FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017
|
|
- Tiffany Harmon
- 6 years ago
- Views:
Transcription
1 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding Hall. The revised Facility Program Plan was approved by the Board of Regents at the October 2016 meeting. A building committee was appointed and the design team of JLG Architects was selected on July 13, The Preliminary Facility Statement was approved by the Board of Regents at the April 2015 meeting. The State Legislature passed and the Governor signed Senate Bill 10 on February 19, The bill approved the renovation of Harding Hall for an estimated cost not to exceed $12,000, A. ARCHITECTURAL, MECHANICAL AND ELECTRICAL SCHEMATIC DESIGN The spaces are consistent with the program requirements and facility described in the Facility Program Plan. The following drawings are attached that illustrate the design: Architectural and Structural Schematic: Drawing Title Page No. First Floor Plan 7 Second & Third Floor Plans 8 Exterior Elevations 9 Architectural Renderings North Elevation & Interior Lobby 10 As stated in the Facility Program Plan, SDSU is planning to reuse and upgrade Harding Hall for academic use. The first floor of the building will be dedicated to two classrooms, study space, and building service space. The finishes and technology for the classrooms and study space in the lower level have been identified as an add alternate to the project, in order to accommodate budget flexibility and maintain a viable project. A small addition will be required to meet the code required circulation needs of the facility. The proposed addition includes the building elevator, lobby, study space and stairs to floors immediately adjacent to the grade level. The south addition that would have provided a link to Daktronics Hall has been removed from the project scope, due to budget limitations. Based on the space needs identified in the programming phase; Harding Hall will adequately accommodate the Economics Department. The Economics Department will fully occupy the second and third floors of the building. Additional space on the first floor has been allocated to University classroom space and student study space, but is insufficient for an additional academic department. The space function, use code and net square footages are enumerated in the following table. Pg. 1 of 10
2 Harding Hall Space Program Program Function Space Use Code* Net Square Footage (NSF) Notes Classroom 110 2,576 University and Department Scheduled Instruction (Classroom & Seminar) Office 310 6,085 Department Head, Advising, Reception, Faculty Offices and Graduate Student Offices Office Service 315 2,273 Waiting Area, File, Copy, and Break Room Meeting Rooms 350 1,560 Conference Rooms, Workroom, and Collaboration. Study Space 410 1,485 General Open Student Study Space (Not Restricted) Storage General Building, Department, and Student Organization Storage. Building Service XXX 3,705 Restrooms, Custodial, Vending, IT, Electrical and Mechanical Circulation Space WWW 6,842 General Building Circulation and Entrance Lobby Total NSF 24,817 *Space use codes as defined by the National Center for Education Statistics Facilities Inventory and Classification Manual (FICM) The original 1952 structure which consists of cast-in-place concrete floor slabs, joist, beams and interior columns with exterior masonry load bearing walls set on concrete spread footings will remain intact. The spatial configuration is designed to work around existing interior columns. Removal of interior columns would require extensive structural work and be cost prohibitive for the project. Cut openings through the existing concrete slab may be required for new HVAC ductwork. New openings; as well as, additional roof loads from equipment will require reinforcement of the concrete floor and roof slabs. This will likely be accomplished with carbon-fiber sheet reinforcing. The building addition will likely be steel framed with metal stud infill wall construction. The addition will likely be clad with a metal panel and curtain wall system. The general aesthetic goal is a combination of masonry, metal, and glass that will tie into the aesthetics of the recently completed Architecture, Mathematics, and Engineering Building. The foundation of the addition is to be standard spread footings located below frost depth. The need for over-excavation or deep foundation systems is not expected. Maintenance & Repair: A number of maintenance and repair projects will be a part of this major renovation. The projects include tuckpointing, HVAC replacement, plumbing replacement, asbestos abatement, roof replacement, accessibility alterations, window replacement, improved building envelope, energy efficiency upgrades, electrical upgrades, fire suppression, fire alarm replacement and entrance door replacement. Asbestos Abatement: All asbestos containing materials will be abated prior to general construction. A certified asbestos remediation Contractor will be hired to perform the work. Selective demolition has been performed to determine the extents of hazardous materials throughout the building. Mechanical Schematic: The design of the building HVAC system shall provide for the safe operation of the building as well as the health and comfort of the occupants. Code requirements and LEED V4 silver rating shall be the standard for the design of the HVAC systems of this facility. Pg. 2 of 10
3 The building is supplied with steam for heating from the Central Heating Plant and will be connected to the Central Chiller Plant with a new line that will extend from a connection located south of the Architecture, Mathematics, and Engineering Building. The new line will be sized to accommodate future connection to Daktronics Engineering Hall. The campus steam service will be reused in place. Heating The existing steam piping and pneumatic controls will be removed. The first floor mechanical room will contain steam to hot water heat exchangers, hot water circulation pumps, condensate pumps, and accessories. Multiple heat exchangers are being considered to allow greater flexibility and efficiency in the building heating system. The system will provide tempering of fresh air to the building, perimeter radiant heating, and terminal heating through a chilled beam system. The chilled beam system pumps heated or chilled water through a piping system that is integrated with the fresh air supply system. As the tempered and dehumidified outdoor air passes over the heated or cooled coils of the chilled beam it is conditioned further to meet the desires of the building occupant. Cooling Due to the restricted ceiling space available the mechanical cooling will be provided by a chilled beam system. This system allows for reduced duct sizes, since terminal heating and cooling is being provided by a water loop system. The primary purpose for air being supplied to the building is for indoor air quality. The air is dehumidified and tempered at the air handler and then conditioned to meet occupant comfort needs at the space by the chilled beam system. This system allows for maximum controllability, and efficiency. It also reduces the impact on ceiling height due to reduced duct sizes. Heat recovery will be used within the chiller equipment; as well as, between circuits serving the south and north zones of the building. The heat recovery will allow sharing of heat, while reducing the demand on the central steam and chilled water systems. Ventilation The building is not currently mechanically ventilated. The project will include a dedicated outdoor air system consisting of two (2) energy recovery ventilators with total energy wheels. One unit will be installed in the first floor mechanical room. This unit will serve the first floor and north entrance addition. The second unit will be installed on the roof and be dedicated to the second and third floors. Fresh air will be distributed vertically through multiple duct chases to reduce the size and quantity of horizontal duct runs through the chilled beam system. Controls The building automation systems shall be designed as a direct extension of the existing campus system. The system shall contain all points and programming as required to allow for automated control and monitoring of the new heating, cooling and ventilation system. Pg. 3 of 10
4 Plumbing Schematic: Water Service There is currently a 4 cast iron water service for the building. There is no fire protection service in the building at this time. A new 6 fire protection service will be provided from the 8 main near the northwest corner of the building. It is also the intent of this project to replace the existing domestic water connection due to the age of the cast iron piping. The new sanitary waste for the building will be connected to existing underfloor mains within the existing footprint of the building. Domestic Piping Copper piping will be used throughout the building per SDSU design standards. Waste Piping The existing roof drain will remain in place and not be modified. Rain leaders will be rerouted as needed due to site modifications. Above grade waste, vent and storm piping shall be cast iron drain piping with no-hub couplings. Piping below grade shall be PVC, per SDSU design standards. Existing cast iron vent piping that is no longer in use shall be removed. Plumbing Fixtures Plumbing fixtures will meet ADA requirements and be low flow sensor operated. Gas Service Gas service will only be required for miscellaneous loads. Primary heating and cooling will be provided by the Central Utility Plants. Electrical Schematic It is not anticipated that the existing electrical service serving the building will need to be replaced. All of the secondary electrical within the building will be replaced to accommodate changes to the floor plan and occupant needs. Site Lighting Site lighting will be a continuation of existing site lighting established for the engineering quadrangle. Power Distribution Switchboards: Existing 208 Volt switchboard will remain and serve mechanical equipment loads. New panelboards will be installed as required for plug loads and lighting throughout the building. Emergency Power An emergency generator is not required. Grounding All grounded buses from switchboards and panelboards will be connected at a central ground system in the electrical room. Pg. 4 of 10
5 Security System Rough-in for card readers at the main entrances shall be provided. Lighting Systems LED lighting fixtures will be utilized where possible. Counseling rooms may require less institutional style lighting. Motion detectors will be used to provide automatic on-off switching of lights in offices, storage rooms, bathrooms, and other selected rooms. The use of task-oriented lighting will also be examined. Daylighting will be used to supplement electrical lighting where appropriate. Exterior lighting will be controlled by a photocell. Emergency Egress Lighting Interior light will have a battery backup installed in the fixture for emergency egress lighting. Exit signs will be LED with battery backup. Data & Communications Hardwired data ports will be provided in all offices, conference rooms, and classrooms. Wireless system access points will also be provided on the first, second, and third floors. Fire Alarm System An addressable fire alarm system will be designed into the project and consist of an upgraded main fire alarm control panel, smoke and heat detectors in accordance with NFPA 101 & 72 standards. Energy Conservation There are a number of strategies being implemented to reduce energy consumption within the building. The energy conservation strategies include: variable frequency drives (VFDs), LED light fixtures, occupancy sensors, and optimizing daylight. 1.B. CHANGES FROM THE FACILITY PROGRAM PLAN Program and Scope Changes Due to budget limitations the link addition to Daktronics Hall has been removed. Move the existing e-commerce trading room from Berg Ag Hall to Harding Hall. Include the first floor classroom and study space furnishings, fixtures, and equipment as an add alternate due to budget limitations. 1.C. IMPACT TO EXISTING BUILDING OR CAMPUS-WIDE HEATING/COOLING/ELECTRICAL SYSTEMS Campus Utilities No change is required to campus electrical, water, or sanitary sewer systems as part of this project. Pg. 5 of 10
6 Network Service A dedicated secure network service will be required as part of the e-commerce trading classroom. All other network and telecommunications will remain unchanged. Storm Sewer The existing storm water drainage pathways shall be modified to reduce the potential of water infiltration to the building from storm water runoff. 1.D. TOTAL CONSTRUCTION COST ESTIMATES Total Probable Project Cost Probable Construction Cost $ 5,411,700 Design Contingency 541,170 Owner Contingency 270,585 Design/Professional Services 753,773 Reimbursable Expenses & Energy Model 51,117 Enhanced Building Commissioning 40,588 Geotechnical & Testing 25,050 Project Administration 374,469 Miscellaneous 58,700 Asbestos Abatement 200,000 Probable Project Cost $ 7,727,152 Identified Add Alternates Alternate 01: First Floor FF&E 918,000 Probable Project Cost w/ Alternates 8,645,152 Construction & Design Funding Sources FY 15 General Funds HEFF M&R (Planning & Design) $ 70,000 FY 16 General Funds HEFF M&R (Design & Construction) 1,730,000 FY 17 General Funds HEFF M&R (Construction) 1,500,000 Subtotal 3,300,000 Other Tuition (University Support Fees) 5,000,000 Total Funding Available $ 8,300,000 1.E. CHANGES FROM COST ESTIMATES FOR OPERATIONAL OR M&R EXPENSES The impact to anticipated M&R, routine maintenance, utilities, and operational cost has not changed from the amounts estimated in the FPP. End of Report Attachments: Floor Plans, Elevations, & Three Dimensional Renderings Pg. 6 of 10
7 Pg. 7 of 10
8 Pg. 8 of 10
9 Pg. 9 of 10
10 Pg. 10 of 10
SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 9 F DATE: June 26-28, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 I DATE: December 4-6, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student
More informationFACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY
FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III C DATE: June 19-20, 2013 ****************************************************************************** SUBJECT: SDSU Physical
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationWelcome Center, New Student Services, and Career and Employment Services
Architectural Program Welcome Center, New Student Services, and Career and Employment Services East Memorial Stadium Renovation May 2014 Prepared By Table of Contents Introduction.... 1 Competitive Market....
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit
More informationMINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011
MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011 The Building Committee for the SDSU Central Heating Plant Boiler Replacement and Plant Upgrades met
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: South Dakota State University
More informationElement Z General Design Requirements Existing Facilities Information
Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G
More informationPROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California
PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall
More informationFACILITY DESIGN PLAN FOR PHYSICAL EDUCATION COMPLEX FROST ARENA HVAC REPLACEMENT SOUTH DAKOTA STATE UNIVERSITY. May 17, 2013
FACILITY DESIGN PLAN FOR PHYSICAL EDUCATION COMPLEX FROST ARENA HVAC REPLACEMENT SOUTH DAKOTA STATE UNIVERSITY May 17, 2013 SDSU requests approval of this Facility Design Plan to continue design and implement
More information1733 TW ALEXANDER DRIVE
DURHAM, NC R&D PRODUCTION FACILITY ADJACENT TO RESEARCH TRIANGLE PARK ±97,875 SF FOR SALE OR LEASE 85 PROPERTY OVERVIEW 86 Falls Lake Foundry Commercial is pleased to offer the 1733 TW Alexander Drive
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationDraft Feasibility Study for the Expansion of Southeast Library
DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW
More informationdate: 10 july 2012 the pennsylvania state university: burrowes building
the pennsylvania state university: burrowes building. faculty/staff committee project overview introductions goals of the renovation critical considerations exterior envelope mechanical systems interior
More informationExhibit A Library Shell Construction
Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior
More informationOverbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %
8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationAdministration Building Needs Assessment
Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationAdministrative Offices
CUYAHOGA COUNTY PUBLIC LIBRARY EXISTING FACILITY ASSESSMENT December 2009 Administrative Offices 2111 Snow Road, Parma, Ohio 44134 Location Entry Site View of Staff Entrance ADM Administrative Offices
More informationFACILITY COMPONENTS - MIDDLE SCHOOL
SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls
More informationNAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase
General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such
More informationFranklin Hall Renovation TABLE OF Document Indiana University Bloomington
VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...
More informationAppendix J - Custom Uniformat for EDU Migration
Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations
More informationLUFacilities Policy Service Level Agreement v1.1
PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationDESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST
DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 V DATE: October 3-5, 2017 ****************************************************************************** SUBJECT: SDSU Precision Ag Classroom
More informationVILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) x507
John E. Barton Mayor Ellen M. Brayman Clerk/Treasurer VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY 12839 (518) 747-5426 x507 Trustees: James Gallagher Robert Cook Michael Horrigan Thomas VanAernem
More informationTABLE OF CONTENTS. (Δ = Rev 06/08)
TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationBOARD OF TRUSTEES OCTOBER 13, 2014
Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property
More informationTEXAS A&M ENGINEERING
TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas
More informationBronx Community College. Five-Year Capital Plan FY through FY
Five-Year Capital Plan FY 2019-20 through FY 2023-24 Projects in priority order / costs in $ thousands Project Name FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 (B) Campus-Wide Fire Alarm Replacement DC
More informationSECTION DESIGN REQUIREMENTS BASIS OF DESIGN GENERAL INFORMATION
BASIS OF DESIGN GENERAL INFORMATION 1.1 During the Schematic Design phase, the Consultant shall develop a Basis of Design (BOD) Document. This document shall provide a comprehensive description of the
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More informationPROCUREMENT AND CONTRACTING DOCUMENTS GROUP
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders
More informationBorough of Doylestown Building and Zoning Department
Borough of Doylestown Building and Zoning Department 57 West Court Street, Doylestown, PA 18901 215.345.4140 RESIDENTIAL BUILDING AND ZONING PERMIT APPLICATION PACKAGE BACKGROUND A building permit is required
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls
More informationCity of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist
City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist This checklist contains the standard information required on submittals for commercial construction
More informationMINIMUM PLAN INFORMATION REQUIRED FOR A BUILDING PERMIT
DEVELOPMENT SERVICES DEPARTMENT BUILDING & SAFETY DIVISION 156 S. BROADWAY, SUITE 130 TURLOCK, CALIFORNIA 95380 PHONE 209-668-5560 FAX 209-668-5107 MINIMUM PLAN INFORMATION REQUIRED FOR A BUILDING PERMIT
More informationGeneral Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action
Project Number: Prepared By: Action General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationTABLE OF CONTENTS. (Δ = Rev 11/15) Update #7
TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting October 25, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationTABLE OF CONTENTS. (Δ = Rev 04/17) Update #8
TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationAIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7
AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting
More informationRESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS
RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More informationInspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.
Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure
More informationDivision 00 Procurement and Contracting Requirements
SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders
More information2.3.6 Design Development
2.3 Management of the Project 2.3.6 Design Development Canadian Handbook of Practice for Architects 2.3.6 Introduction Design Development Tasks Engineering Services for Design Development Structural Mechanical
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General
More informationCity High Middle School pre-design recommendations. March 29, 2017
City High Middle School pre-design recommendations March 29, 2017 City High Middle School table of contents 2 3 4 5 6 7 8 9 10 11 12 13 table of contents project description and purpose existing systems
More informationS CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS
S CHEDULE G - D OCUMENTS S UBMITTAL R EQUIREMENTS This Attachment lists the items to be provided by the Architect in accordance with Owner/Architect Agreement. This list is not all-inclusive, nor is it
More informationW. EDWARD BALMER SCHOOL
W. EDWARD BALMER SCHOOL NORTHBRIDGE, MA SCHEMATIC DESIGN SCHOOL BUILDING COMMITTEE MEETING FEBRUARY 28, 2018 N O R T H B R I D G E PUBLIC SCHOOLS 1. SITE PLANNING UPDATE 2. BUILDING DESIGN UPDATE 3. MECHANICAL
More informationMASSEY HOFFMAN ARCHITECTS
Green is Simply Good Practice How Good Design Strategies and Construction Practices can Achieve a LEED for Homes Certification Often it seems that the motivation for building green comes from the desire
More informationThule Prototype BIM Manual for Dormitories. February 5, 2010
Thule Prototype BIM Manual for Dormitories February 5, 2010 TABLE OF CONTENTS INTRODUCTION Executive Summary 2 Goals 2 Scope and Use 2-4 Program Assumptions Kit of Parts GUIDELINE INTEGRATION Site Design
More informationUCC Permit Application Procedures
How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.
More informationPermit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2) Applicant must complete
More informationVOLUME 4 DIVISION SPECIFICATIONS
Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1
More information4043 N. Ravenswood Suite 207 Chicago, IL
Green is Simply Good Practice A Demonstration of How Good Design Strategies and Construction Practices Can Achieve a LEED for Homes Certification Often it seems that the motivation for being green comes
More informationKU West Campus LEEP II High Bay Facility Project # , A (c)
Number Revision Title Rev Date Discipline Bulletin Drawings B-West Structural Category S051 0 General Notes - Sheet 1 7/31/13 Structural Bid Package B- West Campus S052 0 General Notes - Sheet 2 7/31/13
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationCITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION
1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the
More informationPiping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.
NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation
More informationTABLE OF CONTENTS Public Safety Building
DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary
More informationTraining Certification Categories
Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and
More informationBusiness School Program Plan Revision 2
UNIVERSITY OF COLORADO DENVER Business School Program Plan 2 August 18, 2009 Business School Program Plan 2 Business School Program Plan 2 University of Colorado Denver I. Executive Summary The Business
More informationKEY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III E DATE: December 4-5, 2013 ****************************************************************************** SUBJECT: FY15 HEFF
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 7 L DATE: June 27-29, 2017 ****************************************************************************** SUBJECT: FY18 HEFF M&R Projects
More informationNEW MIDDLE SCHOOL PROJECT
Monthly Report October 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle
More informationG703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project
Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor
More informationLASALLE - BACKUS EDUCATION CAMPUS
INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More information2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY
PART 1 - GENERAL SECTION 01 01 11 MULTIPLE CONTRACT SUMMARY 1.01 SCOPE OF WORK A. This Section includes a summary of each Contract, including responsibilities for coordination and temporary facilities
More informationCONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,
More informationCITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS
CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS Update April 29, 2013 12 Permit application forms and contact information can be found on our website under Inspection Department
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations
More informationBENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY
BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY Prepared for the City of Benson, Minnesota by Widseth Smith Nolting May 2016 City of Benson, Minnesota CITY HALL/POLICE STATION
More informationAGILITAS Property Development
Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development
More informationCity of South Pasadena COMMUNITY IMPROVEMENT
City of South Pasadena COMMUNITY IMPROVEMENT Office Address: Mailing Address: 6940 Hibiscus Ave S 7047 Sunset Dr S South Pasadena, FL 33707 South Pasadena, FL 33707 *PHONE: (727) 343-4192 * FAX: (727)
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation
More informationUpdate on FCPS Construction/Renovation Projects. November 2015
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationCase Study: Golisano Institute for Sustainability
Case Study: Golisano Institute for Sustainability Rochester Institute of Technology - Golisano Institute for Sustainability Sustainability Hall at Rochester Institute of Technology A001.01 (RIT) is a LEED-Platinum
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements
More information