1 RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7

2 The Contractor shall consider in his price all costs or expenses of all requirements stipulated in the section entitled General preceding this Bill. General: 1. The rates to be inserted shall include for all costs associated with the followings: -All items listed in the data sheet scope of works, tehnical description, specifications, drawings and Bill of quantities. -The contractor's supplied materials, testing labor and overheads. -Protection of materials, Municipality property and public service equipment in the vicinity of the works. The contractor shall make the necessary temporary water, electrical power connections etc to prevent interruption of the power and water supply for the existing functioning building. The contractor is responsible to fix any damage that may occur during demolition and construction work. -Clearing and cleaning the places and transport the debris and litter collected to a place approved by the corresponding municipality, on his expenses,including any fees. -Scaffoldings and any kind and type of special equipment 2. Contractor's other costs for any item of work or obligation which is necessary for the completion of the works as required by the tender documents. All site and management costs, including salaries, general and insurance expenses, costs for temporary site facilities, site operation expenses, taxes, permits, all costs for labor, works, provisions, fuel, materials and equipment for Site Installations required by the Contractor and stipulated in the Tender Documents shall be included in the various unit prices of the Bill of Quantity. No extra payment will be allowed by the Employer for any of these activities. All skilled labour should have experience in renovation works,especially in old structures. The contractor shall take all necessary measures to protect and minimize environmental hazards including pollution, noise, dust etc. Abbreviation: m: meter lm: linear meter m2: square meter m3: cubic meter kgr: kilogram ls: lump sum pc: piece Architectural & Civil Works 1 Demolishing & Dismantling Works 2/7

3 Preambles The rates to be inserted shall include for all costs associated with the followings: -The contractor is responsible to fix any damage that may occur during demolition and construction work by replacing, repairing, and reinstatements of any infrastructure networks affected and/or damaged. -Clearing and cleaning the places and transport the debris and litter collected to a place approved by the corresponding municipality, on his expenses,including any fees. -Scaffoldings and any kind and type of special equipment are included in the rates. All skilled labour should have experience in renovation works, especially in old structures. The contractor shall take all necessary measures to protect and minimize environmental hazards including pollution, noise, dust etc. The contractor is obliged to use trucks with sealed cover Stripping out of existing wooden benches, all works included, and the removal to a designated disposal site. Stripping out of existing railings, all works included, and the removal to a designated disposal site. Removal of excavation and demolition products by any means. Loading and unloading by mechanical means, and transportation to a designated disposal site on dirt roads..00 kgr m Earth Works Preambles: The Contractor shall take into consideration that all direct and indirect works and expenses required for the completion of the coming items are included in the unit price. All works must be according to technical description, drawings and specifications. Rates shall include : 1. Shore up the sides of excavation and take all precautions to keep the adjacent buildings and existing infrastructure utilities (sewage, water, electricity and telecommunication works )safe. And repaire any damage occure in the site. 2. Cleaning the site and removing all debris and rubbles to approved dump site, on his expenses, including any fees. The contractor shall take all necessary measures to protect and minimize environmental hazards including pollution, noise, dust etc. The contractor is obliged to use trucks with sealed cover. 3. Suitable clean sand or soil material should be used for backfilling in layers (25cm max each & compaction test 98%), selected from the approval excavated soil or imported. Prices shall include supply, wetted, compacted transporting, tested and anywhere else, needed all according to drawings specifications, conditions and directed instructions by the Engineer or his representative 2.1 Excavations compliant to Greek Technical Standards ΕΤΕΠ m Excavations compliant to Greek Technical Standards ΕΤΕΠ m Uprooting and removal of logs. m /7

4 2.4 Backfilling on specified areas by using approved materials (all works included). This item includes the backfilling to maintain the required levels as described in the drawings, technical descriptions and according to the Construction Manager's instructions. m Concrete & Reinforcement Concrete Works Preambles: The Contractor shall take into consideration that all direct and indirect works and expenses required for the completion of the coming items are included in the unit price. Rates of concrete works shall include: -Shuttering, supply and placing of concrete, vibrating, curing, striking. The concrete mix shall be transported in concrete transit mixing trucks in accordance with greek regulations and specification to avoid any contamination, segregation and loss of consituent materials. -Concrete additives -Making and transporting of formwork, oil, nails. -Mix ratio for reinforced concrete shall be in accordance with greek regulations and specification for concrete. Cleaning, fabrication, placing, the provision for all necessary temporary fixings and supports including tie wire and chair supports, laps, spacers and wastage Reinforced concrete C16/20, according to the National Concrete Technology Regulations (ΚΤΣ) Reinforced concrete C12/15, according to the National Concrete Technology Regulations (ΚΤΣ) Reinforcement steel mesh (B500c), supply, fabricate and installation of steel mesh T131 Reinforcement steel rods (B500c), supply, fabricate and installation of steel bars of diameter Ø 8mm - 20mm m m kgr kgr Finishes Precast concrete curbs of dimensions x15x30 cm m /7

5 4.2 Safety rubber floor tiles of dimensions 50x50x5cm, shockproof, consisting of a mixture of recycled natural rubber grains and coloured (green or dark red) polyurethane glue. The industrially manufactured product must be very resilient and compliant to standards by the Greek Standardisation Agency (ΕΛΟΤ), ΕΝ 1176 & ΕΝ Works include the supply, transportation, packaging and unpacking, temporary storage and onsite retention, assembly, fixing on a concrete base will all additional materials and equipment required, according to the manufacturer s instructions, as well as onsite protection measures for damages during construction, all according to Greek Technical Standards (ΕΤΕΠ ). m Pressed soil m Steel constructions 5.1 Steel railing m Miscellaneous & urban furniture/equipment 6.1 Clearing and cleaning/preservation of existing stone wall 6.2 Wooden bench pc Wooden seesaw two seats Individual seesaw spring pc Wooden swing two seats Octagonal cast iron waste basket pc Information sign (reflective) on a type 2 base compliant to standards (ΕΛΟΤ EN m ). EMVAC Works 7 Electrical Works 7.1 Supply and installation of main switchboard in enclosure 7.2 Supply, installation and connection of supply and distribution cables 3X10 m Supply, installation and connection of distribution cablesnyy 3X2.5 m Supply and installation of underground conduit Ø40 m Supply, installation and connection of earthing conductor 16mm² m Supply and installation of earthing rod 2.5m 7.7 Excavation works hr 2 5/7

6 7.8 Supply installation (base and anchoring) and connection of pole mounted, prewired lighting fixtures for outdoor use pc 4 8 Mechanical Works Supply and Install UPVC pipes PN6, as per ΕΝ 1329 ΕLΟΤ 686, laid, jointed, tested, with all required fittings and auxiliary materials, Ø100, complete all as per drawings and Supply and Install UPVC pipes PN6, as per ΕΝ 1329 ΕLΟΤ 686, laid, jointed, tested, with all required fittings and auxiliary materials, Ø100, painted in the color of stone complete all as per drawings and Engineer instruction. Drilling into stone wall of a hole for installation of a PVC Ø100 pipe and after installation backfilling and restoration of the wall, complete all as per drawings and Excavation for pipe trench, complete all as per drawings, technical description and Backfilling of pipe trench, complete all as per drawings, technical description and Sand for pipe embedment, complete all as per drawings, technical description and Warning mesh as per technical description and Supply and Install floor drain, jointed and tested, with all required fittings and auxiliary materials, complete all as per drawings, technical description and Cleaning of drainage pit, adjustement of the top in order to meet the new final surface level and replacement of the grating, complete all as per technical description and m 3 m 3 m m m m Excavation into stone wall for creation of a tray for installation of recessed pipe Ø25 and after installation restoration of the wall, complete all as per drawings, technical description and 6/7

7 8.11 Supply and Install HDPE pipes PN20, as per ΕΝ , laid, jointed, tested, with all required fittings and auxiliary materials, m 23 Ø25, complete all as per drawings and 8.12 Excavation for pipe trench, complete all as per drawings, technical description and m Backfilling of pipe trench, complete all as per drawings, technical description and m Sand for pipe embedment, complete all as per drawings, technical description and m Warning mesh as per technical description and m Supply and Install recessed chromium plated brass antifreeze water faucet 1/2", complete all as per drawings and Engineer instruction Precast reinforced concrete manhole 30x30 with cast iron A15 cover Supply and Install ball valves of chromium plated brass, 3/4", complete all as per drawings and 7/7

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9 RFP/GRC/LSV/2017-005: RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE Annex A - BILL OF QUANTITIES 1/9 The Contractor shall consider in his price all costs or expenses of all requirements

More information

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3 ITB 2016-279 Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL-10-00098764 Bill of Quantity : Package2 - Lot 3 Package 2 Lot1- Installation, Connection

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Programme of Assistance to the Palestinian People UXOs and Rubble Removal from Gaza Strip Removal of Residential and public Debris from North Governorate (Package 7)

More information

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1 BILLS OF QUANTITIES - Name of Project CONSULTANT:

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) Emergency Removal and Crushing of Rubble and Debris Management PAL 10-92895 Lot # 13: Rubble Removal from Different Locations of Gaza Governorates Bill of Quantity (BOQ) Bill of Quantity (BOQ) PREAMBLE

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

July Bill No.1: Preliminaries

July Bill No.1: Preliminaries Bill No.1: Preliminaries 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture, computers, printers, photocopier,

More information

Bill No.1: Preliminaries

Bill No.1: Preliminaries Bill No.1: Preliminaries Item No. Description of Works Qty. 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture,

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) PAL 10-92895 - Emergency Removal and Crushing of Rubble and Debris Management Lot # 10: Site Preparation and Crushing of Concrete Rubble Bill of Quantity (BOQ) Bill of Quantity (BOQ) ITB 2015-039 PREAMBLE

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance PAL 10-00071488 Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

Jericho Agro Industrial Park

Jericho Agro Industrial Park Bill. 1 Excavation Earth Works and Embankment Work 1 Description Unit QTY Price/ Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Rehabilitation of Tunis & Omer Bin Abdel Aziz Sidewalks PAL 10-71488 : UXOs and Rubble Removal From Gaza Strip Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

APPENDIX A MEASUREMENT AND PAYMENT

APPENDIX A MEASUREMENT AND PAYMENT P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged

More information

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1 PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS October 1990 CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Testing and Approval...1 5.3 Irrigation Pipe and Fittings...1

More information

APPENDIX 5: CONSTRUCTION CHECKLISTS

APPENDIX 5: CONSTRUCTION CHECKLISTS APPENDIX 5: CONSTRUCTION CHECKLISTS This appendix presents the construction checklists for the various retaining wall mitigation strategies: 10.1 Void Fill 10.2 Surface Bond Overlay 10.3 Reinforced Overlay

More information

2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum

2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum D E N V E R I N T E R N A T I O N A L A I R P O R T CONTRACT NO. 201208796 ADDENDUM NUMBER TWO Scope of this Addendum Addendum Number Two includes modifications to the following Contract Documents issued

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 PARTICULAR SPECIFICATIONS FOR THE CONSTRUCITON OF STORM WATER DRAINAGE NETWORK March 2018 BUREAU TECHNIQUE POUR LE DEVELOPPEMENT P.O.B

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing

More information

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

The Regional Municipality of Peel Basis of Payment

The Regional Municipality of Peel Basis of Payment Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 610 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS TABLE OF CONTENTS 610.01 SCOPE 610.02 REFERENCES 610.03

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA 106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard

More information

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No.

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No. (SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No. Special Provision No. 407S06 July 2010 Aggregate Requirements, Lift Rings,

More information

FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )

FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. ) PAGE 1 OF 6 FOR USE WHEN UNIT S FORM THE BASIS OF PAYMENT - TO BE USED ONLY WITH THE GENERAL CONDITIONS AND OTHER STANDARD DOCUMENTS OF THE UNIT MASTER MUNICIPAL CONSTRUCTION DOCUMENTS. Owner: Contract:

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes

APPLICABILITY TABLE. Council BSC CHRC GRC IRC LSC MRC RRC Applicable Yes Yes Yes Yes Yes Yes Yes Precast roof slabs refer Standard Drawing CMDG-D-03 Special cast iron cover and frame, refer Service Authority. Special cast iron cover and frame, refer Service Authority. Cast iron cover and frame Ø 200

More information

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY PART 1 - GENERAL SECTION 01 01 11 MULTIPLE CONTRACT SUMMARY 1.01 SCOPE OF WORK A. This Section includes a summary of each Contract, including responsibilities for coordination and temporary facilities

More information

A. BILL OF QUANTITIES FOR SANITARY SEWER

A. BILL OF QUANTITIES FOR SANITARY SEWER Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

B. Fiberglass for construction in back lot easements placed on cast-in-place base. Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements

More information

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ Original Issue Bamyan MAC Site Services Phase Bamyan, Bamyan, Afghanistan Project Components:. Site Services Phase NOTICE TO ALL BIDDERS COMPLETE

More information

REPUBLIC OF LEBANON MINISTRY OF ENERGY AND WATER UNITED NATIONS DEVELOPMENT

REPUBLIC OF LEBANON MINISTRY OF ENERGY AND WATER UNITED NATIONS DEVELOPMENT REPUBLIC OF LEBANON MINISTRY OF ENERGY AND WATER UNITED NATIONS DEVELOPMENT PROGRAMME FEASIBILITY ASSESSMENT AND DESIGN OF A WASTEWATER MANAGEMENT SYSTEM IN AL AMAYER-WADI KHALED (KNAISSE VILLAGE) VOLUME

More information

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT Addendum No. 2 Attachment B Contract Document Revisions Specifications: TABLE OF CONTENTS ADDENDUM NO. 2 Attachment B Contract

More information

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:] SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated

More information

This type of masonry shall consist of brick laid in full beds of cement mortar.

This type of masonry shall consist of brick laid in full beds of cement mortar. SECTION 11.0 DRAINAGE STRUCTURES 11.01 Scope of Work This item shall consist of installation and construction of storm drainage pipes, culverts, basins, headwalls, manholes, junction boxes, head ditches,

More information

Requirements for Measuring and Pricing of Traffic Signs and Road Markings

Requirements for Measuring and Pricing of Traffic Signs and Road Markings Requirements for Measuring and Pricing of Traffic Signs and Road Markings February 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows: ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled

More information

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances 2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL BILL NO 17 CONCRETE WORK (All Provisional) 17/1 Clear site of all obstacles and dispose as directed by the Engineer on site. SM 500 200 100,000.00 17/2 Set out works over land and water ITEM 1 50000 50,000.00

More information

BUILDING SEWER AND GRINDER PUMP CONNECTION & CONSTRUCTION STANDARDS

BUILDING SEWER AND GRINDER PUMP CONNECTION & CONSTRUCTION STANDARDS TOWN OF MILO, NEW YORK Department of Sewer and Water Attention: Doug Marchionda, Jr. Operator Jeffrey Finger Operator 137 Main Street Penn Yan, New York 14527 Telephone No.: (315) 536-8501 Facsimile No.:

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY REFERS BROUGHT FORWARD : PREVIEW COPY ONLY

CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY REFERS BROUGHT FORWARD : PREVIEW COPY ONLY CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY PRELIMINARY & GENERAL FOR ALL SITES A1.1 Safety requirements (According to Act 85 of 1983 and E4E and E7/1) and Value related (Project, public liability,

More information

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE...

ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE... ANNEX 3 DETAILED PRICE SCHEDULE RELATED TO THE BILL OF QUANTITIES 1. GENERAL... 3 2. DESCRIPTION OF ITEMS... 5 3. PRICES TO BE FULLY INCLUSIVE... 5 4. COVERAGE... 6 5. BIDDER TO PRICE EACH ITEM... 6 6.

More information

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution. ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

WORKS DESCRIPTION Unit. Quantity Unit price Total USD

WORKS DESCRIPTION Unit. Quantity Unit price Total USD BILL OF QUANTITIES MAIN DESIGN OF LANDSLIDE REMEDY ON THE STATE ROAD OF II A CLASS NO 70, SECTION: SEDLARE - DEBELO BRDO, from km 4+960 to km 4+978, ID-373 No 3 4 5 WORKS DESCRIPTION Unit Quantity Unit

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 02514 MANHOLES 1.0 GENERAL 1.1 SCOPE This section provides for construction of sewer manholes complete in place, including the furnishing and adjusting to grade of an existing

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

INVITATION TO TENDER ITT PS

INVITATION TO TENDER ITT PS FINANCE RISK AND SUPPLY CHAIN MANAGEMENT SUPPLY CHAIN MANAGEMENT INVITATION TO TENDER ITT PS20170704 AMENDMENT NO. 3 1. REVISED TABLE 3 UNIT PRICES The ITT is hereby amended as follows: In Schedule A,

More information

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts

More information

Special Provision No. 421F01 April 2006

Special Provision No. 421F01 April 2006 RIGID PIPE CULVERTS Item No. FLEXIBLE PIPE CULVERTS Item No. CSP ARCH CULVERTS Item No. STRUCTURAL PLATE CSP Item No. CORRUGATED STEEL PIPE EXTENSIONS Item No. ROCK EXCAVATION FOR CULVERTS Item No. CLAY

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

REVISED PER ADDENDUM No. 1 - Unit Price Bid Schedule

REVISED PER ADDENDUM No. 1 - Unit Price Bid Schedule 1. Mobilization, Insurance, Bonds, General Requirements, BMPs, Record Drawings, Testing Requirements, Utility Location, Demobilization and Site Maintenance. 1 L.S. 2. Supply and install complete 384,238

More information

Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries

Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA requirements. (2) If CAM decides to cancel any s listed in the Bills

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS

CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 408 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS TABLE OF

More information

Job Order Sewer Repair Services

Job Order Sewer Repair Services Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified

More information

Price Schedule 1 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE COVERAGE BIDDER TO PRICE EACH ITEM...

Price Schedule 1 1. GENERAL DESCRIPTION OF ITEMS PRICES TO BE FULLY INCLUSIVE COVERAGE BIDDER TO PRICE EACH ITEM... Price Schedule 1 1. GENERAL... 3 2. DESCRIPTION OF ITEMS... 5 3. PRICES TO BE FULLY INCLUSIVE... 5 4. COVERAGE... 6 5. BIDDER TO PRICE EACH ITEM... 6 6. DESCRIPANCIES BETWEEN RATES... 6 7. MEASUREMENT...

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No. Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations

More information

CATCHMENT STRUCTURE 13M X 15M

CATCHMENT STRUCTURE 13M X 15M BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information