors have had suspended acoustical ceilings installed below the original plaster ceilings to cover ventilation ductwork, piping and electrical conduit.

18 FLOOR PLANS FIRST FLOOR

19 MEZZANINE

20 SECOND THROUGH SIXTH FLOORS

21 ROOF

22 Safety Issues During the evaluation, two items were noted that currently pose a risk to the general public and those associated with this structure. 1. Decorative terra cotta tiles have cracked and could fall into the public right of way. 2. Storage of combustible materials. *Both of these items have been addressed with the owner, and corrective actions are currently underway.

23

24 The future of this structure It appears in the near future that this historic structure will have new ownership with intent to do a complete rehabilitation. This rehabilitation will have to include the following components to meet the minimum requirements of today s code: Complete fire protection system, including a sprinkler system, standpipes, fire pump and fire alarm throughout. Secondary means of egress (additional stairwell).

25 Summary The building s current condition is fair. The roof has been repaired, halting any further deterioration. The original construction method has maintained its structural integrity with no safety issues noted during this evaluation. This building has the potential to once again be a significant asset to the downtown area. Nathan Schanlaber Nathan Schanlaber Fire Marshal Hot Springs Fire Department

HOT SPRINGS FIRE DEPARTMENT EVALUATION OF DOWNTOWN LEGACY STRUCTURES Savoy Hotel Thompson Building Dugan Stewart Building May 16, 2012

HOT SPRINGS FIRE DEPARTMENT EVALUATION OF DOWNTOWN LEGACY STRUCTURES Savoy Hotel Thompson Building Dugan Stewart Building May 16, 2012 HOT SPRINGS FIRE DEPARTMENT EVALUATION OF DOWNTOWN LEGACY STRUCTURES Savoy Hotel Thompson Building Dugan Stewart Building May 16, 2012 0 On May 16,, 2012 Hot Springs Firefighters conducted an evaluation

More information

B. RESIDENTIAL MASTER PLUMBER $ $ $

B. RESIDENTIAL MASTER PLUMBER $ $ $ FEE SCHEDULE FOR LICENSE Res. Non-Res. Out of State BUILDING CATEGORIES A. GENERAL CONTRACTOR (Unlimited Scope) B. BUILDING CONTRACTOR $ 100.00 $ 150.00 $ 300.00 Limited to construction and remodeling

More information

PROSPECTUS - REPAIR & ALTERATION WILLIAM J. HOLLOWAY, JR. U.S. COURTHOUSE AND U.S. POST OFFICE - COURTHOUSE OKLAHOMA CITY, OKLAHOMA

PROSPECTUS - REPAIR & ALTERATION WILLIAM J. HOLLOWAY, JR. U.S. COURTHOUSE AND U.S. POST OFFICE - COURTHOUSE OKLAHOMA CITY, OKLAHOMA Prospectus Number: POK- 0046/0072-0Kl 8 s FY 2018 Project Summary The General Services Administration (GSA) proposes repair and alteration for the William J. Holloway, Jr. United States Courthouse (Holloway

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS APPENDIX 3C DOMINION HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.

More information

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary

More information

How to Prepare Your LSE Report

How to Prepare Your LSE Report LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

Building Safety Inspection Report Form STRUCTURAL

Building Safety Inspection Report Form STRUCTURAL Broward County Board of Rules and Appeals Building Safety Inspection Report Form STRUCTURAL Policy # 05-05 Amended 031512 Building Information Building Structure address Legal description Folio # of Building

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement. NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation

More information

TODAY S DATE: November 15th, 2018

TODAY S DATE: November 15th, 2018 TODAY S DATE: November 15th, 2018 Top Left: Twin City Glass is working on setting the curtain wall at the main entrance on the South side of the Addition. Top Right: TCG has almost finished glazing the

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1 Midwest Technical Inspections Survey Worksheet BVSC BVSC Account / Account Code: Agency: Insured: Policy #: Telephone: Alt. Phone: Building Data - Section 1 Building Name (Entire Valuation) Section Name

More information

Spring Run Assisted Living Willow Street, Pennsylvania Architectural The Pennsylvania State University Introduction

Spring Run Assisted Living Willow Street, Pennsylvania Architectural The Pennsylvania State University Introduction Introduction ANDREW SOLOMON 9 Introduction: The purpose of this report is to summarize my thesis project. Thesis was a 2 semester course in which I performed multiple analyses and a new design of the structural

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 7 High Rise Anatomy Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 7 High Rise Anatomy Revised Truck Module Page 1 of 7 HIGH RISE BUILDING CONSTRUCTION The Truck Module 1000.00 sections are designed to be companion documents to EOM section 503.00 Objectives The objective of this section is to provide

More information

NEWPORT OFFICE CENTER Washington Boulevard, Jersey City, New Jersey

NEWPORT OFFICE CENTER Washington Boulevard, Jersey City, New Jersey 570 Washington Boulevard, Jersey City, New Jersey EXECUTIVE SUMMARY Newport Office Center 6 is a stand alone 340,000 square foot building which was built and delivered as a "state-of-the art" build-to-suit

More information

Historic Preservation Commission

Historic Preservation Commission Historic Preservation Commission APPLICATION F CERTIFICATE OF APPROPRIATENESS PROPERTY ADDRESS: DATE: APPLICANT S NAME: APPLICANT S MAILING ADDRESS: CITY:. ZIP: TELEPHONE # HOME/CELL: WK: EMAIL: PROPERTY

More information

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

Draft Feasibility Study for the Expansion of Southeast Library

Draft Feasibility Study for the Expansion of Southeast Library DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW

More information

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Minnesota Healthcare Engineers Association, Fall Conference Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Categories of Rehabilitation Work in Healthcare Facilities Bob Dehler, P.E. robert.dehler@state.mn.us

More information

Auburn University Construction Project April

Auburn University Construction Project April Small Animal Teaching Hospital Phase I: Construction Cost: $8.8 million. Phase I consists of (1) constructing an addition to the Overton-Rudd Auditorium to expand classroom and lecture hall capacity, (2)

More information

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi 1 Site Summary Address 7105 Berkman Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1995 Total Campus Building Area (combined) 14,890 SF Introduction is located

More information

INTERNATIONAL BUILDING CODE

INTERNATIONAL BUILDING CODE INTERNATIONAL BUILDING CODE MODEL BUILDING CONDITIONS ASSESSMENT The Reid and Hughes building is a four-story, four-bay, brick building, constructed in 1869 with a later addition known as the Williams

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S./I.S. 266 - QUEENS, 74-10 COMMONWEALTH BLVD, New York, 11426 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20

More information

BUILDING CONDITION ASSESSMENT

BUILDING CONDITION ASSESSMENT BUILDING CONDITION ASSESSMENT 500 MacNab Street North, Hamilton ID. No.: EBE 16-0153 Prepared for Corporation By Effective Building Engineering Ltd.. Final Report: July 2016 Project No. 16-0153 Table of

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

Fire Protection Systems

Fire Protection Systems Fire Protection Systems Existing System Background In the event of a fire in a large high-rise building such as the River Tower, a number of factors need to be considered in both the design and operation

More information

Delco Activity Center Site Summary

Delco Activity Center Site Summary 1 Site Summary Address 4601 Pecan Brook Austin, TX 78724 Number of Permanent Campus Facilities 1 Original Year of Construction 2003 Total Campus Building Area (combined) 60,294 SF Introduction The is located

More information

UNC Charlotte Science Building Project. Informational Meeting: May 3, 2018

UNC Charlotte Science Building Project. Informational Meeting: May 3, 2018 UNC Charlotte Science Building Project Informational Meeting: May 3, 2018 Project Team Owner and Designers UNC Charlotte Donia Schauble Senior Project Manager - Design Jennifer Price Senior Construction

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Terra Cotta Skyscrapers in Chicago. Outline

Terra Cotta Skyscrapers in Chicago. Outline Restoration of Historic Terra Cotta Skyscrapers in Chicago Edward Gerns Wiss, Janney, Elstner Assoc. Inc. 10 South LaSalle, Chicago, IIlinois Outline Background Terra Cotta Wall Systems Case Studies Marquette

More information

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING

More information

PRELIMINARY STRUCTURAL INVESTIGATION REPORT

PRELIMINARY STRUCTURAL INVESTIGATION REPORT 124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ

More information

Project Location: 384 Railroad Avenue, Pittsburg, CA. APN:

Project Location: 384 Railroad Avenue, Pittsburg, CA. APN: MEMORANDUM Date: 5 January 2010 To: From: Project: Re: Via: Alexandra Endress Associate Planner City of Pittsburg Sheila McElroy Mecca Block Phase II Crosby Building: design compatibility E-mail Project

More information

Consulting Parties Meeting Center Building Concept. February 23, 2010

Consulting Parties Meeting Center Building Concept. February 23, 2010 Consulting Parties Meeting Center Building Concept Presentation Organization Project Team Project Goals Building Evaluation Heritage Existing Conditions Life Safety Evaluation Programmatic Fit Concept

More information

NYC Department of Education

NYC Department of Education Asset: HS FOR ENVIRONMENTAL STUDIES - M, 444 WEST 56 STREET, New York, 10019 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-26 7:33 AM 2018-01-04 3:41 PM AA : Architectural

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 134 - BROOKLYN, 4001 18 AVENUE, New York, 11218 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-02

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

THE BOOKEND BUILDINGS BURLINGTON, IOWA

THE BOOKEND BUILDINGS BURLINGTON, IOWA THE BOOKEND BUILDINGS BURLINGTON, IOWA Downtown Partners, Inc. (herein referred to as DPI) in Burlington, Iowa, is seeking proposals from individuals or developers who are interested in the purchase and

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 54 MINISCHOOL - QUEENS, 86-02 127TH STREET, New York, 11418 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

Initial Design & Size

Initial Design & Size Want to Save time and money on your next building project? Careful planning will help you to anticipate problems, make the right decisions, and to speed construction. If you don t know the answers to all

More information

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #15

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #15 New Main Hospital, Site Park, and Underground Garage Construction Progress Update #15 Date: January 29, 2010 From: Gary Claar Engineering Services 355-1660 Gary.Claar@NationwideChildrens.org On January

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

6-Storey Residential Buildings Combustible Construction. A Regulator s Perspective City of Richmond, BC Canada

6-Storey Residential Buildings Combustible Construction. A Regulator s Perspective City of Richmond, BC Canada 6-Storey Residential Buildings Combustible Construction A Regulator s Perspective City of Richmond, BC Canada Our first...learning curve Remy mid-rise Project 5388 Cambie Street, Richmond BC It s Allowed

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 753 (OLD P85/STERLING HS) - K, 510 CLERMONT AVENUE, New York, 11238 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-22

More information

Reliance House Investors Report. IR11 September 2018

Reliance House Investors Report. IR11 September 2018 Reliance House Investors Report IR11 September 2018 Extension & Conversion of Reliance House to Create 139 Luxury Apartments The 3 storey extension, refurbishment, adaptation and the sub-division works

More information

43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle

43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle Classification: Cluster: Location: Total Area: No. of Stories Acreage Owned: Acquired: 1904 Most Recent Improvements: THE CONSERVATORY Conservatory Close to junction of Inselrhue and Loiter Way, Belle

More information

Moonlight Architecture, Inc. Architecture Interior Design Site Planning

Moonlight Architecture, Inc. Architecture Interior Design Site Planning Moonlight Architecture, Inc. Architecture Interior Design Site Planning 22 May 2018 18057 Mr. Michael J. Petit de Mange, County Administrator Kent County Levy Court 555 Bay Road Dover, DE 19901 RE: Facilities

More information

TIF DEALS, LANDMARK STATUSES APPROVED. TIF Provides Key to Hyde Park Hotel Project

TIF DEALS, LANDMARK STATUSES APPROVED. TIF Provides Key to Hyde Park Hotel Project FOR IMMEDIATE RELEASE June 6, 2012 CONTACT: Mayor s Press Office 312.744.3334 press@cityofchicago.org TIF DEALS, LANDMARK STATUSES APPROVED TIF Provides Key to Hyde Park Hotel Project The development of

More information

WATKINS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

CLASS A OFFICE BUILDING

CLASS A OFFICE BUILDING Century Management Company 1 E n t e r p ri s e Wa y, Ro s e v i l le, CA V I N E YA R D P O I N T E B U S I N E S S P A R K SF, - ±6 e, ±2 abl Avail TWO-STORY CLASS A OFFICE BUILDING Ro s e v i lle, CA

More information

ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P WARNER ROBINS, GEORGIA. December 28, 2005

ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P WARNER ROBINS, GEORGIA. December 28, 2005 ASBESTOS SURVEY WARNER ROBINS HOUSING AUTHORITY PROJECT SITE GA06P160003 WARNER ROBINS, GEORGIA Prepared for: Warner Robins Housing Authority Ms. Charles Alexander Prepared by: Holley Consultants, Inc.

More information

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309) COMMERCIAL, INDUSTRIAL & MULTI-FAMILY RESIDENTIAL PROJECTS GENERAL INFORMATION The provisions of the International Building Code, 2006 Edition as amended by the City of Pekin adopting ordinance, shall

More information

Building Architecture

Building Architecture The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L

More information

Appendix M : Life Safety and Fire Protection Assessment

Appendix M : Life Safety and Fire Protection Assessment Appendix M : Life Safety and Fire Protection Assessment STATE OF WYOMING JOINT LEGISLATIVE AND EXECUTIVE TASK FORCE DEPARTMENT OF ADMINISTRATION & INFORMATION CONSTRUCTION MANAGEMENT WYOMING STATE CAPITOL

More information

Armenia Camp Construction Update Photos April 18, 2016

Armenia Camp Construction Update Photos April 18, 2016 Armenia Camp Construction Update Photos April 18, 2016 Spring has arrived in Armenia. The snow is melting quickly and the conditions for construction are becoming more favorable each day. The pace is picking

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date BUILDING AND SAFETY Tenant Improvement Checklist Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date APPLICATION The following items will be required at the permit counter before

More information

THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA

THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA SUMMARY This paper presents some structural observations, findings, and recommendations

More information

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16 New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16 Date: March 1, 2010 From: Gary Claar Engineering Services 355-1660 Gary.Claar@NationwideChildrens.org More and more

More information

CORTLAND INDUSTRIAL CENTER 30 Kellogg Road Cortland New York

CORTLAND INDUSTRIAL CENTER 30 Kellogg Road Cortland New York CORTLAND INDUSTRIAL CENTER 30 Kellogg Road Cortland New York D. Yaman Properties (607) 756-5872 Charles Bank Realty Trust (617) 795-0072 Offering a Wide Variety of Industrial Opportunities Overview The

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

RYAN BIGGS CLARK DAVIS

RYAN BIGGS CLARK DAVIS December 7, 2016 Mr. Timothy Wales, P.E. City Engineer City of Saratoga Springs City Hall - 474 Broadway Saratoga Springs, New York 12866 Re: 26 Caroline Street Investigation Saratoga Springs, New York

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 42 - MANHATTAN, 71 HESTER STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior

More information

Building Technology Consultants, Inc East Rand Road, Suite L-100. Christopher R. Kottra, PE, CCCA Senior Engineer

Building Technology Consultants, Inc East Rand Road, Suite L-100. Christopher R. Kottra, PE, CCCA Senior Engineer Christopher R. Kottra, PE, CCCA Senior Engineer ckottra@btc.expert REGISTRATIONS Licensed Professional Engineer (PE), Illinois Certified Construction Contract Administrator (CCCA) Construction Document

More information

Pg. xiv, xv Definitions. Pg. 2 A brief history pg. 12 Codes definition. Pg. 13 The principal purpose of code. Pg. 16 IBC. PG. 27 PG.

Pg. xiv, xv Definitions. Pg. 2 A brief history pg. 12 Codes definition. Pg. 13 The principal purpose of code. Pg. 16 IBC. PG. 27 PG. Last Lec. output Pg. xiv, xv Definitions. Pg. 2 A brief history pg. 12 Codes definition. Pg. 13 The principal purpose of code. Pg. 16 IBC. PG. 27 PG. 55, 98 2 Construction Types and Building Sizes Chapter

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 119 - BRONX, 1075 PUGSLEY AVENUE, New York, 10472 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-01-23 8:39 AM 2018-05-14 6:28 PM AA : Architectural - Associate

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

TIF ASSISTANCE, TAX INCENTIVES, AND LANDMARK STATUSES PROPOSED. TIF Would Support New Boathouse on North Branch

TIF ASSISTANCE, TAX INCENTIVES, AND LANDMARK STATUSES PROPOSED. TIF Would Support New Boathouse on North Branch FOR IMMEDIATE RELEASE May 9, 2012 CONTACT: Mayor s Press Office 312.744.3334 press@cityofchicago.org Department of Housing and Economic Development (HED) (312) 744-9267 TIF ASSISTANCE, TAX INCENTIVES,

More information

for lease office. showroom. production. manufacturing. 4,800 SF up to 22,300 SF BUILDING THE

for lease office. showroom. production. manufacturing. 4,800 SF up to 22,300 SF BUILDING THE for lease office. showroom. production. manufacturing.,800 SF up to,00 SF THE BUILDING BUILDING FEATURES 0 & EAST TH AVENUE MT. PLEASANT CBRE Limited is proud to present the completely re-invented Alpha

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

MAINTENANCE & OPERATIONS

MAINTENANCE & OPERATIONS MAINTENANCE & OPERATIONS Department Goal The goal of the Maintenance & Operations Department for the - Capital Improvement Budget/Program is to maintain, refurbish or upgrade municipal facilities to maximize

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION Askanase Hall was originally constructed in 1966; a 1975 addition extended the building to the north and the west. Although specific information could not be located,

More information

In the design development phase, submit finish and material selections to Facilities Management Planning Group for review.

In the design development phase, submit finish and material selections to Facilities Management Planning Group for review. 09 00 00 FINISHES 09 01 00 Maintenance of Finishes 09 01 20 Maintenance of Plaster and Gypsum Board 09 01 20.91 Plaster Restoration 09 01 30 Maintenance of Tiling 09 01 30.91 Tile Restoration 09 01 50

More information

CORTLAND INDUSTRIAL CENTER 30 Kellogg Road Cortland New York

CORTLAND INDUSTRIAL CENTER 30 Kellogg Road Cortland New York CORTLAND INDUSTRIAL CENTER 30 Kellogg Road Cortland New York D. Yaman Properties (607) 756-5872 Charles Bank Realty Trust (617) 795-0072 Offering a Wide Variety of Industrial Opportunities Overview The

More information

Anson County. Facilities Assessment & Proposed Improvements to BC Moore & Historic Courthouse

Anson County. Facilities Assessment & Proposed Improvements to BC Moore & Historic Courthouse Anson County Facilities Assessment & Proposed Improvements to BC Moore & Historic Courthouse Presentation to the Board of County Commissioners March 26, 2007 Participants & Credits Outline of Presentation

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

TABLE OF CONTENTS Page

TABLE OF CONTENTS Page TABLE OF CONTENTS Page Executive Summary i Facility Profile and Summary 1 Section 1 Site Conditions 4 Section 2 Building Exterior 7 Section 3 Building Interior 11 Section 4 Mechanical Systems 14 Section

More information

CLT The new use of timber in Australia Prepared for AIRAH Victoria Division Meeting, February 2014

CLT The new use of timber in Australia Prepared for AIRAH Victoria Division Meeting, February 2014 CLT The new use of timber in Australia Prepared for AIRAH Victoria Division Meeting, February 2014 Jonathan Barnett, PhD, FIEAust, CPEng Technical Director Is Timber the Future? 2 What is CLT Cross-Laminated

More information