1 Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E.

2 Project Overview The Ironton Russell Bridge Project entails the construction of a cast in place concrete cable stayed bridge over the Ohio River with structural steel approaches connecting the towns of Ironton, Ohio and Russell, Kentucky. The bridge will provide two 12-ft driving lanes and two 4 ft shoulders; a driving lane and shoulder in each direction. Span lengths for the approaches vary widely as they cross numerous (6) rail lines, the Ohio River levee and city streets. On the Kentucky side the spans are 140-ft and 235-ft; in Ohio the spans are 110-ft, 144-ft, 186-ft and 144-ft. The approach bridges are founded on small diameter drilled shafts (Kentucky) or steel pile (Ohio). The main span unit consists of three spans; two flanking spans at 370-ft and the center span of 900-ft. The main span unit is supported by two CIP, 316-ft tall, diamond shaped towers, founded on large diameter drilled shafts with rock sockets. When completed, the 900-ft main span will be the longest span the Ohio DOT has built. The contract value for construction of the new structure and removal of the existing is $81,266,742.05, with Brayman Construction Corporation the low bidder. Recent Construction Highlights - Main Span Kentucky Back Span & Tower 3: A picture taken from the existing bridge shows the partially completed back span false work between Pier 2 and Tower 3. The Tower 3 formwork for Segment 3 remains in place while the recently placed concrete is curing. In the distance the AK Steel mill can be seen. Page 1 of 8

3 Tower 3(KY) Segment 4: Rebar for Tower 3 Segment 4 is installed as Rob Baker (Figg) counts the individual bars and verifies their location. (right). Tower 3 (KY) Bridge Health Monitoring: Shown tied to the rebar in Tower 3 Segment 4 is a vibrating wire strain gauge. This sensor along with others in the Towers and in the superstructure will be used to collect scientific measurements of predetermined design and maintenance parameters throughout the life of the structure. (Left) Page 2 of 8

4 Tower 4 (OH) Footing Cell: The downstream half of the Tower 4 footing cell walls have been cast. Crews are currently forming the upstream half of the walls (above). Water stopping seals have been cast in the construction joints to prevent water from entering the cell once it is submerged and de watered (right). Page 3 of 8

5 Recent Construction Highlights Approaches Kentucky Approach: Setting of the Kentucky approach steel girders was completed in early September. Using the turn-of-thenut method Ironworkers tighten the 372 bolts that make up a single connection (above). The span from the Kentucky abutment to Pier 1 is currently being formed for the cast in place deck (left). Page 4 of 8

6 Scheduled Actual Select Milestone Events (Schedule Update 13) Date Date Notice to Proceed 3Feb12 Open Bridge to Traffic 25Apr16 End Project 2Feb17 Ohio Approach Set Structural Steel Ohio Approach Complete Deck Concrete Ohio Approach Main Span Cast KY Tower Footing Cast OH Tower Footing Cast First KY Tower Section Cast Last KY Tower Section Cast First OH Tower Section Cast Last OH Tower Section Complete KY Back span Complete OH Back span Set form traveler KY Tower Set form traveler OH Tower Main span Closure Pour Kentucky Approach Set Structural Steel Kentucky Approach Complete Deck Concrete KY Approach 21Jan14 8Apr14 17Dec13 3Jul14 29Jan14 26Feb15 21Jan14 18Sep14 11Sep14 19May15 30Nov15 4Nov13 10May13 14June13 6Sept13 % Complete ($) Paid $32.6M/Total $81.5M 40.0% % Complete (Time) Day 575 of % Bridge and Roadway Summary At Tower 3 (KY), Segment 3 was cast on September 16, Work for Segment 4 is ongoing and placement is expected in the next week. Work at the Pier #2 (KY) integral cap is completed placement 4 of 4 was made on September 12, At Tower 4(OH), construction of the pre cast tub is ongoing. The bottom soffit of the tub is cast and in place around the drilled shaft casings. The first half of the vertical walls of the tub were cast on September 20, The second half of the tub walls will be cast in the next two weeks. Carr concrete continues offsite pre casting of the back span floor beams. Currently 26 of the 52 beams have been completed. All Ohio approach substructure elements are complete except for the forward Abutment (OH). Steel girder erection for the Ohio approach is scheduled for late fall 13. Work at the Ohio approach continues to focus on the street improvements. Second Street remains closed. Sub contractor Boone-Coleman continues work on approach embankment and MSE wall construction. All Kentucky approach substructure elements are completed. Steel girder erection is 100% complete. Forming of the deck for the first placement is underway. Page 5 of 8

7 Tower 3 (KY) Progress thru 10/1/13 Page 6 of 8

8 Substructure Progress Chart thru 10/1/13 Kentucky Approach Ohio Approach Rear (KY) Abutment % complete Pier 6 % complete Drilled shafts 12 of Pile Installed 24 of Footing 7 of Footing 100 Backwall 2 of Stem 100 Wing walls 6 of Cap 100 Pier 1 Pier 7 Drilled shafts 3 of Pile Installed 24 of Footing 100 Footing 100 Stem 100 Stem 100 Cap 100 Cap 100 Main Span Pier 2 Pier 8 Drilled shafts 6 of Pile Installed 27 of Footing 100 Footing 100 Pier Segment 3 of Stem 100 Diaphragm Segment 4 of Cap 100 Pier 3 (Ky Tower) Forward (OH) Abutment Drilled shafts 6 of Pile Installed 22 of Footing 100 Footing 0 Tower Segments 3 of Backwall 0 of 2 0 Wingwalls 0 of 2 0 Pier 4 (OH Tower) Drilled shafts 6 of Footing 0 Tower Segments 0 of 18 0 Pier 5 Drilled shafts 4 of Footing 100 Pier Segments 2 of Diaphragm Segment 1 of 4 25 Page 7 of 8

9 Superstructure Progress Chart thru 10/1/13 Precast Floorbeams # cast % cast 52 pieces total 42 of Precast Anchorblocks # cast % cast 108 pieces total 6 of Main Span Unit % complete Kentucky Back span Segments 0 of 12 0 Ohio Back span Segments 0 of 12 0 Kentucky Cantilever Segments 0 of 15 0 Ohio Cantilever Segments 0 of 15 0 Kentucky Approach % complete Girders Fabricated 24 of Girders Erected 24 of Deck Castings 0 of 3 0 Ohio Approach % complete Girders Fabricated 35 of Girders Erected 0 of 35 0 Deck Castings 0 of 4 0 Page 8 of 8

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309

More information

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer St. Anthony Falls I-35W Bridge Replacement ASHE National Conference June 13, 2014 Dustin Thomas, P.E. I-35W Bridge Construction Engineer The Former Bridge - 9340 Opened to traffic in 1967 Steel truss bridge

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Tilikum Crossing Transit Bridge. Portland, OR

Tilikum Crossing Transit Bridge. Portland, OR Tilikum Crossing Transit Bridge Portland, OR Technical Information Size of Project: The Tilikum Crossing Transit Bridge is 1,720 ft. long and required 24,000 cy total concrete Strength Requirements: The

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE Code Pre/Route AFE Function Part 0 1000 7116 1174 N Hadley Eisenbeisz Bridge Construction Engineer Rick Brandner Mitchell Area Darrell utter Assistant

More information

2016 ACEC/PA ANNUAL MEETING

2016 ACEC/PA ANNUAL MEETING 2016 ACEC/PA ANNUAL MEETING z I-49 North, Segment K (I-220 to Martin Luther King Drive) Interchange Project Durk Krone, P.E., TRC Engineers Inc., Baton Rouge, La 1 I-49 North Segment K Project 2 AGENDA

More information

LRFD Bridge Design Manual Changes

LRFD Bridge Design Manual Changes LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and

More information

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot

More information

Economical Design / Case Studies

Economical Design / Case Studies Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of

More information

Strengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions

Strengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions 13 th BIENNIAL SYMPOSIUM OCTOBER 25-28, 2010 Strengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions Jian Huang, Ph.D., P.E. and R. Wayne McLennon, P.E. TranSystems Corporation 2400 E. Commercial

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY

More information

Red Wing Bridge Alternates

Red Wing Bridge Alternates Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure

More information

Results you can rely on

Results you can rely on z 1 I-49 North Segment K Project 2 AGENDA PROJECT OVERVIEW BRIDGE DESIGN ARCHITECTURAL ENHANCEMENTS SPECIAL PROVISIONS COST ESTIMATE AND FINAL BIDS CONSTRUCTION 3 SITE LOCATION PROJECT SITE ARKANSAS 185

More information

I-94/I-69 Interchange Bridge Construction

I-94/I-69 Interchange Bridge Construction I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer

More information

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***

More information

Dan Carrier Parsons Brinckerhoff Project Manager Cooper River Bridge Charleston, South Carolina

Dan Carrier Parsons Brinckerhoff Project Manager Cooper River Bridge Charleston, South Carolina OTEC 2004 Dan Carrier Parsons Brinckerhoff Project Manager Charleston, South Carolina Dan Carrier Background! Hazelet & Erdal 1966-1984 (Cincinnati, Ohio Office) Bridge Designer! Parsons Brinckerhoff 1984-2004

More information

Accelerated Bridge Construction in USA

Accelerated Bridge Construction in USA Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration

More information

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal FEHRL Long Life Bridges SQUARE (Brussels) Thursday June 10, 2010 Objective RAPID RENEWAL Bridge Systems WHAT IS THE BIG IDEA? Manufactured Bridges

More information

MILTON-MADISON BRIDGE REPLACEMENT

MILTON-MADISON BRIDGE REPLACEMENT MILTON-MADISON BRIDGE REPLACEMENT Andy Barber P.E. Kevin Hetrick P.E. 1 Presentation Overview KYTC lead Environmental Study TIGER Grant INDOT lead Design Build solution Bridge Sliding Project Status Questions

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS SECTION 1 - MISCELLANEOUS STANDARDS 1.00.01 -.05 Table of Contents 1.11.01 Decimal Parts of a Foot and Inch 1.21.01 Factors

More information

I-345 Feasibility Study Public Meeting

I-345 Feasibility Study Public Meeting I-345 Feasibility Public Meeting December 11, 2012 December 11, 2012 1 Feasibility Team TxDOT Dallas District & Bridge Division Parsons Brinckerhoff Huitt-Zollars APM Halff Associates Civil Associates

More information

ABRAHAM LINCOLN BRIDGE

ABRAHAM LINCOLN BRIDGE ABRAHAM LINCOLN BRIDGE PROJECT LOCATION: CONNECTING LOUISVILLE, KY WITH JEFFERSON, IN ACROSS THE OHIO RIVER. CATEGORY B: TRANSPORTATION PROJECT OWNER: KENTUCKY TRANSPORTATION CABINET COWI North America

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

STRUCTURES INSPECTION SELF STUDY TRAINING COURSE PART ONE

STRUCTURES INSPECTION SELF STUDY TRAINING COURSE PART ONE STRUCTURES INSPECTION SELF STUDY TRAINING COURSE PART ONE 2012 STRUCTURES INSPECTION SELF STUDY TRAINING COURSE PART ONE 2012 STATE CONSTRUCTION OFFICE This 2012 update was produced by Dan Hurtado, P.

More information

Short Span Steel Bridges

Short Span Steel Bridges Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics

More information

Pueblo's New 4th street

Pueblo's New 4th street PROJECT Pueblo's New 4th street BRIDGE Bridge aesthetics selected by the Pueblo community complement the bridge theme, which blends contemporary sculpture, natural environment, and Pueblo heritage. Rendering:

More information

I2-0 LIST OF ACTIVE SSDs

I2-0 LIST OF ACTIVE SSDs I2-0 0002.0001 Structural Standard Drawings - Layering Structure Aug 1, 2014 Dec 18, 2014 0005.0002 Retaining Wall - Rustication Details Jun 1, 2002 Jul 17, 2002 0007.0002 Grout Vent Detail Mar 1, 2006

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66532 227 th STREET (TWP 45) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY SEPTEMBER 12, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By: Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By: ABSTRACT Shafi M. Sharifan, Ph.D., P.E. Wei Koo & Associates Orange, California Kosal Krishnan,

More information

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be

More information

7 Bridges in 74 Days. NC 12 Detour

7 Bridges in 74 Days. NC 12 Detour 7 Bridges in 74 Days (Or Less) NC 12 Detour Ocracoke NC 12 Bridges Ocracoke NC 12 Bridges Existing 7 bridges built in 1950's Timber structures w/ ACP Clear width 22.5 ft. 36 to 152 ft. long Limited redirective

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE 412.1 OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA BURLINGTON NORTHERN AND SANTA FE RAILWAY By: John W. Hronek

More information

PHASING CONSIDERATIONS FOR BRIDGES

PHASING CONSIDERATIONS FOR BRIDGES PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural

More information

DEVELOPMENT OF GUIDE FOR SELECTION OF SUBSTRUCTURE FOR ABC PROJECTS

DEVELOPMENT OF GUIDE FOR SELECTION OF SUBSTRUCTURE FOR ABC PROJECTS DEVELOPMENT OF GUIDE FOR SELECTION OF SUBSTRUCTURE FOR ABC PROJECTS Quarterly Progress Report For the period ending August 31, 2018 Submitted by: PIs - Armin Mehrabi, Hesham Ali Graduate Students - Mohamadtaqi

More information

EGCE 406: Bridge Design

EGCE 406: Bridge Design EGCE 406: Bridge Design Design of Slab for Praveen Chompreda Mahidol University First Semester, 2006 Bridge Superstructure Outline Components of bridge Superstructure Types Materials Design of RC Deck

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 60019 MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS AUGUST 29, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF

More information

John James Audubon Bridge

John James Audubon Bridge John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

ABC Technology and Steel Bridges

ABC Technology and Steel Bridges ABC Technology and Steel Bridges Accelerated Bridge Construction (ABC) Technologies C. C. Fu, Ph.D., P.E. Director/Research Professor Bridge Engineering Software & Technology (BEST) Center Department of

More information

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

John James Audubon Bridge. Introduction

John James Audubon Bridge. Introduction John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project PHASE 2 MONTHLY COST AND SCHEDULE UPDATE AS OF DECEMBER 31, 2015 FEBRUARY 2016 Phase 2 Cost Summary December Expenditures $ 62.9 Million Total Expenditures $ 655.6 Million

More information

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc. Grade Separation Systems Single-Span Rail Bridge Construction Procedure An innovation from art engineering inc. GSS Single-Span Example Shown: An existing railroad grade crossing. Existing railroad Existing

More information

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION

MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION MINNESOTA HISTORIC PROPERTY RECORD PART I. PROPERTY IDENTIFICATION AND GENERAL INFORMATION Common Name: Camp Ripley Bridge Bridge Number: 4969 Identification Number: Location: Feature Carried: TH 115 Feature

More information

Class Topics & Objectives

Class Topics & Objectives EGCE 406: Bridge Design Design of Slab for Bridge Deck Praveen Chompreda, Ph.D. Mahidol University First Semester, 2010 Class Topics & Objectives Topics Objective Bridge Superstructures Students can identify

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

PLANNING AND DESIGN PARAMETERS BRIDGE STRUCTURES. Engr. Ericson Mammag Feasibility Study Preparation CHARM2 Project

PLANNING AND DESIGN PARAMETERS BRIDGE STRUCTURES. Engr. Ericson Mammag Feasibility Study Preparation CHARM2 Project PLANNING AND DESIGN PARAMETERS BRIDGE STRUCTURES Engr. Ericson Mammag Feasibility Study Preparation CHARM2 Project KEY ELEMENTS IN RURAL INFRA Planning & Design Bridges Potable Communal Small Water Roads

More information

IMUA ANNUAL PRESENTATION 2013

IMUA ANNUAL PRESENTATION 2013 IMUA ANNUAL PRESENTATION 2013 1 Who We Are: Founded in 1947 in Colorado Have expanded to a company of approximately 2,000 With Operations Constructing Transportation, Water and Energy Infrastructure throughout

More information

PennDOT e-notification No. 13

PennDOT e-notification No. 13 PennDOT e-notification No. 13 Bureau of Project Delivery Bridge Design and Technology Division April 3, 2006 (Revised April 2016) Interim Revision to Bridge Standard Drawing(s) Drawing 86-353 PE (Change

More information

Accelerated Bridge Construction Award

Accelerated Bridge Construction Award Accelerated Bridge Construction Award PBES SR 288 Main Street Bridge Project Wampum Borough, Pennsylvania This is a first for PADOT to incorporate an all precast project built in an accelerated manner

More information

EXODERMIC DEXKS AND STEEL BRIDGES

EXODERMIC DEXKS AND STEEL BRIDGES EXODERMIC DEXKS AND STEEL BRIDGES Recent revisions to the Exodermic design promise to further reduce costs and simplify erection By Robert A. Bettigole Pictured at top is part of the Boston Central Artery/Tunnel

More information

A NEW STEEL ARCH BRIDGE FOR THE US 52 MISSISSIPPI RIVER CROSSING

A NEW STEEL ARCH BRIDGE FOR THE US 52 MISSISSIPPI RIVER CROSSING A NEW STEEL ARCH BRIDGE FOR THE US 52 MISSISSIPPI RIVER CROSSING GREG HASBROUCK, PE MARTIN FURRER, PE, SE FAITH DUNCAN, PE BIOGRAPHY Greg Hasbrouck is a Project Manager with Parsons in Chicago and was

More information

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Design of the Main Spans of the Chongqing Caiyuanba Bridge ARCH 04 M.C. Tang and J. Sun @CIMNE, Barcelona, 2004 DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Man-Chung Tang* and John Sun+

More information

Safe, innovative, quality construction since Riding on the Strength

Safe, innovative, quality construction since Riding on the Strength Safe, innovative, quality construction since 1880 Riding on the Strength of EXPERIENCE The Expertise The Experience The People The Equipment The Work Ethic The quality To get your job done safely, on time

More information

3.0 TEMPORARY DETOUR BRIDGES

3.0 TEMPORARY DETOUR BRIDGES 3.0 TEMPORARY DETOUR BRIDGES Table of Contents 3.1 General...1 3.2 STORAGE SITES:...2 3.3 BID ITEMS:...2 3.4 INDEX OF PLAN SHEETS with H-Pile:...3 3.5 INVENTORY SHEET FOR DETOUR BRIDGES WITH H-PILE:...4

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - WILKIN COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - WILKIN COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 84505 CSAH NO. 14 OVER THE OTTER TAIL RIVER DISTRICT 4 - WILKIN COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.

More information

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010 Specification Changes and Their Effect on Plans Bridge Construction Issues BRG VTC April, 2010 Brian D. Merrill, P.E. BRG Construction & Maintenance Branch Also: Common Plan Review Items Revised Specifications

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 January 20, 2012 To: Users of the Bridge Design Manual From: Tim Keller, Administrator, Office of Structural

More information

Society of Women Engineers Region H Conference

Society of Women Engineers Region H Conference Society of Women Engineers Region H Conference Faith Duncan, PE & Greg Hasbrouck, PE Replacing the Aging US 52 Mississippi River Bridge February 27, 2016 Project Overview US 52 / IL 64 over the Mississippi

More information

Presented by: Taya Retterer BRG Webinar July 30, 2012

Presented by: Taya Retterer BRG Webinar July 30, 2012 Presented by: Taya Retterer BRG Webinar July 30, 2012 PHASED CONSTRUCTION RECOMMENDATIONS FOR BRIDGES Will be posted to the TxDOT Website http://www.dot.state.tx.us/business/contractors_consultants/bridge/default.htm

More information

New Jersey Turnpike Authority

New Jersey Turnpike Authority New Jersey Turnpike Authority DOCUMENT UPDATE REQUEST Forward to Assistant Chief Engineer, Design Initiator Russell Saputo, PE Submittal Date 6/21/16 Firm Stantec Consulting Services Inc. Telephone 201-587-9040

More information

John A. Roebling Bridge Rehabilitation History

John A. Roebling Bridge Rehabilitation History John A. Roebling Bridge Rehabilitation History Presented By: Rob Hans, P.E. Chief District Engineer Kentucky Transportation Cabinet 1 Introduction Original Construction Completed 1867 First Major Reconstruction

More information

UPDATED 04 OCT 07. Following are sample questionnaires to be used to collect information from owners of affected facilities.

UPDATED 04 OCT 07. Following are sample questionnaires to be used to collect information from owners of affected facilities. 7.0 UTILITY RELOCATIONS QUESTIONNAIRES Following are sample questionnaires to be used to collect information from owners of affected facilities. 7.1 Company Information COMPANY INFORMATION (revised 9/04)

More information

SOUTH MEDFORD INTERCHANGE BRIDGES

SOUTH MEDFORD INTERCHANGE BRIDGES Eleven bridges were required for the project THe I-5 south medford Interchange by Keith Kaufman, Knife River Corporation Northwest and Daniel J. McIntier, formerly with H.W. Lochner Inc. Interstate 5 is

More information

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction

Modjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction Introduction This memo presents a summary of a three dimensional (3D) analysis of the Organic concept for the proposed St. Croix River bridge project. The Organic concept has several attributes that are

More information

Fort (M-85) Street Bascule Bridge

Fort (M-85) Street Bascule Bridge Fort (M-) Street Bascule Bridge DESIGN Overview History Geotech/Substructures Superstructure Aesthetics CONSTRUCTION Steel and Machinery Fabrication Existing Bridge Removal Road Reconstruction Bridge Replacement

More information

Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions

Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions Scott Eshleman, P.E., S.E, CVS, Stanley Consultants Keith Sargent, P.E., Thomas Engineering Group, LLC February

More information

Accelerated Bridge Construction (ABC) National Status

Accelerated Bridge Construction (ABC) National Status Accelerated Bridge Construction (ABC) National Status by Mary Lou Ralls, P.E., Ralls Newman, LLC 88 th Annual Transportation Short Course Texas A&M University College Station, Texas Session: Construction

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 WESTMINSTER DRIVE UNDERPASS ACCELERATED BRIDGE CONSTRUCTION USING GIGO (GET IN-GET OUT) BRIDGE CONCEPT Mark D Andrea, M.Sc., P.Eng. Stantec Consulting Ltd., Canada

More information

OHIO S CONCRETE BRIDGES

OHIO S CONCRETE BRIDGES Ohio Fulton Road BRIDGE REPLACEMENT by Gregory Kronstain, Ohio Department of Transportation, John Dietrick, Michael Baker Jr. Inc., and Brendan Finn, Cuyahoga County Engineer s Office OHIO S CONCRETE BRIDGES

More information

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C Accelerated Design-Build Replacement of SEPTA s Crum Creek Viaduct Jeffrey D. Knueppel, P.E. General Manager Robert L. Lund, Jr., P.E. Assistant General Manager EM&C Key Presentation Take-Aways NEED TO

More information

Highway Bridge Structure Components

Highway Bridge Structure Components Highway Bridge Structure Components Basic Bridge Components 1 Deck and 2 Stringer 3 Bearing 4 Pedestal 5 Footing 6 Piles 7 Underpass 8 Embakment 9 Live Loading Basic Bridge Components 1-Deck & wearing

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 57518 CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY AUGUST 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY AYRES

More information

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs) LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs) 0002.0001 Structural Standard Drawings - Layering Structure n/a Aug 2014 Dec 18, 2014 0005.0002 Retaining Wall - Rustication Details n/a Jun 2002 Jul

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

Construction and design features of the Bridge over the Danube River. Bulgaria

Construction and design features of the Bridge over the Danube River. Bulgaria Construction and design features of the Bridge over the Danube River. Bulgaria Javier MANTEROLA Pr. Dr. jmanterola@cfcsl.com Antonio MARTÍNEZ Dr. amartinez@cfcsl.com Juan Antonio NAVARRO janavarro@cfcsl.com

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

JFK Airport Light Rail Transit System

JFK Airport Light Rail Transit System JFK Airport Light Rail Transit System Author: Co-Author: Company: José M. Rodriguez, P.E., Senior Project Director D. Brice Urquhart, P.E., Project Manager Figg Bridge Engineers, Inc. Address: 424 N. Calhoun

More information

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD 2018 Purdue Road School Transportation Conference Rendering by Touchstone Architecture Martin Furrer, PE, SE March 6, 2018 DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD Project Location

More information

Corrosion Resistant Reinforcing Steel (CRR)

Corrosion Resistant Reinforcing Steel (CRR) Corrosion Resistant Reinforcing Steel (CRR) Virginia DOT Workshop Charlottesville, VA Prasad Nallapaneni, VDOT Assistant State Structure & Bridge Engineer October 4, 2017 Presentation Outline IIM S&B 81

More information

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY ABSTRACT Jugesh Kapur, PE, SE 1 The seismic design and detailing of bridges made of precast prefabricated members

More information

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD

UNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 14511 MSAS NO. 115 OVER THE RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

Inventory Inspection and Load Rating of a Complex Segmental Concrete Bridge. Presented by Matthew J. Lengyel, PE, SE

Inventory Inspection and Load Rating of a Complex Segmental Concrete Bridge. Presented by Matthew J. Lengyel, PE, SE Inventory Inspection and Load Rating of a Complex Segmental Concrete Bridge Presented by Matthew J. Lengyel, PE, SE Introduction Project Overview Parallel Segmental Bridges (1F 763 and 3F 763) Number of

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge. The Design and Construction of Alfords Point Bridge Mark Bennett, Senior Bridge Engineer (New Design) RTA Harry Cheung, Project Engineer, RTA Trung Doan Project Engineer, RTA Synopsis The bridge over the

More information