1 Planning for Biomed Facility Puts Energy Efficiency Under Microscope Chilled beams, runaround-loop ERV system included May 19, 2014 By DAN VASTYAN, Common Ground, Manheim, Pa. HPAC Engineering Constructing Washington State University s biomed building was a challenge, given rigid temperature and humidity set points, 24/7 operation, and high ventilation rates. The first part of a planned research complex, the new Pharmaceutical & Biomedical Sciences Building on Washington State University (WSU) Spokane s Riverpoint Campus features research and teaching laboratories, classrooms, and administrative and faculty offices. Constructing the four-story, 125,000-gross-square-foot facility was challenging, given the rigid temperature and humidity set points, 24/7 operation, and high ventilation rates that were required in a modern and architecturally pleasing building, Ken Billington, construction administrator with Affiliated Engineers Inc. (AEI), who oversaw construction and worked with the contracting team to coordinate and complete installation of the mechanical, electrical, and plumbing systems, said. 1 of 7
2 The Pharmaceutical & Biomedical Sciences Building s north side features a floorto-ceiling glass curtain wall, which presented design challenges related to perimeter conditioning. Spokane s weather conditions, when combined with the sleek building facades, required a good amount of creativity to achieve sustainable operating costs, Billington, who works out of AEI s Seattle office, continued. We feel that the end product resulted in a high-performance, state-of-the-art facility. Rapid Construction 2 of 7
3 Gary Solberg, project supervisor and manager for McClintock and Turk Inc., assembles piping connected to a below-grade sump pump. Work started at the biomed facility in the summer of 2012 and finished in November of 2013, Gary Solberg, project supervisor and manager for Spokane-based mechanical-contracting and design-build specialist McClintock and Turk Inc., said. It was a fast-track project, for sure. To keep pace, Solberg ran two shifts. For the majority of the project, McClintock and Turk kept 15 to 20 employees, including plumbers, pipefitters, welders, and apprentices, on the job. One of our toughest challenges was packing all the mechanical components into limited ceiling space, Solberg said. The labs have high ceilings, further limiting the available space. Yet we needed to install two separate domestic-hot-water systems one for the labs and one for restrooms and complete systems for fire suppression, plumbing, hydronic heating and cooling, acid-waste piping for the labs, and sheet-metal ductwork. Design Challenges 3 of 7
4 Among the design challenges the building presented, two stand out in Billington s mind: Conditioned-air delivery. The floor-to-ceiling glass curtain wall on the building s north side and resulting lack of space to run ductwork made conditioning the perimeter difficult. Radiant panels both floor- and wall-mounted and a radiant heated/chilled slab help to condition perimeter spaces. Air balancing. With the potential for hazardous chemicals and materials in the air, pressure in laboratories needs to remain negative to prevent infiltration. Offset air tracking was incorporated into the building s design, Billington said. This ensures proper pressurization independent of supply/exhaust-air quantities at any given time due to biosafety-cabinet and fume-hood operation in the laboratories. Pressurization remains constant during all operating phases of safety-cabinet and fume-hood operation. This was especially important at the building s lowest level. An anatomy lab and other specialized lab spaces on this level were subject to even more stringent pressurization and air-change rates, Billington said. Equipment Selection During the construction phase, McClintock and Turk worked with manufacturer representative Suntoya Corp., which supplied HydroTherm boilers, Taco pumps, expansion tanks, and accessories, and other key components. There are two mechanical rooms in the building: one in the penthouse dedicated to heating and one in the basement dedicated to cooling. In the penthouse, six 3-million-Btuh condensing boilers are piped in series, assembled in a lead-lagand-rotate configuration. A fin-tube baseboard system provides supplemental heat to office spaces and meeting rooms. In stairwells, wall-mounted radiators are used. Spread across all floors of the building, 305 variable-air-volume boxes supply primary heat to some areas and supplemental heat to others. 4 of 7
5 Radiant ceiling panels and in-floor radiant tubing heat large zones, while the latter also provides cooling. A modulating three-way valve responds to outdoor and indoor conditions for ideal supply-water temperature and draws water from the boilers or chillers, depending on the need. From the basement, three 275-ton Carrier Evergreen centrifugal chillers, with cooling towers on the roof, cool the building via the radiant system, with more than 300 chilled beams and coils serving the primary air-handling systems. The chilled beams, which are a mix of active and passive systems, are located throughout the office and laboratory areas. Radiant ceiling panels are utilized in public areas, including the cascading stairs on the building s north face. At full load, the building requires 18,000 MBH in heating mode and approximately 825 tons of cooling capacity. Chilled-water pumps in the basement mechanical room. 5 of 7
6 Energy Recovery In all, the heating and cooling systems contain approximately 6,000 gal. of water, a large quantity considering the facility s size. Given copious amounts of insulation, that volume means valuable thermal mass, not standing heat loss. It also means a lot of pumping power. The heating and cooling systems use 23 large vertical inline pumps from Taco. Each pump is outfitted with suction diffusers to conserve space in the mechanical rooms. Taco s inline pumps feature a close-coupled design for improved alignment and increased seal life. Flow rates of up to 2,500 gpm and heads of up to 300 ft TDH are available for broad application. As is the case with most buildings of this type, and despite the number of pumps and the large water volume, the amount of energy required by utilizing pumped energy is substantially less than if fans and air-side equipment had been used exclusively to condition the building, Billington said. The building s energy-recovery loop circulates fluid between two air streams and captures heat from the building s exhaust, redirecting this energy to offset the heat required for building ventilation air. This results in a sensible effectiveness of up to 50 percent and equates to significant savings in overall heating cost. Because of the potential for hazardous materials in the laboratories and the physical location of the two air streams being affected, an enthalpy-wheel energy-recovery system was not considered. High air exchange created the need for energy recovery. A runaround-loop system was chosen because it has been proven effective in transferring energy between process loads (exhaust-air heat) and required ventilation air while eliminating the potential for cross-contamination. Dan Vastyan is an account manager for Common Ground [1], a trade-communications firm based in Manheim, Pa. For Design Solutions author guidelines, call Scott Arnold [2], executive editor, at , or write to him at scott.arnold@penton.com [3]. 6 of 7
7 of 7
SHIYUN CHEN ADVISOR: DR. BAHNFLETH. 1 Executive Summary Building Summary 3. 3 Existing Mechanical System. 4
Table of Contents 1 Executive Summary... 1 2 Building Summary 3 3 Existing Mechanical System. 4 4 Mechanical Design Objectives..... 4 5 Mechanical System Evaluation. 5 5.1 Air Distribution System Evaluation....
More informationChilled Beams. The new system of choice?
Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams
More informationGeorgetown University New Science Center
Georgetown University New Science Center Final Thesis Proposal PENN STATE UNIVERSITY Prepared For: Dr. William P. Bahnfleth Department of Architectural Engineering Prepared By: Kevin M Edstrom Mechanical
More informationThesis Proposal. Clemson University Advanced Material Research Laboratory Anderson, SC. David Anderson Mechanical Option. Photo by Fred Martin
Thesis Proposal Photo by Fred Martin Clemson University Advanced Material Research Laboratory Anderson, SC David Anderson Mechanical Option Friday, December 15, 2006 Table of Contents 1. Executive Summary
More informationEMD SERONO RESEARCH CENTER EXISTING
EMD SERONO RESEARCH CENTER EXISTING BILLERICA, MA SHIYUN (SHARON) CHEN MECHANICAL AE SENIOR THESIS Building System Dedicated Outdoor Air System/ Systems Breadth Building Design Team Building: EMD Serono
More informationGrunenwald Science and Technology Building
Grunenwald Science and Technology Building Clarion University- Clarion, PA AE 482 Mechanical Project Proposal: Proposal for Alternative Designs Shane Helm The Pennsylvania State University Architectural
More informationMechanical Systems Project Proposal
Mechanical Systems Project Proposal December 15, 2006 Table of Contents 1.0 Executive Summary... 2 2.0 Building Background... 3 3.0 Proposal Objectives... 5 4.0 Initial Considerations... 6 5.0 Proposed
More informationInterdisciplinary Science and Engineering Building
1 1 Senior Thesis Capstone Project Treado Thesis Proposal Interdisciplinary Science and Engineering Building University of Delaware Newark, DE 19716 2 2 Table of Contents Executive Summary 3-4 Building
More informationSouth Jefferson High School Huyett Road Charles Town, WV 25414
Thesis Proposal Mechanical System Redesign Report Charles Town, WV 25414 Prepared for Dr. Jelena Srebric The Pennsylvania State University By Jonathon Gridley Friday, December 15, 2006 1.0 Table of Contents
More informationDepth: Mechanical Redesign
Depth: Mechanical Redesign Redesign Objectives The most important objective of the mechanical redesign is to provide Greenbriar East with ventilation that meets the requirements of ASHRAE Standard 62-2001.
More informationThe Milton S. Hershey Medical Center Academic Support Building. AE Senior Thesis Kari Anne Donovan Mechanical Option
The Milton S. Hershey Medical Center Academic Support Building AE Senior Thesis Kari Anne Donovan Mechanical Option Presentation Outline Existing Conditions Distributed Chilled Water Feasibility Study
More informationAir-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels
Air-Water Systems and Beams Early 1980 s 1980 1990 2005 Buildings well insulated for heating Advent of personal computers Need to remove heat from space Limited space available TROX USA 1 2 Principle of
More informationCity High Middle School pre-design recommendations. March 29, 2017
City High Middle School pre-design recommendations March 29, 2017 City High Middle School table of contents 2 3 4 5 6 7 8 9 10 11 12 13 table of contents project description and purpose existing systems
More informationDavid H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option. Proposal
0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Proposal David H. Koch Institute for Integrative Cancer Research Massachusetts Institute of Technology Cambridge,
More informationProject Proposal Proposal for Investigation of Alternative Systems
Project Proposal Proposal for Investigation of Alternative Systems 01.15.2010 Defense Media Activity Building Fort George G. Meade Penn State University Architectural Engineering Faculty Advisor: Dr. Treado
More informationDEA Clandestine Laboratory Training Center
DEA Clandestine Laboratory Training Center David M. Potchak Penn State University Architectural Engineering Mechanical Option Background Information Existing Mechanical Systems Redesign Objectives Alternate
More informationDesign Standard Sustainability
Design Standard Sustainability Purpose Educational institutions have the ability to influence the ideals and principles of our future decision makers; as such, East Side Union High School District (ESUHSD)
More informationTechnical Report Three Mechanical Systems Existing Conditions Evaluation
09 10 Technical Report Three Mechanical Systems Existing Conditions Evaluation WESTINGHOUSE ELECTRIC CO. NUCLEAR ENGINEERING HEADQUARTERS CAMPUS Pittsburgh, PA Daniel P. Aughenbaugh Mechanical Dr. Bahnfleth
More informationMechanical Systems Proposal
Mechanical Systems Proposal Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option December
More informationMechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion
Mechanical Systems Redesign Proposal Thesis Proposal Morton Hospital Expansion Taunton, MA Courtney Millett Mechanical Option Advisor: Dr. Bahnfleth December 12, 2014 Revised: January 16, 2015 Revised:
More informationKEY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationMECHANICAL PROJECT PROPOSAL (Revised)
PSUAE MECHANICAL PROJECT PROPOSAL (Revised) REDESIGN PROJECT Nicholas B Scheib 2011 M e c h a n i c a l O p t i o n - IP Table of Contents The Sunshine Elementary School Executive Summary... 2 Project
More informationProposal: Mechanical System Redesign
Proposal: Mechanical System Redesign The 959 Eighth Avenue 10019 Faculty Advisor: Dr. James Freihaut December 12, 2005 Table of Contents 1.0 Executive Summary 2.0 3.0 Proposal Obectives 4.0 Preliminary
More informationElement Z General Design Requirements Existing Facilities Information
Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G
More informationEnergyPro Building Energy Analysis. Nine-story Office Building
EnergyPro Building Energy Analysis Nine-story Office Building EnergyPro Building Energy Analysis for an office building Project Scope The purpose of the EnergyPro energy model was to evaluate the energy
More informationMechanical Project Proposal
Mechanical Project Proposal Miller Children s Hospital Prepared for: Dr. James Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared by: Stephen Haines December 18
More informationTechnical Assignment 2 Building and Plant Energy Analysis
Technical Assignment 2 Building and Plant Energy Analysis Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards Advisor: James Freihaut October 4, 2010 Table of Contents Executive
More informationNorth Pocono High School
Building System Integration Energy and Cost Analysis Architectural Engineering Senior Thesis Presentation Pennsylvania State University Presentation Outline Project Outline Existing System Design Conditions
More informationFACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017
FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding
More informationFUNDAMENTALS OF CHILLED BEAMS ANSI/ASHRAE STANDARD , METHODS OF TESTING CHILLED BEAMS
FUNDAMENTALS OF CHILLED BEAMS ANSI/ASHRAE STANDARD 200-2015, METHODS OF TESTING CHILLED BEAMS NEMIC 2017 Hello! I am Davor Novosel I am here because I love to share what I know about chilled beams with
More informationCeiling Radiant Cooling Panels
Copyright 2006, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc This posting is by permission from ASHE Journal This article may not be copied nor distributed in either paper
More informationLOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS
LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS R. Hutcheson, P.Eng. LEED AP, CxA, S. Jorens B.Eng., D. Knapp, PhD., P.Phys., LEED AP Arborus Consulting
More informationAE 481W Thesis Proposal
AE 481W Thesis Proposal I I Advisor: Dr. Treado UNIVERSITY OF CALIFORNIA SAN DIEGO RADY SCHOOL OF MANAGEMENT LA JOLLA, CA TABLE OF CONTENTS Executive Summary.3 Mechanical System Overview..4 Design Objectives,
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/06/2013 BUILDING SURVEY DATE
0067 1110 WEST GREEN STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.810 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 18,640,900 OFFICE BUILDING GROSS SQUARE FEET 175,513
More informationExample LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal
Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal
More informationInterdisciplinary Science and Engineering Building
1 1 Senior Thesis Capstone Project Treado Thesis Proposal Interdisciplinary Science and Engineering Building University of Delaware Newark, DE 19716 2 2 Table of Contents Executive Summary 3-4 Building
More informationAcknowledgements 4. Executive Summary 5
Table of Contents Acknowledgements 4 Executive Summary 5 Building Overview.. 6 Building Summary.. 6 Site. 6 Evaluation of Existing Mechanical System. 7 Mechanical System Overview 7 Design Objective 7 Outdoor
More informationpercent hours of the year heat rejected to loop percent hour building load on loop, Btuh percent hour building load on loop, Btuh
HOBOKEN RESIDENTIAL C- Ground Loop Pump Calculations Central Geothermal System building load on loop, Btuh Bin - 5 5 25 35 45 55 hours of the year Count 3 35 48 64 79 89 96 96 3 32 3 6 5 7 274 292 86 46
More informationMechanical Depth. Redesign and Analysis
Depth Redesign and Analysis 14 Analysis Scope The scope of my mechanical redesign will include the 2 nd and 3 rd floors of the SW hospital wing which includes Semi-Private, Private and Isolations rooms.
More informationEnergyPro Building Energy Analysis. Single-story School Building
EnergyPro Building Energy Analysis Single-story School Building EnergyPro Building Energy Analysis for a single-story school bulding Project Scope The purpose of the EnergyPro energy model was to evaluate
More informationLevel 1 Modules tdp-101 hvac industry overview tdp-103 concepts of air conditioning tdp-102 abcs of comfort
TDP-101 HVAC Industry Overview This TDP provides a general overview of the commercial HVAC industry and provides an awareness of the design process and construction. The documents involved in construction,
More informationThe Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario
The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario Visionwall Technologies Inc. 14904-123 Avenue Edmonton, Alberta, Canada T5V 1B4 Tel: 403 451 4000 Fax:
More informationCeiling Radiant Cooling Panels
2006, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc (wwwashraeorg) Published in ASHE Journal Vol 48, Oct 2006 For personal use only Additional reproduction, distribution,
More informationThe Elithis Tower is an experimental and demonstration. Elithis Tower in Dijon, France. nzeb case studies
COM Elithis Tower in Dijon, France Elithis Tower, located in Dijon, France, provides strong evidence that net zero energy office buildings are achievable in near future. The building, which was designed
More informationAN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER. MICHAEL HALLENBECK, PE, CEM Southland Industries
AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER MICHAEL HALLENBECK, PE, CEM Southland Industries BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY
More informationCoach House: Hunziker Hall:
Number: Morristown, NJ From: Sergiu Pelau Sheet: 1 of 5 Date of Visit: 12/7/11 Coach House: 1. Central plant located in Hunziker Wing connecting piping is leaking a. Gas fired plant 10 year old b. Two
More informationBroad Institute Expansion: Cambridge, Massachusetts. Mechanical Thesis Proposal : REVISION I
Broad Institute Expansion: Cambridge, Massachusetts Mechanical Thesis Proposal : REVISION I Table of Contents Executive Summary... 2 Building Overview... 3 Mechanical System Overview... 4 Mechanical System
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation
More informationHVAC SYSTEM DESIGN PROCESS
HVAC SYSTEM DESIGN PROCESS Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Summer 2011 Grondzik 1 HVAC System Design Process Establish design intents/criteria (including code/standard compliance) Establish
More informationBroad Institute Expansion: Cambridge, Massachusetts. Mechanical Thesis Proposal
Broad Institute Expansion: Cambridge, Massachusetts Mechanical Thesis Proposal Table of Contents Executive Summary... 2 Building Overview... 3 Mechanical System Overview... 4 Mechanical System Design Objectives...
More informationPARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68%
Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Address 666 Burrard St, Vancouver Management QuadReal Property Group Type of Building Office Year of Construction 1984 Number
More informationSURNA Grow Facility: Systems Comparison - IEA
SURNA Grow Facility: Systems Comparison - IEA May 2016 SURNA Grow Facility This analysis provides the projected energy and associated cost comparison between the Surna proposed facility in comparison to
More informationThe New Student Housing Building at The Mount St. Mary s s University Emmitsburg,, Maryland
The New Student Housing Building at The Mount St. Mary s s University Emmitsburg,, Maryland Erik Shearer Mechanical Presentation Outline Project Background Current Mechanical Systems Mechanical Alternatives
More information43% reduction in water use below code maximum 100% 100% 14% reduction in lighting power density. 56% of offices have thermal comfort controls 100%
Insert school or unit logo Nocera Lab LEED CI v3.0 12 Oxford Street, Cambridge, MA GOLD Project Profile Laboratories are typically regarded as an energy intensive building typology. Many of these buildings
More informationTable of Contents. Page 1
Table of Contents Acknowledgments...2 Executive Summary...4 Project Background...5 Existing Mechanical System...8 Proposed Mechanical Redesign...13 Impact of Proposed Mechanical System on Structure...36
More informationItalcementi Center for Research and Innovation
Italcementi Center for Research and Innovation Bergamo, Italy LEED-NC v2.1 EAc1 A. Project Narrative (Viridian) analyzed the energy use of the proposed Italcementi Center for Research and Innovation located
More informationDemonstration of modeling of radiant cooling system in design builder. Prashant Bhanware & Bharath Reddy
Demonstration of modeling of radiant cooling system in design builder Prashant Bhanware & Bharath Reddy CONTENTS Introduction to Design Builder Building Energy Simulation Modeling procedure Making a model
More informationFinal Thesis Report Mechanical System Alternatives Analysis
[Type text] Nassau Community College Life Sciences Building Garden City, NY Final Thesis Report Mechanical System Alternatives Analysis Prepared By: Prepared For: James D. Freihaut, PhD Dustin Eplee Date:
More informationCREATIVE ENERGY NES Building Compatibility Design Guide October 15
City Builders Energy Innovators Creative Thinkers CREATIVE ENERGY NES Building Compatibility Design Guide October 15 CREATIVE ENERGY VANCOUVER PLATFORMS INC. Suite 1 720 Beatty Street Vancouver, Canada
More informationUniversity of Minnesota Duluth Civil Engineering Building
Energy Data Attachment University of Minnesota Duluth Civil Engineering Building LEED Energy Modeling The energy modeling for LEED NC 2.2 was performed against ASHRAE 9.1-24 Appendix using equest version
More information2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load.
Redesign Introduction This report is an in depth analysis of the mechanical systems of the Outreach Innovation Building located in University Park, PA and the impact these changes had on other systems
More informationMODULE 5 HVAC FUNDAMENTALS OF MODERN LABORATORY DESIGN
MODULE 5 HVAC FUNDAMENTALS OF MODERN LABORATORY DESIGN Module 5 PG1 MODULE 5 GOAL Provide a fundamental understanding of Laboratory Heating, Ventilating and Air Conditioning Concepts and Systems Module
More informationRetail Effects of ANSI/ASHRAE/IES Standard
Retail Effects of ANSI/ASHRAE/IES Standard 90.1-2016 Prepared by Dialectic Inc. INTRODUCTION Background ANSI/ASHRAE/IES 90.1-2016 Energy Standard for Buildings Except Low-Rise Residential Buildings replaces
More informationThe Ed Roberts Campus
The Ed Roberts Campus Proposal Anderson Clemenceau Mechanical Option Advisor: Donghyun Rim December 12, 2014 2 Contents Executive Summary... 3 Building Overview... 4 Existing Mechanical System... 5 Airside
More informationOklahoma University Children s Medical Office Building
Oklahoma University Children s Medical Office Building Oklahoma City, O.K., BAE Advisor: Laura Miller Presentation Outline VRF System Dedicated Outdoor Air System Evaluation VRF Indoor Units Design Criteria
More informationTDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify,
TDP Catalog TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, sell, and apply HVAC equipment in commercial
More informationA Paradigm Shift in ERV Technology. Paul Ehrlich, PE President Building Intelligence Group PLLC
A Paradigm Shift in ERV Technology Paul Ehrlich, PE President Building Intelligence Group PLLC August 9, 2013 Existing Buildings and Energy Existing buildings: Floor space: Floor space per building: Energy
More informationIntegration of Mechanical System Redesign. The New Learning Center Lutheran Theological Seminary at Philadelphia
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign The New Learning Center Lutheran Theological Seminary at Philadelphia Wesley S. Lawson Architectural Engineering Mechanical Option
More informationHunter s Point South Intermediate School & High School
Hunter s Point South Intermediate School & High School Long Island City, NY M E C H A N I C A L O P T I O N Technical Report Two Building and Plant Energy Analysis Report By: Advisor: Dr. Stephen Treado
More informationWESTINGHOUSE ELECTRIC NUCLEAR
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Daniel Aughenbaugh Mechanical Option PRESENTATION OUTLINE INTRODUCTION EXISTING MECHANICAL SYSTEM MY DESIGN
More informationMOLD & MILDEW. VOLAR Barracks Rehabs Ft. Polk & Ft. Hood
MOLD & MILDEW CORRECTIVE ACTIONS VOLAR Barracks Rehabs Ft. Polk & Ft. Hood Jack Osborne, P.E. Fort Worth District Corps of Engineers Scope: OVERVIEW Ft. Polk (awarded Jan 09) Remodel 16 VOLAR Style Barracks
More informationOlivet Nazarene University Student Life and Recreation Center Project By Elara Engineering
Olivet Nazarene University Student Life and Recreation Center Project By Elara Engineering 29 N. Wacker Renovation Project CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate
More informationASHRAE Standard Ventilation Compliance Evaluation Mechanical Technical Report #1. Bronx School for Law, Government, & Justice Bronx, NY
ASHRAE Standard 62.1 2004 Ventilation Compliance Evaluation Mechanical Technical Report #1 Bronx, NY Prepared By: Yulien Wong Faculty Advisor: Dr. Jelena Srebric October 4, 2005 TABLE OF CONTENTS 1.0 EXECUTIVE
More informationPart 1 Review Questions on material covered in Midterms I & II
1 Arch 463 ECS Fall 2001 Name FINAL 40 Multiple Choice Questions Part 1 Review Questions on material covered in Midterms I & II 1. Passive systems for environmental control A. can enhance human comfort
More informationAppendix E-1f: Small Building Methodology for Pre-SB2030 Projects
Appendix E-1f: Small Building Methodology for Pre-SB2030 Projects Prescriptive Bundle Option Method for Office Buildings less than 30,000 GSF This section describes energy strategy requirements for three
More informationEADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Mechanical System Renovation Construction Management & Lighting/Electrical Breadths Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationAchieving Near Net-Zero Energy Usage in Laboratory
Page 1 of 8 Published on www.tradelineinc.com (http://www.tradelineinc.com) Home > Achieving Near Net-Zero Energy Usage in Laboratory Facilities Achieving Near Net-Zero Energy Usage in Laboratory Facilities
More informationashrae) VENTILATING PRINCIPLES AIR CONDITIONING OF HEATING AND 7th Edition A Textbook with Design Data Based on the 2013 ASHRAE Handbook Fundamentals
PRINCIPLES OF HEATING VENTILATING AND AIR CONDITIONING 7th Edition A Textbook with Design Data Based on the 2013 ASHRAE Handbook Fundamentals William J. Coad Harry J. Sauer, Jr. ashrae) Contents Part I
More informationnycaspelegislative@gmail.com newsletter@asseny.org PS62R NYC s First Net Zero Energy School (and one of the first in the World) What is Net Zero? Our Definition : The building will produce (on site) as
More informationDraft Feasibility Study for the Expansion of Southeast Library
DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW
More informationCREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected)
(Responsible Individual) (Company Name) I,, from verify that the information provided below is accurate, to the best of my knowledge. CREDIT COMPLIANCE (Please complete the color coded criteria(s) based
More informationColorado Mountain College: Sustainable Design Standards
Colorado Mountain College: Sustainable Design Standards Objective: Design and build to the highest energy and water standards in order to meet the College s Carbon Neutrality Objective in the most cost-effective
More information3/6/2017 Past president & currently on the board of directors for the Wisconsin Geothermal Association
Saving energy and money with Geothermal technology Presented By Mark Flock President Flock s Heating & Air Conditioning WaterFurnace GeoPro Master Dealer Nate Certified Ground Source Loop Installer Member
More informationApplying Geothermal Technology for Large Scale Projects
Jeff Urlaub, PE MEP Associates, LLC jeffu@mepassociats.com 715.832.5680 Engineering Future Focused Solutions Applying Geothermal Technology for Large Scale Projects Breakout Session Category (e.g. Residential)
More informationMechanical Thesis Proposal
Mechanical Thesis Proposal New Braunfels Regional Rehabilitation Hospital Adam Bernardo Mechanical Option Faculty Advisor: Dr. William Bahnfleth Revised: 2/13/12 New Braunfels, TX ADAM BERNARDO MECHANICAL
More informationEnergy Modeling of Dedicated Outdoor Air Systems for a Small Commercial Pilot Project
Energy Modeling of Dedicated Outdoor Air Systems for a Small Commercial Pilot Project BUILDING ENERGY SIMULATION FORUM, AUGUST 17, 2016 AMY MONTGOMERY, MASc, P.Eng. Overview Pilot project: energy efficient
More informationGARFIELD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationExisting Earth and Ocean Sciences (EOS) Building
11 ENERGY SYSTEMS 11.0 ENERGY SYSTEMS The novel approach to capturing and sharing energy with a neighbouring building is an elegant solution to the problem of adding a building to a campus and of how to
More informationThesis Proposal. Park. Findlay 12/10/2010. Connor Blood
1 Park Place Corporate Center One Mechanical Senior Thesis Project Thesis Proposal Park Place Corporate Center One Findlay Township,, PA 12/10/2010 Proposal Connor Blood 2 Park Place Corporate Center One
More informationYORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE
YORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE Contents YORK Passive Chilled Beams 3 CB-PBE-YK / CB-PBR-YK Performance Data 5 CB-PBE-YK Dimensions 7 CB-PBR-YK Dimensions 8 Specifications 9 2 YORK Passive
More informationRedland Tech Center Rockville, MD. Shawn Pepple Construction Management April 14, 2009
Rockville, MD Redland Tech Center Project Overview Two office buildings with stand alone parking garage Building II: 9 levels; 210,240 SF Building III: 6 levels; 136,430 SF Parking Garage: 6 levels; 310,600
More informationPart 1 Review Questions on material covered in Midterms I & II
1 Arch 463 ECS Fall 2016 Name FINAL 40 Multiple Choice Questions Part 1 Review Questions on material covered in Midterms I & II 1. The Climate Consultant is a powerful site analysis tool because A. it
More informationComparing Economics of Various Methods of Improving Energy Efficiency of Commercial Buildings
Comparing Economics of Various Methods of Improving Energy Efficiency of Commercial Buildings Marek Czachorski¹, Tim Kingston¹ and Jaroslav Wurm, PhD² ¹Gas Technology Institute, Des Plaines, Illinois,
More informationReed Berinato Mechanical Option. Building and Plant Energy Analysis Report October 27, Contents
Contents Executive Summary... 3 LEED Green Building Rating Discussion... 4 ASHRAE Standard 90.1-1999... 5 Introduction to ASHRAE Standard 90.1-1999... 5 Envelope Compliance... 5 Lighting Compliance...
More information1. How the research adds to the understanding of the area investigated
Final Scientific/Technical Report Project Title: CID #: Recipient: Eagan Civic Arena DE-EE0002807 Cherryl Mesko City of Eagan Minnesota 3830 Pilot Knob Road Eagan, MN 55122 cmesko@cityofeagan.com 651-675-5505
More informationEvaluating Alternative Fume Hood System Technologies Using Advanced Building Simulation
Evaluating Alternative Fume Hood System Technologies Using Advanced Building Simulation William J. Kosik, P.E., C.E.M. 1 Karl Aveard, AIA Associate 2 Heather R. Beaudoin, P.E., C.E.M. 3 Erik L. Olsen 3
More informationTHESIS PROPOSAL UNIVERSITY RIDGE AT EAST STROUDSBURG UNIVERSITY EAST STROUDSBURG, PA PREPARED FOR: JAMES FREIHAUT, PH.D.
THESIS PROPOSAL UNIVERSITY RIDGE AT EAST STROUDSBURG UNIVERSITY EAST STROUDSBURG, PA PREPARED FOR: JAMES FREIHAUT, PH.D. BY: MATTHEW CARR MECHANICAL OPTION JANUARY 22, 2007 Table of Contents Executive
More informationERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD (I-P edition) Energy Standard for Buildings Except Low-Rise Residential Buildings.
ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD 90.1-2010 (I-P edition) Energy Standard for Buildings Except Low-Rise Residential Buildings April 17, 2013 The corrections listed in this errata sheet apply to
More informationTechnical Development Program
TDP Catalog TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, sell, and apply HVAC equipment in commercial