1 FLANDERS ELEMENTARY SCHOOL Located at 167 Boston Post Road, East Lyme, Connecticut the school s original structure was built in 1964 and replaced the Central Office Building as the elementary school. Two additions were completed in 1976, providing additional classroom space and a gymnasium. General Building Information: Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet Overview: The intent in reviewing existing conditions at the Flanders Elementary school is to evaluate the physical plant and its systems to identify deficiencies for the entire facility; including exterior envelope, interior finishes, structural elements, handicap accessibility, mechanical, electrical, plumbing and fire protection. ( KBA ) staff and consultants visited and photographed the building and reviewed existing available documents to gather all necessary data about each space. Due to its date of construction, the Elementary school is not Handicapped Accessible and significant renovations would be required to provide accessibility. Some doors in the original building are too narrow and are not building code compliant. The thresholds at the 1976 bathrooms and locker rooms by the gymnasium are too steep and are not code compliant. The school is not sprinklered nor does it have adequate rescue windows, and the fire marshal would like to see it become sprinklered to correct this. There are no occupancy load signs in the assembly spaces. Some exterior door and window systems are deteriorated. Asbestos is present in locations throughout the building and should be considered during any renovations. The building has little mechanical ventilation and independent window mount air conditioning units can be found throughout the school to compensate for temperature, ventilation and humidity issues. Many of the interior spaces are carpeted, the carpeting in the corridors is new but the carpeting within the rooms is worn and frayed and has become a tripping hazard. The carpeting also traps dust, dirt and pollutants. The parking lot is deteriorating. The vehicular and pedestrian traffic flow is an important issue at this location, as it causes safety concerns. Additional parking is needed; the current lot overflows onto a gravel and dirt area adjacent to the neighboring football field, which has become worn and has inadequate drainage. A. Exterior Building Envelope: The building s exterior envelope was reviewed for overall soundness and water/air tightness. elements were evaluated as described below. A separate roof, window and structural report assessing the exterior envelope were also undertaken. Exterior Walls: The 1964 portion of the building consists of masonry walls with a vented brick veneer, with no insulation and a painted interior finish. KBA No B - 1 Last Edit 09/28/11

2 The 1976 portion of the building consists of masonry walls with a non-vented brick veneer, with 2 of rigid insulation and a painted interior finish. A non-vented masonry veneer assembly will retain water and cause spalling and cracking. The structural system consists of a steel frame. The building sits on a concrete foundation. Refer to the Structural Report for additional information. Exterior Doors and frames: The exterior doors and frames are hollow metal systems. Many secondary doors are showing areas of deterioration and are not properly balanced so they do not close automatically. A1 A2 Exterior Windows and louvers: The 1964 exterior windows are non-insulated single pane aluminum frame units, original to the building, with awning style operable windows. The 1976 exterior windows are insulated double pane aluminum frame units. The windows are showing signs of deterioration. They are permitting drafts and air infiltration, greatly diminishing the energy performance of the exterior wall assembly. Refer to the Windows Report for additional information. Roof: The roof system is a multi-ply modified bitumen membrane with a granulated cap sheet. It is approximately 10 years old and generally in good condition. The roof has primary and secondary overflow drains, connected to the site drainage system. Refer to Roof Report for additional information. KBA No B - 2 Last Edit 09/28/11

3 B. Interior Building Elements: The building s interior spaces were evaluated for overall condition of architectural systems and appearance, including quality of equipment, materials and finishes. Accessibility and code compliance were also reviewed. Walls: The 1964 interior walls are painted masonry block. The 1976 classroom addition interior walls are a mixture of masonry block at core elements and movable partition panels between classrooms. Doors, Frames and Hardware; All the 1964 doors are painted hollow metal doors and Frames with wire glass lites the 1976 doors stained wood in Metal partition system frames. The doors are generally in good condition. The existing doors have knobs throughout the school and are not ADA compliant. Some interior doorways are smaller than code minimum for existing buildings. Narrow door Interior Finishes-Floors and Ceilings: The building is predominately carpeted. Bathroom and wet locations are tiled in the 1964 portion and VCT in the 1976 portion. The floor finish in the corridor surrounding the gymnasium is VCT. The carpeting throughout the corridors was recently replaced. The classroom carpets are showing signs of wear and ripples and tears pose tripping hazards. The 1964 portion of the school is predominately open to the painted roof structure, with surface mounted light fixtures across the beams. The bathroom ceilings are gypsum with surface mounted fixtures. The multi-purpose room has an acoustical ceiling tile system. The 1976 portion of the school has an acoustical ceiling tile system throughout with recessed light fixtures. The masonry walls are painted and are in excellent condition. The partition walls are pre-finished in wall covering and are in good condition. The light fixtures generally provide adequate lighting. Casework: The casework throughout the school is plastic laminate. It is good condition but looks dated and aged. It is not ADA compliant. Signage; Room signage is intermittent and varies throughout the entire facility and is not ADA compliant. Miscellaneous Accessories and Equipment: Fire extinguishers were observed in throughout the facility. A3 KBA No B - 3 Last Edit 09/28/11

4 Typical Spaces: Corridors: The Corridors are in good condition. The egress analysis shows that as part of the means of egress, the corridors and doors have ample width to accommodate the buildings occupants. The 1964 corridors do not have ceilings. The 1976 ceilings are typically suspended acoustical panel with recessed light fixtures in great condition. The level of light throughout is adequate. Drinking fountains are found throughout; they are not ADA compliant, some are not mounted at a child height and have a step built around them. There are open expansion joints visible in the hall that are not smoke tight as is required by code. Open joint A4 A5 Administration Suite: The Offices are generally in good condition, though they are limited on space. The floors are generally carpet. The walls are painted masonry. The ceilings are typically open to the painted roof structure above with Surface mounted light fixtures in good condition. The level of light is adequate. The furniture observed (desks, cabinets, shelving, etc) was high quality and in excellent condition. Cafeteria/Auditorium ( Multi-Purpose Room): The floors are VCT. The walls are painted masonry in good condition. The ceilings are typically suspended acoustical panel with recessed light fixtures in good condition. The level of light is adequate. The acoustical panel ceiling tiles are dirty around air diffusers and they are sagging. A6 KBA No B - 4 Last Edit 09/28/11

5 The stage platform is not accessible. The stage has no storage and many items are stored on or around the stage. The doors to the corridor appear to be original and are too narrow per code and should be replaced. Gymnasium: The Gymnasium was added in One half of the space is capable of exiting directly to the exterior. The Floor consists of a sheet sport floor product with game lines. The walls are painted CMU. Wall pads protect the masonry walls. The pads are torn at several locations from wear around receptacles. A7 A8 The locker rooms have been converted into classrooms. The floor level between the corridor and these rooms changes by up to 1 ½ with a ramped 6 threshold. This floor change does not meet code because the change in level may cause tripping. The ceiling is open to the painted roof structure above with suspended fluorescent light fixtures. At the time of the survey, lighting appears to be sufficient when combined with daylight, but may be insufficient during overcast days when using artificial lighting alone. The Gymnasium equipment appears original but in working condition. A wall clock is missing and the wires are visible, the clock should be replaced or the wall opening should be closed. Storage space is shared with an electrical room, which also functions as the PE office. The electrical equipment must be kept clear and not be blocked by equipment or a desk. Learning Resource Center: The Learning Resource Center is strategically located at the center of the Core building. It is a spacious and welcoming space with support areas consisting of work room, A.V. storage, and access to the computer lab. Reading and stack areas are delineated within the overall spaces for proper function. The circulation desk is centrally located on one wall and has good visual control of all areas. The support spaces are inadequate. The casework is original and does not provide enough storage for the AV equipment and many things are stacked in the A/V room on counters. Floors are typically carpet in the Library and VCT in the support spaces with 4" rubber base. Area carpets were also observed in the A/V room. KBA No B - 5 Last Edit 09/28/11

6 Walls are masonry CMU around the main space and movable partitions around the support rooms. Though the semi-permanence of the casework and equipment presently make partition rearrangement restricted. Ceilings are suspended acoustical panels with recessed 2x4 light fixtures. The quality of light is adequate; the ceiling is in good condition. Miscellaneous equipment such as TV s on a cart, projectors, and video recording equipment are observed. These are used for school wide broadcasts by the students. The Resource Center is a very functional and pleasant space. However, there is a lack of storage. Typical Classrooms: The classrooms are typically 810 square feet. Floors are typically carpeted with 4" high rubber base. The carpeting is showing signs of wear and tears and ripples in the carpeting pose tripping hazards. Walls are painted CMU in the 1964 construction and moveable panel partitions with wall covering in the 1976 addition. The ceiling is painted exposed roof structure in the 1964 portion of the building with surface mounted light fixtures in good condition. The 1976 ceilings are typically suspended acoustical panel recessed light fixtures, in good condition. Concern has been expressed about corrosion on portions of the exposed roof structure and assembly. Artificial light fixtures have been replaced with various energy efficient units in several rooms for testing and natural daylight is accessed with skylights in several locations. In the original construction the exterior window system is original, single pane glass in aluminum frames. The windows in the addition are insulated double pane glazing in aluminum frames, but the seal on many units is broken and dried. Whiteboards and/or chalkboards and tack boards are present in all classrooms. A mounted projection screen is present in some rooms. A clock and speaker system is present in each classroom. The perimeter heating units are original. They are located behind the built-in casework, in most classrooms. Refer to MEP report for additional information. Window shades consist of horizontal blinds, in good condition, in all classrooms. Casework consisting of plastic laminate provides storage within each room. Furniture consists mostly of tables and chairs. File cabinets and other storage systems were observed. Computer stations were present in some classrooms. Overall the classrooms are in good condition. Special Education Classrooms: The Special Education areas are dispersed throughout the school. The spaces appear to be adequate for the function and population being served. The floor finishes in these rooms was noted to be carpet. Fabric shades have been hung from light fixtures to adjust the color temperature and brightness of the light for special needs students. Refer to typical classroom notes for additional information. KBA No B - 6 Last Edit 09/28/11

7 Toilets: The 1964 section of the school has: o One Boys Bathroom with 12 lavatories, 16 urinals and 6 toilets o One Girls Bathroom with 12 lavatories and 16 toilets o One men s room with 1 toilet, 1 urinal and 1 lavatory o One women s room with one toilet and one lavatory o One each of a private bath with 1 toilet and one lavatory in four kindergarten classrooms. These rooms are very small and cannot become ADA compliant without adding space. o One nurse s bathroom with a lavatory and a toilet. The 1976 section of the school has: o One Boys Bathroom with 5 lavatories, 6 urinals and 3 toilets o One Girls Bathroom with 5 lavatories and 7 toilets o One men s room with 1 toilet, 2 urinal and 2 lavatory o One women s room with 3 toilets and 2 lavatories o One special education bathroom with a lavatory and a toilet. None of the plumbing fixtures in the building have proper accessibility compliance. Floor finishes in the 1964 bathrooms are ceramic tile and have been patched repeatedly, giving the floor a mottled appearance. The floor finish in the 1976 bathrooms is VCT or ceramic tile, generally in good condition. Walls are painted masonry units. The 1964 ceilings are gypsum with surface mounted light fixtures. The 1976 ceilings are suspended acoustical panel with recessed light fixtures. Toilet accessories are present including: mirror, paper towel dispenser, toilet paper dispenser and soap dispenser. They do not meet accessibility requirements in their location or mounting height. The toilet partitions are metal and are showing moderate signs of corrosion and damage; some have been replaced and do not match the existing. Storage: The storage spaces are dispersed throughout the facility. The amount of storage is typically lacking. Some uses share space with storage. Some rooms have been taken over to become storage. Mechanical Room: The Boiler is located in a sunken area of the school. The painted walls are peeling and should be stripped and re painted. All the mechanical areas are enclosed and separated by rated assemblies as required by code. Refer to MEP reports for additional information. KBA No B - 7 Last Edit 09/28/11

8 Recommendations: Repaint janitorial office room walls. Provide fire separation door between janitor s office and boiler room. Investigate masonry veneer issues and repair. Remodel smaller rooms with small doors to become code compliant. Replace acoustic tile ceiling in Multi-purpose room. Provide backer rods and caulking to close vertical open expansion joints. Remove carpeting throughout and replace with a hard surface finish, provide quality walk off mats a t the entrances. This is recommended to reduce the pollutants and contaminants that can become trapped in carpets and cause health and developmental issues in children. Remodel the existing bathrooms to provide ADA compliance, and fully updated finishes, partitions, and accessories. Upgrade entire facility to fully comply with ADA requirements. Provide additional security measures around facility. Remove raised floors into bathrooms and classrooms to provide a level transition along the path of egress. Repair and replace gymnasium wall pads. Refer to additional portions of the report for additional recommendations. KBA No B - 8 Last Edit 09/28/11

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good. EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

Thurgood Marshall Recreation Center Summary

Thurgood Marshall Recreation Center Summary Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District ATHLETIC FACILITY CAMPUS DATA ATHLETIC FACILITY 22628 Hwy 105 West, Montgomery TX 77356 1 MASTER PLAN 2 CIVIL - SITE General Existing Conditions and Deficiencies Overall concrete site paving: Good Overall

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No. 20140101C CONSTRUCTION ESTIMATE AND PROJECT BUDGET Dated June 7. 2014 Estimated Cost HARD COSTS $ 1,560,284 Core Renovations (Toilet Rooms, Ceilings

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

MADELEY RANCH ELEMENTARY SCHOOL

MADELEY RANCH ELEMENTARY SCHOOL MADELEY RANCH ELEMENTARY SCHOOL CAMPUS DATA MADELEY RANCH ELEMENTARY SCHOOL 3500 Madeley Ranch Road, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 94,750 Pre-K - 4 th

More information

NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

NOTE: Significant revisions or additions to the previous standards are highlighted in italics. 12 Furnishings NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all applicable portions of these standards are incorporated

More information

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY Prepared for the City of Benson, Minnesota by Widseth Smith Nolting May 2016 City of Benson, Minnesota CITY HALL/POLICE STATION

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

Columbia County Health Care Center Added Amenities

Columbia County Health Care Center Added Amenities Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

BUILDING CONDITION: INTERIOR

BUILDING CONDITION: INTERIOR Typical interior finishes at the Main Building consist of VCT flooring, plaster walls, and lay in ceilings at classrooms and instructional spaces Corridors have terrazzo flooring and partial height glazed

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

PHYSICAL EDUCATION February 3, 2014

PHYSICAL EDUCATION February 3, 2014 PHYSICAL EDUCATION February 3, 2014 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any project requirements that may differ from

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

K.B. Polk Recreation Center Summary

K.B. Polk Recreation Center Summary K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016

More information

PHYSICAL EDUCATION September 30, 2010

PHYSICAL EDUCATION September 30, 2010 PHYSICAL EDUCATION September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from the prototype

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 30 3 32 33 34 35 36 37 38 39 40 4 42 43 44 45 46 DIVISION 02 EXISTING CONDITIONS Demolition; Removal & Disposal: CMU Partitions AD Quan UM

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1964 3,035 Page 1 of 27 1. Architectural / Structural & Site Exec Summary Warnica Public School is a one storey structure of masonry construction

More information

AGILITAS Property Development

AGILITAS Property Development Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development

More information

Assessment Report Burgess Park Gymnasium. Summary

Assessment Report Burgess Park Gymnasium. Summary Assessment Report Burgess Park Gymnasium Summary The existing Burgess Park Gymnasium is an approximately 17,460 gross square feet singlestory structure built of concrete, wood and steel. The building,

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

A. All tackboards shall be mechanically fastened to walls; gluing shall not be allowed.

A. All tackboards shall be mechanically fastened to walls; gluing shall not be allowed. 10 1101 VISUAL DISPLAY BOARDS A. All white boards, chalkboards, glass boards, and smart boards shall be mechanically fastened to walls; gluing shall not be allowed. Paint-on and vinyl display boards are

More information

Reilly Elementary School Site Summary

Reilly Elementary School Site Summary 1 Reilly Elementary School Site Summary Address 405 Denson Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1954 Total Campus Building Area (combined) 41,622

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Brunson-Dargan Observed By: Creed/Carter Principal: Mrs. Ada O Sindab

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi 1 Site Summary Address 7105 Berkman Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1995 Total Campus Building Area (combined) 14,890 SF Introduction is located

More information

SPACE TYPE: ENHANCED OFFICE

SPACE TYPE: ENHANCED OFFICE SPACE TYPE: ENHANCED OFFICE Construction Criteria The unit costs for Enhanced Office space types are based on the construction quality and design features in the following table. This information has been

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play

More information

Facility Improvements

Facility Improvements AL-SI-02 ASPHALT PLAY AREA UPGRADE AL-SI-09 CURB RAMP ADDITIONS Asphalt improvements needed around building and playshed to provide a safe play area. Curb ramps needed to provide wheelchair access and

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Avonmore Elementary School B347A Edmonton Report run on: March 8, 211 1:28 AM Building Name: Address: Location: Building Id: Gross Area

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

Delco Activity Center Site Summary

Delco Activity Center Site Summary 1 Site Summary Address 4601 Pecan Brook Austin, TX 78724 Number of Permanent Campus Facilities 1 Original Year of Construction 2003 Total Campus Building Area (combined) 60,294 SF Introduction The is located

More information

Cost Estimate Details

Cost Estimate Details C 0131 1 Inadequate Parking Construct or Expand Parking Lots $67,000 F 0132 1 Inadequate Drop Off Zone Widen Sidewalk, Construct Pathway and $77,000 Canopy RR 0132 2 No Landings at Classroom Exits Construct

More information

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION

More information

.2 These guidelines should be read with the specific technical sections of McGill s Building Design and Technical Standards.

.2 These guidelines should be read with the specific technical sections of McGill s Building Design and Technical Standards. Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when planning for Corridors and Hallways. These standards are not intended to restrict or replace professional judgment..2

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: SAINT FRANCIS COLLEGE - BROOKLYN, 180 REMSEN STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-05

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade

More information

Minuteman Regional Vocational Technical School

Minuteman Regional Vocational Technical School Minuteman Regional Vocational Technical School List of Recommendations L1 AAB compliance: Improvements to front entrance (concrete ramps, railings, etc.) Required by AAB cost trigger L2 AAB compliance:

More information

Architect and Engineer: Friar Associates inc.

Architect and Engineer: Friar Associates inc. Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities

More information

Barrington Elementary School Site Summary

Barrington Elementary School Site Summary 1 Barrington Elementary School Site Summary Address 400 Cooper Drive Austin, TX 78753 Number of Permanent Campus Facilities 3 Original Year of Construction 1969 Total Campus Building Area (combined) 79,689

More information

Beckley-Saner Recreation Center Summary

Beckley-Saner Recreation Center Summary Beckley-Saner Recreation Center Summary Address Building Purpose 114 West Hobson Avenue, Dallas, TX 75224 Recreation Center Original Year of Construction 1949 Building Area 34,510 SF Inspection Date July

More information

Interior construction includes interior partitions, interior doors, and fittings.

Interior construction includes interior partitions, interior doors, and fittings. 6. ENGINEERING SYSTEMS REQUIREMENTS C10 INTERIOR CONSTRUCTION SYSTEMS REQUIREMENTS INTERIOR CONSTRUCTION TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT

More information

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619 880 S Indiana Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

PHYSICAL ASSESSMENT SUMMARY

PHYSICAL ASSESSMENT SUMMARY SULLIVAN COUNTY SCHOOLS PHYSICAL ASSESSMENT SUMMARY AKARD ELEMENTARY Address: 22 Mount Area Drive, Bristol, TN 7620 Phone: 2--167 Fax: 2--1681 Principal: Garry Booker Grades: K- Year Constructed: 196 Renovations/Additions:

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28- 1 Metz Elementary School Site Summary Address 84 Robert Martinez Jr. Austin, TX 78702 Number of Permanent Campus Facilities 1 Original Year of Construction 1993 Total Campus Building Area (combined) 61,905

More information

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor

More information

TERMINAL BUILDING EVALUATION

TERMINAL BUILDING EVALUATION TERMINAL BUILDING EVALUATION 1.0 INTRODUCTION This report evaluates the existing Terminal Building at Frederick Municipal Airport (FDK) to determine the suitability of the building for continued use as

More information

HIDDEN VALLEY ELEMENTARY SCHOOL

HIDDEN VALLEY ELEMENTARY SCHOOL SCHOOL DATA Address: 3435 Bonita Vista Santa Rosa, CA 95404 Established: 975 Permanent Classrooms: 29 Portable Classrooms: 8 Building Area: Site Area: Satellite Building Area: Satellite Site Area: 48,802

More information

Waverley Elementary School Feasibility Study

Waverley Elementary School Feasibility Study Waverley Elementary School Feasibility Study FREDERICK COUNTY PUBLIC SCHOOLS Feasibility Study Meeting #2 November 16, 2017 1 AGENDA 1. PROJECT OVERVIEW recap of last meeting, schedule 2. ARCHITECTURAL/

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School Dr. Harry L. Halliwell Memorial School October 2016 Address: 358 Victory Highway, Slatersville, RI 02876 D R AF T Report Generated: October 06, 2016 MඵAඵPඵPඵ^ Ξ :ĂĐŽďƐ ϮϬϭϲ 1 Dr. Harry L. Halliwell Memorial

More information

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018 FREMONT UNIFIED S C H O O L D I S T R I C T Thornton Middle School Conversion Quattrocchi Kwok Architects Sept 26, 2018 1 Transforming Thornton Incoming 6 th graders in year 2021/22 Student population

More information

OFFICE Space STANDARD SPECS Page 1

OFFICE Space STANDARD SPECS Page 1 OFFICE Space STANDARD SPECS Page 1 Standard features listed are based on manufacturer availability- Substitutions may occur and interchanged with items of similar standard likeness at the discretion of

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

Gerald Desmond Bridge Replacement

Gerald Desmond Bridge Replacement Item # Room # icip. # of Occupants 101 12 Conference / Crew Room 1 400 400 Supervisor Offices Conference and secondary training room for up to 12 people Flooring: VCT Electrical Type: rmal (utility power)

More information

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify

More information

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new

More information

INSPIRE each student to develop a strong

INSPIRE each student to develop a strong DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Pate Elementary School Observed By: Creed/Carter Principal: Grade

More information