1 METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which has a higher strength and/or workability shall also be allowed. 2. Grout Mix The proportions of grout and the minimum strength of work cubes shall comply with the following requirements : Range of water/cement ratio Target Resistance to crushing (cube strength) 7 days 28 days (Typically 0.45) 21 N/mm 2 30 N/mm 2 The quantities of cement in the mix shall be measured by weight. The grout shall be free from segregation, slumping and bleeding. Grout shall be mixed on site and shall be pumped into its final position as soon as possible. Non-shrink admixture (SIKA Intraplast-Z TM ) shall be added at approximately 1% by weight. 3. Grout Test Two sets of three test cubes shall be taken per one grouting operation for testing purpose. Three test cubes shall be tested at 7 days and the remaining cubes at 28 days after casting. The characteristic strength of the grout shall be 21 N/mm 2 and 30 N/mm 2 at 7 days and 28 days.

2 4. Main Load Bearing Component Reinforcing Steel The main steel component and the grout shaft of the micropile shall be designed to support the external loads and bending to be transmitted to/from the load bearing stratum for end-bearing/tension piles, which shall consist of a top anchorage or pilecap (provided by the structural/pilecap contractor) and an axial steel component. Typical axial steel component consisting of hot rolled deformed high tensile bar with minimum yield stress of 460 N/mm 2 or API Pipe. B. FABRICATION OF MICROPILE API Pipes 1. If API Pipes are used, they shall be joint by either a pipe sleeve (screw-type) or fully butt-welded all around (see installation procedure). 2. Spacers consist of a small piece of steel plate tag-welded onto the pipe at 3m intervals, each interval in 2 direction or using PVC spacers adhered using epoxy or tie wire. Reinforcement Bars 1. The reinforcement of the piles are typically prefabricated on-site or elsewhere and brought to site. The bars and links are tied together with tie wire to form prefabricated cages. 2. To join the lengths of the cages, the reinforcement bars shall be lapped 40 times the diameter or 40D. The joining of the bars (if necessary) shall be done by tie wire or welding. 3. Spacers used shall be PVC pipes cut into small lengths and tied to the reinforcement bars. Alternatively, ready-made PVC round spacers can be clipped to the links. A second alternative consist of PVC lantern which is clipped to the main-bars.

3 C. METHOD FOR DRILLING / MICROPILE INSTALLATION STEP 1 : The pile point is determined by a surveyor and position the drill rig on top of the point. The first drill rod with a drill bit is placed above the drill point. Ensure verticality is achieved before starting drilling works. This is done by checking the verticality of both the first drill rod and the mast using a spirit level.

4 STEP 2 : DTH Hammer Drilling Technique For drilling in both soft and/or hard soils (typically SPT N>50), the hole can be drilled with the wash boring method using either using wash boring or using the DTH hammer. For drilling into soils and weathered rock above the solid rock formation, the down-the-hole hammer will also be employed. Depending on the behaviour of soil encountered on-site, the borehole may be temporarily cased. Upon reaching rock or firm soil strata, drilling can be continued without casing. Drilling in rock shall be done by the Down-the-Hole (DTH) pneumatic hammer method, used for hard rock formation. The system employs a pneumatic self-actuating hammer at the end of the drill rod that strikes the drilling surface while the drill rod is slowly rotated. An air compressor will be used for powering the hammer. The air used to drive the hammer as the hole is advanced removes cuttings continuously.

5 STEP 3 : Upon completion of the drilling, the borehole is cleaned by flushing out any soil particles from the inside of the casing with recirculation water or air. API pipes installation : - If a mobile crane is to be used for, move the drilling rig back. The pipe shall also be lowered segment-by-segment using a mobile crane. Cordon the area for safety reasons. If the drilling rig winch is to be used, lift the pipes up segment-by-segment using the winch. Cordon the area for safety reasons. The joints of the API Pipe, if present, shall be properly screwed together with grease to assist the tightening. If welding is used, clean the edge of the pipe and conduct a full butt-weld all over the outside of the API pipe.

6 STEP 4 : If in Step 3, the mobile crane is used to install the API Pipes, the same mobile crane can be used to pull/withdraw the temporary casing. Shall this cannot be done due to safety reasons (crane parked too far away), move the drill rig back. Withdraw the casing using the winch tied around the casing. Shall this be unsuccessful, reattach the adaptor and using the reverse circulation method (wash boring), flush water into the casing to loosen it while withdrawing the casing using the rotary unit.

7 STEP 5 : Mix the cement bag with water in a mixer according to the design mix measurement. The mixed grout shall be filtered and poured into a holding tank. Grouting of the micropile is then carried out by tremie method using a hose installed right up to the end tip of the pile rebar assembly cage or API Pipe with flow holes cut at the tip of the API pipe. Pump the grout into the pile using a piston or diaphragm pump.grouting is done until neat grout appears at the top of the borehole. Upon completion, the grout hose is extracted. Shall any leftover temporary casing is extracted, or at any time after grouting, the grout level drops below the cut-off level, top-up the hole with grout.

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction Lesson 4 Construction Techniques and Materials schnabel-eng.com Learning Outcomes Describe sequence of construction for a micropile Identify materials used to construct a micropile Describe principle function

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES Page 1 of 8 PILING PART-VI OF RCC BORED CAST IN-SITU PILES REV. NO. PRAPARED APPROVED DATE 00 Marina P Mishra COPYRIGHT AND CONFIDENTAL The information on this document is the property of BHARAT HEVY ELECTRICAL

More information

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION Section 67.0 Knoxville, Tennessee March 2013 1. Description STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION a) This work shall consist of constructing micropiles as shown on the Contract plans in accordance

More information

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

A. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years.

A. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years. NORWOOD HALL EXTERIOR RESTORATION MISSOURI S&T ISSUED FOR BID SECTION 316300 - BORED PILES PART 1 - GENERAL 1.1 SUMMARY A. Section includes resistance piers, couplings, and brackets. 1.2 ACTION SUBMITTALS

More information

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows: ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled

More information

Combined Pile Foundation System for a Residential Complex

Combined Pile Foundation System for a Residential Complex Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil

More information

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3 Contents 1. Introduction 3 2. Selection of Pile Type 3 3. Soil Report / Boreholes 3 4. Obstructions 3 5. Design and Installation of Piling Mat 3 6. Permit to Dig 4 7. Setting out 4 8. Water 5 9. Attendant

More information

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar Advances in Hollow Thread Bar Micro Pile Installation Techniques, Equipment, Materials, Testing and Monitoring ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems

More information

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items:

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items: RIVERSIDE MEDICAL CENTER EAST EXPANSION KANKAKEE, ILLINOIS SECTION 02382 - DRILLED PIERS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. Work Included: Provide all labor, materials, equipment, transportation

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

Supervision of Piling Works

Supervision of Piling Works Page 1 of 7 Supervision of Piling Works Sayeed Ahmed Assistant Director (Planning & Development) Independent University Bangladesh, Dhaka, Bangladesh e-mail ABSTRACT Supervision is utmost important in

More information

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer

More information

Drilling of grout holes will be measured for payment on the basis of the linear feet of holes actually drilled.

Drilling of grout holes will be measured for payment on the basis of the linear feet of holes actually drilled. I - Measurement and payment Mobilization and Demobilization: Payment will be made for costs for assembling all plant and equipment at the site preparatory to initiating the work and for removing it there

More information

CHAPTER III METHODS AND MATERIALS

CHAPTER III METHODS AND MATERIALS CHAPTER III METHODS AND MATERIALS 3.1: Tensile Tests 3.1.1: Introduction The first phase of testing for the experimental program, was to conduct tensile tests of No. 4, No. 5, and No. 6 nominal diameter

More information

Micropile Lateral Load Testing in the Charleston, SC Area

Micropile Lateral Load Testing in the Charleston, SC Area Micropile Lateral Load Testing in the Charleston, SC Area A special thanks to: William B. Wright, PE, Bryan T. Shiver, PE, Kenneth J. Zur, PE, Jackson C. Gosnell, PE, Theodore G. Padgett, PE, and William

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCES AND GATES (PARK) SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,

More information

Assisting Energy Savings While Protecting 2009 REVISIONS TO GUIDELINES FOR THE CONSTRUCTION OF VERTICAL BOREHOLES

Assisting Energy Savings While Protecting 2009 REVISIONS TO GUIDELINES FOR THE CONSTRUCTION OF VERTICAL BOREHOLES Ground Source Heat Pump Systems Assisting Energy Savings While Protecting Groundwater 2009 REVISIONS TO GUIDELINES FOR THE CONSTRUCTION OF VERTICAL BOREHOLES FOR CLOSED LOOP HEAT PUMP SYSTEMS Kevin McCray,

More information

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division Drilled Shaft Inspection HQ Construction Office HQ Geotechnical Division Drilled Shafts: What are Drilled Shafts Drilled Shaft Construction Challenges of Drilled Shaft Construction The WSDOT SHAFT Special

More information

SAFE SYSTEMS FOR PILING OPERATIONS

SAFE SYSTEMS FOR PILING OPERATIONS SAFE SYSTEMS FOR PILING OPERATIONS TYPE & METHOD OF CONSTRUCTION OF PILE BORED CAST-IN-SITU (BCIS) BCIS WITH CONVENTIONAL RIG BCIS WITH ROTARY RIG DRIVEN CAST-IN-SITU (DCIS) DCIS WITH CONVENTIONAL DP RIG

More information

Lesson 7 REINFORCING CAGE. Version 1-1/

Lesson 7 REINFORCING CAGE. Version 1-1/ Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain

More information

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP A. TECHNICAL INFORMATION OF OUR FOUNDATION WORKS The major types of our foundation works (with illustrative diagram, where applicable) are set out below: 1. Bored piles 0.80m 3.5m pile shaft By Grabbing

More information

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000 DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories

More information

Specialising in Ground Engineering & Slope Stabilisation

Specialising in Ground Engineering & Slope Stabilisation Specialising in Ground Engineering & Slope Stabilisation Ground Engineering & Slope Stabilisation for the Road, Rail, Construction & Mining Industries Company Profile Warner Company is proudly an Australian

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

SPECIAL SPECIFICATION 4492 Tie Back Anchors

SPECIAL SPECIFICATION 4492 Tie Back Anchors 2004 Specifications CSJ 0504-02-022 SPECI SPECIFICATION 4492 Tie Back Anchors 1. Description. This Item shall govern for the installation of tie-back anchors in place, with grouting as required in accordance

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE 44-1 44-1.01 Description 44-1 44-1.02 Materials 44-1 44-1.03 Proportions 44-1 44-1.04

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd. The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation

More information

TP EA. Product Description. Properties and Benefits. Applications. Reaction Resin Mortar Based on Epoxy Acrylate. Approvals / Certificates:

TP EA. Product Description. Properties and Benefits. Applications. Reaction Resin Mortar Based on Epoxy Acrylate. Approvals / Certificates: Approvals / Certificates: Product Description The TP EA is a 2-component reaction resin mortar based on an epoxy acrylate. This product may be used in combination of a hand-, battery- or pneumatic tool

More information

Hilti HIT-RE 100 mortar with rebar (as anchor)

Hilti HIT-RE 100 mortar with rebar (as anchor) Injection mortar system Hilti HIT-RE 100 330 ml, 500 ml and 1400 ml foil pack Statik mixer rebar BSt 500 S Benefits - suitable for non-cracked and cracked concrete C 20/25 to C 50/60 - high loading capacity

More information

Construction. Injectable hose for sealing construction joints in watertight structures. Product Description. Product Data. Tests.

Construction. Injectable hose for sealing construction joints in watertight structures. Product Description. Product Data. Tests. System Product Data Sheet Edition 09/01/2009 Identification no: 02 07 03 07 010 2 000099 ( SikaFuko Eco 1 Injectable hose for sealing construction joints in watertight structures Construction Product Description

More information

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT Tracy Brettmann, P.E., D.GE, Vice President, A. H. Beck Foundation Company, Houston, Texas, (713) 413-3800, tracy.brettmann@ahbeck.com

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

Construction. Universal anchoring adhesive. Product Description 1 1/7. Product Data Sheet Edition _1 Sika AnchorFix -S

Construction. Universal anchoring adhesive. Product Description 1 1/7. Product Data Sheet Edition _1 Sika AnchorFix -S Product Data Sheet Edition 2010-08_1 Sika AnchorFix -S Sika AnchorFix -S Universal anchoring adhesive Construction Product Description Uses Characteristics / Advantages Styrenated polyester based two part

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA 106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard

More information

Quality Assurance Review for Bridge Construction

Quality Assurance Review for Bridge Construction Quality Assurance Review for Bridge Construction March 7, 2000 Date Project No. County-Route-Section Project Contacts Contractor TABLE OF CONTENTS Reinforcing Steel... 2 Concrete... 2 Structural Steel...

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

TERWA REBAR CONNECTION COUPLERS. CARES Technical Approval 5058 TA1B

TERWA REBAR CONNECTION COUPLERS. CARES Technical Approval 5058 TA1B EURO ACCESSORIES TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B www.euroacc.co.uk Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger

More information

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007

More information

Injectable hose with integral valves for sealing construction joints in watertight structures

Injectable hose with integral valves for sealing construction joints in watertight structures Technical Data Sheet Version 2014-09-18 Id no: 02 07 03 07 010 2 000099 SikaFuko SikaFuko Injectable hose with integral valves for sealing construction joints in watertight structures Construction Product

More information

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 02370 AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast

More information

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors 2004 Specifications CSJ 0581-02-121 & 0200-11-100 SPECI SPECIFICATION 4401 Prestressed Ground Anchors 1. Description. Install post-tensioned permanent ground anchors in place, with grouting as required

More information

ISO INTERNATIONAL STANDARD. Building construction machinery and equipment Terms and definitions

ISO INTERNATIONAL STANDARD. Building construction machinery and equipment Terms and definitions INTERNATIONAL STANDARD ISO 11375 First edition 1998-04-01 Building construction machinery and equipment Terms and definitions Machines et matériels pour la construction des bâtiments Termes et définitions

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 2 - Foundation The British Standard Code of Practice BS8004 defines a foundation as 'that part of the structure designed and constructed to be in direct contact with and transmitting loads to the ground'

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE 001 First Draft W Hession 12.02.2014 Introduction This document

More information

Deep Foundation. Deep Foundation Applications

Deep Foundation. Deep Foundation Applications Deep Foundation Deep Foundation Applications 1. Soils with: High compression Low shear strength Swelling/shrinkage 2. Resist lateral loads 3. Surface erosion 4. Resist tension (anchors) 1 Typical Applications

More information

Injectable hose for sealing construction joints in watertight structures

Injectable hose for sealing construction joints in watertight structures System Product Data Sheet Edition 2011-11_1 Injectable hose for sealing construction joints in watertight structures Construction Product Description Uses Characteristics / Advantages Tests Approval /

More information

PROPERTY TEST OF CONCRETE ISOLATORS

PROPERTY TEST OF CONCRETE ISOLATORS MCEER Buffalo Summer 2007 PROPERTY TEST OF CONCRETE ISOLATORS Robert Wurstner Home Institution: University at Buffalo REU Host Institution: University at Buffalo REU Facility Advisor: Dr. Michel Bruneau

More information

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE Karsten Beckhaus (1), Martin Larisch (2), Habib Alehossein (3,4) (1) BAUER Spezialtiefbau GmbH, Deutschland (2) Keller Australia Pty Ltd, Australia (3)

More information

Hilti HIT-CT 1 post installed rebars

Hilti HIT-CT 1 post installed rebars Hilti HIT-CT 1 post installed rebars Injection mortar system Benefits Hilti HIT-CT 1 330 ml foil pack (also available as 500 ml foil pack) Statik mixer Rebar - Hilti Clean technology (Clean-Tec) - Environmentaly

More information

DESIGN AND CONSTRUCTION OF HEAVY INDUSTRIAL ANCHORAGE FOR POWER-PLANTS

DESIGN AND CONSTRUCTION OF HEAVY INDUSTRIAL ANCHORAGE FOR POWER-PLANTS DESIGN AND CONSTRUCTION OF HEAVY INDUSTRIAL ANCHORAGE FOR POWER-PLANTS Peter J. Carrato, William F. Brittle Bechtel Power Corporation, USA Abstract Fossil fueled power-plant projects provide many design

More information

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding)

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Always Try To Do The Best In Your Life TYPES OF FOUNDATION TYPES OF FOUNDATION a) Shallow Foundation System i) Spread Foundation

More information

Vibrating Wire Concrete Stress Cell User Manual

Vibrating Wire Concrete Stress Cell User Manual Vibrating Wire Concrete Stress Cell User Manual Man170 2.1.0 06/08/2014 C. Spalton A. Small C. Rasmussen Manual No. Revision Date Originator Checked Authorised for Issue User Manual 1 Contents Section

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4.

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4. LATRINE CONSTRUCTION Pour flush latrine 2 Pour flush micro septic tank 3 Initial investment, location, human resources 4 Concrete rings 5 Box 6 Cover 7 Slab and ceramic pan 8 Ring mold 9 Structure and

More information

Construction. Injectable hose with integral valves for sealing construction joints in watertight structures. Product Description. Product Data.

Construction. Injectable hose with integral valves for sealing construction joints in watertight structures. Product Description. Product Data. System Product Data Sheet Edition 22/02/2012 Identification no: 02 07 03 07 010 2 000099 SikaFuko Injectable hose with integral valves for sealing construction joints in watertight structures Construction

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

Sealing products. The new Generation of sealing-products

Sealing products. The new Generation of sealing-products Sealing products The new Generation of sealing-products Product Overview Product wolfseal KB 16 Application wolfseal KB 16.7 can be installed in construction joints of all types in concrete units up to

More information

SPECIAL INSPECTION AND TESTING AGREEMENT

SPECIAL INSPECTION AND TESTING AGREEMENT COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FT. BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650

More information

Range Point Monuments

Range Point Monuments Department of Public Works Survey Department Right-of-Way Services - Dept. 507 201 W. Colfax Avenue Denver, CO 80202 www.denvergov.org/publicworks Range Point Monuments If in asphalt - #6 rebar, 30 long,

More information

Construction. Injectable Hose for Sealing Construction Joints in Watertight Structures. Product Description. Tests. Product Data

Construction. Injectable Hose for Sealing Construction Joints in Watertight Structures. Product Description. Tests. Product Data Construction System Product Data Sheet Edition: 03/09/2013 Identification no: 02 07 03 07 010 2 000099 Version: GCC Injectable Hose for Sealing Construction Joints in Watertight Structures Product Description

More information

SikaProof Bentonite Plastic DPM overlap - Compacted Backfill Scale 1:5. Detail no: SB01 - Nov 2013

SikaProof Bentonite Plastic DPM overlap - Compacted Backfill Scale 1:5. Detail no: SB01 - Nov 2013 100 100 1.1 Metre wide piece of fully bonded to cast concrete 300 SikaSwell P Profile 2010H Compacted backfill Plastic DPM Min. 300mm overlap with Bentonite Paste in the lap 300 300 Plastic DPM overlap

More information

Mechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company

Mechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company PRINCE WILLIAM COUNTY Department Development Services Building Development Division STATEMENT OF SPECIAL INSPECTIONS (Building/Other Structures other than Retaining Walls) Version 2015-12-31 Building Permit

More information

SECTION REINFORCING STEEL

SECTION REINFORCING STEEL SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance

More information

TECHNICAL DATA SHEET SIKA ANCHORFIX-1 GREY 300ML (6's)

TECHNICAL DATA SHEET SIKA ANCHORFIX-1 GREY 300ML (6's) TECHNICAL DATA SHEET SIKA ANCHORFIX-1 GREY 300ML (6's) Sika AnchorFix-1 is a single cartridge, two component, mix-in-the-nozzle, fast curing, solvent and styrene free, methacrylate based chemical anchoring

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

PC HOUSE FOR INCHEON BRIDGE PILE-CAP

PC HOUSE FOR INCHEON BRIDGE PILE-CAP PC HOUSE FOR INCHEON BRIDGE PILE-CAP Min-Kwan Kim Manager, Samsung C&T Corporation minkwan.kim@samsung.com Chung-Hee Lee Deputy General Manager, Samsung C&T Corporation chunghee67@samsung.com 1. INTRODUCTION

More information

Concreting (UNDER CONSTRUCTION)

Concreting (UNDER CONSTRUCTION) Concreting (UNDER CONSTRUCTION) Clauses From IS 456 10.2 Batching To avoid confusion and error in batching, consideration should be given to using the smallest practical number of different concrete

More information

WALL CANTILEVER WORK STATION JIB CRANE

WALL CANTILEVER WORK STATION JIB CRANE SECTION 14662 WALL CANTILEVER WORK STATION JIB CRANE ***** Gorbel, Inc. manufactures a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station

More information

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine

More information

MasterFlow 928T. High strength, non-shrink cementitious grout

MasterFlow 928T. High strength, non-shrink cementitious grout High strength, non-shrink cementitious grout DESCRIPTION MasterFlow 928T is a ready to use product in powder form, which requires only the on-site addition of water to produce a non-shrink grout of predictable

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS

INNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE

More information

Project report on a deep well construction

Project report on a deep well construction Project report on a deep well construction The Project The client GCO is in the process of assembling the world s biggest dredge mining operation at Senegal s coast. The Mining Concession comprises of

More information

TORQUE TESTING & INSTALLATION INSPECTION OF DRILLED - IN ANCHORS

TORQUE TESTING & INSTALLATION INSPECTION OF DRILLED - IN ANCHORS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0501 Effective: 04/30/02 DOCUMENT NO. P/BC 2002-092 Revised: Previously Issued As: Guideline #3 TORQUE TESTING & INSTALLATION INSPECTION

More information

TECHNICAL MANUAL. PEC Column Shoe. Heavy-duty Bolted Column Connections

TECHNICAL MANUAL. PEC Column Shoe. Heavy-duty Bolted Column Connections TECHNICAL MANUAL PEC Column Shoe Heavy-duty Bolted Column Connections Version: PEIKKO GROUP 09/2018 PEC Column Shoe For bolted column connections Advanced casting process with the help of standard accessories

More information

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration

More information

TERWA REBAR CONNECTION COUPLERS

TERWA REBAR CONNECTION COUPLERS TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger than the associated rebar, sometimes

More information

.1 ANSI/ASME B31.1, Power Piping, (SI Edition)..2 American Society for Testing and Materials (ASTM)

.1 ANSI/ASME B31.1, Power Piping, (SI Edition)..2 American Society for Testing and Materials (ASTM) Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 03300 - Cast-in-Place Concrete.2 Section 05121 - Structural Steel for Buildings.3 Section 05500 - Metal Fabrications 1.2 REFERENCES.1

More information

TECHNOLOGY. Hydromill

TECHNOLOGY. Hydromill TECHNOLOGY Hydromill Everywhere the diaphragm wall market is moving to higher and higher targets in terms of depth and verticality control. Metro stations, new foundations for residential and commercial

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

SECTION GEOTECHNICAL INSTRUMENTATION

SECTION GEOTECHNICAL INSTRUMENTATION SECTION 13510 GEOTECHNICAL INSTRUMENTATION PART 1 GENERAL 1.1 WORK INCLUDED A. This section covers the work necessary for furnishing and installing new piezometers, movement monuments, and inclinometers

More information

SECTION TIMBER FLOATS

SECTION TIMBER FLOATS SECTION 06210 PART 1 - GENERAL 1.01 SUMMARY A. This section covers furnishing and installing the timber float framing for the pile guide area, and all other components not specifically mentioned, necessary

More information

Injectable hose with integral valves for sealing construction joints in watertight structures

Injectable hose with integral valves for sealing construction joints in watertight structures System Product Data Sheet Edition 2011-12_1 Injectable hose with integral valves for sealing construction joints in watertight structures Construction Product Description Uses Characteristics / Advantages

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING SECTION 32 13 13 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for providing portland cement concrete work and all other incidental concrete improvements for the project

More information

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for

More information

STATEMENT OF SPECIAL INSPECTION FORM

STATEMENT OF SPECIAL INSPECTION FORM Project Title: Permit #: Project Address: STATEMENT OF SPECIAL INSPECTION FORM This Statement of Special Inspections is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. Special

More information