1 SE 01-Twister SE 02-Twister & Stepper SE 03-Bike & Trapezius SE 04-Jump Tower SE 05-Arm Rotation SE 06-Balance Seat SE 07-Track Tracer SE 08-Roman Chair & Hyperextension SE 09-Double Airwalker SE 10-Airwalker System SE 11-One Arm Rotation SAYSU GmbH Outdoor Fitness Equipment Weitzesweg 16 A Bad Vilbel/ Germany Tel.: 0049 (0) Fax: 0049 (0) Web: info@saysu.de 1
2 Underground Before the installation you have to decide on which underground the equipment will be installed. Possible undergrounds are (more precisely defined in DIN ; table F.1): Concrete/stone Bitumen Top soil lawn shock absorbing underground according to DIN EN 1177 Loose material only for equipment with longer posts (on request): o Sand o Gravel o Mulch o Wood chips Unit According to DIN table F.1 SE 01-Twister SE 02-Twister & Stepper Drop height <0,6m (<1,0m)** Concrete/ stone/ bitumen Only when underground installation Top soil/ lawn Shock absorbing underground (according to drop height) Loose material* <0,6m SE 03-Bike & Trapezius <1,0m SE 04-Jump Tower <0,6m We advise against using sand SE 05-Arm Rotation <0,6m SE 06-Balance Seat <0,6m SE 07-Track Tracer <0,6m SE 08-Roman Chair & Hyperextension <0,6m SE 09-Double Airwalker <0,6m SE 10-Airwalker <0,6m SE 11-One Arm Rotation <0,6m * Upon request we can manufacture adjusted equipment for use with loose material, we advise against the use of sand or coarse gravel ** drop height <0,6m when underground installation; drop height >1m when above-ground installation 2
3 Under-ground installation with loose material If you use loose material like sand, gravel, mulch or wood chips, then you have to built the foundation 200mm below ground level and bevel the foundation around the mounting plate (see page 4). After installation, the anchoring will be filled up to ground level with the filling material. Then only the main column of the equipment rises out of the ground. The top ends of the screws have to be carried out in compliance with DIN EN :2008 (D) Under-ground installation with other underground For underground installation the foundation is created 60mm below ground level and the anchoring will be filled up to the ground level (see mark on main column) with the filling material. Then only the main column of the equipment rises out of the ground. The top ends of the screws have to be carried out in compliance with DIN EN :2008 (D) Above-ground installation Not possible when using loose material. For above-ground installation the foundation is created at ground level. In this case the anchoring should be covered with the plastic foundation covering (soon available!). The top ends of the screws have to be carried out in compliance with DIN EN :2008 (D) Concrete, stone or bitumen undergrounds are NOT licit with units that have a drop height of >60cm (see DIN EN ). This concerns the units SE 01-Twister and SE 03-Bike & Trapezius. Foundation system 1 or 2 The following overview shows you, which of the foundation system is used for which units: units SE 01-03, SE 05-06, SE 08-09, SE 11: foundation system 1 continue on page 5 unit SE 04: foundation system 2 continue on page 6 unit SE 07, SE 10: foundation system 3 continue on page 8 3
4 Beveling of the foundation with loose filling material To avoid edges of the foundation looking out of the covering, it is required to bevel the foundation along the mounting plate on all sides as shown in figure (a) (see DIN EN ). Figure (a)applicable only when loose filling material is used! Beveling of the foundation in case of above- ground installation with loose material Ground level R=100mm 200mm 400mm 45 4
5 Foundation system 1 SE 01-Twister SE 02-Twister & Stepper SE 03-Bike & Trapezius SE 05-Arm Rotation SE 06-Balance Seat SE 08-Roman Chair & Hyperextension SE 09-Double Airwalker SE 11-One Arm Rotation 1. Dig a hole for the foundation as shown in figure (b), with the minimum dimensions of (l) 700mm, (w) 700mm, (h) 1000mm. 2. Position the foundation anchor in the hole as shown in figures (b) and (d). 3. Ready-made C25 concrete should be used. Approximately 0,49m³ concrete is needed for every hole. 4. Fill the hole with concrete up to in the case of underground installation: 60mm under ground level. In the case of underground installation with loose filling material: 200mm under ground level, and bevel the concrete foundation according to figure (a). in the case of above-ground installation up to ground level. Figure (b) Equipment fixing bolt Mounting plate 1000mm Foundation anchor concrete foundation hole min. dimensions (l) 700mm, (w) 700mm, (h) 1000mm 700mm 700mm Please note The size of the hole fort he foundation is depending on the consistency oft he ground. The dimensions mentioned above are applicable for normal conditions with firm ground. If the ground is extremely soft, a much bigger foundation is needed. Use only appropriate material and follow the installation instructions closely!!! Next: positioning the foundation anchor continue on page 7 5
6 Foundation system 2 SE 04-Jump Tower 1. Dig a hole for the foundation as shown in figure (c), with the minimum dimensions of (l) 800mm, (w) 800mm, (h) 1000mm. 2. Position the foundation anchor in the hole as shown in figures (c) and (d). 3. Ready-made C25 concrete should be used. Approximately 0,64m³ concrete is needed for every hole. 4. Fill the hole with concrete up to in the case of underground installation: 60mm under ground level. In the case of underground installation with loose filling material: 200mm under ground level, and bevel the concrete foundation according to figure (a). in the case of above-ground installation up to ground level. Figure (c) Equipment fixing bolt Mounting plate 1000mm Foundation anchor concrete foundation hole min. dimensions (l) 800mm, (w) 800mm, (h) 1000mm 800mm 800mm Please note The size of the hole fort he foundation is depending on the consistency oft he ground. The dimensions mentioned above are applicable for normal conditions with firm ground. If the ground is extremely soft, a much bigger foundation is needed. Use only appropriate material and follow the installation instructions closely!!! Next: positioning the foundation anchor continue on page 7 6
7 Positioning the foundation anchor The foundation anchor included in the delivery should be positioned in the concrete as shown in figure (d). The equipment fixing bolts have to be above the concrete. Avoid concrete remaining on the mounting plate or the equipment fixing bolts. The parts of the foundation anchor rising out of the concrete must stay free from any soiling. In order to ensure an exact upright position of the main column after the installation, the mounting plate of the foundation anchor has to be adjusted absolutely horizontally by using a level while concrete casting. Figure (d) Equipment fixing bolt ground level resp. -60mm and -200mm (loose material) foundation anchor concrete Next: equipment installation continue on page 10 Foundation system 3 7
8 Installation Instructions SESE- SE 07-Track Tracer SE 10-Airwalker For these units, a twin anchoring system is used. 1. Dig a hole for the foundation as shown in figure (c), with the minimum dimensions of (l) 2x700mm, (w) 700mm, (h) 1000mm. 00mm. 2. Position the foundation anchor in the hole as shown in figures (e) and (f).. 3. Ready-made C25 5 concrete should be used. Approximately 0,49m³ concrete is needed for every hole. hole 4. Fill ill the hole with concrete up to in n the case of underground installation: installation 60mm under ground level. In the case of underground installation with loose filling material: 200mm under ground level, and bevel the concrete foundation according to figure (a). in the case of above-ground ground installation i up to ground level. Figure (e) SE 07: 1736mm 1736 SE 10: 986mm 986 Mounting plate 1000 mm Equipment fixing bolt Foundation anchor concrete foundation hole min. dimensions (l) 2x700mm, mm, (w) 700mm, (h) 1000mm min. 700mm Please note min. 700mm 700mm The size of the hole for the he foundation is depending on the consistency oft he ground. The dimensions mentioned above are applicable for normal conditions with firm ground. If the ground is extremely soft, a much bigger foundation is needed. Use only appropriate material and follow the installation instructions closely!!! closely!! Next: positioning the foundation anchor continue on page 9 8
9 Positioning of the foundation anchor The foundation anchor and distance piece included in the delivery should be positioned in the concrete as shown in figure (f). The equipment fixing bolts have to be above the concrete. Avoid concrete remaining on the mounting plates or the equipment fixing bolts. The parts of the foundation anchor rising out of the concrete must stay free from any soiling. In order to ensure an exact upright position of the main columns after the installation, the mounting plates of the foundation anchor have to be adjusted absolutely horizontally by using a level while concrete casting. Figure (f) SE 07: 1736mm SE 10: 986mm Equipment fixing bolt ground level resp. -60mm and -200mm (loose material) foundation anchor concrete min. 700mm min. 700mm The foundation can be carried out as two separate foundation blocks or one countinous block. Next: equipment installation continue on page 10 9
10 Mounting of equipment Before mounting the totally assembled delivered equipment to the foundation, it has to be assured the concrete has dried completely. The drying time is changing depending on the weather conditions. The drying time of concrete at normal weather conditions is approximately 15 days. After the concrete has dried, the respective equipment can be mounted on the foundation anchor by screwing the included nuts onto the equipment fixing bolts as shown in figure (g). Take care there are no foreign particles or any soiling between the equipment and the foundation anchor, so the fixing plate of the equipment is flush to the mounting plate of the foundation anchor. To avoid dismounting of the equipment by unauthorised persons, the nuts can be welded to the equipment fixing bolts. Figure (g) equipment nut, washer, nut mounting plate equipment screw thread Filling material: e.g. lawn, shock absorbing material, etc. Max. 60mm from top of flange Figure (h) Cover the anchoring with filling material or the plastic foundation covering after mounting the equipment (see figure(h)). Please regard the regulations of DIN EN 1176 and EN 1177 if applicable. Stand Juni
INSTALLATION MANUAL IN-GROUND
INSTALLATION MANUAL IN-GROUND Dig holes according to positions on drawings (see the following pages). Dimensions of holes: e.g. 50 x 50 x 75 cm (see the following pages). Fill with concrete leaving a depth
More informationWARNING- THIS EQUIPMENT IS DESIGNED FOR ADULTS ONLY. ONLY HEALTHY PEOPLE AGES 13 AND UP SHOULD USE THE EQUIPMENT.
INSTALLATION DETAILS Recommended crew (Adult): 2 Installation time: 2 hours (plus time for concrete to cure) User age: 13 and up Weight: 163 lbs MAINTENANCE: As the owner of the equipment you are responsible
More informationA Assembly instructions Maxi Cheops pyramid (registered design) Art B to set into concrete
Seiltechnik A Assembly instructions Maxi Cheops pyramid (registered design) Art. 4643-3B to set into concrete LEDON:Produktudvikling:huck montagevejledninger:4643_3b-01-en-005.doc - 1 - Seiltechnik Huck
More informationSPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN. Reference is made in this Specification to the following:
SPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN 1. SCOPE This specification covers the design, fabrication and testing of tubular section, galvanised steel friction fit jointed street light columns of
More informationInstallation instructions. LORO-ATTIKASTAR siphonic drains
instructions with clamping flange, for pressure flow for bituminous or plastic roof sealing sheets, according to EN 1253, steel, hot-dip galvanised consist of the drain body and the stainless steel suction
More informationPSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange
Pipeline Accessories PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange General Information Sectional View Technical Data 1 PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange General
More informationPRODUCT INFORMATION Dero Hoop Rack
PRODUCT INFORMATION Dero Hoop Rack 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com H O O P R A C K The Hoop Rack is
More informationInstallation Instructions Easy Climb 1 Art
Installation Instructions Easy Climb 1 Art. 4591-40-1 Operator: Location: Revision history Revision 0 2009-08-21 The first allowed version Assembly instruction Revision 1 2011-08-12 B25 in C25/30 u. Fallschutz
More informationAssembly and users manual. Pallet racking Alfa
Assembly and users manual Pallet racking Alfa ASSEMBLING OF FRAMES Tightening Torque Screw M0 8.8 Max. tightening torque 7 Nm Taptite M6 Max. tightening torque 5 Nm Taptite M8 Max. tightening torque 5
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More informationAssembly instructions Fortuna Play Course Art part
A Assembly instructions Fortuna Play Course Art.4591-65 3-part Operator: Location: LEDON:Produktudvikling:huck montagevejledninger:4591-65 3er-en-002.doc - 1 - Revision history Revision 0 2010-12-07 The
More informationHuck Seiltechnik GmbH Aßlar/Berghausen Germany
Seiltechnik GmbH 35614 Aßlar/Berghausen Germany A Assembly Instructions Arch Swing with Buried Ground Anchors Art-No. 4580-4B Operator: Location: T:\PLAY\Play Installation Instructions\Word Document Install
More informationM501A ATTENTION! For outdoor use only Only for domestic use For children aged 3 to 12 years. Child's weight maximum 30 kg INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS M501A Reference : M 501A ATTENTION! L. 175 x l. 130 x h. 145 cm For outdoor use only Only for domestic use For children aged 3 to 12 years. Child's weight maximum 30 kg INSTALLATION
More informationConergy SolarFamulus II
Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use
More informationCustomer Support: (03)
Customer Support: (03) 9786 0055 Windsor Multi Play Set (MPS132B) Thank you for purchasing the Windsor Multi Play Set (MPS132B) Warning: Only for domestic outdoor use. This Play Set satisfies all the requirements
More informationAssembly instructions Mini Cheops Pyramid Art B to set into concrete
A Assembly instructions Mini Cheops Pyramid Art. 4643-1B to set into concrete \\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4643_1B-01-en-004.doc - 1 - Revision
More informationFoundation Frame RF-01
Foundation Frame RF-01 INSTALLATION MANUAL Foundation Frame RF-01 Installation Manual 1 GENERAL DATA RF-01 Foundation Frame Foundation frame PERCo-RF01 0-01 (hereinafter the frame) is designed to ease
More informationAmerican Metal Specialties, Inc.
American Metal Specialties, Inc. www.cablerailings.com (253) 272-9344 (253) 627-3843 Fax PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 05 73 00 STAINLESS STEEL ORNAMENTAL HANDRAILS AND RAILINGS For best
More informationASSEMBLY AND OPERATING MANUAL LTW SLIDE RAIL SYSTEM - Type PV
Manufacturer: LTW Tiefbauvertriebs GmbH Holter Weg 11 D 41836 Hückelhoven-Brachelen Phone: +49 (0) 24 62 / 2009 0 Fax: +49 (0) 24 62 / 2009 15 e-mail: info@ltw-verbau.de homepage: http:\ \ www.ltw-shoring.com
More informationCantilever Racking The ideal storage solution for oversized long goods
Cantilever Racking The ideal storage solution for oversized long goods Cantilever Racking Cantilever racking is specially designed to accommodate long, bulky and oversized goods such as pipes, aluminium
More informationMETAL & DUAL SEATED PISTON VALVES
VP Series VESSEL & REACTOR VALVES METAL & DUAL SEATED PISTON VALVES PROCESS VALVES HIGH PERFORMANCE PISTON VALVES Dual Seal Piston Valve Code: VP4D-VP6D High sealing performance of Dual Seal specially
More informationASSEMBLY ADVICE SAFETY ADVICE
WARNING: ONLY FOR DOMESTIC OUTDOOR USE. This swing satisfies all the requirements of the European standard EN71 and Australian Standard AS/NZS ISO 8124 and has been certified by an independent laboratory.
More informationINSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER
INSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER I. SAMPLER SUSPENDED BY CABLE The Vortox Liquid Sampler is a precision instrument manufactured of stainless steel, easy to install,
More informationInstructions for 12 IGT system
Instructions for 12 IGT system Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system. Since local soil and
More informationMounting instructions for Fitness bike
Diagram 1: Overall view of the fitness equipment stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 All rights and product modifications reserved. State: 20.04.2017 p.
More informationRolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:
Instructions for ssembly and Use Mobile working platforms according to DIN EN 00:00-03 Working platform 0.7 x.8 m max. working height: indoors.3 m outdoors.3 m Rolling Towers Load bearing capacity.0 kn/m
More informationTECHNICAL MANUAL. PC Beam Shoe. Hidden Beam Shoe for Corbel System
TECHNICAL MANUAL PC Beam Shoe Hidden Beam Shoe for Corbel System Version: PEIKKO GROUP 03/2012 PC Beam Shoe Corbel system to support beams System benefits Easy and fast beam installationtion Fits into
More informationInstruction Manual TWISTLOCK SAND VOLLEYBALL SOCKETS SVB23/SVB27
Instruction Manual TWISTLOCK SAND VOLLEYBALL SOCKETS Customer Service (800) 247-7668 SVB23/SVB27 P A R T S L I S T Item Qty Description Item Qty Description A 1 Sand Volleyball Socket (3 or 4 ) B 1 Twistlock
More informationVESSEL & REACTOR VALVES. VR Series RISING DISC PROCESS VALVES. Sold by: G&W Industrial Sales
VR Series VESSEL & REACTOR VALVES RISING DISC PROCESS VALVES CRUST BREAKING BOTTOM OUTLET VALVES Rising Disc Valves M Seal for high Pressure & Temperature. Dual Seal, Soft Seal, M Ring and M Control are
More informationifix INSTALLATION MANUAL PV flat roof installation system Version
ifix PV flat roof installation system INSTALLATION MANUAL Version 2012-09-06 ifix Installation Manual Version 2012-09-06 Seite 1 Table of contents Table of contents... 1 Special characteristics of ifix...
More informationFPM115MF ( <02>)
() Thank you for choosing the VuePoint wall mount. The VuePoint wall mount is designed to support a monitor sized up to 37 (94 cm) and weighing up to 27 kg (60 lbs). Hardware for multiple mounting configurations
More informationVERsacourt LED Light System Installation Instructions
VERsacourt LED Light System Installation Instructions PART LIST TEE BAR ASSEMBLY 10 12 LIGHT ASSEMBLY (hardware included) EXTENSION COLLAR BASE POLE EXTENSION POLE ANCHOR PAGE 1 REQUIRED TOOLS AND MATERIALS
More informationFIXTURE CARRIERS TABLE OF CONTENTS S-WD-FC
TABLE OF CONTENTS Pictorial Index Product Recommendations Water Closet Carriers Matching Water Closet & Carrier Closet Carrier Selection & Battery Set-Up Stud & Nipple Adjustment to Finished Wall Anchoring
More informationROAD CLOSURE GATE PLAN ESTIMATED QUANTITIES CONCRETE FOOTINGS FOR S. D. DEPT. OF TRANSPORTATION DECEMBER 1996 ELEVATION CABLE TIE DOWN FOOTING
ADMIN. S 1 1 13 199 POST Anchor Bolts (4 Required) 1 Pole Base Plate Footing PLAN POST Chamfer on Footing ESTIMATED QUANTITIES ITEM UNIT QUANTITY Footing & Eyebolt Class M5 Concrete CU.YD. 0.5 The quantity
More informationROOF MOUNT KIT OWNERS MANUAL
ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Southwest Windpower, Inc. 1801 W. Route 66 Flagstaff, Arizona 86001 Phone: (928) 779-9463 Fax: (928) 779-1485 E-mail: info@windenergy.com Web: www.windenergy.com
More informationCANTILEVER IPE
IPE 90-120 RAL 3000 Columns RAL 1004 Shelves Galvanized crosses and accessories Freestanding shelving particularly suitable for the storage of long materials such as pipes, bars, sections, sheets in packs,
More informationStainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K
T Premium Panel, protection category IP 69K IP 69 K.6 H H H Optionally with or without keyboard housing Resistant to high-pressure cleaning (protection category IP 69K). The seal lies between two surfaces
More informationM505 ATTENTION! For outdoor use only Only for domestic use For children aged 3 to 12 years. Child's weight maximum 30 kg INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUTIONS M505 Reference : M 505 L105 x l. 130 x h. 145 cm ATTENTION! For outdoor use only Only for domestic use For children aged 3 to 12 years. hild's weight maximum 30 kg INSTALLATION
More informationInstallation Instructions Birds Nest Tower Art
A Installation Instructions Birds Nest Tower Art. 4652-20 Operator: Location: \\Fileserver\text\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\4652-20-eng-003.doc - 1 - Revision
More informationEconomic concrete distribution with stationary booms
Economic concrete distribution with stationary booms 1 MT 2059-5 GB File under: A 1.00, BP 1.03, A 4.00, BP 4.03, CPD 4.10 The MX stationary boom system a summary The factor of time is playing an increasingly
More informationWalraven Rooftop Solutions
Versatile, durable solutions and support Walraven Rooftop Solutions For supporting rooftop installations BIS Yeti 480 Walraven Rooftop Solutions Your challenge, our support! Walraven Rooftop Solutions
More informationWalraven Rooftop Solutions
Versatile, durable solutions and support Walraven Rooftop Solutions For supporting rooftop installations BIS Yeti 480 Walraven Rooftop Solutions Your challenge, our support! Walraven Rooftop Solutions
More informationD D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.
Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete
More informationPC Beam Shoe. Corbel system to support beams. Technical Manual. Version: DK 4/2012 Design standard: DS EN Eurocodes + NA (Denmark)
PC Beam Shoe Corbel system to support beams Version: DK 4/2012 Design standard: DS EN Eurocodes + NA (Denmark) Technical Manual PC Beam Shoe Corbel system to support beams System benefits Easy and fast
More informationSECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
Page 220548-1 SECTION 220548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationRAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017
For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For
More informationCANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is
More informationSECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS
More informationINNOVATIVE SLOPE STABILISATION BY USING ISCHEBECK TITAN SOIL NAILS
Dipl.-Wirt.Ing. Oliver Freudenreich Friedr. Ischebeck GmbH phone: ++49 2333 8305-0 Loher Str. 31 79 fax: ++49 2333 8305-55 e-mail: freudenreich@ischebeck.de D-58256 Ennepetal www.ischebeck.com INNOVATIVE
More informationPSG, TSG, SGS, SR Corrosion-resistant PFA and PTFE lining Indication of flow even at very low flow rates Optionally with integrated check valve
Richter and -Way Sight Glasses PSG, TSG, SGS, SR Corrosion-resistant PFA and PTFE lining Indication of flow even at very low flow rates Optionally with integrated chec valve Richter and -way sight glasses
More informationH 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers
Page 1 IMPORTANT Please retain this instruction sheet in your files. It contains important replacement parts information. All equipment should be installed in accordance with these instructions. It is
More informationInsulation boards PhoneStar
Sound Insulation Bavaria Insulation boards PhoneStar Installation instructions Wall Version 15.05. 2015 ONE solution universal in every area PhoneStar is an innovative, very efficient insulation board
More informationASSEMBLY AND OPERATING MANUAL LTW EG CORNER - MANHOLE
Manufacturer: LTW Tiefbauvertriebs GmbH Holter Weg 11 D 41836 Hückelhoven-Brachelen Phone: +49 (0) 24 62 / 2009 0 Fax: +49 (0) 24 62 / 2009 15 e-mail: info@ltw-verbau.de homepage: http:\ \ www.ltw-shoring.com
More informationGuide Specification. Dayton Superior, plastic and elastomeric architectural form liners. Select paragraphs below applicable to project.
Guide Specification SECTION 03361 ARCHITECTURAL FORM LINERS Dayton Superior, plastic and elastomeric architectural form liners. This section is based on a system of Dayton Superior, which is located at:
More informationWalraven Support System
walraven.com Walraven Support System A solid and reliable foundation for any Strut based installation Walraven Support System A solid and reliable foundation for any Strut based installation BIS Yeti 480
More informationSPECIFICATION SS-20 / 4 STEEL STRUCTURES FOR SUBSTATION AND SWITCHING STATION MATERIAL
1 JULY 2009 SPECIFICATION SS-20 / 4 STEEL STRUCTURES FOR SUBSTATION AND SWITCHING STATION MATERIAL I. SCOPE This Specification covers the technical characteristics, the manufacturing and testing of steel
More informationROOF MOUNT KIT OWNERS MANUAL
ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF
More informationLEADING IN WELDING SAFETY CATALOGUE 2014 CONSTRUCTION. Version 14/01
LEADING IN WELDING SAFETY CATALOGUE 2014 CONSTRUCTION Version 14/01 CONSTRUCTION Table of contents TABLE OF CONTENTS General information 3 Quality 4 Swivel arms 5 Swivel arms supports 16 Poles 18 Columns
More informationHighways Square Trolley Pole. HSTP Range. Sales Direct: +44 (0) w: e: Highways Square Trolley Pole
The brand new HSTP is the latest innovation in square CCTV trolley poles and is an ideal column for urban and traffic CCTV schemes. Built to complement our extensive range of highway masts as well as boasting
More informationSERIES SURGICAL LIGHTS
SERIES SURGICAL LIGHTS TEC-B-0012 REV1 Skytron's Aurora LED Surgical Lighting provides advanced bright, cool and color correct illumination to the surgical field and a selectable color temperature of 4,000K
More informationMODEL # MSC-4120-BM. Spring Breeze with Me and My Toddler Metal Swing Chair OWNER S MANUAL
MODEL # MSC-4120-BM Spring Breeze with Me and My Toddler Metal Swing Chair OWNER S MANUAL ASSEMBLY, INSTALLATION, CARE, MAINTENANCE AND USER INSTRUCTIONS FOR RESIDENTIAL USE ONLY WARNING This product is
More informationRHA100 Sandite Applicator
User Guide RHA100 Sandite Applicator Permaquip Ltd Brierley Industrial Park, Stanton Hill Sutton-In-Ashfield, Nottinghamshire, NG17 3JZ Tel: +44 (0) 1623 513349 Fax: +44 (0) 1623 517742 E-mail: sales@permaquip.co.uk
More informationInstructions for 12 and 15 IGT systems (12 pictured)
Instructions for 12 and 15 IGT systems (12 pictured) Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system.
More informationMade in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1.
Submittal Sheet Materials: 1.5 Schedule 40 Steel Pipe (1.9 OD) Finishes: Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sanded down 2. Washed
More informationCantilevered Rail System
Knight Global's Cantilevered Rail Systems are designed to eliminate the need for a four post floor structure system. It provides an alternative to workstations with minimal floor space. A wide range of
More informationNexus Under Dispenser Containment System. Installation Instructions
Nexus Under Dispenser Containment System Model Q510 Installation Instructions Franklin Fueling Systems 3760 Marsh Rd. Madison, WI 53718 USA Tel: +1 608 838 8786 800 225 9787 Fax: +1 608 838 6433 www.franklinfueling.com
More informationInstructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000
Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000 (How to move your pallet racking using the Link 4 Pallet Rack Lifter) This process is for a typical rack move and reset. Each
More informationBuilding permits are not required for patios made of concrete or pavers on grade.
DECKS CITY OF BEMIDJI BUILDING DEPARTMENT (218) 759-3573 www.ci.bemidji.mn.us This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code, Bemidji City Ordinances
More informationVESSEL & REACTOR VALVES. VD Series DISC VALVES PROCESS VALVES
VD Series VESSEL & REACTOR VALVES DISC VALVES PROCESS VALVES FULL FLOW BOTTOM OUTLET VALVES Tank Bottom Disc Valve M Ring for high temperature & vacuum. Other sealing systems are available Code: VD4R-VD6R
More informationFlat roof for the loading-optimized elevation (adhesive system)
Mounting systems Flat roof for the loading-optimized elevation (adhesive system) FLAMONT Production I Professional wholesale Adhesive mounting without roof penetration no weight easy to install low price
More informationPROVEN 15/TM1500 FOUNDATION INSTRUCTIONS
PROVEN 15/TM1500 FOUNDATION INSTRUCTIONS Foundation Pack for Proven 15/TM1500 PACKING LIST LIST OF PARTS TO BE SENT WITH BASE PLATE 1 - GALVANISED BASE PLATE 10 M36 FOUNDATION RODS WITH BOSSES FITTED 10
More informationSafety Ladders: Made of Aluminium
Y-Spar Anodized aluminium alloy ladder. Guide-rail profile: 52 x 51 mm. Comes with joint plate. Mounting brackets extra to order. Mounting distance: recommended 1400 mm - max. 1680 mm. Installation of
More informationModel # 338SM-OP. 9/30/2011 Page 1 of 12
Model # 338SM-OP 9/30/2011 Page 1 of 12 9/30/2011 Page 2 of 12 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationSERIES SURGICAL LIGHTS
SERIES SURGICAL LIGHTS TEC-B-0012 REV1 Skytron's Aurora LED Surgical Lighting provides advanced bright, cool and color correct illumination to the surgical field and a selectable color temperature of 4,000K
More informationDOC NO. ISSUE Page Date. GVTG of LARGE COLUMN ASSEMBLY & INSTALLATION DIAGRAM GENERAL
of 5.0 GENERAL The purpose of this technical procedure is to detail those actions necessary to ensure that Large Columns are joined in compliance with the applicable design standards. Columns come in tapered
More informationEquipment for Engineering Education
Equipment for Engineering Education Operating Instructions HM70.24 Boundary Layer Plate G.U.N.T. Gerätebau GmbH P.O. Box 25 D-2288 Barsbüttel Germany Phone (040) 670854-0 Fax (040) 670854-4 Table of Contents
More informationA EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD
A70-1001-EN-201805 ROUND STORAGE SILO Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL ARSKAMETALLI LTD www.arskametalli.fi CONTENTS Introduction Delivery information EU Declaration of Conformity
More informationMounting instructions for Multifunctional trainer wood
Diagram 1: Overall view of the fitness equipment stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten State: 08.02.2017
More informationAll content of this installation guide is taken from ASTM1759, ISO13272 and ATV127 standards which the first two standards are the basic national standard of Iran and the ATV standard has been used in
More informationW E I N S P I R E W O R K
W E I N S P I R E W O R K Updated 13.08.2018 Founded in 1906, GBP Ergonomics AB is a leading producer of ergonomic workspaces in Scandinavia, supplying work stations, lockers, pedestals, trolleys, accessories
More informationR E CYC L E RAC K. Green By Design
R E CYC L E RAC K Green By Design Take green to the next level with the Recycle Racks. Combining basic materials with innovative design, Dero has created a completely unique bike rack. The Recycle Racks
More informationtracks for building maintenance units (BMU)
1/11 A track at roof level is required to allow the machine to traverse. Two different types of track may be considered: one in concrete and the other with two metal rails. 1. Concrete track During the
More informationMAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure
MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures Product brochure Product advantages MAXIMO MXH Heated Formwork The cost-effective solution for concreting
More informationHELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION
HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used for
More informationSAS Micropile Manual. Basic dimensioning and design recommendations. Table of Content:
SAS Micropile Manual Basic dimensioning and design recommendations Table of Content: Page System Description 2 Load Capacities 2 Minimum Drill Hole Diameter 3 Load Transfer to Ground 4 Corrosion Protection
More informationMODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications
MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall
More information.1 ANSI/ASME B31.1, Power Piping, (SI Edition)..2 American Society for Testing and Materials (ASTM)
Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 03300 - Cast-in-Place Concrete.2 Section 05121 - Structural Steel for Buildings.3 Section 05500 - Metal Fabrications 1.2 REFERENCES.1
More informationInternational GmbH ALUPURA
International GmbH Recessed covers ALUPURA ALUPURA Recessed covers ALUPURA product line Aluminium manhole-covers with variable surface. The variable surface of ALUPURA recessed-covers make manholes, inspection
More informationIMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING
INSTALLATION DETAILS Recommended crew (Adult): 2-3 Installation time: 8-12 Hours not including concrete cure time User age: 5-12 Use zone: 22 Diameter Weight: 990 Actual Dimension: 120 Diameter MAINTENANCE:
More informationPERI PD 8 The cost-effective shoring for slab tables and high loads
PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0
More informationFITNESS PLAYGROUND ITEM NO: 8010
FITNESS PLAYGROUND ITEM NO: 8010 OWNER S MANUAL CAUTION: This unit is designed to be used safely by up to 4 children between the ages of 3 years to 8 years old with a maximum weight of 100 pounds (45.4
More informationTECHNICAL MANUAL. PCs Corbel Hidden Corbel for Supporting Beams
TECHNICAL MANUAL PCs Corbel Hidden Corbel for Supporting eams Version: PEIKKO GROUP 0/06 PCs COREL Corbel system to support beams Free up space below beams by using hidden corbels Easy formwork with constant
More informationTactile Pad Installation Guide. All Surfaces.
Tactile Pad Installation Guide. All Surfaces. ALLSAFE FLOORING P/L ABN: 65 536 404 581 Factory 2, 6 Walker Street Braeside, VIC 3195 Tel: 1300 466 754 Fax: 1800 466 754 info@allsafeflooring.com.au www.allsafeflooring.com.au
More informationCoating Specifications
Quadax Series Butterfly Valves Version May 2011 müller co-ax ag Gottfried-Müller-Str. 1 74670 Forchtenberg Germany Tel. +49 7947 828-0 Fax +49 7947 828-11 E-Mail info@co-ax.com Internet www.co-ax.com Table
More informationSECTION METAL EQUIPMENT LOCKERS
SECTION 10 51 13 - METAL EQUIPMENT LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified
More informationModel # 800SM-PS3. 8/3/2016 Page 1 of 8
Model # 800SM-PS3 8/3/2016 Page 1 of 8 /3/2016 Page 2 of 8 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationModular Simplicity Dero
B I K E H AV E N Modular Simplicity The Bike Haven bridges the gap between short and long term bike parking. The simple, modular canopy design makes it easy to create the bike shelter that fits your needs.
More informationDistriubted by Material Storage Systems, Inc CANTILEVER. Distriubted by Material Storage Systems, Inc
CANTILEVER General Characteristics of Cantilever Cantilever rack is a medium to heavy duty storage solution for large, long or irregular shaped loads. As the name suggests, this rack features load bearing
More informationHeartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)
Perma-Column Installation Instructions Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete and our unique Sturdi-Wall Plus wet-set bracket
More informationMade in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes
Submittal Sheet Materials: 1. 5 Schedule 40 Steel Pipe (1.90 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available. Powder Coat Our powder coat finish assures a high level
More information