1.1 Dimensions Timber of up to mm thick (KD) can be heat-treated. The maximum thickness varies depending on the type of timber.
|
|
- Christian Howard
- 6 years ago
- Views:
Transcription
1 Page: 1 of 6 1 Timber details 1.1 Dimensions Timber of up to mm thick (KD) can be heat-treated. The maximum thickness varies depending on the type of timber. 1.2 Quality In principle, only timber that has minimal knots and is crack-free should be heat-treated. Only rough-sawn product is treated. 1.3 Timber moisture The maximum wood moisture level of the lumber to be heat-treated is 8-10% 10%. If this is not the case, a correct treatment cannot be assured (colour variation, cracks). But we provide the opportunity of a secondary drying, which is charged separately according to time and effort. If the lumber is delivered kiln-dried, check a cross-section to confirm that the wood moisture has equalised, so that an optimal treatment result may be achieved. 2 Packet details s and packing If the packets delivered do not meet the criteria set out below, either the lumber will not be accepted for batch treatment or a charge will be made for additional handling. The following rates will be charged: Lumber 26,50 / m 3 Strips 70,- / m 3 Important Note Material that has been heat-treated and previously dried to 8-10% does not have to be delivered wrapped in plastic sheeting. A slight increase in wood moisture due to transportation does not have any negative effect on the heat treatment. Please do not wrap the timber that is to be delivered to us in plastic sheeting. If the timber is delivered shrink-wrapped in this way, we will have to charge 5 5 per packing unit (one packet or one pallet) for collection and removal of the sheeting. 2.1 Composition of a packet The lumber packets must contain only one type of timber of the same thickness. The packets must all have the same number of plies. The packets must be securely fastened after kiln drying! Use only metal strapping to bind the packets, because plastic strapping melts during treatment.
2 Page: 2 of Packet measurements Width [m] Height [m] Standard 1* 1,10 1,10 Standard 2** 1,20 1,20 *optimal for transport by truck **optimal for maximum utilisation of kiln 2.3 Stacking of lumber The dunnage must be set out precisely, with the outermost runners flush with the packet and all runners of equal thickness. The required thicknesses and spacing for the dunnage are set out in Table 1. Timber thickness Runner thickness Runner spacing [m] [mm] [mm] 4-10 min. 20 0,30 26 min. 20 0,50 32 min. 20 0,50 40 min. 24 0,50 50 min. 24 0,50 Table 1: : Minimum imum thickness and required spacing for dunnage. Note: Depending on the treatment process the dunnage can be used from one to a maximum of three times. Packet chocks from mm thick must be delivered with each packet. The number of packet chocks must be at least half the number of packet runners. It is helpful if the packet chock is attached to the packet (see Figure 1) or to use a pallet (see Figure 3.1). These pallets can be buyed from company Thermoholz Austria (Price on application). Figure 1: Ideal arrangement of a lumber packet for heat treatment.
3 Page: 3 of Stacking of strips Strips are best stacked only with other strips (maximum stripwidth: 80 mm), as shown in Figure 2. Important: follow the stacking scheme to assure good ventilation. This stacking scheme is dependent on the length and width of the strips, and is ever definited after consulting company häussermann Austria. The pallets used should have 3 wooden chocks and the bases of the pallets should have a material thickness of 30 mm. N.B.: The pallets must be securely fastened with steel strapping bands. Figure 2: Ideal stacking of strips for heat treatment. 2.5 Stacking of laminate flooring For heat treatment of laminate flooring, packets of 3-53 pieces should be created, each packet having a total thickness of approx. 26 mm. These packets should be stacked as described at points 2.3 and 2.4 (see Figure 3 and Figure ). As the flooring laminates dry out during the heat treatment, deformation occurs to some degree, making part of the uppermost layer unusable. To minimise this deformation, a cover sheet can be used for the top layer (see Figure 3). If wood-based panels are used as cover
4 Page: 4 of 6 sheets, it must be noted that any glue they contain evaporates during the treatment and can cause the upper laminate flooring layers to stick together. Cover sheet for weighting and fixing Figure 3: Stacking of flooring laminate flooring of country home. Figure 3.1: Stacking of flooring laminate, flooring of country home and sawn lumber. CORRECT
5 Page: 5 of 6 Figure 3.2: Stacking WRONG there is a big damage expectede Fault ault: Binded on the wrong position, pallets are too thin, packet chocks are uncontinuous, different thickness of the dunnage and irregular dunnage. 3 Schedule Delivery of raw materials 2 5 working days prior to the date planned for commencement of treatment. (Actual time required will depend on the order). Collection of finished goods at the latest 2 days after the treatment has been completed. Delivery and pickup only after consulting company Thermoholz Austria via telephone or E- E mail! The treated lumber has a moisture content of 2 7%, therefore the thermo lumber must be conditioned. (2 4 weeks) 4 Quantities The sectional area of the high-temperature chamber can accommodate material 2 packets wide and 2 stacks high. The packets in the high-temperature chamber must not extend more than a total of 5.50 m or 8.60 m or m to the rear!
6 Page: 6 of 6 Max m Max m Max m 1.20 m 1.20 m 5 Settlement A measurement list or packing list should be included when the raw materials are delivered. This is used as a basis for settlement. Note: The lumber shrinks by 7 10% during treatment. This shrinkage is compensated for to some extent when the timber absorbs moisture to equilibrium moisture content. 5.1 Lumber The following details must be stated on the packet: * Packet number (on the front of each packet) * Number of pieces (next to packet number) The thicknesses, widths and lengths are given in the measurement list. 5.2 Strips The following details must be stated on the packet: * Packet number (on the front of each packet) * Number of pieces (next to packet number) The thicknesses, widths and lengths are given in the packing list. Only the actual dimensions prior to treatment of the batch are charged for! Contact Mirako GmbH Markt 113 A-3334 Gaflenz Tel.: (0043) 7353 / Fax: (0043) 7353 / office@mirako.at
FORMWORK PANELS NATURAL BEAUTY FOR CONCRETE SURFACES.
FORMWORK PANELS NATURAL BEAUTY FOR CONCRETE SURFACES. 01 AT A GLANCE AREAS OF APPLICATION Concrete formwork systems Wall formwork Floor formwork Formwork for engineered structures (bridge constructions,
More informationUnloading Handling Storage
structurlam.com version 5.0, March 2017 INTRODUCTION What is CrossLam? CrossLam or otherwise known as Cross Laminated Timber (CLT) panels are produced from dried SPF lumber which are stacked together at
More informationProduct certification HEAT-TREATED TIMBER TR
Product certification HEAT-TREATED TIMBER 2 (13) CONTENTS 1 General..... 3 2 Initial testing... 3 3 Inspection visits and external product testing... 4 4 Requirements for quality assurance... 4 4.1 Description
More informationPassion for timber. pfeifergroup.com
Passion for timber GLUlam pfeifergroup.com Philosophy Wood is the construction material with the longest tradition in the building industry. Wood is once again en vogue because of the modern development
More informationfermacell Powerpanel H 2 O Linear Shower Outlet 2.0
fermacell Product Data Sheet fermacell Powerpanel H 2 O Linear Shower Outlet 2.0 Product The prefabricated is the quick and economic dry solution for flush-to-floor installation of shower trays (included
More informationHolzindustrie Schweighofer Products
1 Holzindustrie Schweighofer Products Tradition meets innovation that s how we work. Vasile Dan Ciortan Rădăuți 2 Perfection. The principle behind everything we do. Perfection in Timber We select our raw
More informationDelivery specifications of Telegärtner Karl Gärtner GmbH
Delivery specifications of Telegärtner Karl Gärtner GmbH Table of contents 1 Purpose & Scope... 2 2 General provisions... 2 2.1 Cargo securing... 2 2.2 Delivery notes... 2 2.3 Delivery of large quantities...
More informationSouthern Yellow Pine Export Grades Sustainability Strength Versatility
Southern Yellow Pine Export Grades Sustainability Strength Versatility AmericanSoftwoods.com 1 Contents Using this booklet 3 4 5 6 7 8 9 10 11 12 13 14 15 Southern Yellow Pine Grades Kiln-drying assures
More informationHYPERION MATERIALS & TECHNOLOGIES Hyperion Carbide Recycling
At Hyperion, we are serious about sustainability and our efforts to reduce the negative impact on our environment. HYPERION MATERIALS & TECHNOLOGIES Hyperion Carbide Recycling HYPERION - DO MORE WITH LESS
More informationPackaging Information IPS Gas Bulk Packs
FORMANCE PIPE IPS PRODUCTS BULK PACKS - GAS DISTRIBUTION (Series 6500,6800,8100,8300) SIZE TYPE PIPE OD 10 IPS 10.750 12 IPS 12.750 14 IPS 14.00 16 (Note 1) IPS 16.00 LAYER 20 /40 /50 JOINTS LAYER 20 /40
More informationNolco. Flexible protection for heavy and fragile goods
Nolco Flexible protection for heavy and fragile goods Safe, customer specified and applicable to many requirements Nolco Industrial Packaging is employed to handle transportation, transit, and storage
More informationFLOOR SCREEDS & ADDITIVES SOLUTIONS FOR INDUSTRIAL, RETAIL, RESIDENTIAL & PUBLIC BUILDINGS UZIN. THE FLOOR BELONGS TO YOU.
FLOOR SCREEDS & ADDITIVES SOLUTIONS FOR INDUSTRIAL, RETAIL, RESIDENTIAL & PUBLIC BUILDINGS UZIN. THE FLOOR BELONGS TO YOU. WHY UZIN SCREEDS & ADDITIVES? In the current fast moving and dynamic environment,
More informationSouthern Yellow Pine Export Grades Sustainability Strength Versatility
Southern Yellow Pine Export Grades Sustainability Strength Versatility AmericanSoftwoods.com 1 Contents Using this booklet 3 4 6 7 8 9 10 11 12 13 14 15 Southern Yellow Pine Grades Dressed No.1 Dressed
More informationSafe Transport of Steel Coils in Standard Dry Van and Open Top Containers
Safe Transport of Steel Coils in Standard Dry Van and Open Top Containers Sea conditions The weather is not always like this!!! Ordinary Sea Passage Specially in winter periods, sea passages are often
More informationPESMEL FULLY AUTOMATED STRIP PACKING LINES
PESMEL FULLY AUTOMATED STRIP PACKING LINES New Sensitive Way of Packing with High Capacity Pesmel Strip Packing Line, is designed to protect strips against damages, moisture and dirt. The new way of packing
More informationPESMEL SHEET PACKING LINE
PESMEL SHEET PACKING LINE Fully Automatic Sheet Packing Solutions Pesmel Sheet Packing Line is designed to protect metal sheets against moisture, dirt and damages. The key equipment in the line are Longitudinal
More informationSTAND ON TIMBER QUALITY
STAND ON TIMBER QUALITY Ukrainian Sawmill Holding Company is an environmental sustainable manufacturer of sawn timber and wood pellets A combination of high-tech and innovation UHLK implements state-of-the-art
More informationsheet packing line Customized sheet stacks add great value, since we can ship the required quantity directly to clients.
sheet packing line fully automatic sheet packing solutions Pesmel Sheet Packing Line protects sheets against moisture, dirt and damages. The key equipments in the line are longitudinal Steel Wrappers equipped
More informationMaterial Handling & Maintenance
Material Handling & Maintenance Rotation should be first-in / first-out A. All material should be dated when received. Place date on right side corner of product. B. Temporarily remove older stock from
More informationTECHNICAL SPECIFICATION FOR MATERIAL
TECHNICAL SPECIFICATION FOR MATERIAL 8.1 Indian Standards The following IS apply to this section: I.S No Subject 303-1975 Specification for plywood for general purposes (second revision) with AmdtNo.1
More information7.1 Wood/Lumber/Board Storage 7.2 Flat Glass 7.3 Steel Formwork/ Plates/Coils 7.4 Paper Storage 7.5 General Requirements
7.1 Wood/Lumber/Board Storage 7.2 Flat Glass 7.3 Steel Formwork/ Plates/Coils 7.4 Paper Storage 7.5 General Requirements 7.1 Wood/Lumber/Board Storage 7.1.1 Ground and environmental conditions: 7.1.1.1
More informationstructure. lightness. montastep. rebated façade profiles with hidden fastening system made of steel and aluminium
structure. lightness. montastep. rebated façade profiles with hidden fastening system made of steel and aluminium 2.50.6e rebated Façade with hidden fastening system MONTASTEP rebated façade profiles are
More informationPassion for timber FORMWORK. pfeifergroup.com
Passion for timber FORMWORK BEAMS pfeifergroup.com PHILOSOPHY The Pfeifer-Group is developing a new generation of timber formwork beams. After intensive development and test phase we are launching one
More informationPRODUCT CATALOGUE AND QUALITY SPECIFICATION SLP-THERMOWOOD
PRODUCT CATALOGUE AND QUALITY SPECIFICATION SLP-THERMOWOOD Helsinki We combine Finnish wood, natural appearance and ecological thinking. As a result we offer durable and valuable wood products. Suomen
More informationSwedish wood a versatile, modern material
Swedish wood a versatile, modern material The Swedish wood industry The third largest exporter With 70 percent of its land covered in forest, Sweden is the third largest exporter of sawn timber in the
More informationVPA 8 Status: October 2014 Test Certificates. Containers made of plastic with bung hole or removable lid 4. Fibre drums 5
VPA 8 Status: October 2014 s Survey: page s for: Sheet steel containers with bung hole with / without PE inner receptacle 2 Sheet steel containers with removable lid with/without PE inner receptacle 3
More informationUnit C: Forest Management. Lesson 3: Measuring Timber Stands
Unit C: Forest Management Lesson 3: Measuring Timber Stands 1 Terms Basal area Board foot dbh Diameter at breast height Log rules Lumber overrun Taper Wedge prism 2 How do I calculate board feet? A board
More informationDesign guideline for pallets within Ericsson
DESIGN RULES 1 (1) Design guideline for pallets within Ericsson Summary This document describes design guidelines that shall be considered when pallets are designed within Ericsson. General This document
More informationDuo-/Trio beams WHERE IDEAS CAN GROW.
Duo-/Trio beams WHERE IDEAS CAN GROW. WHERE IDEAS CAN GROW. Wood is naturally CO 2 -neutral and energy-efficient in all respects. As a building material, its positive properties help protecting against
More informationTHE SL86 All round TALENT
solutions THE SL86 All round TALENT The ultimate large volume container sized 800 x 600 mm LOAD CAPACITY UP TO 500 KG »BITOBOX SL86 the ideal large volume container for lean production environments« BITOBOX
More informationWooden suspended floors
UPONOR PEX PRODUCTION UNDERFLOOR HEATING WOODEN SUSPENDED FLOORS Wooden suspended floors 08 2006 Uponor Underfloor Heating in Wooden suspended floors Wooden suspended floors The term suspended floors in
More informationPerformance Floors for Warehouses and Distribution Centres. Kevin Dare, Managing Director, Face Consultants Ltd.
Performance Floors for Warehouses and Distribution Centres Kevin Dare, Managing Director, Face Consultants Ltd. Performance Floors for Warehouses and Distribution Centres. Kevin Dare, Face Consultants
More informationIN-LINE THERMOFORMING MACHINES. Complete turn key IN-LINE installations. from material handling through to boxing units of finished products
IN-LINE THERMOFORMING MACHINES Complete turn key IN-LINE installations from material handling through to boxing units of finished products More than just fast: Reliable the IN LINE process IN LINE technology
More informationIN-LINE THERMOFORMING MACHINES. Complete turn key IN-LINE installations. from material handling through to boxing units of finished products
IN-LINE THERMOFORMING MACHINES Complete turn key IN-LINE installations from material handling through to boxing units of finished products More than just fast: Reliable the IN LINE process IN LINE technology
More informationShelving & Racking Bins & Containers Warehouse equipment
Shelving & Racking Bins & Containers Warehouse equipment 500 kg! BITO SL container: Weighs as little as 13,6 kg Stacks 1500 kg! Base dim. 800x600 mm Runners Excellent stacking stability 2 height options
More informationExternal timber cladding. Industrially painted cladding. Ordering, transport, storage, installation, maintenance GUIDE
29.07.2014 1. How to order... 2 1.1. What should be paid attention to when choosing and ordering external timber cladding... 2 1.2. Industrially painted external timber cladding. Why to order it, pros
More informationwww.pallite.co.uk THE PALLITE RANGE LIGHTWEIGHT PAPER PALLETS, PALLET BOXES AND COMPONENTS DESIGNED TO REDUCE THE TOTAL COST OF DELIVERY. PALLITE is a range of strong and recyclable transit packaging providing
More informationVersion November Epoka Packing Instruction
Version 1.01 01. November 2018 Contents Logistics Instructions... 3 Packing Specification for Truck, Sea and Air:... 4 Packing Specification for Truck, Sea and Air Non-boxed goods... 7 Packing Specification
More informationThermoWood Cladding & Trim
ThermoWood Cladding & Trim ThermoWood Cladding & Trim Highest quality 100% natural Chemical free Offering enhanced physical properties and attractive deep brown tones, ThermoWood is an exceptional natural
More informationCONSULTING CIVIL AND STRUCTURAL ENGINEERS. Preben Naidoo And Associates. Tel: (033) , Fax: (033) , E mail:
CONSULTING CIVIL AND STRUCTURAL ENGINEERS Preben Naidoo And Associates Tel: (033) 342 2705, Fax: (033) 342 6480, E mail: preben@pnaengineers.co.za STATUS QUO REPORT: COGTA: WHITBY LODGE Prepared For: DEPARTMENT
More informationDRY CONSTRUCTION SYSTEMS
DRY CONSTRUCTION SYSTEMS Adrienn LEPEL BUTE Dry construction systems Prefabricated elements assembly on site Minimal use of water dry construction systems Assembled partitions Suspended ceilings Raised
More informationINSTALLATION GUIDE DUOFUSE DECKING
INSTALLATION GUIDE DUOFUSE DECKING We recommend reading through the entire installation instructions before starting, and check the website for the latest installation instructions. Plastivan disclaims
More informationDelivery Instructions - Finished goods Leaflet for suppliers
Delivery Instructions - Finished goods Leaflet for suppliers This delivery instruction applies generally to all deliveries to the SITECO lighting systems in Traunreut (hereinafter referred to as Siteco)
More informationRegulation IO-7.0: General Commodity Storage
Regulation IO-7.0: General Commodity Storage 7.1 Wood/Lumber/Board Storage 7.2 Flat Glass 7.3 Steel Formwork/ Plates/Coils 7.4 Paper Storage 7.5 General Requirements Revision: 00 October 2010 Page 1 of
More information"Value Proposition" TRU-RAIL Returnable Support Packaging (RSP)
Presented by: "Value Proposition" TRU-RAIL Returnable Support Packaging (RSP) Our goal is to meet packaging objectives across the Metals Industry Supply Chain, and to maximize efficiencies for both Inhouse,
More informationPipes, Piles, and Accessories
Pipes, Piles, and Accessories ON-SITE RECOMMENDATIONS FOR SAFE HANDLING Contents: 1. General 2. Reception of products and inspection 3. Unloading and moving 4. Storage 5. Handling of coated pipes 6. Installation
More information850 SOLID LIGHTWEIGHT READYBLOCK
Material Datasheet 850 SOLID LIGHTWEIGHT READYBLOCK STANDARD FINISH With the ReadyBlock range of Dense and Lightweight Aggregate Blocks from CEMEX, you are assured to find the building solution you need.
More informationPilkington Optitherm SN Pilkington Optitherm SN Pro T Handling and Processing Guidelines.
Pilkington Optitherm SN Pilkington Optitherm SN Pro T Handling and Processing Guidelines. Pilkington Optitherm SN and Pilkington Optitherm SN Pro T 1. Product description 2. Product range SN Pro T are
More informationTENDER DOCUMENT PART-II
NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT TAMILNADU REGIONAL OFFICE TENDER DOCUMENT PART-II (PRICE BID) RENOVATION OF SENIOR OFFICERS CABIN AT NABARD REGIONAL OFFICE NUNGAMBAKKAM CHENNAI-34 ISSUED
More informationEUROKRAFT HANDLING RECOMMENDATIONS FOR PAPER SACKS CEPI. Part 1: Best practice instructions for filling sites
CEPI EUROKRAFT European Producers of Sack Kraft Paper and Kraft Paper HANDLING RECOMMENDATIONS FOR PAPER SACKS June 2017 Part 1: Best practice instructions for filling sites INTRODUCTION Paper sacks are
More informationTYPICAL BEARING WALL FRAMING
BASIC WOOD FRAMING City of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code,
More informationNZQA registered unit standard 738 version 5 Page 1 of 7
Page 1 of 7 Title Kiln dry timber Level 4 Credits 25 Purpose People credited with this unit standard are able to: demonstrate knowledge of kiln drying operations; demonstrate knowledge of dry and wet bulb
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied
More informationPlywood (untreated or H3 treated) must not be allowed to come in contact with soil.
Plyfloor Advantages Superior strength Stiffness of Plyfloor is nearly three times that of particle type boards of the same thickness. This means thinner Plyfloor panels are cost effective floor panels.
More informationTechnical delivery conditions in general HB
CONTENT Area of application page 1 Quality specifications page 1 Feasibility page 1 Distinction page 2 Packing page 2 Quantity check page 2 Complaint page 2 Delivery page 2 Inserts page 3 Personalised
More informationDraft for comments only Not to be cited as East African Standard
EAST AFRICAN STANDARD Traveling bees-box Specification EAST AFRICAN COMMUNITY CD/K/659:2010 ICS 65.140 EAC 2010 First Edition 2010 CD/K/659:2010 Foreword Development of the East African Standards has been
More informationDuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing
Composite Decking Installation Guide Hidden Plastic Clip Fixing Table of Contents SECTION ONE: General Information Site Preparation......2 Site Storage.....2 Safety. 2 Tools....2 Foundation & Sub Structure.2
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But
More informationOne Meter Internal Dome Oven AVERAGE GUIDE
FIELD FURNACE REFRACTORIES Pty Ltd. 8 Arnott Place Wetherill Park NSW 2164 Phone: 02-9729-1799 Fax: 02-9729-1899 One Meter Internal Dome Oven AVERAGE GUIDE Quantity Description Unit price Total 192 Tapered
More informationbinderholz NATURE IN ARCHITECTURE
GLULAM KVH binderholz NATURE IN ARCHITECTURE WOOD - AN INTELLIGENT RAW MATERIAL Wood is a fascinating, versatile and intelligent material that plays an important role for us humans in many different ways.
More informationA Member of the Constructor Group. P90 Silverline Pallet Racking The next generation of pallet storage
A Member of the Constructor Group P90 Silverline Pallet Racking The next generation of pallet storage xxxxxxx xxxxxxxxx xxxxxxx The next generation of adjustable pallet racking. Adjustable pallet racking
More informationInspection Report(CLC)
Inspection Report(CLC) PRODUCT DESCRIPTION O-cn-0915056 (Re-Inspection after O-cn-0914894 performed on 01-14-2012) Product Name: Steel Metal Desk Inspection location: TianJin, China Inspection date: 12-31-2011
More informationStainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K
T Premium Panel, protection category IP 69K IP 69 K.6 H H H Optionally with or without keyboard housing Resistant to high-pressure cleaning (protection category IP 69K). The seal lies between two surfaces
More informationTechnical data sheet with laying instructions
The loose laid uncoupling mat for difficult substrates indoors Product properties and areas of application IndorTec FLEXBONE-2E: Uncouples ceramic and natural stone coverings from difficult substrates
More informationHIRSCH Porozell MODULAR BOARDS FOR UNDERFLOOR HEATING. Expanding with Ideas.
MODULAR BOARDS FOR UNDERFLOOR HEATING Expanding with Ideas. Porozell Porozell THE Partner for System Users for Over 25 Years. As a system supplier, develops, produces and sells boards for top-quality radiant
More informationMAKING HAENER BLOCK: TIPS AND GUIDELINES
MAKING HAENER BLOCK: TIPS AND GUIDELINES 1. Block Machine Set-up: The over all width, length and the depth of a Haener mold is greater than a standard mold; the pallet delivery chain may have to be retimed
More informationProduct Data Sheet Rockpanel Brilliant
Product Data Sheet Rockpanel Brilliant Durable - Xtreme - FS-Xtra United Kingdom 1 Product description ROCKPANEL boards are prefabricated compressed mineral wool boards with synthetic binders. The surface
More informationBauBuche Beech laminated veneer lumber. Product profile
BauBuche Beech laminated veneer lumber Product profile 01 BauBuche Beech laminated veneer lumber Product profile Product profile 01 04-19 - EN Sheet 1 / 7 Sheet CONTENTS 2 3 4 5 6 7 General information
More informationProduct Data Sheet Rockpanel Chameleon
Product Data Sheet Rockpanel Chameleon Durable - Xtreme - FS-Xtra United Kingdom 1 Product description ROCKPANEL boards are prefabricated compressed mineral wool boards with synthetic binders. The surface
More informationSTEP-BY-STEP PLANS FOR CONSTRUCTING A 250 STICK ROCKET BARN (RBN 3.0) (see RBR plans for furnace and metal component construction)
STEP-BY-STEP PLANS FOR CONSTRUCTING A 250 STICK ROCKET BARN (RBN 3.0) (see RBR plans for furnace and metal component construction) DESIGNED BY PETER SCOTT DESIGN COPYRIGHT PETER SCOTT MAY 13, 2008 DESIGNED
More informationPacking room and warehouse accessories
135 Packing room and warehouse accessories Shelving 136 Packing Stations 138 Do Not Stack Cones 138 Other Packing accessories 139 Glue Guns & Adhesives 142 Warehouse accessories 143 136 THE BOOK OF PACKAGING
More informationCHAPTER 6 TYPES OF CONSTRUCTION
CHAPTER 6 TYPES OF CONSTRUCTION SECTION 61 GENERAL 61.1 Scope. The provisions of this chapter shall control the classification of buildings as to type of construction. SECTION 62 CONSTRUCTION CLASSIFICATION
More informationLPKF WeldingQuipment GmbH. Michel Kist Sales Manager. Design guideline s for laser plastic welding Sales Training 2018
LPKF WeldingQuipment GmbH Michel Kist Sales Manager Design guideline s for laser plastic welding Sales Training 2018 Agenda General design requirements General design requirements hybrid welding LPKF Laser
More informationSTRAW BONDED SOLID PANELS AS A WALLING MATERIAL A TWO STOREY HOUSE WITH DURA
115 STRAW BONDED SOLID PANELS AS A WALLING MATERIAL A TWO STOREY HOUSE WITH DURA S. Jayakody 1, M. Kondadeniya 2, M. T. R Jayasinghe 3 1 Deputy Geneal Manager, International Construction Consortium, Kalubowila,
More informationMulti Rip Saws for Dividing Panel Materials
Multi Rip Saws for Dividing Panel Materials 02 HOMAG multi rip saws Content HOMAG multi rip saws Content 03 First-Class Saw Quality with HOMAG Machines for Discerning Customers As the degree of automation
More informationProduct Data Sheet Rockpanel Woods
Product Data Sheet Rockpanel Woods Rockpanel Woods Product Data Sheet Rockpanel Woods Product description Amaze onlookers and make the users of your building feel good. With facades that radiate the warm,
More informationTHERMORY COLLECTION 2014 DECKING - PANELS - FLOORS
THERMORY COLLECTION 2014 DECKING - PANELS - FLOORS 2 THERMORY THERMORY collection is produced by Brenstol, a Northern European manufacturer of profiled solid wood products. With more than 13 years of experience,
More informationCCSB Contact: Larissa A. Franklin Telephone (703) Item Description Class
Re: Ice Making Machines Item 123550 CCSB Contact: Larissa A. Franklin Telephone (703) 838-1824 franklin@nmfta.org Proponent: Commodity Classification Standards Board Present Classification Provisions Item
More informationDoing Business With Harley-Davidson, Packaging Original Equipment Manufacturing and Assembly Operations Last Update: July 2015
INTRODUCTION This document details the minimum acceptable packaging requirements for purchased components used at Harley-Davidson s Manufacturing and Assembly facilities. The principal objective of these
More informationWALL WOODEN FLOOR DECKING CLADDING TILES
FLOOR DECKING WALL CLADDING WOODEN TILES WHY SEASONED TIMBER? WOOD Timber decking creates spaces that are functional, practical and aesthetically pleasing. With the right design and periodical care, a
More informationINSTALLATION INSTRUCTIONS
1 of 6 INSTALLATION INSTRUCTIONS IMPORTANT! Store the floorboards at room temperature for at least 48 hours, still in their packaging, prior to commencing installation. Ideal room temperature is 18-22
More informationSOPHISTICATED. ELEGANT.
SOPHISTICATED. ELEGANT. montaline. CLADDING PROFILES IN STEEL AND ALUMINIUM NEW: Fast and economical fitting with the MONTAFIX fastening system 2.30.7e CAN A FACADE LOOK MORE EXPENSIVE THAN IT IS? MONTALINE
More informationFire Door Installation
FA LCON PANEL PRODUCTS LTD 14.1 It is vital that performance doorset are installed by competent tradesmen and It is strongly recommended that the installer is a member of a recognised quality assurance
More informationGLUE-DOWN INSTALLATION VIRTUO 30 / 55
Before laying the flooring, it is a good idea to inspect it and to identify any problems with the appearance. If there are any visible defects, please notify GERFLOR and wait to hear from them before laying
More informationCustomer Packaging Guidelines
Customer Packaging Guidelines Customer Packaging Guidelines 05.02.16 v1 CONTENTS Introduction Packaging Tips: Parcels Envelopes Packaging Tips: Pallets Crates Drums Pipes Spools & Reels Packaging Tips:
More informationSpecification for Engineered, Laminate and Bamboo Installation
Specification for Engineered, Laminate and Bamboo Installation Covering: Installation as floated floors Installation of Engineered and Bamboo flooring by direct adhesive fixing Site sanding and coating
More informationWaupaca Foundry, Inc. Dunnage Options
Waupaca Foundry, Inc. Options Returnable and Non-Returnable 1 Non-Returnable skids with cardboard boxes 30 X 36 Cardboard Box Unit with Wooden Skid 32 Deep 28.5 Tall WF-B-3036 Unit Description Cardboard
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised February 6, 2015 the Richmond 16'x28' Building w/ full loft Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This
More informationMADA FRENCH ADHESIVE MADE IN KSA. Member of
Member of Mada French Adhesive FEATURES Do you need to finish a wall as quickly as possible? Do you have a rough base surface and want to achieve a smooth final surface finish? TRY THE LATEST INNOVATION
More informationPFEIFER VS Slim Box SGP
12/2014 PFEIFER VS Slim Box SGP J&P BUILDING SYSTEMS PTE LTD. No. 48 Toh Guan Road East #08-104 Enterprise Hub SG-SINGAPORE 608586 Tel. +65-6569-6131 Fax +65-6569-5286 E-Mail info@jnp.com.sg INTERNET www.pfeifer.de
More informationUser Instructions for pin-less Ligno-Scanner S and Ligno-Scanner D
User Instructions for pin-less Ligno-Scanner S and Ligno-Scanner D Lignomat USA Ltd 14345 NE Morris Ct Portland OR 97230 USA Tel: 1-800-227-2105 FAX: 1-503-255-1430 E-mail: sales@lignomat.com www.lignomat.com
More informationINSTALLATION MANUAL Heritage Series
INSTALLATION MANUAL Heritage Series STEEL ROOF PANELS HEAD OFFICE 1418 Michael St., Ottawa, ON K1B 3R2 WATS LINE: 1 800-267-0860 TEL.: 1 613-746-3206 FAX: 1 613-746-0445 Contents Page Introduction, Storage..
More informationVersion november Epoka Packing Instruction
Version 1 16. november 2012 Epoka Packing Instruction Contents Logistics Instructions... 3 Packing Specification for Truck, Sea and Air:... 4 Packing Specification for Truck, Sea and Air Non-boxed goods...
More informationGeneral packaging instructions_en
Seite 1 / 9 1. Objective of the general packaging provisions The objective is to provide our suppliers with simple and practical guidelines that outline our requirements and supplier responsibilities and
More informationLOG BOOK. Solid wood products for the DIY store.
LOG BOOK. Solid wood products for the DIY store. OUR WORLD: BIODIVERSE. PLANED TIMBER STRUCTURAL TIMBER GARDEN TIMBER SAWN TIMBER SOLID WOOD PANELS 3 MULTI-PURPOSE PANELS HOME TO WOODWORKERS, LUMBERJACKS
More information2012 IBC Review of Height and Area Opportunities for Light-Frame and CLT
2012 IBC Review of Height and Area Opportunities for Light-Frame and CLT Michelle Kam-Biron, P.E., S.E., SECB Director of Education American Wood Council Outline 2012 IBC Heights and Areas Type III, IV,
More informationLIMIT STATES DESIGN INFORMATION for Specific Engineering Design for New Zealand Construction
technical certificate LIMIT STATES DESIGN INFORMATION for Specific Engineering Design for New Zealand Construction Technical Note 82-07-04 (Replaces 82-07-02, 82-06-06, 06-03-82, 98-01-39 and 05-11-39)
More informationINDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES. Four-Side Interlock Loose Lay Installation
INDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES Four-Side Interlock Loose Lay Installation The following pages are guidelines only... please read this manual thoroughly
More informationSentry Buildings. Assembly Book. the Richmond. 16'x32' Building w/ Full Loft. Revised February 6, 2015
Sentry Buildings Assembly Book Revised February 6, 2015 the Richmond 16'x32' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775
More informationspace saving money saving The presswood pallet LOOK FOR OUR FULL RANGE ON: ABOUT US THE VIERHOUTEN GROUP OUR BROCHURE Export ready
ABOUT US Presswood is the largest European manufacturer of disposable pallets. The first Presswood pallet (named INKA Pallets) was made in 1971 in Siegertsbrunn just outside Munich. This production facility
More information