1 Project #: University of Colorado Denver Facilities Projects Scope of Work Questionnaire Please review questionnaire, provide comments, and save the form. Project Manager Assigned: Overview Project Location: Building/Rm./Area: General Description of Project: Anschutz Medical Campus CU Denver Campus Drawings Attached? ilities Management Distribution tification of the Project and a request for feedback will be sent to the following people: Health & Safety Dave Turnquist Mike Barden and Ken Neeper (Projects) Jay Campbell (Facilities Operations) Vimol Mitchell and Jim Nelson (BMO) Dave Thorson (Engineering) Chris Jarecki (Code Official) Tom Sawyer (Fire & Life Safety) Diana Taipalus and Chimgeh Bataa (Finance and Administration) Carol Caulkins (Facilities Support Services) Todd Akey (State Buildings ministration and Finance Melissa Lemieux (Real Estate) Grace Reed (Space Acquisitions) Optional Recipients (select as needed): University Police Ethan Carter Doug Abraham Robin Brown (Electronic Security) Office of Information Technology Institutional Planning Rob Lee Betty Charles Grant Nixon Michael Del Giudice Andre Vite (University Architect)

2 Suzann Ruedeman (School of Medicine Facilities Director) Client (select name) sponse from SOW Review Group to the Project Manager: ponse will be anticipated within ten (10) business days from date of electronic distribution. sponse Instructions: Each comment should correspond to its respective question in the questionnaire. Responses are entered at the bottom of this form. ill a Permit be required? ill a 3rd-Party Code Review be required? ill DRB review be required? Project Information: t Sure t Sure t Sure This Questionnaire presents an overview of the proposed project and solicits reviewer comments which will enable the Project Manager to complete the scope of work. Anticipated Funds Available: Is the existing use of the project area changing? If "", describe how is the space/facility currently being used before and after completion? Is the number of persons in the area increasing/decreasing? (indicate # of persons) t Sure

3 Before: After: Outline the client's proposed schedule for the project; include the deadlines for the project deliverables: Will the project require exterior staging and/or parking Is this leased space? Will moving services and/or temporary storage of equipment and furniture during remodel be required? Architectural change? (see page 5) Mechanical (HVAC/Plumbing) change? (see page 6) Electrical Change? (see page 7) Health & Safety concerns? (see page 8) Will roadways, parking, and sidewalks be impacted? (see page 9) Additional Project Information Is there any electronic security required? (see page 10)

4 Will Information Technology be impacted? (see page 11) Will Education/Audio Support be impacted? (see page 11) Architectural Are walls being built, or existing walls being removed? If yes, please describe: Will there be any removal or addition of doors? If yes, please explain: Will there be any removal of, or addition to the floor coverings? If yes, please explain: Is new millwork anticipated? Will the roofing be affected? Will the ceiling be: Hardcap Acoustical Tile If other, please explain: Will furniture be included in this project? Will outside Architect/Engineer consultants be retained? w/grid System Ceiling Other

5 Do you anticipate any mechanical system changes? If "yes", describe the mechanical changes: Are there new ventilation requirements? Does the room currently have HVAC? Are there plumbing additions or changes? If "yes", explain: Mechanical (HVAC/Plumbing) Are any bio-safety cabinets or laminar flow hoods involved directly or tied-into the ductwork? Bio-Safety cabinet or laminar hood to be moved or removed? Bio-Safety cabinet with exhaust ductwork? *If you answered "yes" to any part of above, a green tag must be performed. Are any chemical fume hoods to be moved, removed, affected, or tied into the existing ductwork? If "yes", please describe modification needs: Are any autoclaves present? Are there any refrigerators or freezers to be moved, removed, or affected in the area?

6 Are any electrical system changes anticipated? Is the lighting being changed? Are equipment electrical loads being changed? Electrical Will there be any removal of or additional transformers? Describe the information systems modifications, if any to the existing space (data jacks, telephone jacks, etc.) Will any major electrical outages be required? Health and Safety Will any (potentially) asbestos containing materials be disturbed? An asbestos and a lead based paint survey must be completed and documented. Please identify: Will any sink traps be removed?

7 Will fluorescent light fixtures be changed / moved? Is any (potentially) lead-based paint present? Are physical hazards associated with the work, project equipment, or operations present? If "yes", please identify (electrical hazards, natural gas lines, water lines, etc.) *If you answered "" to above, appropriate lockout/isolation controls will need to be implemented. Will hazardous (ignitable, corrosive, reactive, or toxic) wastes be generated by this project? Will the project involve release of ANY material or odors into the air? (Any project work that may affect air quality in nearby buildings or adjacent areas of the same building should be discussed with HSD, to minimize operational problems during the project.) Are any infectious materials/wastes present? If yes, please list (biohazard boxes, sharps containers, glass slides, etc.) *Green Tagging must be performed if you answered yes to question above Are there any cryogenic materials in use? Was the area used for radioactive materials? Is this project currently sprinklered?

8 If no, will sprinklers be required? Are there any mercury thermostats or switches present in the project? Is there lead sheeting or shielding present in the project? Are there any batteries present in the project from fire alarm systems or emergency lighting systems? Is there any Freon present in refrigeration and/or air conditioning units? Hazardous Materials Are there hazardous materials used in conjunction with proposed activity? Has a chemical process been clearly articulated for the code official? Is an HMIS required by the code official? Will parking permits be required? Site Impact - Facilities Support Services / University Police If yes, please list (contractor, vendors, etc.) *Parking and Transportation must be involved if you answered yes to above Will any parking spaces, lots, loading zones, drive aisles, driveways, parking meters, parking structures, or streets either at Anschutz Medical Campus or Downtown Denver Campus be affected?

9 Will any aspect of the project affect pedestrian walkways? Will the project affect access to buildings (doors, docks, ramps, etc.)? If yes, please explain: Will signage be needed for alternate routes, parking, pedestrian walks, and vehicles? If yes, please explain: Will the project require additional dumpsters, or dumpster relocation? If yes, please explain:: Is it anticipated that contractors will be working after hours or on weekends? *If you answered yes to above the University Police and Facman Dispatch require a list of names & dates prior to work Will exterior lighting be affected? Electronic Security Will locks be changed during the project or after the project? Are there currently cameras, security systems that would be affected by the project? Will there be new cameras, security systems added to the project? During the project will there be areas affected for security (securing the project area, security outside the project area, etc.)? Will card access be added?

10 Will card access be changed or modified? Are there Privacy materials (HIPAA, FERPA, Pll, etc.) coming to the project? Will there be a need for panic (duress, medical, etc.) alarms in the finished space? Are there high value or high risk materials coming to the finished space? Will there be equipment (ULT freezers, incubators, etc.) installed in the finished space? Will IT wall jacks be moved? Will new IT wall jacks be needed? Will IT wall jacks be deleted? Will new computers be added? Will new telephones be added? Will wireless networking be required? Information Technology

11 Will workstation support be required when the computers are moved to the renovated area? If yes, how many computers will need support? Will Audio Visual Systems be impacted by the project? If yes, explain impact: Will classroom space be impacted by the project? If yes, explain impact: Education Support / Audio Visual Relocation Will this work require any moving prior to project start? Will this project results in any moves post construction? Will there be staff moves involved?

LUFacilities Policy Service Level Agreement v1.1

LUFacilities Policy Service Level Agreement v1.1 PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University

More information

TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS

TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS The Town of East Haddam is seeking bids from qualified contractors who will

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

Procedure for Department Managed Repair and Renewal Projects Under $15,000

Procedure for Department Managed Repair and Renewal Projects Under $15,000 Applies to: All Medical School Departments GUIDELINES: Issued: March 28, 2012 Revised: February 8, 2016 PURPOSE: To provide guidance to departments for repair and renewal projects with an estimated budget

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018 Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as

More information

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

FACILITIES MAINTENANCE WORKER

FACILITIES MAINTENANCE WORKER FACILITIES MAINTENANCE WORKER Summary Statement: Under supervision, is responsible for performing routine building maintenance tasks and assisting Building Maintenance Supervisor with the performance of

More information

1. Division 1 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1. Division 1 Section Temporary Facilities and Controls for limitations and procedures governing temporary use of Owner's facilities. CFA A HVAC PROJECT SECTION 01100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

New Ringgold Middle School. Project Slideshow August 26, 2017

New Ringgold Middle School. Project Slideshow August 26, 2017 New Ringgold Middle School Project Slideshow August 26, 2017 Aerial Photo from West Provided by Hudson Group Taken 8.16.2017 Aerial Photo from North Provided by Hudson Group Taken 8.16.2017 Aerial Photo

More information

EHS Involvement in Laboratory Renovation and New Laboratory Construction

EHS Involvement in Laboratory Renovation and New Laboratory Construction EHS Involvement in Laboratory Renovation and New Laboratory Construction Page 2 of 11 Checklist I Programming and Pre-Design: Assessing equipment and materials list Obtain equipment list if available o

More information

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist

STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist The following checklist shows the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the

More information

Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014

Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T DEFINED: Measure T is a local ballot measure on the November 2014 ballot seeking voter authorization

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Table of Contents About the Funding Guide Page 3 Carpenter Shop Page 4 Custodial Services Page 5 Electrical Shop Page

More information

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications)

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications) Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.

More information

Procedure for Department Managed Repair and Renewal Projects Under $15,000

Procedure for Department Managed Repair and Renewal Projects Under $15,000 Applies to: All Medical School Departments GUIDELINES: Issued: March 28, 2012 Revised: April 13, 2015 PURPOSE: To provide guidance to departments for repair and renewal projects with an estimated budget

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

Guidelines for Laboratory Closure

Guidelines for Laboratory Closure Guidelines for Laboratory Closure These guidelines are to facilitate the process of laboratory closure when an investigator is vacating, relocating, or renovating a lab space. These guidelines only cover

More information

Service Level Agreement for University Facilities

Service Level Agreement for University Facilities Service Level Agreement for University Facilities Construction, Facilities and Operations will provide services to its customers in accordance with the attached: Services and Funding Sources exhibit, which

More information

Instructional Science Facility Phase I

Instructional Science Facility Phase I Instructional Science Facility Phase I University of Wisconsin La Crosse Campus October 27, 2015 UWL Science Lab Building Phase 1 1 Project Schedule Timeline July Aug Sept Oct Nov Dec Jan Feb Mar Apr May

More information

CIBL Categories of Work Classification Guidelines

CIBL Categories of Work Classification Guidelines 11 May 06 CIBL Categories of Work Classification Guidelines The following is provided as guidelines for classifying design, engineering and construction work. Project examples are provided for reference

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE. Section Subject Effective date Procedure Number

PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE. Section Subject Effective date Procedure Number PHYSICAL PLANT OPERATIONAL & MAINTENANCE ADMINISTRATIVE PROCEDURE Section Subject Effective date Procedure Number Administration Work Orders May 30, 2013 A-06 Purpose This procedure is designed to augment

More information

New Science Bldg. at Saddleback College Bi-Weekly Progress Update

New Science Bldg. at Saddleback College Bi-Weekly Progress Update Project Name: Saddleback College Sciences Bldg. Date Through: November 15, 2015 - November 30, 2015 Site Location: Prepared By: 28000 Marguerite Parkway Mission Viejo, CA 92692 Thomas Bekele, Kitchell

More information

Interior Remodeling Proposal

Interior Remodeling Proposal Date Prospect Name Address Interior Remodeling Proposal General & Administrative Project supervision Dust protection & site preparation (add Build Clean filtration system during remodeling to control dust)

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Greater Orlando IFMA Chapter CFM Roundtable. Welcome to the September 2008 CFM Roundtable

Greater Orlando IFMA Chapter CFM Roundtable. Welcome to the September 2008 CFM Roundtable Welcome to the September 2008 CFM Roundtable presented by Thanks to our Major sponsors: The Greater Orlando IFMA Chapter, AND Our major sponsors MilliCare by Cubix and Workplace Resource of Central Florida

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND MCKINLEY INSTITUTE OF TECHNOLOGY N E I G H B O R H O O D M E E T I N G A P R I L 2 4, 2 0 1 7 1 1 LPA MASTER PLAN 2 PHASE 1 SCOPE Blue Line 3 PHASE 1 SCOPE Blue Line 4 BOND T REVISED PROGRAM SCOPE 1 Modernize

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations

More information

Safety and Environmental Orientation and Practices for Contractors

Safety and Environmental Orientation and Practices for Contractors Safety and Environmental Orientation and Practices for Contractors Welcome to the University of California, Irvine. Some University facilities are unique and the practices listed here are for your safety

More information

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free / / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary

More information

Yardmen Arena Expansion & Renovation Project Update

Yardmen Arena Expansion & Renovation Project Update For Immediate Release 25, September,2017 Yardmen Arena Expansion & Renovation Project Update BELLEVILLE ON With 33 days until puck drop of the home opening game of the American Hockey League s Belleville

More information

WARSASH MARITIME ACADEMY CADET TRAINING RELOCATION PROJECT UPDATE 30 JUNE 2017

WARSASH MARITIME ACADEMY CADET TRAINING RELOCATION PROJECT UPDATE 30 JUNE 2017 WARSASH MARITIME ACADEMY CADET TRAINING RELOCATION PROJECT UPDATE 30 JUNE 2017 Welcome to our fourth newsletter setting out the progress we are making in preparation for the relocation of the Warsash Maritime

More information

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018 ` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform Statewide

More information

Via Internet Site Posting- 1 Page + attachments. Addendum No. 3 Tender Call No Closing Date: 12:00 NOON (LOCAL TIME) December 19, 2017

Via Internet Site Posting- 1 Page + attachments. Addendum No. 3 Tender Call No Closing Date: 12:00 NOON (LOCAL TIME) December 19, 2017 Michael Pacholock Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services December

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

Laboratory Close-Out Guidelines

Laboratory Close-Out Guidelines Office of Laboratory Safety 2300 I Street, NW Ross Hall, Suite B- 05 Washington, DC 20037 t. 202-994- 8258 I labsafety@gwu.edu Guidelines The Principal Investigator (PI) is responsible for leaving laboratories

More information

2) These Standards are available on the University s website at:

2) These Standards are available on the University s website at: March 2014, rev 00 A) General 1) Definitions a. The University: Northern Illinois University; NIU. b. Prime Professional (s): Architects and Engineers and Contractors. c. EHS: NIU Environmental Health

More information

Service Level Agreement for University Facilities

Service Level Agreement for University Facilities Service Level Agreement for University Facilities Facilities-related departments within the Office of the Executive Vice President and Chief Operating Officer (EVP & COO) will provide services to university

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. E-Mail to fiona@ymginc.com Print Document Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) ````````````````````````` (Cell) E-Mail

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons (CPHD) (ISD) Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform

More information

LWIB Executive Committee Special Meeting Agenda August 12, 2014 Conference Call Please dial :30 a.m.

LWIB Executive Committee Special Meeting Agenda August 12, 2014 Conference Call Please dial :30 a.m. LWIB Executive Committee Special Meeting Agenda August 12, 2014 Conference Call Please dial 1-855-353-1808 11:30 a.m. 1. Welcome and Introductions: Rod Blackburn, Chair (11:30) 2. Butler Workforce Center

More information

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY Prepared for the City of Benson, Minnesota by Widseth Smith Nolting May 2016 City of Benson, Minnesota CITY HALL/POLICE STATION

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

ADDENDUM NO 1 Issued November 21, 2017

ADDENDUM NO 1 Issued November 21, 2017 SEATTLE HOUSING AUTHORITY #4936 SPRUCE STREET TOWNHOMES RENOVATION ADDENDUM 1 ADDENDUM NO 1 Issued November 21, 2017 FROM: TO: Seattle Housing Authority Mel Henley 190 Queen Anne Avenue North P.O. Box

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

Owen County School District

Owen County School District Owen County School District Maintenance Board Report 02/20/2012 District Maintenance Projects or Requests: Working with the architects and engineers to develop a temporary support system for the main electrical

More information

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS MATURE NEIGHBOURHOOD OVERLAY REGULATIONS PROPOSED REGULATION 01 FRONT SETBACK The Front Setback shall be a minimum of 3.0 m and shall be consistent within 1.5 m of the Front Setback on Abutting Lots, to

More information

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT 186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS PROJECT NUMBER MDVL092051 Renovate Vehicle Maintenance Facility Bldg 200 23 June 2017 ADDENDUM #1 PERFORMANCE WORK STATEMENT 1.0 SCOPE. This addendum to

More information

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building

More information

If this link does not work, please go to and enter the access key: 61bd832e4bbf162

If this link does not work, please go to   and enter the access key: 61bd832e4bbf162 If this link does not work, please go to https://secure.smartbidnet.com/laiu and enter the access key: 6bd832e4bbf62 Yes, I'll Bid All Codes No, I Won't Bid this Job Click Here to View the Project You

More information

Proposed Project Title: _

Proposed Project Title: _ REQUEST FOR CAPITAL PROJECT OR FEASIBILITY STUDY UNIVERSITY OF ILLINOIS SPRINGFIELD CAMPUS Proposed Project Title: _ Building Name and Number: Room Number(s): Project Description/Scope of Work/Floorplan

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

Health Life Safety Survey and Master Facilities Plan

Health Life Safety Survey and Master Facilities Plan Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master

More information

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Addendum No. 2 For Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Capital Planning & Facilities Management Lincoln Building Akron, Ohio

More information

UTAH STATE UNIVERSITY A&E DESIGN MANUAL DIVISION 0 USU GENERAL DESIGN CRITERIA THE CRITERIA ARE GENERAL GUIDELINES BASED ON PAST EXPERIENCES AND

UTAH STATE UNIVERSITY A&E DESIGN MANUAL DIVISION 0 USU GENERAL DESIGN CRITERIA THE CRITERIA ARE GENERAL GUIDELINES BASED ON PAST EXPERIENCES AND DIVISION 0 USU GENERAL DESIGN CRITERIA THE CRITERIA ARE GENERAL GUIDELINES BASED ON PAST EXPERIENCES AND MATERIALS THAT USU HAS FOUND TO BE SUCCESSFUL. WHERE SPECIFIC PRODUCTS ARE IDENTIFIED HEREIN, THE

More information

Office of Planning, Design and Construction. Capital Program Update May 10, 2017

Office of Planning, Design and Construction. Capital Program Update May 10, 2017 Office of Planning, Design and Construction Capital Program Update May 10, 2017 Projects Under Construction Translational Research Center Translational Research Center Phase I Site work Status: Completed

More information

Bureau of Indian Affairs

Bureau of Indian Affairs Bureau of Indian Affairs Office of Facilities Management and Construction JUSTICE / DETENTION FACILITIES SPACE TEMPLATES Table of Contents BUREAU OF INDIAN AFFAIRS JUSTICE DETENTION FACILITIES SPACE TEMPLATES

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation

More information

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

THE UNIVERSITY OF COLORADO DENVER ANSCHUTZ MEDICAL CAMPUS GUIDELINES AND STANDARDS FOR DESIGN AND CONSTRUCTION PROJECTS PART 3

THE UNIVERSITY OF COLORADO DENVER ANSCHUTZ MEDICAL CAMPUS GUIDELINES AND STANDARDS FOR DESIGN AND CONSTRUCTION PROJECTS PART 3 THE UNIVERSITY OF COLORADO DENVER ANSCHUTZ MEDICAL CAMPUS GUIDELINES AND STANDARDS FOR DESIGN AND CONSTRUCTION PROJECTS PART 3 UNIVERSITY PROGRAM GUIDELINES Contents: 3.1 University Program Guidelines

More information

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following: New buildings or renovations to existing buildings for which an application for a permit was made to the Department or a municipality before April 9, 2004. New buildings or renovations to existing buildings

More information

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope Project Scope & Budget Breakdown Mandatory Scope Recommended Additional Scope Wish List Scope Site Plan EXISTING Site Plan PROPOSED First Floor Plan PROPOSED Basement Floor Plan PROPOSED Mandatory Scope

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

Prepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl

Prepared for Florida State University Facilities Planning& Construction By Environmental Health & Safety Tallahassee, Fl SITE ASSESSMENT CHECKLIST FOR DEMOLITION AND RENOVATION PROJECTS INSERT BUILDING NAME FSU BUILDING NUMBER XXX CAMPUS OF FLORIDA STATE UNIVERSITY TALLAHASSEE, FLORIDA Prepared for Florida State University

More information

Finance & Administration. Policy Number: FA Approved By: Richard R. Rush Effective Date: 2/26/08 President Page 1 of 7

Finance & Administration. Policy Number: FA Approved By: Richard R. Rush Effective Date: 2/26/08 President Page 1 of 7 President Page 1 of 7 PURPOSE: Operations, Planning, and Construction (OPC) is responsible for the maintenance and operations of the campus grounds and facilities funded by operating fund budget allocation.

More information

Facility Layout and Equipment Specification Review Packet

Facility Layout and Equipment Specification Review Packet FULTON COUNTY HEALTH DEPARTMENT 606 S. SHOOP AVENUE WAUSEON, OHIO 43567-1712 TELEPHONE 419-337-0915 FAX 419-337-0561 WIC 419-337-6979 www.fultoncountyhealthdept.com fultcohd@odh.ohio.gov Facility Layout

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report September 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle

More information

DEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION

DEL MAR UNION SCHOOL DISTRICT BOND PROJECT DESCRIPTION DEL MAR UNION SCHOOL DISTRICT TECHNOLOGY & 21 ST -CENTURY LEARNING INITIATIVE BOND PROJECT DESCRIPTION The Board of Trustees of Del Mar Union School District ("District") has evaluated the need to acquire,

More information

185 DISCOVERY DRIVE COLMAR, HATFIELD TOWNSHIP MONTGOMERY COUNTY, PA. 2.9+/- acres. Approximately 38,000 square feet

185 DISCOVERY DRIVE COLMAR, HATFIELD TOWNSHIP MONTGOMERY COUNTY, PA. 2.9+/- acres. Approximately 38,000 square feet Ten Penn Center 1801 Market Street, Suite 550 Philadelphia, PA 19103 www.colliers.com/philadelphia MAIN +1 215 925 4600 FAX +1 215 925 1040 Submitted By 185 DISCOVERY DRIVE COLMAR, HATFIELD TOWNSHIP MONTGOMERY

More information

Welcome Center, New Student Services, and Career and Employment Services

Welcome Center, New Student Services, and Career and Employment Services Architectural Program Welcome Center, New Student Services, and Career and Employment Services East Memorial Stadium Renovation May 2014 Prepared By Table of Contents Introduction.... 1 Competitive Market....

More information

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS OVERLAY REGULATIONS Effective September 1, 2017 On May 29, City Council approved the following changes to the Mature Neighbourhood Overlay (Section 814 of Edmonton Zoning Bylaw 12800). These new regulations

More information

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new

More information

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings) 1. Ground Level Indoor Inspection a. Univents are on and air discharge grills are free of obstructions. If false, send email to building principal and facilities director asking staff to be instructed

More information

Administration Building Needs Assessment

Administration Building Needs Assessment Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural

More information

CHARLES COUNTY GOVERNMENT ITB NO GOVERNMENT BUILDING ATRIUM RENOVATION

CHARLES COUNTY GOVERNMENT ITB NO GOVERNMENT BUILDING ATRIUM RENOVATION CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 26, 2017 ITB NO. 18-03 GOVERNMENT BUILDING ATRIUM RENOVATION ADDENDUM NUMBER

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2) STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2) Applicant must complete

More information

10 Year Plan. Facilities Planning Guide. December 15, 2014

10 Year Plan. Facilities Planning Guide. December 15, 2014 10 Year Plan Facilities Planning Guide December 15, 2014 October 21, 2014 Facilities Study Session o Existing funding sources established relating to facilities Routine Restricted Maintenance Account (RRMA)

More information

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

Delta Gamma Sorority Renovation Budget Scope 3/7/2018 Delta Gamma Sorority Renovation Budget Scope 3/7/2018 PROJECT: Barbara Cerni Delta Gamma Sorority Tallahassee, Fla. This scope is based on the 50% Construction Documents drawn by BKJ Architecture dated

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

Columbia County Health Care Center Added Amenities

Columbia County Health Care Center Added Amenities Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center

More information

June 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development

June 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development June 12, 2017 Addendum #6 RFP #2017-003 Modular Relocation & Site Development Questions & Answers 1) To better facilitate a functional and qualified design build budget, please provide details, drawings,

More information

See attached answers to questions and requests for clarification received.

See attached answers to questions and requests for clarification received. Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

UNIVERSITY OF COLORADO DENVER Anschutz Medical Campus. PROGRAM PLAN AND BUDGET FOR ENERGY EFFICINCY and SUSTAINABLILITY

UNIVERSITY OF COLORADO DENVER Anschutz Medical Campus. PROGRAM PLAN AND BUDGET FOR ENERGY EFFICINCY and SUSTAINABLILITY UNIVERSITY OF COLORADO DENVER Anschutz Medical Campus PROGRAM PLAN AND BUDGET FOR ENERGY EFFICINCY and SUSTAINABLILITY R1 North Tower Energy Savings Project FUNDING YEAR 2013-2014 August 12, 2013 i ACKNOWLEDGMENTS

More information

3.3 Guidelines for Performing Building Inspections All building inspectors should read and understand the following information:

3.3 Guidelines for Performing Building Inspections All building inspectors should read and understand the following information: 3.0 BUILDING SAFETY INSPECTIONS 3.1 General Information In order to maintain safe working environments for all University employees and students, quarterly building safety inspections are required. To

More information

Appendix B: Decommissioning Checklist for Lab Move

Appendix B: Decommissioning Checklist for Lab Move Laboratory Decommissioning/Commissioning Document - LS-003 12 Appendix B: Decommissioning Checklist for Lab Move This form is for lab moves only from one UTK location to another UTK location General Information

More information