1 AREMA UNLOADING PIT CALCULATIONS AUTHORS Steven P. Lorek, PE (Principal Author) HDR Engineering, Inc Carver Road, Suite 200 Cincinnati, OH Phone: Fax: ABSTRACT The paper submitted for publication will document the process taken to revise the unloading pit section of the AREMA manual. The original section on unloading pits was incorporated into the Manual in Upon review of Section 8.4 for reaffirmation in 2010, it was determined that the figures in section were developed prior to the implementation of the alternate loading and the concrete figures should be removed from Chapter 15. Figures and were reviewed in relation to current live load and fatigue criteria specified in Section 1. The documentation will include commentary of the history of the section, steps take to revise the section, and the detailed calculations required to make the table changes. AREMA MANUAL OF RECOMMENDED PRACTICE PUBLICATION ARCHIVE ARCHIVE REASON: TABLE CALCULATIONS UPDATE PUBLICATION YEAR: 2012 COMMITTEE: SUBCOMMITTEE: REVISION: ATTACHMENTS: 15 - Steel Structures 08 Painting & Special Construction Figure Unloading Pit Fifteen Foot Maximum Span Executive Summary AREMA MRE Figure (2011) Letter Ballot AREMA MRE Figure (2014) Calculations AREMA

2 EXECUTIVE SUMMARY In order to determine the capacity of both the supporting steel beams and concrete structure of the unloading pits under alternate loading, a preliminary analysis was performed. The unloading pit can be found in the 2011 American Railway Engineering and Maintenance (AREMA) Chapter 15 Section 8.4. The current tables of the beam requirement and concrete pit reinforcing were developed under E80 loading. The following is a summary of the findings and analysis of the unloading pit under alternate loading. SUPPORTING BEAM Using a MathCAD template, the supporting beams were analyzed for the alternate loading in both bending and shear. The investigation used the same steel beam section with respect to the varying span length as that of the AREMA - Figure We used the same design requirements such as A.S.T.M A36 structural steel and live impact of 28%. As shown on the enclosed table most of the supporting steel beams were determined deficient for the alternate loading condition. All other design assumptions are included with this document. A summary is enclosed. CONCRETE PIT STRUCTURE A structural analysis (computer model) was performed on the concrete pit structure. The walls are design per foot and the footing length varied with respect to wall height at a 1:1 ratio to sustain the applied loads. The pit was analyzed using the same restrictions and design requirements stated in the AREMA section It is determined that the proposed reinforcing would not work for the E80 or alternate loading conditions. A complete wall model will need to be developed in order to obtain an exact result for the proposed reinforcing listed in AREMA figure Enclosed in this document is the model used to evaluate the concrete pit. A spreadsheet with the number of proposed iteration is also included in order to full analyze the pit as the span length the wall height the wall thickness and footing thickness varies. CONCLUSIONS Supporting Beam - The enclosed table demonstrates that three beam sections would still work for the alternate loading with the respective listed span length; HP12X74 for 8 and 9 feet spans, W16X89 for 12ft span and W21X101 for 15ft span. All other beams are deficient in either bending or shear or both. For these failing sections, larger sections would need to replace the present proposed beams, given that their structural capacity does not permit the alternate loading at the stated span length. Concrete Pit Structure - The concrete pit structure needs further analysis by the committee in order to accurately determine the capacity of the reinforcing as the wall height and span varies. AREMA

3 AREMA MRE Figure (2011) AREMA

4 AREMA MRE Figure (2011) AREMA

5 AREMA MRE Figure (2011) AREMA

6 Letter Ballot Number: Title: Proposed Revisions to for alternate live load criteria Proposed Letter Ballot: Proposed revisions to the section include updates to the following figures: Figure (Sheet 2 of 3) revision. (See attached) Figure (Sheet 3 of 3) revision. (See attached) Rationale: Table is being revised to accommodate the alternate live loading criteria. Figure Unloading Pit Fifteen Foot Maximum Span To comply with the current live load criteria specified in Section 1, the beam supported superstructure is being upgraded to accommodate the current alternate live loading. In addition, the welded diaphragm connection to the main supporting beams of Figure is being revised to represent a bolted diaphragm connection. This will improve the fatigue category and extend service life while allowing for a reduced beam section. AREMA

7 Letter Ballot Number: AREMA

8 AREMA MRE Figure (2014) AREMA

9 AREMA MRE Figure (2014) AREMA

10 AREMA MRE Figure (2014) AREMA

11 CALCULATIONS DESIGN ASSUPMTIONS: Design Method: (Steel) Sevice Load Design - Steel Beam Structural Steel Yield Strength: Fy = 36 ksi Live Load: AREMA - Alternate Live Load Impact ( Steel Beams only) : 28% Maximum Speed on tracks: 10 MPH Design Method: (Concrete) Load Factor Design - Concrete Pit Concrete Compressive Strength: f'c = 3 ksi Reinforcing Steel Yield Strength: fy = 60 ksi Unit Weight of Soil: w s = 120 pcf Angle of Internal Friction Φ = 0 Horizontal Earth Pressure: E = 1/2*w s *h^2 AREMA (Case 6) Horizontal Live Load Surcharge: h' = h*q AREMA (Case 6) Surchage Load q = 4 ksf Reference :- Chapter 15 - Section Unloading Pit Structural Steel Beam Structural Steel (Fatigue) Diaphragm Connection Simple Beam Fatigue was evaluated assuming that the channel-section diaphragm is bolted to the web of the Unloading Pit beam at mid-depth with matched angles or a T-section. The bolted detail is evaluated at the bolt furthest from mid-depth according to AREMA Table , Section 2 for bolted connections. (See figures, below) W8x67, C5x6.7, WT3x12.5 W14x132, C10x15.3, WT3x12.5 W10x57, C6x8.2, WT3x12.5 W16x100, C12x20.7, WT3x12.5 AREMA

12 AREMA

13 CALCULATIONS AREMA

14 CALCULATIONS AREMA

15 CALCULATIONS AREMA

16 CALCULATIONS AREMA

STEEL DECKS FOR RAIL BRIDGES

STEEL DECKS FOR RAIL BRIDGES STEEL DECKS FOR RAIL BRIDGES Duncan Paterson PE PhD HDR Inc. 9987 Carver Rd Cincinnati OH 513-984-7500 duncan.paterson@hdrinc.com Steve Lorek, PE HDR Inc. 9987 Carver Rd Cincinnati OH 513-984-7500 Steve.Lorek@hdrinc.com

More information

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota

AREMA 2008 Annual Conference. LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota AREMA 2008 Annual Conference LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE NNW, Inc. Rochester, Minnesota 55904 507-281-5188 Steve K. Jacobsen, PE 2 LOW PROFILE RAILROAD BRIDGE Steve K. Jacobsen, PE

More information

GUSSET PLATES IN RAILROAD TRUSS BRIDGES FINITE ELEMENT ANALYSIS AND COMPARISON WITH WHITMORE TESTING

GUSSET PLATES IN RAILROAD TRUSS BRIDGES FINITE ELEMENT ANALYSIS AND COMPARISON WITH WHITMORE TESTING GUSSET PLATES IN RAILROAD TRUSS BRIDGES FINITE ELEMENT ANALYSIS AND COMPARISON WITH WHITMORE TESTING Walid S. Najjar, Ph.D., P.E. 1, Frank DeOrtentiis, P.E. WSP SELLS 555 Pleasantville Road, Briarcliff

More information

Simple Span Bridge Design with espan140

Simple Span Bridge Design with espan140 Simple Span Bridge Design with espan140 Short Span Steel Bridge Alliance NACE 2017 Short Span Steel Bridge Workshop Cincinnati, OH April 9, 2017 Michael Barker, PE University of Wyoming & SSSBA Bridge

More information

City of Mesquite General Design Standards Revision Date:

City of Mesquite General Design Standards Revision Date: SCREENING WALLS (Public and Private) Page 1 of 6 Section 1 General Design & Notes 1.1 Standards 1.1.1 All screening walls in the City of Mesquite and within its Extraterritorial Jurisdiction (ETJ), both

More information

For Two Steel Bridges

For Two Steel Bridges Load Rating For Two Steel Bridges Jing juan Li PHD, PE, SE Senior Project Manager RHC ENGINEERING September 2013 Project Introduction Outline Load rating procedure: Determine load rating method Determine

More information

30 kip/ft (Dead load) 5 ft. 20 ft

30 kip/ft (Dead load) 5 ft. 20 ft UNIVERSITY OF CALIFORNIA, BERKELEY Dept. of Civil and Environmental Engineering Spring Semester 2017 Structural Engineering, Mechanics and Materials Ph.D. Preliminary Examination: Design Consider the frame

More information

Supplemental Plan Check List for Concrete Special Moment Resisting Frame

Supplemental Plan Check List for Concrete Special Moment Resisting Frame Plan Check / PCIS Application Number: Your feedback is important, please visit our website to complete a Customer Survey at /LADBSWeb/customer-survey.jsf. If you have any questions or need clarification

More information

OVERALL STRUCTURAL SYSTEM

OVERALL STRUCTURAL SYSTEM EXECUTIVE SUMMARY The at the Pittsburgh International Airport, PA, is a 275,000 square foot multi-use building located directly adjacent to the airport s landside terminal. The building consists of an

More information

How to Design a Singly Reinforced Concrete Beam

How to Design a Singly Reinforced Concrete Beam Time Required: 45 minutes Materials: -Engineering Paper -Calculator -Pencil -Straight Edge Design For Flexural Limit State How to Design a Singly Reinforced Concrete Beam Goal: ΦMn > Mu Strength Reduction

More information

Software Verification

Software Verification EXAMPLE 9 ACI Handbook Two-Way Slab Example 2 PROBLEM DESCRIPTION The two-way slab system arranged three-by-three is shown in Figure 9-1. The slab consists of nine 6.5-inch-thick 20-foot 24-foot panels.

More information

STEEL REACTION FRAME

STEEL REACTION FRAME STEEL REACTION FRAME Kyle Coleman, CEE Laboratory Manager Andrew Myers, Assistant Professor Jerome F. Hajjar, Professor and Chair, Director, STReSS Laboratory Department of Civil and Environmental Engineering,

More information

CHAPTER 15 STEEL STRUCTURES 1

CHAPTER 15 STEEL STRUCTURES 1 5 CHAPTER 5 STEEL STRUCTURES FOREWORD Part through Part 4, Part 6, and Part 7 formulate specific and detailed recommendations for the design, fabrication, erection, maintenance, inspection, and rating

More information

North Shore at Canton Baltimore, MD Beau Menard Technical Report 1

North Shore at Canton Baltimore, MD Beau Menard Technical Report 1 North Shore at Canton Baltimore, MD Beau Menard Technical Report 1 Structural Schneider 10/05/05 Structural Concepts Executive Summary North Shore at Canton is a 4 story town home and parking garage structure

More information

John Jay College Expansion Project

John Jay College Expansion Project Technical Report #1 Michael Hopper Mike AE Consultant: Dr. Lepage [Type the company name] September 29 th, 2008 Technical Report #1 Table of Contents Executive Summary.3 Introduction.4 Structural System.6

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

16. Design of Pipeline Structures.

16. Design of Pipeline Structures. 16. Design of Pipeline Structures. a. General. 1) The following guidelines are for the design of structures for water and sewer pipelines including structural concrete and miscellaneous metals design.

More information

Footings GENERAL CONSIDERATIONS 15.2 LOADS AND REACTIONS 15.4 MOMENT IN FOOTINGS

Footings GENERAL CONSIDERATIONS 15.2 LOADS AND REACTIONS 15.4 MOMENT IN FOOTINGS 4 Footings GENERAL CONSIDERATIONS Provisions of Chapter 15 apply primarily for design of footings supporting a single column (isolated footings) and do not provide specific design provisions for footings

More information

OCTAGONAL SHAPE REDUCES AIRPLANE HANGAR COSTS

OCTAGONAL SHAPE REDUCES AIRPLANE HANGAR COSTS OCTAGONAL SHAPE REDUCES AIRPLANE HANGAR COSTS While a square hangar would have been simpler to design, an octagonal building substantially reduced life cycle costs By Charles Sacre, P.E. THE PROGRAM FOR

More information

Structural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/

Structural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/ 120 Montgomery Street, Suite 1410 San Francisco, California 94104 415/781-1505 Fax 415/781-2718 sde@sdesf.com Rajendra Sahai, SE Principal John W. Laws, SE Principal Steven Lepisto, SE Principal STRUCTURAL

More information

Name: 1 FOR ANY AISC DESIGN AIDS: YOU MUST SPECIFY THE TABLE USED. CE311 Fall 2017 Exam 3 11/16/2017. ASD Load Combinations: LRFD Load Combinations:

Name: 1 FOR ANY AISC DESIGN AIDS: YOU MUST SPECIFY THE TABLE USED. CE311 Fall 2017 Exam 3 11/16/2017. ASD Load Combinations: LRFD Load Combinations: CE 311 Celebration of Knowledge 3 100 points November 16, 2017, 7pm to 9:30pm YOU MUST CITE ANY AISC DESIGN AIDS USED You are allowed to have the AISC manual, and a calculator. Given Formulae: Live Load

More information

Visteon Village Corporate Center

Visteon Village Corporate Center Visteon Village Corporate Center Van Buren Township, MI Technical Assignment #1 Jamison Morse Structural Option Advisor: Dr. Andres Lapage Jamison Morse Structural Option Visteon Village Center Advisor:

More information

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania TECHNICAL REPORT 1 Structural Concepts / Structural Existing Conditions Penn State Hershey Medical Center Children s Hospital Matthew V Vandersall The Pennsylvania State University Architectural Engineering

More information

Precast Concrete Bearing Wall Panel Design (Alternative Analysis Method) (Using ACI )

Precast Concrete Bearing Wall Panel Design (Alternative Analysis Method) (Using ACI ) Precast Concrete Bearing Wall Panel Design (Alternative Analysis ethod) (Using ACI 318-14) Precast Concrete Bearing Wall Panel Design (Alternative Analysis ethod) (Using ACI 318-14) A structural precast

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

BACKGROUND: SUBSURFACE CONDITIONS:

BACKGROUND: SUBSURFACE CONDITIONS: 2 BACKGROUND: The planned project consists of a prefabricated modular apartment building with underground parking, located on the site bounded by Dexter Avenue N. to the east, multi-story residential/commercial

More information

M.S. Comprehensive Examination: Design

M.S. Comprehensive Examination: Design UNIVERSITY OF CALIFORNIA, BERKELEY Dept. of Civil and Environmental Engineering Spring Semester 2017 M.S. Comprehensive Examination: Design Consider the shown frame and the cross-section of the column

More information

Masonry and Cold-Formed Steel Requirements

Masonry and Cold-Formed Steel Requirements PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as

More information

Cantilever or Restrained Retaining Wall Calculations

Cantilever or Restrained Retaining Wall Calculations Cantilever or Restrained Retaining Wall Calculations Organization: F.E.C. Project Name: Example Report Design by: LAA Job #: 9876 Date: 10/21/2013 Codes used: 2010 & 2013 CBC, 2009 & 2012 IBC, ACI 318-08

More information

NATIONAL CORRUGATED STEEL PIPE ASSOCIATION

NATIONAL CORRUGATED STEEL PIPE ASSOCIATION NATIONAL CORRUGATED STEEL PIPE ASSOCIATION Designdatasheet No. 18 ISSUED: June 1995 UPDATED: September 1999 This Data Sheet is for general use only and should not be used without first securing competent

More information

HIGH RISE CONDO SOHO, NEW YORK, NY

HIGH RISE CONDO SOHO, NEW YORK, NY HIGH RISE CONDO SOHO, NEW YORK, NY TECHNICAL ASSIGNMENT 1 October 5, 2006 Joseph The Pennsylvania State University Structural Option Faculty Advisor: Andres Lepage TABLE OF CONTENTS TABLE OF CONTENTS 2

More information

Perma-Column Deck Post Design Manual

Perma-Column Deck Post Design Manual Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models Project Number S007-12 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com

More information

Cantilever or Restrained Retaining Wall Design Calculations

Cantilever or Restrained Retaining Wall Design Calculations Cantilever or Restrained Retaining Wall Design Calculations Organization: F.E.C. Project Name: Ex 3 Driveway Short Wall Design by: LAA Job #: Date: 7/5/2016 Codes used: 2012 + 2015 IBC, ACI 318-14, ACI

More information

DIVISION: METALS SECTION: STEEL DECKING REPORT HOLDER: EPIC METALS CORPORATION 11 TALBOT AVENUE RANKIN, PENNSYLVANIA 15104

DIVISION: METALS SECTION: STEEL DECKING REPORT HOLDER: EPIC METALS CORPORATION 11 TALBOT AVENUE RANKIN, PENNSYLVANIA 15104 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2047 Reissued 07/207 This report is subject to renewal 07/209. DIVISION: 05 00 00

More information

Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models

Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models Project Number S007-12 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com

More information

Hyatt Place North Shore. Pittsburgh, PA T. Technical Assignment #1. Kyle Tennant. Kyle Tenn. Structural (IP) [Type the document subtitle]

Hyatt Place North Shore. Pittsburgh, PA T. Technical Assignment #1. Kyle Tennant. Kyle Tenn. Structural (IP) [Type the document subtitle] Technical Assignment #1 Hyatt Place North Shore [Type the document subtitle] T Kyle Tenn Kyle Tenn Kyle Tennant Structural (IP) Dr. Ali Memari O c t o b e r 4 2 0 1 0 Table of Contents I. Executive Summary

More information

It is recommended that repairs be undertaken to bring these steel connections back to original design strength on a priority basis.

It is recommended that repairs be undertaken to bring these steel connections back to original design strength on a priority basis. August 30, 2016 REF: 16LET019 Address: Attention: Subject: BAE Systems, San Francisco Ship Repair Foot of 20 th Street San Francisco, CA 94107 Mr. Justin Gleaton, Dockmaster Dry Dock No. 2 Dolphin & Stair

More information

Lintel Tables Design Notes and Limitations

Lintel Tables Design Notes and Limitations LINTEL TABLES Lintel Tables Design Notes and Limitations 1. These tables apply to one and two family residential structures only that conform to the requirements of the 2006, 2009 or 2012 International

More information

David A. Walenga Technical Assignment #1

David A. Walenga Technical Assignment #1 Executive Summary Contained in this report is design information related to the structural system of the Residence Inn by Marriot located in Stamford, Connecticut. Specifically, this report covers: code

More information

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By: Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By: ABSTRACT Shafi M. Sharifan, Ph.D., P.E. Wei Koo & Associates Orange, California Kosal Krishnan,

More information

Cross Frame Design for Curved and Skewed Bridges

Cross Frame Design for Curved and Skewed Bridges Cross Frame Design for Curved and Skewed Bridges Using AASHTO LRFD, 8 th Edition Travis Butz, PE To View Presentation on Your Mobile Device: www.burgessniple.com/event/2018/otec Cross frames in the 8 th

More information

How Loads Are Distributed

How Loads Are Distributed LOAD DISTRIBUTION 1 LOAD DISTRIBUTION This section illustrate how load will transmit from the deck to the stringers. Determining the fraction of load carried by a loaded member and the remainder distributed

More information

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Simplified Building Schematic for Typical Floor (Levels 9 through 22): Introduction to Structural System Simplified Building Schematic for Typical Floor (Levels 9 through 22): Key: - Tower Columns - Tower Shear Walls - Parking Garage Columns - Parking Garage Shear Walls Solid

More information

Diaphragm wall with tieback supports (English units)

Diaphragm wall with tieback supports (English units) Diaphragm wall with tieback supports (English units) Deep Excavation LLC Software program: DeepEX 2015 Document version: 1.0 December 16, 2014 www.deepexcavation.com Deep Excavation LLC 1 A. Project description

More information

Client Project Job # Wall Loc. SBWall Report deg 120 pcf 950 psf deg 0.0 ft. 6.0 ft 6.0 ft 2.0 ft. W16x50.

Client Project Job # Wall Loc. SBWall Report deg 120 pcf 950 psf deg 0.0 ft. 6.0 ft 6.0 ft 2.0 ft. W16x50. SBWall Report Soils Data Soil Friction Angle, phi Soil Unit Weight, gamma Soil Surcharge (uniform), qs Passive Resistance, FSp Passive Wedge Width, PW*B Backfill Slope Angle, beta Ignore Passive Resistance,

More information

DESIGN INFORMATION WAFFLE-CRETE. FOR MORE INFORMATION, WRITE OR CALL International, Inc.

DESIGN INFORMATION WAFFLE-CRETE. FOR MORE INFORMATION, WRITE OR CALL International, Inc. WAFFLE-CRETE DESIGN INFORMATION STRUCTURAL PRECAST PRECAST CONCRETE CONCRETE BUILDING BUILDING SYSTEMS SYSTEMS FOR MORE INFORMATION, WRITE OR CALL WAFFLE-CRETE International, Inc. P.O. BOX 1008 Hays, Kansas

More information

Cantilever or Restrained Retaining Wall Design Calculations

Cantilever or Restrained Retaining Wall Design Calculations Cantilever or Restrained Retaining Wall Design Calculations Organization: F.E.C. Project Name: Ex 4 Fence Wall Design by: LAA Job #: Date: 7/5/2016 Codes used: 2012 + 2015 IBC, ACI 318-14, ACI 530-11 NOTES:

More information

3.1 2WH V2.0 Composite and Non-Composite Deck Catalog. 36/4 Attachment Pattern. 2W Series Embossment.

3.1 2WH V2.0 Composite and Non-Composite Deck Catalog.  36/4 Attachment Pattern. 2W Series Embossment. 3.1 2WH-36 12" 12" 2-1/8" 2-1/8" 36" 2WH-36 Profile 36" 2WHS-36 Profile Panel Properties Gage Weight 36/4 Attachment Pattern Base Metal Thickness Yield Strength Tensile Strength Area 2W Series Embossment

More information

Final Recommendation

Final Recommendation Structural Evaluation and Retrofit of a Warehouse Project Background Student Collaboration with Introduction Design Loads Faculty, Licensed Engineers Warehouse Localutility useswarehouseasoffice, as office,

More information

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Simplified Building Schematic for Typical Floor (Levels 9 through 22): Introduction to Structural System Simplified Building Schematic for Typical Floor (Levels 9 through 22): Key: - Tower Columns - Tower Shear Walls - Parking Garage Columns - Parking Garage Shear Walls Solid

More information

Project. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal

Project. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal Project San Jose City College Physical Education Building PLACE IMAGE HERE Prepared For Ken Bauer, AIA Principal LPAS 2484 Natomas Park Drive Sacramento, CA 95833 916.443.0335 Prepared By Steve Ratchye,

More information

4.1 BH /4 Attachment Pattern. B Series Embossment. Panel Properties. Gross Section Properties Distance to N.A. from Bottom.

4.1 BH /4 Attachment Pattern. B Series Embossment. Panel Properties. Gross Section Properties Distance to N.A. from Bottom. 4.1 BH-36 2-3/8 3-5/8 6 2-3/8 3-5/8 6 1-1/2 1-1/2 36 BH-36 Profile 36 BHN-36 Profile 36/4 Attachment Pattern Panel Properties Gage Weight Base Metal Thickness Yield Strength Tensile Strength Area B Series

More information

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

More information

Farquhar Park Aquatic Center. York, PA

Farquhar Park Aquatic Center. York, PA Technical Report #1 Jason Kukorlo Consultant: Dr. Linda M. Hanagan October 5, 2009 1 TABLE OF CONTENTS I. Executive Summary.3 II. III. IV. Introduction..4 Structural System Overview Foundation...6 Superstructure..7

More information

Structural Engineering, Mechanics, and Materials. Preliminary Exam - Structural Design

Structural Engineering, Mechanics, and Materials. Preliminary Exam - Structural Design Fall Semester 2018 Preliminary Exam - Structural Design A small building is located in downtown Berkeley. The structural system, either structural steel or reinforced concrete, comprises gravity framing

More information

Earth and Engineering Sciences Building University Park, Pennsylvania

Earth and Engineering Sciences Building University Park, Pennsylvania Executive Summary The Earth and Engineering Sciences building is a 4 story educational and laboratory facility. An additional basement level is located below grade and provides the foundation for the East

More information

MASONRY WALL DATA: Wall Height = ft. Nominal Wall Thickness = 8.00 in. Depth to c.g. Steel, Wall = 3.81 in.

MASONRY WALL DATA: Wall Height = ft. Nominal Wall Thickness = 8.00 in. Depth to c.g. Steel, Wall = 3.81 in. TIME: 10:49 AM Page: 1 DESIGN METHOD : ACI 530-99: Working Stress Design MASONRY MATERIAL : Hollow Core Concrete Masonry Units MORTAR TYPE : Type S MORTAR MATERIAL : Portland Cement Lime Mortar BLOCK PLACEMENT

More information

Reinforced Concrete Spread Footing (Isolated Footing) Analysis and Design. Design Footing

Reinforced Concrete Spread Footing (Isolated Footing) Analysis and Design. Design Footing Reinforced Concrete Spread Footing (Isolated Footing) Analysis and Design Design Footing Reinforced Concrete Spread Footing (Isolated Footing) Analysis and Design A square spread footing supports an 18

More information

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA Structural Analysis Overview: During the structural analysis of the in Lancaster, Pa, a redesign of the lateral and gravity system from masonry bearing and shear walls to a staggered truss system was performed.

More information

Design of Reinforced Concrete Slabs

Design of Reinforced Concrete Slabs Lecture 07 Design of Reinforced Concrete Slabs By: Prof Dr. Qaisar Ali Civil Engineering Department UET Peshawar drqaisarali@uetpeshawar.edu.pk 1 Topics Addressed Introduction Analysis and Design of slabs

More information

CITY OF LOS ANGELES CALIFORNIA

CITY OF LOS ANGELES CALIFORNIA BOARD OF BUILDING AND SAFETY COMMISSIONERS MARSHA L. BROWN PRESIDENT VAN AMBATIELOS VICE-PRESIDENT VICTOR H. CUEVAS HELENA JUBANY ELENORE A. WILLIAMS CITY OF LOS ANGELES CALIFORNIA ANTONIO R. VILLARAIGOSA

More information

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2014 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

CHEF MENTEUR BRIDGE REPLACEMENT

CHEF MENTEUR BRIDGE REPLACEMENT CHEF MENTEUR BRIDGE REPLACEMENT Gumbo Engineers, Inc. Lucy Farrar, Travis Honore, Jeremy Vezina, Thomas Harrison PRELIMINARY DESIGN Fall 2016 Semester CE 4750 Professional Issues Mr. Miles Williams INTRODUCTION

More information

Prestressed Concrete Girder Continuity Connection

Prestressed Concrete Girder Continuity Connection Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status

More information

Executive Summary...2 Introduction...3 Structural System Overview Buffalo,...4 Foundation...4 Floor System...4 Gravity System...4 Lateral System...

Executive Summary...2 Introduction...3 Structural System Overview Buffalo,...4 Foundation...4 Floor System...4 Gravity System...4 Lateral System... Table of Contents University at Buffalo CTRC/Incubator Executive Summary...2 Introduction...3 Structural System Overview Buffalo,...4 New York Foundation...4 Floor System...4 Gravity System...4 Lateral

More information

OF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE THE EXISTING COMPLEX. THE FLOOR SYSTEM OF GEORGE READ HALL IS A HAMBRO COMPOSITE SYSTEM

OF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE THE EXISTING COMPLEX. THE FLOOR SYSTEM OF GEORGE READ HALL IS A HAMBRO COMPOSITE SYSTEM EXECUTIVE SUMMARY: GEORGE READ HALL IS A FIVE STORY DORMITORY ON THE UNIVERSITY OF DELAWARE S CAMPUS. EMCOMPASSING 129,000 SQUARE FEET, IT IS THE LARGEST OF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 05 5117 ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Temecula Medical Center Temecula, CA

Temecula Medical Center Temecula, CA Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas

More information

Part 28. Temporary Structures for Construction TABLE OF CONTENTS

Part 28. Temporary Structures for Construction TABLE OF CONTENTS Section/Article Part 28 Temporary Structures for Construction 2015 TABLE OF CONTENTS Description 28.1 General............................................................................... 8-28-2 28.1.1

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

ISSUE A Code Change # 2 Class 3 and Class 4 Buildings

ISSUE A Code Change # 2 Class 3 and Class 4 Buildings ISSUE A Code Change # 2 Class 3 and Class 4 Buildings (new) Section 1604.9 Disproportionate Collapse. Design for structural integrity of new buildings to protect against disproportionate collapse shall

More information

Parapet/railing terminal walls shall be located on the superstructure.

Parapet/railing terminal walls shall be located on the superstructure. GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of deck slab extensions at abutments. For general requirements and guidelines

More information

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California Reissued June 1, 2002 ICBO Evaluation Service, Inc. 5360 Workman Mill Road, Whittier, California 90601 www.icboes.org Filing Category: DESIGN Concrete DURISOL WALL FORMS FOR CONCRETE CONSTRUCTION DURISOL

More information

DESIGN CALCULATIONS INSTA-FOOTING LOAD BEARING CAPACITIES ON CONCRETE SLAB. January 14, 2017 Rev -

DESIGN CALCULATIONS INSTA-FOOTING LOAD BEARING CAPACITIES ON CONCRETE SLAB. January 14, 2017 Rev - DESIGN CALCULATIONS INSTA-FOOTING LOAD BEARING CAPACITIES ON CONCRETE SLAB January 14, 2017 Rev - Projection Name: Owner: Prepared by: Insta-Footing Design Calculations Insta-footing, LLC Richard Nolan,

More information

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals. As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed

More information

Lateral System Analysis and Confirmation Design

Lateral System Analysis and Confirmation Design Andrew Covely Structural Dr. Linda Hanagan The Helena New York City, NY November 15, 2004 Pictures courtesy of Fox & Fowle Architects Lateral System Analysis and Confirmation Design Executive Summary This

More information

Ministry of Forests & Range

Ministry of Forests & Range Ministry of Forests & Range DRAWING SCHEDULE DRAWING No. / MODEL TYPE STD-EC-040-01 STD-EC-040-02 STD-EC-040-03 STD-EC-040-04 STD-EC-040-05 STD-EC-040-06 STD-EC-040-07 STD-EC-040-08 DESCRIPTION REV. DATE

More information

Design of Semi gravity Retaining Walls

Design of Semi gravity Retaining Walls Design of Semi gravity Retaining Walls Example 13.1 A semi gravity retaining wall consisting of plain concrete (weight = 145 lb/ft³) is shown in Figure 13.9. The bank of supported earth is assumed to weigh

More information

research report Cold-Formed Steel Gable End Wall Design Using the Prescriptive Method for One and Two Family Dwellings RESEARCH REPORT RP05-2

research report Cold-Formed Steel Gable End Wall Design Using the Prescriptive Method for One and Two Family Dwellings RESEARCH REPORT RP05-2 research report Cold-Formed Steel Gable End Wall Design Using the Prescriptive Method for One and Two Family Dwellings RESEARCH REPORT RP05-005 REVISION 006 American Iron and Steel Institute Cold-Formed

More information

AASHTOWare BrR 6.8 Steel Tutorial Steel Plate Girder Using LRFR Engine

AASHTOWare BrR 6.8 Steel Tutorial Steel Plate Girder Using LRFR Engine AASHTOWare BrR 6.8 Steel Tutorial Steel Plate Girder Using LRFR Engine STL6 - Two Span Plate Girder Example 1'-6" 37'-0" 34'-0" 1'-6" 8 1/2" including 1/2" integral wearing surface FWS @ 25 psf 3'-6" 3

More information

7th task: Pad footing

7th task: Pad footing 7th task: Pad footing Pad footing Design of dimensions Design of plain concrete pad footing Design of reinforced concrete pad footing Drawings (shape and reinforcement of footings) Difference between PC/RC

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

SCOPE OF WORK: for new structure for exterior elevator according to manufacturer requirement, with a 36ft tower to install new elevator for 2 floors

SCOPE OF WORK: for new structure for exterior elevator according to manufacturer requirement, with a 36ft tower to install new elevator for 2 floors 5190 Indian Mound St Sarasota Fl. 34232 T 941 330-5095 F 941 866-2695 E-mail: jc generalcontractors@mac.com Web: http://jcontractor.com http://www.sarasotageneralcontractor.net Friday, June 24, 2016 The

More information

DESIGN OF WALLS FOR SHEAR

DESIGN OF WALLS FOR SHEAR mortarless masonry Design Manual Part 3 (IS 456:2000) Section 5 Page: 1 SECTION 5. DESIGN OF WALLS FOR SHEAR Shear walls: Load-bearing walls are mostly designed to carry axial compression loads, however

More information

Proposed Modifications to the LRFD Design of U-Beam Bearings

Proposed Modifications to the LRFD Design of U-Beam Bearings Proposed Modifications to the LRFD Design of U-Beam Bearings Charles D. Newhouse, Scott A. Bole, W. R. Burkett, Phillip T. Nash, Mostafa El-Shami Performed in Cooperation with the Texas Department of Transportation

More information

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

Supplemental Plan Check List for Concrete Special Moment Resisting Frame

Supplemental Plan Check List for Concrete Special Moment Resisting Frame Supplemental Plan Check List for Concrete Special Moment Resisting Frame Plan Check/PCIS Application No.: Date: Your feedback is important; please visit our website to complete a Customer Survey at www.ladbs.org/ladbsweb/customer-survey.jsf.

More information

Analysis and Design of One-way Slab System (Part-I)

Analysis and Design of One-way Slab System (Part-I) Lecture-02 Analysis and Design of One-way Slab System (Part-I) By: Prof Dr. Qaisar Ali Civil Engineering Department UET Peshawar www.drqaisarali.com 1 Topics Addressed Concrete Floor Systems Analysis and

More information

CONCRETE TECHNOLOGY CORPORATION

CONCRETE TECHNOLOGY CORPORATION PRECAST, PRESTRESSED HOLLOW CORE SLABS DESIGN CRITERIA & SPAN-LOAD CHARTS FOR STORM WATER DETENTION VAULT LIDS (CHARTS REVISED /18/08) Introduction Design Criteria for Development of the Span-Load Charts

More information

AASHTOWare BrD/BrR Prestress Tutorial 1 Simple Span Prestressed I Beam Example

AASHTOWare BrD/BrR Prestress Tutorial 1 Simple Span Prestressed I Beam Example AASHTOWare BrD/BrR 6.8.3 Prestress Tutorial 1 Simple Span Prestressed I Beam Example Material Properties Beam Concrete: f'c = 6.5 ksi, f'ci = 5.5 ksi Deck Concrete: f'c = 4.5 ksi Prestressing Strand: 1/2"

More information

Chapter 1. General Design Information. Introduction. Bridge Design Manual Chapter 1 General Design Information

Chapter 1. General Design Information. Introduction. Bridge Design Manual Chapter 1 General Design Information Chapter 1 Bridge Design Manual General Design Information Introduction The Bridge Design Manual is intended to be the primary source of information on the design practices of the Wyoming Department of

More information

Section A A: Slab & Beam Elevation

Section A A: Slab & Beam Elevation CE 331, Spring 2011 Flexure Strength of Reinforced Concrete s 1 / 5 A typical reinforced concrete floor system is shown in the sketches below. The floor is supported by the beams, which in turn are supported

More information

Third Avenue New York, NY. Structural Concepts/ Structural Existing Conditions Report September 30, Michelle L.

Third Avenue New York, NY. Structural Concepts/ Structural Existing Conditions Report September 30, Michelle L. Executive Summary The structural design of 554-556 Third Avenue is composed of two way concrete slabs supported by a system of columns spanning an average of twenty feet. Lateral loads are resisted by

More information

Keywords: Static analysis, Response spectrum method, Irregular reinforced concrete building, Earthquake.

Keywords: Static analysis, Response spectrum method, Irregular reinforced concrete building, Earthquake. www.semargroup.org, www.ijsetr.com ISSN 2319-8885 Vol.03,Issue.07, May-2014, Pages:1205-1209 Comparative Study of Static and Dynamic Analysis of Irregular Reinforced Concrete Building due to Earthquake

More information

Ce 479 Reinforced Masonry Fall 2005

Ce 479 Reinforced Masonry Fall 2005 INTRODUCTION TO STRUCTURAL DESIGN OF REINFORCED MASONRY In the preceding lecture on structural design of masonry, we have seen examples of unreinforced masonry bearing walls. In bearing walls, when the

More information

Steel Roof Deck EC X

Steel Roof Deck EC X IAPMO ES Cover Sheet Evaluation Criteria of Steel Roof Deck EC 007-200 Posted for public commenting on 10/16/2009 to 11/12/2009 INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, EVALUATION

More information

STANDARDIZED STRUCTURES

STANDARDIZED STRUCTURES Q, QH & QL TOWERS 16.1 Q, QH, and QL Towers General Description The series includes three and four leg angle towers, which are suited for a variety of antenna mounting positions and load conditions. The

More information

Elevation. Typical Section

Elevation. Typical Section PS1 - Simple Span Prestressed I Beam Example #4 stirrups @ 12" 120'-0" 6" 6" Elevation 1'-6" 51'-0" 48'-0" 1'-6" 8" Future Wearing Surface 2" thick, 150 pcf AASHTO-PCI BT-72 3'-0" 5 spaces @ 9'-0" = 45'-0"

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Structural Design: Goals: The original design of 200 Minuteman Drive was dictated largely by Brickstone Properties, the building s owner. The new design of 200 Minuteman Drive, with additional floors,

More information