1 Old Dominion University Civil and Environmental Engineering Visitors Council Society of American Military Engineers What Does the Future Hold? State / Federal / Regional Contracts November 18, 2010 Adam J. Jack, PE District Preliminary Engineer / Planning & Investment Manager Hampton Roads District

2 Executive Management Summary Commissioner G. Whirley Chief Deputy Commiss C. Kilpatrick, PE Inspector General Chief of Comm Enterprise Application Office W. Wells J. Caldwell S. McCracken Chief Engineer M. Kerley, PE Chief of System Operations C. Sorrell Chief of Policy & Environ R. Walton Chief or Technology, Research & Innovation Dr. G. Allen Chief of Admin G. Johnson Chief of Planning & Investment R. Busher Chief Financial Officer J. Lawson 9 District Administrators Internal Audit External & Construction Audit Investigations Innovative Project Delivery Location & Design Materials Scheduling & Contracts Structure & Bridge Maintenance Operations & Security Operations Planning Traffic Engineering Environmental Local Assistance Policy Right-of-Way Information Technology VTRC & Education Institute Administrative Services Civil Rights Human Resources Safety & Performance Management Program Management Transportation & Mobility Planning Financial Planning Fiscal 2

3 District Management Summary Commissioner G. Whirley Deputy Chief Deputy Chief Commissioner C. PE C. Kilpatrick, PE Bristol District K. Brittle (acting) Culpeper District J. Utterback, PMP Fredericksburg District Q. Elliott Hampton Roads District D. Heuer, PE Lynchburg District Northern Virginia District R. Cary, PE G. Moore, PE Richmond District T. Hawthorne, PE Salem District R. Caywood, PE Staunton District M. Estes, PE (acting) Business (ADA-B) Construction (DCE) Maintenance (DME) Operations (ROD) Planning & Investment (PIM) Preliminary Engineering (DPE) 3

4 Process for Consultant Contract Use District Programming Project Established District L&D Workload / Resource Evaluation Central Office L&D Workload / Resource Evaluation District Project Management On-Call Services Task Order Central Office Division Advertise Specific Project Services 4

5 District Project Management Decision Process On Call Contract Engineering Services Fee < $750,000 Department Discretion??? Project Contract Engineering Services Fee > $1,000,000 5

6 Expected Project Management Assignments VDOT Non-VDOT Source: VDOT Dashboard Maint & Ops Projects Added 6

7 Typical RFP Procurement Advertise RFP for Services External Process Receive EOI s Internal Process Review EOI s Re-Advertise / Cancel RFP Select best firms (shortlist) based upon EOI s Contact shortlisted firms for interviews 3-6 months Interview shortlisted Prioritize based Negotiate contract firms upon interview for services Award contract 7

8 Typical RFP Procurement What do we look for? Understanding of the Services: Project Objective Environment (Physical and non-physical) Technical Abilities Prior Similar Experience MBE/DBE Participation Consistency in your Response Committee membership 3-5 Voting Members Administrators and Managers Non-voting Project Partners (Technical Advisors) 8

9 Average Project Development Time General CN Value Percent of SYIP Average PE Time Category 1 <$1m 12% 2 yr Category 2 $1- $5m 6% 3 yr Category 3 $5 - $10m 9% 9 yr Category 4 $10 - $30m 26% 8 yr Category 5 >$30m 47% 7 yr 82% of the SYIP takes 7 + yrs to deliver!?!? 9

10 Typical Design-Build Procurement Identify possible Finding of Public External Process Interest (Commissioner Approval) Request for Qualifications Internal Process Request for Open Price Proposals Evaluate & score proposals Evaluate & score proposals Re-Advertise / Cancel RFP Evaluate best value ranking of proposals Award contract 10

11 Typical Design-Build Procurement What do we look for? Qualifications Project Concept and Management Plans Design and Construction Approach Quality Control/Quality Assurance Project Control MBE/DBE participation Best Value Committee Membership Central Office & District Staff Administrators and Managers 11

12 Consultant Evaluations All services performed for Hampton Roads are evaluated every 6-months District Project Manager Draft Evaluation District Section Manager Evaluation Consistency Review Central Office Performance Private Consultant Performance Past Performance (consider 3 yrs of data) 12

13 Comparison Hampton Roads vs. NoVA Average Projects per Category Pro ojects 15 Hampton Roads Northern VA Cat 1 Cat 2 Cat 3 Cat 4 Cat 5 Category 13

14 Comparison Hampton Roads vs. NoVA Average Award per Category ward $100,000,000 $90,000,000 $80,000,000 $70,000,000 $60,000,000 Hampton Roads $50,000,000 ANorthern VA $40,000,000 $30,000,000 $20,000,000 $10,000,000 $- Cat 1 Cat 2 Cat 3 Cat 4 Cat 5 Category 14

15 Comparison Hampton Roads vs. NoVA Total Awards by District of Projects Number Hampton Roads Northern VA Year 15

16 Statewide Advertisement Outlook $600 Estimat tes ($ million ns) $500 $400 $300 $200 $ $0 Winter Spring Summer Fall Season Projects with an estimated value >$2 million 16

17 Statewide Advertisement Outlook Number of Projects Winter Spring Summer Fall Season Projects with an estimated value >$2 million 17

18 2011 Challenges Engineering g Advance competitive PPTA s proposals Route 460 Midtown Tunnel Hampton Roads Bridge-Tunnel Increase use of Consultant On-Call Services Complete PE funded phases Improve partnering with municipalities Eliminate process steps / shorten schedules 18

19 Engineering Consulting Services What is expected in the next 6-months statewide? POSSIBLE SERVICE Statewide Noise Abatement Statewide Wetland Services Limited Services Design Term Contracts (6) Statewide Geotechnical CEI District Wide Bristol CEI District Wide Lynchburg Route 60 over Jackson River Rehab or Replace 13 Bridges (Staunton) Rehab Rhbor Replace 6Bid Bridges (Cl (Culpeper) Limited Services Term Contract Traffic & Signing Contract (NoVA) GROUP Environmental Location & Design Materials Scheduling & Contract Structure & Bridge Traffic Engineering 19

20 On-Call Contract Opportunities Construction Estimating Engineering & Inspection (CEI) Maintenance Plans Operations Area Technical Services Environmental Environmental Documents Noise Abatement Wetlands and Water Quality Innovative Project Delivery (IPD) Design Build/ P3 Services Location & Design (L&D) Computer Generated Rendering Design Services District On-Call Services Permit Construction Services Quality Plan Review Regional Drainage / River Mechanics Regional Surveying Subsurface Utility Designating Traffic Engineering Design Traffic Engineering for Operations Utility Adjustment Plans Materials Geotechnical Engineering Design Pavement Evaluation & Design Transportation Mobility & Planning (TMPD) Chapter 527 Services Multi-Modal Planning Transportation Planning Travel Demand Modeling Right-of-Way Appraisals Structure and Bridge (S&B) Geotechnical Engineering for Bridges Movable Bridge Inspection & Repair Plans Regional New Design & Inspection Regional Maintenance & Repair Plans Regional Safety inspections & Traffic Control Devices Regional Virtis Live Load Ratings Tunnel Repair Plans Traffic Engineering Traffic Engineering Services Traffic Signal System Optimization 20

21 Old Dominion University Civil and Environmental Engineering Visitors Council Society of American Military Engineers What Does the Future Hold? State / Federal / Regional Contracts November 18, 2010 Adam J. Jack, PE District Preliminary Engineer / Planning & Investment Manager Hampton Roads District

Alternative Project Delivery Division Consultant Procurement

Alternative Project Delivery Division Consultant Procurement Alternative Project Delivery Division Consultant Procurement VTCA/VDOT Consultant Forum 2016 September 8, 2016 Jeff Rodgers Director of Consultant Procurement Alternative Project Delivery Division Merged

More information

VTCA CONFERENCE Structure and Bridge Update. Kendal R. Walus, PE State Structure and Bridge Engineer. April 13, 2018

VTCA CONFERENCE Structure and Bridge Update. Kendal R. Walus, PE State Structure and Bridge Engineer. April 13, 2018 VTCA CONFERENCE 2018 Structure and Bridge Update Kendal R. Walus, PE State Structure and Bridge Engineer April 13, 2018 Structure and Bridge Division Assistant S&B Engineers Design Engineering Prasad Nallapaneni

More information

VDOT S STATEWIDE TRANSPORTATION OPERATIONS CENTER (TOC) AND SAFETY SERVICE PATROL (SSP) CONTRACT

VDOT S STATEWIDE TRANSPORTATION OPERATIONS CENTER (TOC) AND SAFETY SERVICE PATROL (SSP) CONTRACT VDOT S STATEWIDE TRANSPORTATION OPERATIONS CENTER (TOC) AND SAFETY SERVICE PATROL (SSP) CONTRACT Performance-based Contracting Peer Exchange Detroit, MI Ken Earnest, P.E. - Acting State Operations Engineer

More information

VDOT UPDATE Hampton Roads Local Damage Prevention Committee - VA811 Membership Meeting

VDOT UPDATE Hampton Roads Local Damage Prevention Committee - VA811 Membership Meeting VDOT UPDATE Hampton Roads Local Damage Prevention Committee - VA811 Membership Meeting April 22, 2015 Michael T. Wilder Southeast Regional Utilities Manager VDOT Mission Statement Our mission is to plan,

More information

VDOT DESIGN-BUILD PROGRAM

VDOT DESIGN-BUILD PROGRAM VDOT DESIGN-BUILD PROGRAM ASCE Richmond Branch Meeting Bryan Stevenson, PE, DBIA - Senior Project Delivery Engineer December 11, 2018 ALTERNATIVE PROJECT DELIVERY(APD) DIVISION ORG CHART Shailendra Patel,

More information

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery General Engineering Consultant Services for I-64 Hampton Roads Bridge-Tunnel Expansion Project Hampton Roads District RFP No. HRD-20171013 Optional Pre-Proposal Conference October 19, 2017 Shailendra G.

More information

VDOT S BRIDGE PRESERVATION PROGRAM. Virginia Concrete Conference, 2012 RICHMOND, VA. March 9, 2012

VDOT S BRIDGE PRESERVATION PROGRAM. Virginia Concrete Conference, 2012 RICHMOND, VA. March 9, 2012 VDOT S BRIDGE PRESERVATION PROGRAM Virginia Concrete Conference, 2012 RICHMOND, VA March 9, 2012 Adam Matteo, PE Assistant State Structure and Bridge Engineer for Bridge Maintenance VDOT Structure and

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Ancillary Structures SPECIFIC SUBJECT: VDOT Guidelines to AASHTO Standard

More information

BrM Annual User Group Meeting Welcome Structure and Bridge. Kendal R. Walus, PE State Structure and Bridge Engineer September 12, 2017

BrM Annual User Group Meeting Welcome Structure and Bridge. Kendal R. Walus, PE State Structure and Bridge Engineer September 12, 2017 BrM Annual User Group Meeting Welcome Structure and Bridge Kendal R. Walus, PE State Structure and Bridge Engineer September 12, 2017 Structure and Bridge Division Assistant S&B Engineers Design Engineering

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

State of the Structures and Bridges Fiscal Year 2017 July 1, 2017

State of the Structures and Bridges Fiscal Year 2017 July 1, 2017 Fiscal Year 2017 July 1, 2017 Prepared By: Structure and Bridge Division, Virginia Department of Transportation Comments and or questions may be directed to Kendal R. Walus, P.E., State Structure and Bridge

More information

Review of Construction Costs and Time Schedules for Virginia Highway Projects

Review of Construction Costs and Time Schedules for Virginia Highway Projects Joint Legislative Audit and Review Commission of the Virginia General Assembly Review of Construction Costs and Time Schedules for Virginia Highway Projects JLARC Staff Briefing December 19, 2000 Introduction

More information

Functional Classification

Functional Classification Functional Classification HB 3202 (2007) Report to Governor and General Assembly Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 January 2009 A PLAN FOR REASSIGNING

More information

ALTERNATIVE PROJECT DELIVERY DIVISION PROGRAM UPDATE

ALTERNATIVE PROJECT DELIVERY DIVISION PROGRAM UPDATE ALTERNATIVE PROJECT DELIVERY DIVISION PROGRAM UPDATE 2018 VTCA VDOT Consultant Forum Shailendra Patel, P.E., DBIA State Engineer APD Division October 2, 2018 Odd Fellows Road Improvements Design-Build

More information

Selection of the Regional Consultant List

Selection of the Regional Consultant List LOCAL DESIGN SERVICES AGREEMENT (LDSA) CONSULTANT SELECTION PROCEDURE A Request For Qualifications (RFQ) pursuant to the ad in the New York State Contract Reporter was made available to any architecture/engineering

More information

Land Use Regulations Update. Robert W. Hofrichter Assistant Administrator, Maintenance Division December 3, 2008

Land Use Regulations Update. Robert W. Hofrichter Assistant Administrator, Maintenance Division December 3, 2008 Land Use Regulations Update Robert W. Hofrichter Assistant Administrator, Maintenance Division December 3, 2008 Access Management Principal Arterials 24 VAC 30-72-10 et seq All Other Highways 24 VAC 30-73-10

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Americans with Disabilities Act Requirements of Maintenance and Operational

More information

VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES JULY 2015

VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES JULY 2015 VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES I. INVITATION JULY 2015 The Village of Glendale requests firms submit proposal and qualifications for ongoing Civil Engineering

More information

research report Examination of an Implemented Asphalt Permeability Specification Virginia Transportation Research Council Final Report VTRC 11-R7

research report Examination of an Implemented Asphalt Permeability Specification Virginia Transportation Research Council Final Report VTRC 11-R7 Final Report VTRC 11-R7 Virginia Transportation Research Council research report Examination of an Implemented Asphalt Permeability Specification http://www.virginiadot.org/vtrc/main/online_reports/pdf/11-r7.pdf

More information

Design-Build Overview Alternate Project Delivery Office. Jeff Roby, P.E., DBIA Design-Build Program Manager Alternate Project Delivery Office

Design-Build Overview Alternate Project Delivery Office. Jeff Roby, P.E., DBIA Design-Build Program Manager Alternate Project Delivery Office Design-Build Overview Alternate Project Delivery Office Jeff Roby, P.E., DBIA Design-Build Program Manager Alternate Project Delivery Office July 17, 2013 Topics Guidance Documents Available Alternate

More information

Transportation Update

Transportation Update Transportation Update Projects Underway Norview Avenue About the Project: The Norview Avenue Interchange Improvement Project will eliminate the existing weave movement associated with the on- and off-ramps

More information

Materials Information Tracking System / Producer Lab Analysis and Information Detail (MITS/PLAID)

Materials Information Tracking System / Producer Lab Analysis and Information Detail (MITS/PLAID) Materials Information Tracking System / Producer Lab Analysis and Information Detail (MITS/PLAID) David A. Kaulfers, P.E., PMP Assistant State Materials Engineer MITS/PLAID What is MITS/PLAID? Purpose

More information

PPTA Project Pipeline

PPTA Project Pipeline PPTA Project Pipeline Commonwealth of Virginia May 2012 Opening Remarks The Commonwealth of Virginia was developed in the 17 th century as a risky, but ultimately highly successful business venture between

More information

Asphalt Quality Task Force Update Regional Asphalt Seminar. David P. Shiells, P.E. District Materials Engineer

Asphalt Quality Task Force Update Regional Asphalt Seminar. David P. Shiells, P.E. District Materials Engineer Asphalt Quality Task Force Update Regional Asphalt Seminar David P. Shiells, P.E. District Materials Engineer Asphalt Quality Task Force Background Authorized by Chief Engineer The purpose of the Task

More information

VTrans2040. VTrans Multimodal Transportation Plan (VMTP) Informational Webinar. June 21, :00 2:00 pm

VTrans2040. VTrans Multimodal Transportation Plan (VMTP) Informational Webinar. June 21, :00 2:00 pm VTrans2040 VTrans Multimodal Transportation Plan (VMTP) Informational Webinar June 21, 2016 1:00 2:00 pm Webinar Agenda VTrans2040 ( Big Picture ) Review Needs Synthesis and Recommendations Overview Objectives

More information

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC #105515 RFQ Information Meeting Raina Rosado, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC July 11,

More information

RFQ Information Meeting

RFQ Information Meeting August 25, 2016 RFQ Information Meeting I-64 Southside Widening & High Rise Bridge Phase 1 Widen From 4 Lanes to 6 Lanes Rick Correa, PE Project Manager Jeff Roby, PE APD Project Manager and POC Agenda

More information

Apparent Bids for Letting of May 24, 2017

Apparent Bids for Letting of May 24, 2017 Apparent Bids for Letting of May 24, 2017 Letting ID: 170524 Cut-Off Time: 10:00:59 AM 118 - CM117SS110746 BLAND, GRAYSON, SMYTH, WASHINGTON 2017 SLURRY SEAL (VOLUME 1 OF 2) $1,598,654.17 SLURRY PAVERS,

More information

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016 I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia RFQ Information Meeting - November 9, 2016 Krishna Potturi, PE Project Manager Suril Shah APD Project

More information

The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services

The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services September 22, 2015 Catherine C. C. Dunn, P.E., D.NE, N.PE, D.PE P.PE Director, Deputy Port Director Development

More information

08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS

08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS 08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION

More information

I-74 Final Design Request For Proposal

I-74 Final Design Request For Proposal Dear Consultants: Introduction I-74 Final Design Request For Proposal Iowa Department of Transportation (In cooperation with Illinois Department of Transportation) October 5, 2007 The Iowa Department of

More information

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ)

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) MARCH 2018 INTRODUCTION AND BACKGROUND The City of Keller is in search of the most qualified firms to provide professional expertise and

More information

Pioneering Alternative Project Delivery in Ohio

Pioneering Alternative Project Delivery in Ohio Pioneering Alternative Project Delivery in Ohio Ali Bahar, PE Principal Engineer Metropolitan Sewer District of Greater Cincinnati Tim Koch, PE, Vice President, Brown and Caldwell 1 Agenda Construction

More information

Trinity Well Field and Production Facilities Project Management Using CMAR

Trinity Well Field and Production Facilities Project Management Using CMAR Trinity Well Field and Production Facilities Project Management Using CMAR Ian Taylor, P.E., PMP New Braunfels Utilities David Bennett, P.E. Freese and Nichols Kirby Anderson MGC Contractors February 27,

More information

COMMUNICATIONS RESTRICTIONS:

COMMUNICATIONS RESTRICTIONS: 02-18-18 Posting Date SUM-SR 91 and SR 303/Ravenna Signal and Roadway Improvements PID No. 102692 City of Hudson Engineering Department Response Due Date: Friday, March 16, 2018 The City of Hudson s Engineering

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

I-64 Capacity Improvements Segment III RFQ Information Meeting

I-64 Capacity Improvements Segment III RFQ Information Meeting I-64 Capacity Improvements Segment III RFQ Information Meeting April 5, 2017 Janet Hedrick, P.E. Design Project Manager Joseph Clarke, P.E. APD Project Manager and POC I-64 Capacity Improvements Segment

More information

Internal Audit Report

Internal Audit Report Internal Audit Report Construction Inspection Program TxDOT Internal Audit Division Objective To determine if an adequate process exists to ensure sufficient coverage and qualifications to inspect construction

More information

Project Prioritization and Major Projects in Hampton Roads. Aubrey Layne

Project Prioritization and Major Projects in Hampton Roads. Aubrey Layne Project Prioritization and Major Projects in Hampton Roads Aubrey Layne Secretary of Transportation June 2, 2016 Context for Reform Legislature enacted significant transportation revenue package in 2013

More information

Internal Audit Follow-Up Report

Internal Audit Follow-Up Report Internal Audit Follow-Up Report Construction Inspection Program TxDOT Internal Audit Division Objective To assess the status of corrective actions for high-risk Management Action Plans (MAPs) previously

More information

DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT ARCHITECTURAL/ENGINEER/HIGH PERFORMANCE BUILDING FEES EFFECTIVE DATE: December 12, 2017

DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT ARCHITECTURAL/ENGINEER/HIGH PERFORMANCE BUILDING FEES EFFECTIVE DATE: December 12, 2017 DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT ARCHITECTURAL/ENGINEER/HIGH PERFORMANCE BUILDING FEES EFFECTIVE DATE: December 12, 2017 I. PURPOSE To provide a standard for a reasonable A/E/HPBS consultant

More information

Business Plan for FY14 FY15

Business Plan for FY14 FY15 Business Plan for FY14 FY15 Commissioner s Message May 2013 The Executive Team and I are pleased to present the new Business Plan for FY 2014-15. This plan builds on the key priorities to deliver our mission:

More information

Any discussions or marketing activities related to this specific project.

Any discussions or marketing activities related to this specific project. 04-11-19 Posting Date South Sandusky Street Widening and Relocation PID No. Not Assigned City of Mount Vernon Response Due Date: 04-24-19 Communications Restrictions Please note the following policy concerning

More information

ARROWS RANSPORTATION LAN

ARROWS RANSPORTATION LAN ARROWS RANSPORTATION LAN Developed by the Transportation Planning Division Of the Virginia Department of Transportation In Cooperation With The U.S. Department Of Transportation, Federal Highway Administration

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905

More information

Park and Ride Lot at I-66/Route 15 Interchange UPC Pre-Proposal Meeting

Park and Ride Lot at I-66/Route 15 Interchange UPC Pre-Proposal Meeting Park and Ride Lot at I-66/Route 15 Interchange UPC 109486 Pre-Proposal Meeting July 12, 2017 Christiana Briganti-Dunn, PE, CCM, NOVA Design-Build Program Manager Mark Gibney, PE, PMP, NOVA Design-Build

More information

HB 2838/SB 1128 (2007) Report to the Governor, JLARC, and CTB. Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219

HB 2838/SB 1128 (2007) Report to the Governor, JLARC, and CTB. Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Biennial Report on the Condition of and Investment Needed to Maintain and Operate the Existing Surface Transportation Infrastructure for FY 2011 and FY 2012 HB 2838/SB 1128 (2007) Report to the Governor,

More information

US-101 CORRIDOR ADVISOR S UPDATE

US-101 CORRIDOR ADVISOR S UPDATE US-101 CORRIDOR ADVISOR S UPDATE MONTECITO ASSOCIATION BOARD OF DIRECTORS 12 MAY 2015 1 SCOPE OF SERVICES Identify & evaluate innovative project delivery strategies: Avoid & minimize delays / expedite

More information

Asphalt Quality Task Force Update Regional Asphalt Seminar, Blacksburg, VA. David P. Shiells, P.E. District Materials Engineer

Asphalt Quality Task Force Update Regional Asphalt Seminar, Blacksburg, VA. David P. Shiells, P.E. District Materials Engineer Asphalt Quality Task Force Update Regional Asphalt Seminar, Blacksburg, VA David P. Shiells, P.E. District Materials Engineer Asphalt Quality Task Force Background Authorized by Chief Engineer The purpose

More information

TRAFFIC ENGINEERING DIVISION

TRAFFIC ENGINEERING DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Administrative and Engineering SPECIFIC SUBJECT: Sealing and Signing of Traffic

More information

Roughness on Virginia s Roads Annual Roughness Report

Roughness on Virginia s Roads Annual Roughness Report Roughness on Virginia s Roads 2003 Annual Roughness Report Prepared by: Robert A. Reid, E.I.T. Senior Pavement Evaluation Engineer And Trenton M. Clark, P.E. Pavement Program Engineer Materials Division

More information

NEVADA BRIDGE PROGRAM

NEVADA BRIDGE PROGRAM NEVADA BRIDGE PROGRAM Nancy Kennedy, P.E. Assistant Chief Bridge Engineer - Inventory/Inspection AASHTO SUBCOMMITTEE ON MAINTENANCE BRIDGE TECHNICAL WORKING GROUP July 19, 2016 NEVADA: WE RE #1!!! # Bridges

More information

Chapter 1: 2035 Virginia Surface Transportation Plan

Chapter 1: 2035 Virginia Surface Transportation Plan Whether children take the bus or bicycle to school, employees take the train to work, or residents drive to the grocery store, transportation is critical to the lives of all Virginians, and is essential

More information

VAA Asphalt News. In This Issue: Issue The Newsletter for Members and Friends of the Virginia Asphalt Association

VAA Asphalt News. In This Issue: Issue The Newsletter for Members and Friends of the Virginia Asphalt Association The Newsletter for Members and Friends of the Virginia Asphalt Association Issue 2-2013 In This Issue: Virginia Transportation Bill Passes! Pinehurst Hosts VAA Annual Meeting World of Asphalt Annual Meeting

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION 1.1 ABOUT THE FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION Established in 1992, the Fredericksburg Area Metropolitan Planning Organization (FAMPO) is the federally designated

More information

Please note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process:

Please note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process: 01-28-19 Posting Date PIK-CR50-3.40 PID No. 108463 Pike County Response Due Date: 03-08-19 Communications Restrictions Please note the following policy concerning communication between Consultants and

More information

Virginia s Integrated Directional Sign Program (IDSP) (Program Overview)

Virginia s Integrated Directional Sign Program (IDSP) (Program Overview) Virginia s (IDSP) (Program Overview) Rick Burgess Program Manager Directional and Service Signing Program VDOT, Traffic Engineering Division OVERVIEW The purpose of the IDSP is provide Virginia motorist

More information

PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT

PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT RFQ No. 21-9SDP5001 601CT0000003698 November 19, 2018 Safety Minute Purpose of Meeting

More information

Please note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process:

Please note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process: 01-14-19 Posting Date PIK-CR50-3.32 PID No. 108129 Pike County Response Due Date: 02-22-19 Communications Restrictions Please note the following policy concerning communication between Consultants and

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

MAINTENANCE DIVISION NOVEMBER Comments should be directed to Emmett Heltzel, P.E. State Maintenance Engineer

MAINTENANCE DIVISION NOVEMBER Comments should be directed to Emmett Heltzel, P.E. State Maintenance Engineer MAINTENANCE DIVISION Maintenance Division State of The Pavement 2010 Virginia Department of Transportation NOVEMBER 2010 Comments should be directed to Emmett Heltzel, P.E. State Maintenance Engineer I

More information

CM AT RISK VS. DESIGN BID BUILD

CM AT RISK VS. DESIGN BID BUILD CM AT RISK VS. DESIGN BID BUILD A TEXAS CASE STUDY ON PROCUREMENT AND IMPLEMENTATION September 28, 2010 Acknowledgement Mike Adams, P.E Executive Director of Engineering and Utilities City of Midlothian

More information

BID RESULTS FOR THE CTB

BID RESULTS FOR THE CTB UPC Project Location and Work Type RECOMMENDATION Contractor INTERSTATE C22 103327 FROM: MM 51.61 N END OF I-85 BRIDGE BRANSCOME INC. 4 $5,459,641.77 [ $9,490,774.52 ] (F0) 0095-964-221, N501 ( $7,558,243.20

More information

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing Project Reston Avenue to Jarrett Valley Drive Public Hearing Nicholas J. Roper, P.E. District Project Development Engineer Email: nicholas.roper@vdot.virginia.gov Phone: (703)259-1953 Agenda 7:00-7:15

More information

Project Delivery. Rodger Rochelle, PE Technical Services Administrator. Mike Holder, PE Chief Engineer

Project Delivery. Rodger Rochelle, PE Technical Services Administrator. Mike Holder, PE Chief Engineer Project Delivery Rodger Rochelle, PE Technical Services Administrator Mike Holder, PE Chief Engineer NC : Project Delivery - Preconstruction Overview of Project Delivery Process Review of Other States

More information

REQUEST FOR PROPOSAL CONSTRUCTION ENGINEERING AND INSPECTION SERVICES (CEI) FOR LYNCHBURG DISTRICT - DISTRICT WIDE CONTRACT. RFP No.

REQUEST FOR PROPOSAL CONSTRUCTION ENGINEERING AND INSPECTION SERVICES (CEI) FOR LYNCHBURG DISTRICT - DISTRICT WIDE CONTRACT. RFP No. REQUEST FOR PROPOSAL CONSTRUCTION ENGINEERING AND INSPECTION SERVICES (CEI) FOR LYNCHBURG DISTRICT - DISTRICT WIDE CONTRACT RFP No. CEI20180426 Date: April 26, 2018 EXECUTIVE SUMMARY Virginia Department

More information

Urban Arterial Roads Pavement Data Collection. October 23, 2012 Todd M. Halacy, P.E. VDOT Local Assistance Division

Urban Arterial Roads Pavement Data Collection. October 23, 2012 Todd M. Halacy, P.E. VDOT Local Assistance Division Urban Arterial Roads Pavement Data Collection October 23, 2012 Todd M. Halacy, P.E. VDOT Local Assistance Division Presentation Topics Background Information: CTB Subcommittee & Local Government Workgroup

More information

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017 I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017 State Project # 0064-965-264, P101, R201, C501, B627, B628, B629, B630, B631, B632, B633, B634, B635, D603, D604, D605,

More information

Statewide Acceleration Transformation (SWAT)

Statewide Acceleration Transformation (SWAT) Presented to: AASHTO SCOE/SCOD Presented by: Marjorie Kirby Paul Hiers, P.E. Statewide Acceleration Transformation (SWAT) July 2017 PD&E Study Comply with the National Environmental Policy Act (NEPA) and

More information

Project Location. Pensacola Bay Bridge Replacement Design Build 03/02/16. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer

Project Location. Pensacola Bay Bridge Replacement Design Build 03/02/16. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Project Location 2 1 GENERAL PROJECT INFORMATION Replacement of the structurally deficient

More information

2025 STATE HIGHWAY PLAN. Technical Report

2025 STATE HIGHWAY PLAN. Technical Report 2025 STATE HIGHWAY PLAN Technical Report 2025 STATE HIGHWAY PLAN DECEMBER 2005 Prepared by Transportation and Mobility Planning Division Virginia Department of Transportation In cooperation with the U.S.

More information

CHESAPEAKE BAY BRIDGE AND TUNNEL 1

CHESAPEAKE BAY BRIDGE AND TUNNEL  1 CHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT @FollowTheGulls www.cbbt.com 1 Hampton Roads Tunnels Downtown Tunnel Original 1952 Parallel - 1987 Hampton Roads Tunnel Original 1957 Parallel - 1976 Mid-Town

More information

ADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION:

ADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION: CENTRAL FLORIDA EXPRESSWAY AUTHORITY NOTICE TO PROFESSIONAL ENGINEERING CONSULTANTS REQUEST FOR LETTERS OF INTEREST FOR GENERAL ENGINEERING CONSULTANT SERVICES CONTRACT NO. 001145 The Central Florida Expressway

More information

Commonwealth of Virginia

Commonwealth of Virginia Commonwealth of Virginia Alternative Project Delivery Division April 2017 Virginia Department of Transportation TABLE OF CONTENTS INTRODUCTION... 2 1.0 DEFINITIONS... 3 2.0 PRELIMINARY PROJECT SELECTION...

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

Contracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM

Contracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM Contracting for Architectural and Engineering (A/E) Services Webinar August 30, 2011 10 AM to 11:30 AM 1 Where We're Going Today Webinar Operation - Fred Ward 5 minutes (+/-) Topic Introduction - John

More information

Project Delivery Process. Bruce Johnson, P.E. State Bridge Engineer Oregon Department of Transportation

Project Delivery Process. Bruce Johnson, P.E. State Bridge Engineer Oregon Department of Transportation Project Delivery Process Bruce Johnson, P.E. State Bridge Engineer Oregon Department of Transportation February 1, 2010 Outline Introduction 1. Planning 2. Design (through DAP) Break 3. Design (DAP through

More information

AVIATION AUTHORITY POLICY

AVIATION AUTHORITY POLICY PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the

More information

2013 DOTD Engineering Conference. Effort to Address Consultant Services Workload and Expedite Requests

2013 DOTD Engineering Conference. Effort to Address Consultant Services Workload and Expedite Requests 2013 DOTD Engineering Conference Effort to Address Consultant Services Workload and Expedite Requests Amount Contracted Last Three Years Data from Lotus Notes FY 2010/2011 - $90.2 million FY 2011/2012

More information

Northern Virginia District DBE Design Workshop Partnering for Success June 2, am to 1pm. Agenda

Northern Virginia District DBE Design Workshop Partnering for Success June 2, am to 1pm. Agenda Northern Virginia District DBE Design Workshop Partnering for Success June 2, 2009 8am to 1pm 15010 Conference Center Drive Chantilly, Virginia 20151 Agenda 8:00 9:00 Registration Coffee, Donuts and Networking

More information

August 31, To Whom It May Concern:

August 31, To Whom It May Concern: August 31, 2017 To Whom It May Concern: The Aerotropolis Atlanta Community Improvement Districts (AACIDs) is soliciting Statements of Qualifications (RFQ) from qualified firm(s) or organization(s) to develop

More information

Implementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement

Implementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement Richard Hefti, P.E., City of Everett, and Patrick Weber, P.E., Brown and Caldwell Implementing Design-Build On a Small Scale Everett s East Clearwell Roof Replacement April 27, 2018 Background: Everett

More information

From Paper to Practice: Putting Risk-Based Asset Management to Work

From Paper to Practice: Putting Risk-Based Asset Management to Work From Paper to Practice: Putting Risk-Based Asset Management to Work Anne-Marie McDonnell, P.E. & Karen Riemer, P.E. Connecticut Department of Transportation Transportation Asset Management Group Connecticut

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E. LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert

More information

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process:

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process: 01-08-19 Posting Date FRA-33-3.70 Smart Technology Connected Vehicle Roundabout Application Project PID No. 109356 City of Dublin Response Due Date: 01-24-19 Communications Restrictions Please note the

More information

NEW MARKET HEIGHTS PHASE OF THE VIRGINIA CAPITAL TRAIL PROJECT RFP QUESTIONS AND ANSWERS

NEW MARKET HEIGHTS PHASE OF THE VIRGINIA CAPITAL TRAIL PROJECT RFP QUESTIONS AND ANSWERS NEW MARKET HEIGHTS PHASE OF THE VIRGINIA CAPITAL TRAIL PROJECT RFP QUESTIONS AND ANSWERS Date: 4-13-12 Project: Subject: New Market Heights Phase of the Virginia Capital Trail Project RFP Questions and

More information

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009 NCDOT s Performance Based Contracting Experience in Charlotte Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009 Overview Performance Base Contracting in NC Project Scope Contract Development

More information

State of Good Repair (SGR) Program Bridge Prioritization Formula. Structure and Bridge Division

State of Good Repair (SGR) Program Bridge Prioritization Formula. Structure and Bridge Division State of Good Repair (SGR) Program Bridge Prioritization Formula Current Formula for FY2018 Funding Round Structure and Bridge Division Prepared by: Structure and Bridge Maintenance Program Area November

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

Transportation Committee DRPT Presentation

Transportation Committee DRPT Presentation Transportation Committee DRPT Presentation Thelma Drake, Director January 14, 2013 www.drpt.virginia.gov Rail and Public Transportation Systems in Virginia 62 Transit Systems 55 Human Service Operators

More information

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods February 21, 2018 James S. Utterback HRBT Project Director Virginia Department of Transportation Ten Hampton Roads Tunnels

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services Request for Qualifications Information Architectural / Engineering Task Contract Design Services At Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road System

More information

& EXPO ASPHALT ON-SITE PROGRAM. Quality and Innovation CONFERENCE. October 3-5, Virginia asphalt association 2016 FALL

& EXPO ASPHALT ON-SITE PROGRAM. Quality and Innovation CONFERENCE. October 3-5, Virginia asphalt association 2016 FALL Virginia asphalt association 2016 FALL ASPHALT CONFERENCE & EXPO Quality and Innovation ON-SITE PROGRAM October 3-5, 2016 Richmond Marriott Downtown vaasphalt.org/vaa-conferences Quality and Innovation

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: VDOT Modifications to the AASHTO Standard Specifications for Structural Supports

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL GENERAL ENGINEERING CONSULTANT SERVICES FOR SOUTHEASTERN VIRGINIA GEC PROJECTS Addendum # 2, Feb. 20, 2009 GENERAL The Virginia Department of Transportation (the Department ) is seeking

More information

REQUEST FOR PROPOSAL. Statewide Movable Bridge Limited Services Term Contract

REQUEST FOR PROPOSAL. Statewide Movable Bridge Limited Services Term Contract REQUEST FOR PROPOSAL Statewide Movable Bridge Limited Services Term Contract GENERAL The Virginia Department of Transportation is seeking expressions of interest from consulting engineering firms who wish

More information

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overview of the Project Development Process Brian Blanchard, PE Assistant Secretary for Engineering and Operations Overall Project Development Process The time it takes to produce a project varies significantly

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL CONSTRUCTION ENGINEERING INSPECTION SERVICES FOR STATEWIDE FINAL ESTIMATES CONTRACTS I, II, III Page 1 GENERAL The Virginia Department of Transportation is seeking expressions of interest

More information