MATERIAL ALLOWANCES AND UNIT PRICES
|
|
- Oswald Boyd
- 6 years ago
- Views:
Transcription
1 PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to portions of the Work performed under a unit price payment method. B. Defect assessment and non-payment for rejected work. 1.2 AUTHORITY A. Measurement methods delineated in the individual specification sections compliment the criteria of this section. B. Take all measurements and compute quantities. The Owner s Representative shall verify measurements and quantities. C. Assist Owner s Representative by providing necessary equipment, workers, and survey personnel as required. 1.3 MATERIAL ALLOWANCES A. Quantities indicated in the Bid Form, as defined in individual Specification sections, are for Bidding and Contract purposes only and are in excess of quantities required to complete the Work indicated on the Drawings. Quantities and measurements supplied or placed in the Work will be verified by the Owner s Representative and shall determine payment. B. If the actual Work requires more or fewer quantities than those quantities indicated, provide the required quantities at the unit sum/prices contracted. C. If the actual Work requires a 10 percent or greater change in quantity than those quantities indicated, the Owner may claim for a Contract Price adjustment. D. Inspection: Inspect products covered by an allowance promptly upon delivery for damage or defects. E. Preparation: Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated with related construction activities. F. Material Allowances: 1. Include in the Contract Sum all material allowances defined in the Contract Documents. No portion of the material allowance shall to be utilized without approval from Owner. 2. Quantities: Where allowance is stated as for a certain quantity: a. The Contract Sum will be considered to include the quantity indicated. b. Actual quantities will be determined by measurement, and the contract sum will be adjusted by Change Order using the unit price stated. c. Return unused materials to the manufacturer or supplier for credit to the Owner, after installation has been completed and accepted. d. At the project closeout s Final Payment, credit the remaining unused material allowance amounts to the Owner by change Order. All unused material allowances will be held until Final Payment. MATERIAL ALLOWANCES AND UNIT PRICES
2 1.4 MEASUREMENT OF QUANTITIES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 A. Measurement Devices: 1. Weigh Scales: Inspected, tested and certified by the applicable state Weights and Measures department within the past year. 2. Platform Scales: Of sufficient size and capacity to accommodate the conveying vehicle. 3. Metering Devices: Inspected, tested and certified by the applicable State department within the past year. B. Measurement by Weight: Concrete reinforcing steel, rolled or formed steel or other metal shapes will be measured by handbook weights. Welded assemblies will be measured by handbook or scale weight. C. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness. D. Measurement by Area: Measured by square dimension using mean length and width or radius. E. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord. F. Stipulated Sum/Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as a completed item or unit of the Work. 1.5 PAYMENT A. Unit Prices: 1. Indicate unit prices for each item on Bid Form. 2. The Owner reserves the right to reject the Contractor s measurement of work-in-place that involves use of established unit prices, and to have this Work measured by an independent surveyor acceptable to the Contractor at the Owner s expense. 3. Accepted unit prices will be included in the Agreement. 4. Accept Unit Prices will be used to adjust the Final Contract Sum. The same accepted unit price will be used for addition to, or deduction from the Contract Sum. B. Payment Includes: Full compensation for all required labor, supervision, Products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit. C. Final payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities verified by the Owner s Representative and accepted by the Architect/Engineer multiplied by the unit sum/price for Work which is incorporated in or made necessary by the Work. 1.6 DEFECT ASSESSMENT A. Replace the Work, or portions of the Work, not conforming to specified requirements. B. If, in the opinion of the Architect\Engineer, it is not practical to remove and replace the Work, the Architect\Engineer will direct one of the following remedies: 1. The defective Work may remain, but the unit sum/price will be adjusted to a new sum/price at the discretion of the Architect\Engineer 2. The defective Work will be partially repaired to the instructions of the Architect\Engineer, and the unit sum/price will be adjusted to a new sum/price at the discretion of the Architect\Engineer. C. The individual specification sections may modify these options or may identify a specific formula or percentage sum/price reduction. MATERIAL ALLOWANCES AND UNIT PRICES
3 D. The authority of the Architect\Engineer to assess the defect and identify payment adjustment is final. 1.7 NON-PAYMENT FOR REJECTED PRODUCTS A. Payment will not be made for any of the following: 1. Products wasted or disposed of in a manner that is not acceptable. 2. Products determined as unacceptable before or after placement. 3. Products not completely unloaded from the transporting vehicle. 4. Products placed beyond the lines and levels of the required Work. 5. Products remaining on hand after completion of the Work. 6. Loading, hauling, and disposing of rejected Products. 1.8 SCHEDULE OF MATERIAL ALLOWANCES A. The Material Allowance listed below shall be include in the Base Bid. The total value of the Material Allowance shall be calculated by multiplying the quantity by the corresponding Unit Price. Unused quantities of the Material Allowance shall be credited to the Owner based on using the remaining quantities and their respective unit prices. Should the quantities required exceed those of the Material Allowance the Unit Prices shall govern and be the basis of determining the additional compensation due to the Contractor. B. General Trades Contract: 1. Material Allowance #G1: Provide Cementitious underlayment for restoration of floors to receive new finishes. Section Cementitious Underlayment. Base bid shall include an amount to provide 5000 square feet of underlayment at a thickness of 1/8 inch based on Unit Price #G1. 2. Material Allowance #G2: Provide two tons of structural steel to be installed in areas directed by the Architect or Construction Manager based on Unit Price #G2 3. Material Allowance #G3 Excavate and remove from site 1000 CY unsuitable soil materials up to 2 depth excluding rock conditions based on Unit Price #G3 4. Material Allowance #G4: Provide 1000 CY imported suitable soil replacement up to 2 depth including compaction to road base standards based on Unit Price #G4 C. Plumbing Contract: 1. Material Allowance #P1: 20 linear ft. 4" diameter PVC soil pipe, installed below grade including cutting, patching, excavation, and all appurtenances necessary, based on Unit Price #P1. 2. Material Allowance #P2: 50 linear ft.: ½ diameter copper pipe with 1 inch of insulation, installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P2. 3. Material Allowance #P3: Five (5):1/2" ball valves, installed based on Unit Price #P3. 4. Material Allowance #P4: 50 linear ft. 1-1/2 diameter copper pipe with 1 inch of insulation, installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P4. 5. Material Allowance #P5: 50 linear ft. 3/4 diameter steel pipe (nat. gas) installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P5 6. Material Allowance #P6: Five (5): 2" ball valves, installed based on Unit Price #P6. 7. Material Allowance #P7: 50 linear ft. 4 diameter cast iron storm water pipe with ½ insulation, installed based on Unit Price #P7. 8. Material Allowance #P8: Ten (10) sprinkler heads installed, based on Unit Price #P8. 9. Material Allowance #P9: 20 linear ft. 1 diameter steel pipe (sprinkler) installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #P9. D. H.V.A.C. Contract: 1. Material Allowance #H1: /4 Ball Valves, installed, based on Unit Price #H1. 2. Material Allowance #H2: x 8 volume damper based on Unit Price #H2. 3. Material Allowance #H3: 4 Digital Temp Sensors based on Unit Price #H3 MATERIAL ALLOWANCES AND UNIT PRICES
4 4. Material Allowance #H4: 4 Digital Humidity Sensors based on Unit Price #H4 5. Material Allowance #H5: 2000 lbs Galvanized steel ductwork installed, including insulation, based on Unit Price #H5 E. Electrical Contract: Refer to Section General Electrical Requirements for Unit price descriptions and quantity allowances to be included in the Base Bid. 1. Material Allowance #E1: Duplex Receptacle & Wiring: b. Allowance Quantity: 75 assemblies 2. Material Allowance #E2: Exit Sign & Wiring: 3. Material Allowance #E3: 2 x 4 Type F1 Light Fixture & Wiring: 4. Material Allowance #E4: 2 x 4 Type F2 Light Fixture & Wiring: 5. Material Allowance #E5: Heat or Smoke Detector & Wiring: 6. Material Allowance #E6: Duct Detector & Wiring: 7. Material Allowance #E7: Fire Alarm Pull Station & Wiring: 8. Material Allowance #E8: Fire Alarm Visual Device & Wiring: c. Material Allowance #E9: Fire Alarm Addressable Device & Wiring: d. Description: Refer to Section e. Allowance Quantity: 15 assemblies 9. Material Allowance #E10: Fire Alarm Speaker: 10. Material Allowance #E11: Intercom Speaker & Wiring: 11. Material Allowance #E12: Secondary Clock & Wiring: 12. Material Allowance #E13: C4 Outlet: b. Allowance Quantity: 50 assemblies F. Fire Protection Contract: 1. Material Allowance #FP1: Ten (10) sprinkler heads installed, based on Unit Price #FP1. 2. Material Allowance #FP2: 20 linear ft. 1 diameter steel pipe (sprinkler) installed, including fittings, hangers, and all appurtenances necessary based on Unit Price #FP SCHEDULE OF UNIT PRICES A. The Base Bid for each prime contract shall include the Material Allowances specified above. Should the quantities required exceed those of the Material Allowance the Unit Prices shall govern be the Basis of determining the additional compensation due to the Contractor: MATERIAL ALLOWANCES AND UNIT PRICES
5 B. General Trades Contract: 1. Unit Price #G1: Provide cementitious underlayment for restoration of floors to receive new finishes where directed by the Architect or Construction Manager per square foot. 2. Unit Price #G2: Provide structural steel where directed by the Architect or Construction Manager per ton. 3. Unit Price #G3: Excavate and remove from the site unsuitable soil materials up to 2 depth excluding rock conditions where directed by the Architect or Construction manager per cubic yard. 4. Unit Price #G4: Provide suitable soil replacement up to 2 depth including compaction to road base standards where directed by the Architect or Construction manager per cubic yard. C. Plumbing Contract: 1. Unit Price #P1: 4" diameter PVC soil pipe below grade. Provide required cutting, patching, excavation and support material and labor to install per linear foot. 2. Unit Price #P2: 1/2" diameter copper pipe with 1 inch of insulation. Provide support material and labor to install per linear foot. 3. Unit Price #P3: 1/2 Ball Valve. Each 4. Unit Price #P4: 1-1/2" diameter copper pipe with 1 inch of insulation. Provide support material and labor to install per linear foot. 5. Unit Price #P5: 3/4" diameter steel pipe (Gas). Provide support material and labor to install per linear foot. 6. Unit Price #P6: 2 Ball Valve. Each 7. Unit Price #P7: 4 diameter cast iron storm water pipe with ½ insulation. Provide support material and labor to install per linear foot. 7. Unit Price #P8: Sprinkler head Each 8. Unit Price #P9: 1" diameter steel pipe (Sprinkler). Provide support material and labor to install per linear foot. D. H.V.A.C. Contract H.V.A.C. Contract: Provide all miscellaneous and incidental material and labor required to install the coordination work items listed below. 1. Unit Price H-1: Provide 1-1/4 Ball Valve in loop water piping and insulated fitting in accordance with applicable Division 23 Sections. Per assembly. 2. Unit Price H-2: Provide 12 x 8 volume damper in accordance with applicable Division 23 Sections. Per assembly. 3. Unit Price H-3: Digital Temp Sensors and labor to install and program. Each. 4. Unit Price H-4: Digital Humidity Sensors and labor to install and program. Each. 5. Unit Price H-5: Galvanized steel ductwork. Per lbs. E. Electrical Contract: Refer to Section General Electrical Requirements for Unit Price descriptions and unit of measurement. 1. Unit Price #E1: Duplex Receptacles and Wiring: 2. Unit Price #E2: Exit Sign and Wiring: 3. Unit Price #E3: 2x4 Type F1 Light Fixture and Wiring: 4. Unit Price #E4: 2x4 Type F2 Light Fixture and Wiring: 5. Unit Price #E5: Heat or Smoke Detector and Wiring: 6. Unit Price #E6: Duct Detector and Wiring: 7. Unit Price #E7: Fire Alarm Pull Station and Wiring: MATERIAL ALLOWANCES AND UNIT PRICES
6 8. Unit Price #E8: Fire Alarm Audible/Visual Device and Wiring: 9. Unit Price #E9: Fire Alarm Addressable Device & Wiring 10. Unit Price #E10: Fire Alarm Speaker: 11. Unit Price #E11: Intercom Speaker and Wiring: 12. Unit Price #E12: Secondary Clock and Wiring: 13. Unit Price #E13: C4 - Outlet: PART 2 - PRODUCTS Not Used PART 3 - EXECUTION Not Used END OF SECTION MATERIAL ALLOWANCES AND UNIT PRICES
SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS
SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationSPECIAL SPECIFICATION 6664 Level (3) Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,
More informationSPECIAL SPECIFICATION 6658 Time Warner Communications System
2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationSPECIAL SPECIFICATION. Water and Sewer System and Appurtenances
2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationBid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)
Bid Form TxDOT CSJ No. 17HGRCKPT Project: Aransas County Airport - 2017 Hangar Project Project Description: Schedule 1A Base Bid: Construct TxDOT 360 concrete apron pavement for box hangar. Schedule 1A
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following
More informationDivision IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT
Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...
More information1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK
1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for
More informationB. RESIDENTIAL MASTER PLUMBER $ $ $
FEE SCHEDULE FOR LICENSE Res. Non-Res. Out of State BUILDING CATEGORIES A. GENERAL CONTRACTOR (Unlimited Scope) B. BUILDING CONTRACTOR $ 100.00 $ 150.00 $ 300.00 Limited to construction and remodeling
More informationCity of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion
City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal
More informationAddendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018
Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA-2019-004 TMWA Capital Project No.: 10-0001.053 October 3, 2018 The following information, clarifications, changes and modifications are by reference
More informationITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION
SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More informationCW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS
October 1990 CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Testing and Approval...1 5.3 Irrigation Pipe and Fittings...1
More informationThe following Specifications of the Special Provisions have been revised and/or added (in red):
RE: City of Monrovia Project MR-011 South Area Infrastructure Improvement Project Addendum #1 December 14, 2017 Dear Bidders: The attached information and clarifications constitutes Addendum #1 for the
More informationMEASUREMENT & PAYMENT (CITY FUNDED PROJECTS)
00950 - Measurement & Payment Page 00950-1 00950 - MEASUREMENT & PAYMENT (CITY FUNDED PROJECTS) (Last revised 5/20/10) SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Base Course & Paving Curb & Gutter,
More informationITEM 555 CHAIN LINK FENCING
ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationCity of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)
COMMERCIAL, INDUSTRIAL & MULTI-FAMILY RESIDENTIAL PROJECTS GENERAL INFORMATION The provisions of the International Building Code, 2006 Edition as amended by the City of Pekin adopting ordinance, shall
More information17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS
17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain
More informationTown of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and
Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically
More informationITEM 706 PIPE SLOPE DRAIN
AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction
More informationSUPPLEMENTAL TECHNICAL SPECIFICATION
July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft
More informationAPPENDIX A MEASUREMENT AND PAYMENT
P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.
ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes
More informationSPECIAL SPECIFICATION 6666 Charter Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,
More informationITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.
AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationUPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04
UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure
More informationSPECIAL SPECIFICATION 7441 Remove Components of Existing Traffic Management System
2004 Specifications CSJ 6185-04-001 SPECIAL SPECIFICATION 7441 Remove Components of Existing Traffic Management System 1. Description. Remove existing surveillance cabinets, intermediate amplifier cabinets,
More information1ARCHITECTURE TABLE OF CONTENTS
TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0102 COVER 00 0107 SEALS PAGE 00 0111 TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 1000 01 2000 01 2100 01 2300 01
More informationItem 247 Flexible Base
Item Flexible Base 1. DESCRIPTION 2. MATERIALS Construct a foundation course composed of flexible base. Furnish uncontaminated materials of uniform quality that meet the requirements of the and specifications.
More informationItem 247 Flexible Base
Item Flexible Base 1. DESCRIPTION 2. MATERIALS Construct a foundation course composed of flexible base. Furnish uncontaminated materials of uniform quality that meet the requirements of the and specifications.
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract
More informationSECTION 2831 ITEM F-162 CHAIN-LINK FENCES
SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling
More informationSECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.
SECTION 31 62 16 STEEL H PILES PART 1 - GENERAL 1.01 SCOPE OF WORK A. Section includes steel H piles embedded into drilled concrete piers. B. Furnish all labor, materials, equipment and incidentals required
More informationTOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR
TOWN OF LABRADOR CITY FORM OF TENDER TLC-04-18 SUPPLY & INSTALLATION OF CONCRETE FLOOR Tenderer Address Telephone # The undersigned bidder has carefully examined the Form of Tender, Instructions to Bidders,
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationINSTALLATION OF AIRFIELD LIGHTING UNDERGROUND ELECTRICAL DIRECTIONAL BORE DUCT
UNDERGROUND ELECTRICAL PART 1 GENERAL 1.1 SECTION INCLUDES: A. The work specified in this section consists of furnishing and installing underground utilities using the method of installation commonly referred
More informationDEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe
Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550
More informationReinforced Soil Slopes (RSS)
Supplemental Technical Specification for Reinforced Soil Slopes (RSS) SCDOT Designation: SC-M-206-1 (4/16) 1.0 DESCRIPTION 1.1 Construct a reinforced soil slope in accordance with these specifications,
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More information[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]
SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationSECTION EROSION CONTROL DEVICES
SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment
More information2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationSECTION 410 FENCES All materials shall be new and without flaws or defects of any type GENERAL
SECTION 410 FENCES 410.1 GENERAL This work shall consist of the construction of fences and gates in substantial compliance with the specifications, lines, and grades shown on the plans or established by
More informationCity of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist
City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist This checklist contains the standard information required on submittals for commercial construction
More informationST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT
ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT August 23, 2018 Please find the following addendum to the below mentioned BID. Addendum No.: 1 Bid#: 312-00-18-30-2 Project Name: 2018 District 12
More informationSECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL
SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS
More informationFinal Estimates Level 2
Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure
More informationCHAPTER 2 REVIEW QUESTIONS
DEWALT Construction Estimating Complete Handbook Excel Estimating Included 2nd Edition Ding SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/dewalt-construction-estimating-completehandbook-excel-estimating-included-2nd-edition-ding-solutions-manual/
More informationCONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE
CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES
ITEM NO. 813 WATER SERVICE FOR FIRELINES 813.1 DESCRIPTION: This item shall consist of water service for fire line installations in accordance with these specifications and as directed by the Engineer.
More informationC. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.
SECTION 01400 QUALITY CONTROL SERVICES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification
More information186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT
186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS PROJECT NUMBER MDVL092051 Renovate Vehicle Maintenance Facility Bldg 200 23 June 2017 ADDENDUM #1 PERFORMANCE WORK STATEMENT 1.0 SCOPE. This addendum to
More informationRFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered
RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater
More informationCITY OF UNION, OREGON TECHNICAL SPECIFICATIONS SECTION 9 UNDERGROUND UTILITIES
A. GENERAL 1. Scope. These specifications cover the installation of the utility systems and appurtenances for the electrical power, telephone, gas, and television as shown in the Drawings. The Work includes,
More informationADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN
ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB #4320 2014 RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN The following changes, additions, and/or deletions shall be made to the Bid Documents
More informationSAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)
More informationc. Sprinkler layout. Sprinkler layout may be modified to adjust for field conditions provided it complies with part
Florida Building Code Plumbing APPENDIX F, 5 th Edition (2014) Amendment to APPENDIX F c. Sprinkler layout. Sprinkler layout may be modified to adjust for field conditions provided it complies with part
More informationSECTION PUBLIC WATER SERVICE CONNECTIONS
SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential
More informationThe work required for this project includes, but is not limited to, the following items, not listed in order of execution.
ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special
More informationRESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS
RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional
More informationREGIONAL CONSTRUCTION STANDARDS
REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright
More informationPLUMBING BUILDING SCOPE OF WORK
PLUMBING BUILDING SCOPE OF WORK 1. The Contractor shall furnish all supervision, materials, labor, equipment, tools, supplies, incidental items, including construction cleanup, etc for accomplishing the
More informationIce Rink Renovation & New Clubhouse
SECTION 331213 - WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for domestic water service connections to buildings. 2. Corporation stop assembly. 3. Curb
More informationSECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS
SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationCity of Westerville Guide to Commercial Inspections
City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing
More informationApril 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5
FINANCE, RISK AND SUPPLY CHAIN MANAGEMENT Supply Chain Management April 11, 2017 INVITATION TO TENDER ITT No. PS20170312 CONTRACTOR FOR MARPOLE PLACE RESTORATION ADDENDUM No. 5 RE: ADDITION TO APPENDIX
More informationSECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSECTION PAVING AND SURFACING
SECTION 02500 - PAVING AND SURFACING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationSECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS
SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3
More informationStandards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington
Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Rev 062017 Provided by UNCW Physical Security and Access OVERVIEW... 3 CABLE INSTALLATION... 3
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section
More informationBID FORM (LUMP SUM CONTRACT)
BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationSPECIAL SPECIFICATION 5989 Settlement Gauge
2004 Specifications CSJ 0047-14-067 SPECIAL SPECIFICATION 5989 Settlement Gauge Description. Install, maintain, and subsequently abandon settlement gauges as indicated for the purpose of obtaining foundation
More informationDocument Supplementary Conditions State of Ohio Standard Requirements for Public Facility Construction
Document 00 73 00 - Supplementary Conditions State of Ohio Standard Requirements for Public Facility Construction Certifications These Supplementary Conditions amend and supplement the General Conditions
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationCommunity Services Dept., City of Mississauga Subdivision Requirements Manual Page 1 of 5 Specifications Revised: September 26, 2005
Subdivision Requirements Manual Page 1 of 5 PART I - GENERAL 1.1 Related Work.1 Rough Grading: Section 02211 1.2 Scope of Work.1 This section includes the supply and installation of all labour and materials
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING
More informationINDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2
INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...
More informationSPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013
SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR
More informationSPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings
1993 Specifications CSJ 0144-01-060 SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings 1. General. (1) Scope. This Section includes the furnishing, installation, and subsequent
More informationNOTE TO THE SPECIFYING ARCHITECT REGARDING SECTION STAGE EQUIPMENT (TWO PROSCENIUMS)
NOTE TO THE SPECIFYING ARCHITECT REGARDING SECTION 11064 STAGE EQUIPMENT (TWO PROSCENIUMS) Use this specification for platform stages with a proscenium that opens to the cafeteria and another proscenium
More informationSECTION C10 CLEANING AND CEMENT LINING GENERAL
SECTION C10 CLEANING AND CEMENT LINING GENERAL The work under this section consists of the cleaning and cement mortar lining of existing cast iron water mains in place within the limits specified on the
More information(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.
Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.
More information