C. Foundation stabilization for pipe and utility structures.

Size: px
Start display at page:

Download "C. Foundation stabilization for pipe and utility structures."

Transcription

1 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization for pipe and utility structures. D. Pipe bedding for pipe and utility structures. 1.2 RELATED REQUIREMENTS A. Section Earth Moving B. Section Storm Drainage Utilities 1.3 REFERENCES A. WSDOT Standard Specifications Washington State Department of Transportation Standard Specifications for Road, Bridge, and Municipal Construction, B. City of Port Townsend Design Standards. C. City of Port Townsend Engineering Construction Standards. D. ASTM D-422 Method for Particle Size Analysis of Soils. E. ANSI/ASTM D1557 Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures Using 10-pound Rammer and 18-inch Drop. F. ASTM C94-86 Ready-Mixed Concrete. G. AASHTO T176 Plastic Fines in Graded Aggregates and Soils by use of the Sand Equivalent Test. H. ASTM D2922 Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). I. ASTM D3017 Test Methods for Moisture Content of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 1.4 DEFINITIONS Port of Port Townsend

2 A. Unsuitable Material: Soil, organics, waste, or other material not complying with these specifications, not capable of supporting foundations or structures, or not capable of compaction to specified density. Old fill soils and buried top soils are unsuitable. B. Pothole: Exploratory excavation to uncover buried utility, structure, or other feature to determine location, elevation, size, and type of material. 1.5 SUBMITTALS A. Quality Assurance/Control Submittals: 1. Test Reports: Sieve analysis for each material. 2. Certificates: WSDOT pit certification for each pit. 1.6 QUALITY ASSURANCE A. Qualifications: 1. Surveyor: Experience on similar projects. 2. Construction Crew Foreman: Minimum six years working experience and four years experience as foreman performing similar work. B. Regulatory Requirements: 1. Work and material shall be in accordance with WSDOT Standard Specifications. 2. Comply with City of Port Townsend standards. 1.7 DELIVERY, STORAGE, AND HANDLING A. Stockpiling: 1. Stockpile materials on site within construction limits and at locations approved by Owner. 2. Direct surface water away from stockpile site to prevent erosion or deterioration of materials. 3. Remove stockpile and leave area in clean, neat condition. Grade site surface to prevent freestanding surface water. 4. Maintain toe of material at least 6 feet from edges of trenches and excavations. Pile so surface water is prevented from flowing into Port of Port Townsend

3 excavations. Provide free access to fire hydrants, water valves, and meters, and leave clearance to enable free flow of stormwater in conduits, and watercourses. 5. Stockpiles not used or disposed of within seven calendar days shall be covered with polyethylene sheet. 1.8 SEQUENCING AND SCHEDULING A. Sequence work to accommodate normal work activities and use of Site by Owner. Comply with Owner requirements. B. Maintain emergency access, access to service roads, and fire access roads around Site. PART 2 - PRODUCTS 2.1 AGGREGATE MATERIALS A. Backfill Material for Pipe: Crushed Surfacing Base Course per WSDOT Standard Specifications Section (3). B. Foundation Material: Crushed Surfacing Base Course per WSDOT Standard Specifications Section (3). Foundation and bedding material shall have less than 5% fines. 2.2 SOURCE QUALITY CONTROL A. Tests and Inspection: Provide sieve analysis per ASTM D422 for each material type. Perform tests and analyses of aggregate material per WSDOT Standard Specifications. If tests indicate materials do not meet specified requirements, change material and retest. PART 3 - EXECUTION 3.1 EXAMINATION A. Site Verification of Conditions: 1. Verify survey benchmark and intended elevations for Work are as indicated. 2. Verify erosion control is in place and operating properly. 3. Verify locations and elevations of existing pipes and structures at points of connection and at crossings prior to beginning Work. Pothole, expose pipes, determine invert elevations, verify with design, and inform Owner Port of Port Townsend

4 3.2 PREPARATION A. Protection: 3.3 CONSTRUCTION of deviations affecting design prior to mobilizing crews and beginning construction. 1. Locate existing utilities, avoid damage or disturbance. For aid in utility location call Dial Dig , 48 hours (two working days) prior to beginning construction. There are utilities on site that Dial Dig will not locate. Employ and pay for locator service to locate and mark utilities in addition to DIAL DIG service. 2. Protect and maintain existing utilities that are to remain. 3. Protect benchmarks and existing structures. 4. Use means necessary to prevent erosion of freshly graded areas during construction or until such time that permanent drainage and erosion control measures are fully operational. A. Grade and Alignment: 1. Identify and set required lines, levels, contours, and datum. 2. Stake alignment and grade and construct in locations shown on Drawings. 3. Establish extent of excavation by area and elevation. 4. Adjust alignment and grade to accommodate conflicts and field conditions. Obtain Owner s approval prior to adjustments. B. Utilities And Structures, Shoring and Bracing of Excavation: 1. Provide sheeting, shoring, and bracing in accordance with state and local codes. Shoring shall be designed by Contractor. 2. Do not use horizontal strutting below pipe barrel. 3. Do not use pipe as support for trench bracing. 4. Do not remove shoring below top of pipe. 5. Backfill immediately following removal of shoring and bracing. Port of Port Townsend

5 6. Support adjacent structures, including utilities and pipe chases, that may be damaged by excavation Work. C. General Excavation: 1. Perform excavation of every description and whatever substance encountered to depths, lines, and grades indicated. 2. Pile trench excavated material so surface water is prevented from flowing into excavation and there is minimum inconvenience to Owner s access to buildings. Provide access to fire hydrants, water valves, and meters, and leave clearance to enable free flow of stormwater in conduits and watercourses. 3. Remove and reconstruct utilities as required to perform Work. 4. Prevent movement of soil in areas supporting underground utilities or structures. 5. Hand trim excavation and leave free of loose matter. 6. Correct unauthorized excavation at no cost to Owner. 7. Schedule Work to include backfilling trenches by completion of each shift. D. Trench Excavation: 1. Unless otherwise indicated, open cut excavations. 2. Exercise caution in operating heavy equipment over pipelines. Do not damage existing improvements. 3. Repair leaks or breaks caused by construction operations immediately at no cost to Owner and in manner acceptable to Owner and utility owner. 4. Control side walls of excavation to minimize caving. 5. Excavate trench bottom to lines and grades shown with proper allowance for pipe thickness and pipe bedding. Do not permit material containing rocks or cobbles larger than 2-1/2 inches in maximum dimension within 6 inches of pipe. Remove material of this type from trench bottom and replace with foundation material. Port of Port Townsend

6 6. Should excavation be carried below lines and grades as shown because of trenching operations, backfill such excavated space to proper elevation as directed by Owner, at no cost to Owner. E. Stockpiling Trench Excavation Soil Material: Stockpile trench excavation material in area as coordinated with Owner. F. Control of Water: 1. Ground water should be expected during excavations. 2. Keep excavation free from water. Dewater as necessary. 3. Direct drainage away from excavation. 4. Grade top perimeter of excavation to prevent surface water from draining into excavation. 5. Direct runoff and water from dewatering into sedimentation filtration. Provide additional filtration necessary to prevent silt-laden water from leaving site. G. Pipe Bedding: 1. Place bedding on approved trench bottom before pipe is installed. Spread smoothly to support pipe uniformly. Do not use blocking to adjust pipe to grade. Dig holes for bells as required to ensure uniform support along pipe barrel. 2. Compact bedding as follows: Compact bedding to at least 95 percent maximum density as determined by ASTM D1557. H. Backfilling: 1. Backfill to grades, contours, levels, and elevations and with material as shown on Drawings and as specified. 2. Do not backfill over wet, frozen, or spongy subgrade surfaces. 3. Place and compact backfill materials in continuous layers not exceeding 6-inch loose lift thickness when using hand equipment and 12-inch loose lift when using heavy compaction equipment, such as hoe-packs. Decrease lift thickness as needed based on compaction test results. 4. Employ placement method that does not disturb or damage utilities in trenches. Port of Port Townsend

7 5. Condition backfill within plus or minus 3 percent of its optimum moisture content so specified compaction can be attained readily. Material containing excessive moisture, beyond moisture content for specified density as determined by laboratory compaction tests, shall not be used for backfill. 6. Raise backfill evenly around structures. 7. Finish area to uniform contour to drain properly and grade entire surface to neat appearing surface. 8. Remove excavated on-site soil material and surplus fill material from site to Owner-approved, Contractor-provided off-site waste site. I. Compaction: 1. Minimum 95 percent, within 2-foot vertical of finish subgrade and minimum 90 percent below this level per ASTM D Compact backfill material by towed or self-propelled mechanical compactors in uniform layers not exceeding 12 inches in loose depth. J. Initial Backfill: 1. After pipe has been laid properly and inspected, place and compact initial backfill around pipe to minimum depth of 8 inches over top of pipe. Place initial backfill in lifts of not more than 6 inches in compacted thickness. Bring lifts together on both sides of pipe and carefully work backfill under pipe haunches by means of shovel, vibration, or procedures approved by Engineer. Take necessary precautions to protect pipe from damage or shifting. 2. Subsequent Backfill: Place and compact subsequent backfill material after initial backfill has been placed and approved by Engineer. 3. Reopen trenches where settlement occurs to depths necessary for compaction; refill and compact with surface restored to grade at no cost to Owner. 4. Water settling or water jetting will not be allowed. 3.4 FIELD QUALITY CONTROL A. Obtain required inspections, tests, approvals, and location recording prior to covering or enclosing Work. Port of Port Townsend

8 B. Inspection: 3.5 PROTECTION 1. Comply with Owner requirements. 2. Comply with City of Port Townsend requirements. 3. After completion of trench and prior to placing pipe. 4. After completion of pipe and bedding, and prior to backfilling. A. Protect bottom of excavations from freezing. B. Protect excavated material and excavating foundation (subgrade) from damage due to excess moisture. C. Take precautions to protect soil from excess moisture by such means necessary, including: Construct ditches and swales to intercept surface water; cover stockpiled material; cover exposed trenches; do not expose more area than can be worked and protected; and dewater by pumping. 3.6 CLEANUP A. Dispose of excavated surplus or unsuitable material at Contractor-provided off-site location approved by Owner. B. Remove and dispose of rubbish from Site in accordance with laws, regulations, and ordinances to approved off-site location provided by Contractor. C. Dispose of waste, surplus, and unsuitable materials according to laws, regulations, and ordinances. END OF SECTION Port of Port Townsend

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

SECTION BUILDING EARTHWORK

SECTION BUILDING EARTHWORK Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered. SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

SECTION TRENCI-JING PART 1 GENERAL

SECTION TRENCI-JING PART 1 GENERAL S SECTION 3123 17 TRENCI-JING PART 1 GENERAL 1.1 STIPULATIONS A. The Specification Sections "General Conditions of Contract", "Special Conditions" and "Division 01 - General Requirements" form a part of

More information

SECTION 02215BP TRENCHING AND BACKFILLING

SECTION 02215BP TRENCHING AND BACKFILLING SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING 32.1 GENERAL SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING This Section covers excavation, backfill, fill and grading associated with utility trench and structural construction. All such WORK

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals.

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals. SECTION 312333 - TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

SECTION EXCAVATION, TRENCHING AND BACKFILL

SECTION EXCAVATION, TRENCHING AND BACKFILL SECTION 02315 EXCAVATION, TRENCHING AND BACKFILL PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Excavation, trenching, and backfill necessary for the construction of the facilities as indicated

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION TRENCH EXCAVATION AND BACKFILL

SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02221 - TRENCH EXCAVATION AND BACKFILL CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Sections... 2 1.03 Reference Standards... 2 1.04 Quality Assurance... 2 1.05 Measurement

More information

The following requirements shall supplement the Standard Specifications:

The following requirements shall supplement the Standard Specifications: Page 1 of 5 DESIGN STANDARDS FOR: GENERAL CONSTRUCTION REQUIREMENTS This design narrative contains general requirements that must be followed by contractors/developers. This section includes a general

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION STRUCTURE EXCAVATION AND EARTHWORK SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES

More information

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE 378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

A. Backfill: Soil material or controlled low-strength material used to fill an excavation. GSA Project No.: GS-P-03-14-AZ-5044 SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparing subgrades for walks. 2. Excavating and backfilling for structures. 3. Subbase

More information

The Six-Inch Layer Compaction Method

The Six-Inch Layer Compaction Method 1/7 1.0 PURPOSE This specification describes the minimum requirements for the backfilling of trenches or the construction of berms primarily for the installation of buried pipelines, cables, ducts and

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

SECTION EXCAVATING, BACKFILLING AND COMPACTING

SECTION EXCAVATING, BACKFILLING AND COMPACTING SECTION 02220 - EXCAVATING, BACKFILLING AND COMPACTING PART 1 GENERAL 1.1 DESCRIPTION A. Provide excavation, overexcavation, fill, backfill and compaction for areas under buildings and structures shown

More information

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 312300 EXCAVATION AND FILL PART 1 - GENERAL 1.1 SUMMARY A. Excavate, backfill, compact, and grade the site to the elevations shown on the Drawings, as specified herein, and as needed to meet the

More information

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code. 1/6 1.0 PURPOSE This specification describes the minimum requirements for filling depressions and for backfilling excavations for structural footings, slabs, floors, buildings, trestles, and the like..

More information

SECTION TRENCHING, BACKFILL AND COMPACTION

SECTION TRENCHING, BACKFILL AND COMPACTION SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 31 23 00 Trenching, Backfilling, and Compaction of Utilities 1. General A. The Contractor shall furnish all labor, materials, tools, equipment, and perform all

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 310000 PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation, backfill, fill and grading required to complete the work

More information

Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS

Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS 7.01 General Provisions 7.01.1 Scheduling 7.01.2 Preservation, Restoration, and Cleanup 7.01.3 Interferences and Obstructions 7.01.4

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

EXCAVATION & BACKFILL SPECIFICATION

EXCAVATION & BACKFILL SPECIFICATION REVISION DATE DESCRIPTION BY REVIEWER 0 12/14/2009 ISSUED FOR CONSTRUCTION MJS TDJ SECTION 1 EARTHWORK 1.1 GENERAL. This section covers general earthwork and includes preparation of the construction areas;

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 33 TRENCHING AND BACKFILL PART 1 GENERAL... 3 1.1 Description... 3 A. Excavation for Utilities Includes... 3 B. Suitable Fill Material...

More information

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed.

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed. SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

EXCAVATION AND BACKF1LL

EXCAVATION AND BACKF1LL S E C T I O N 2 3 1 5 EXCAVATION AND BACKF1LL PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Excavation, trenching, complete and continual dewatering of excavation, sheeting, bracing and shoring of

More information

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe. 31 20 00 EXCAVATION, TRENCHING AND BACKFILLING SECTION 1 - GENERAL 1.1 SUMMARY A. This section includes grading, excavation trenching, dewatering and backfilling for pipeline installation, roadways, walkways,

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete. SECTION 02735 WASTE WATER DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-Place Concrete. 1.02 REFERENCES

More information

Appendix D General Earthwork and Grading Specifications for Rough Grading

Appendix D General Earthwork and Grading Specifications for Rough Grading Appendix D General Earthwork and Grading Specifications for Rough Grading LEIGHTON AND ASSOCIATES, INC. General Earthwork and Grading Specifications 1.0 General 1.1 Intent These General Earthwork and Grading

More information

City of Thomasville Water, Sewer & Natural Gas Specifications SECTION TRENCH EXCAVATION AND BACKFILL

City of Thomasville Water, Sewer & Natural Gas Specifications SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02225 TRENCH EXCAVATION AND BACKFILL PART 1 GENERAL 1.01 SCOPE A. The work under this Section consists of furnishing all labor, equipment and materials and performing all operations in connection

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 1999 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

SECTION EMBANKMENT

SECTION EMBANKMENT 02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

A. Work of this Section is affected by unit prices for earth moving specified in Section "Unit Prices."

A. Work of this Section is affected by unit prices for earth moving specified in Section Unit Prices. SECTION 312000 EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS SECTION 10.1 GENERAL 10.1.1 SCOPE This part of the Manual covers the structural design and installation of reinforced concrete pipe for railway culverts. Pipe geometry may be circular, arch, or elliptical.

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES GENERAL C220 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C220 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...

More information

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials. SECTION 32 15 40 STONE FINES PAVING PART 1 GENERAL 1.1 RELATED WORK Section 32 11 00: Base Courses 1.2 QUALITY ASSURANCE A. Applicable Standards: Any reference shall mean the current or latest editions

More information