1 Master RFI List: March 22, 2013 Version # 1, 2 & 3 1. Can the City confirm the completion and occupancy dates for the Main Street Garage (February 2003?) and Transit Center Garage facilities? Main Street Garage was occupied in March The Transit Center was occupied beginning in June Can the City provide copies of the architectural and engineering drawings and specifications approved for building permit? 3. Can the City provide copies of the As-Built architectural and engineering drawings and specifications 4. Does the City have Project Manuals for the two facilities, including equipment schedules and warranties, periodic maintenance recommendations, operating instructions and similar information that can be shared? There are hard copies of the O&M Manuals. 5. Does the City have records of maintenance and repairs performed at the two facilities for the past five years? 6. For longer periods or since facility was accepted by the City? For some period beyond 5 years. 7. Has the City or any of its retail, restaurant or municipal tenants ever been the subject of a complaint or legal action involving architectural barriers or other instances of allegations of disabled accessibility noncompliance?

2 To our knowledge and that of The City of San Mateo, we do not know of any complaint or legal action involving architectural barriers or other instances of allegations of disabled accessibility non-compliance. 8. Does the City have any documentation establishing the presence of lead based paint or asbestos containing building materials either as part of the original construction of core and shell and interior improvements or subsequent remodeling, maintenance and repairs? From the documents, the original construction did not have lead based paint or asbestos containing materials. The City of San Mateo could not find any records for subsequent tenant improvements, but based on the years for the construction, these materials were not in use in the industry. 9. Does the City have any documentation establishing the presence of chlorinated fluorocarbons, chlorinated hydro fluorocarbons or other suspected ozone-depleting refrigerants in any of the mechanical systems and equipment presently installed at the two facilities? Main Street Garage: There are six condensing units on the second level over the storefronts; and two dedicated condensing units for Cold Stone s refrigerator. Transit Center: There are 2 package units on the roof over the office space area. These are all newer units so there are no chlorinate fluorocarbons or other suspected ozone depleting refrigerants. 10. Does the City have any documentation about building code violations, unsafe conditions or similar instances of regulatory non-compliance at either of the two facilities? No code violations for the cold shell construction of the buildings. 11. For the Annual Operating Budgets, can you identify what specific scope of work the $144,678 in capital expenditures is budgeted for? Not as this time. 12. For the Annual Operating Budgets, can you identify what portion of the $654,622 operating budget is allocated for preventative maintenance such as window refurbishment, paving striping and sealing, mechanical equipment maintenance, etc.? Not as this time. 13. Is the City considering a sale-leaseback of either of the two facilities? Is the Facility Assessment Report intended to support the evaluation of an asset sale to an outside party? The City is not considering or contemplating any such sale. 14. Please confirm that the Scope of Work requires conformance with ASTM E (attached for your reference). Conformance with ASTM E is NOT required. 15. What is the overall square footage of both facilities?

3 The Main Street Garage and the Transit Center contain approximately 10,000 square feet of ground floor retail and restaurant space. The Main Street Garage has approximately 82 parking spaces below grade (2 levels) and approximately 251 parking spaces on 4 above grade levels. The Transit Center has approximately 165 parking spaces below grade (1 level) and approximately 57 spaces at street level. 16. Please confirm that the proposal shall submit an Approach to clearly define the level of effort, means and method that they intend to take to complete the comprehensive condition assessment. This will aide in comparing the submitted proposals Confirmed. 17. Please confirm your acceptance to include a sample report from a prior similar project in an Appendix. We would accept and encourage a sample of previous work completed for a similar project. 18. What is the breakdown of square footage between the two sites/buildings? Main Street Garage has approximately 3,500 sq. ft. of retail/office space + 82 parking stalls below grade and 251 parking stalls above grade on 4 levels. The Transit Center has approximately 6,570 sq. ft. of retail/office space parking stalls below grade and 82 parking stalls at street level. 19. What kind of documents will be made available for review, (e.g., previous FCA s, seismic studies, geotech reports, ADA studies, plans/as-builts, etc.) Permitted Construction Plans only. 20. What is the term of the assessment? The City is interested in identifying short term and intermediate needs. 21. Is an IR and 10-year term adequate? 22. Will the selected consultant be required to follow a specific report format? No 23. We assume a single report would be prepared incorporating both sites can you please confirm this? A single report incorporating both properties and all structures would be sufficient. 24. Is there a specific list of systems to be assessed as part of the FCA (i.e., paving, parking, landscaping, irrigation, topography, drainage, site amenities, etc.)? Please refer to Section IV, Items Is a seismic risk assessment required (i.e., determining probable seismic performance per Seismic Evaluation of Existing Buildings - ASCE 2003 and to assess the global performance of the existing lateral load resisting systems of buildings)?

4 26. Under Section IV. Deliverables, item 3. of the RFP: Please clarify the reference to signage. Is this related to ADA signage or general interior directional signage? Is tenant signage included? the signage assessment should include ADA, code signage (exit signs, fire extinguisher signs, etc.) as well as traffic and interior directional signage. 27. Under Section IV. Deliverables, item 9. of the RFP: Please clarify security. Is this related to hardwired building security systems; i.e., cameras, motion sensors, etc.? Security assessment should also include an evaluation of dead end paths, unlit corners, security breach areas such as locations where trespassers can enter, climb or hide. 28. Does this exclude police and/or volunteer patrols? Yes, these police and volunteer patrols are excluded. 29. Under Section IV. Deliverables, item 10. of the RFP: Please clarify Traffic Safety. Is this limited to vehicle access to and from the properties and interior traffic circulation, traffic control systems or measures? Does this include pedestrian traffic flow and access? We assume the City is not asking for a full traffic study. Correct. The City is not asking and does not want a full traffic study. 30. Will the selected firm or partnership for this facility condition assessment be precluded from submitted on a future RFP for design and construction administration services? 31. Does the City or Capital Realty Group anticipate creating a pre-selected list of consultants based on this RFP for future, similar assessments and studies of buildings in the City s real estate portfolio? No pre-selected list of consultants will be created. It will be an open process available to all who may want to participate. 32. What problems are occurring relative to Traffic Safety? There have not been any problems to date but we would like to know what we can do to enhance Traffic Safety for pedestrians as well as vehicles. 33. Should the FCA concern surface driveways, surface parking, sidewalks, parking meters, site lighting, etc.? Please refer to Question 24 on the Master RFI List. 34. What problems are occurring relative to physical security? There have not been any major physical security problems. That being said, the City wants to be proactive in enhancing security conditions within their facilities. 35. Since existing conditions lack cameras or a security station, what security measures should be evaluated? The City wants the proposal to include what the firm believes will be an integrated system that provides a high level of security.

5 36. What relationships exist between the City of San Mateo and CAL-TRAIN which might have bearing on security? The San Mateo Police patrol the area. Currently CalTrain provides their own security for special events only. On maintenance? CalTrain is responsible for maintenance of their tracks and up to 10 from the edge of the platform. The City maintains the Transit Center. 37. Since the police substation is vacant, what is the current status of security patrols on these premises? The police substation has moved to the larger space at st Avenue from st Avenue. With this move the police have a greater presence in the area. 38. For cost estimating purposes, we would like to include a general contractor specializing in repair and restoration work as part of our team. We believe that this level of pricing will be more accurate but want to provide an incentive to the contractors to participate on the project. Is the corrective work identified as part of the selected consulting team s work product (e.g. identifying and mitigating pathways for moisture intrusion) subject to bidding under the jurisdiction of the City of San Mateo Department of Public Works? The RFP requests identification and the estimated cost to mitigate all identified issues. When a firm submits their proposal the proposed corrective solution would be subject to competitive bidding. 39. Is the Department of Public Works considering awarding an on-call contract with unit pricing and similar cost controls in place to a service and repair contractor for performing this sort of asset preservation and incremental repair work? The City of San Mateo has not yet determined the contracting method for asset preservation and incremental repair work. 40. May we get a copy of the attendee list for everyone that attended the site visit? The attendee list is posted on the City of San Mateo s website. 41. When asking for a Fee Schedule are you referring to our hourly rates or are you asking for a break down for each service? The fee schedule should include separate fees for each of the listed deliverables in IV. DELIVERABLES as well as each of the consultants proposed personnel s hourly rate.

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

STAFF REPORT. To: Planning Commission Meeting date: December 14, 2016 Item: UN Prepared by: Robert Eastman. To allow a vehicle impound yard

STAFF REPORT. To: Planning Commission Meeting date: December 14, 2016 Item: UN Prepared by: Robert Eastman. To allow a vehicle impound yard # 6 ) UN-79-16 ABC TOWING, TITAN TOWING, AND TOW GUY TOWING SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 14, 2016 Item: UN-79-16 Prepared by: Robert Eastman

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

PLEASE NOTE: The cover sheet must include the occupancy type, construction type, and square footage of the area of work.

PLEASE NOTE: The cover sheet must include the occupancy type, construction type, and square footage of the area of work. New Commercial and/or Commercial Tenant Improvements, Remodels, Additions and Alterations Plan Check Submittal Non-Residential Additions/Alterations Design Criteria Seismic Design Category D (most cases)

More information

NEW COMMERCIAL AND/OR COMMERCIAL TENANT IMPROVEMENTS, REMODELS, ADDITIONS AND ALTERATIONS

NEW COMMERCIAL AND/OR COMMERCIAL TENANT IMPROVEMENTS, REMODELS, ADDITIONS AND ALTERATIONS NEW COMMERCIAL AND/OR COMMERCIAL TENANT IMPROVEMENTS, REMODELS, ADDITIONS AND ALTERATIONS PLAN CHECK SUBMITTAL NON-RESIDENTIAL ADDITIONS/ALTERATIONS Design Criteria Seismic Design Category D (most cases)

More information

INDUSTRIAL DEVELOPMENT AVAILABLE

INDUSTRIAL DEVELOPMENT AVAILABLE INDUSTRIAL DEVELOPMENT AVAILABLE BUILD YOUR OWN OR BUILD-TO-SUIT OPPORTUNITIES Santa Cruz Mixed Use Development SWIFT STREET DELAWARE AVENUE http://www.delaware-addition.com 1 2 3 4 5 6 7 8 9 1 11 12 13

More information

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507) City of North Mankato 1001 Belgrade Avenue North Mankato, MN 56003 (507) 625-4141 BUILDING PERMIT GUIDELINES Building Permits are required for all improvements with a value** of $300.00 or more. Sheds,

More information

Community Development Department Council Chambers, 7:30 PM, September 7, 2017

Community Development Department Council Chambers, 7:30 PM, September 7, 2017 STAFF REPORT 2017-30P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, September 7, 2017 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician

More information

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting

More information

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions: SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address REC & PARK: JURI COMMONS PARK RENOVATION Case No. 2018-009517ENV Block/Lot(s) 6532008 Permit No. Addition/

More information

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Planning Commission Staff Report Planning Commission Hearing November 14, 2016 Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Request: A request to develop a 15,996 square foot

More information

CODE ANALYSIS REPORT SECOND FLOOR

CODE ANALYSIS REPORT SECOND FLOOR CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary

More information

REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA

REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA The City of San Mateo hereby requests proposals for engineering design services

More information

STONE COMPANY STORE SITE REQUIREMENTS

STONE COMPANY STORE SITE REQUIREMENTS STONE COMPANY STORE SITE REQUIREMENTS 27 28 SITES MUST POSSESS THE FOLLOWING SET OF CHARACTERISTICS Within, or in close proximity to, major metropolitan areas and/or areas favored by sophisticated and

More information

Section 1 OBC FADS /13 Access to Parking Areas

Section 1 OBC FADS /13 Access to Parking Areas Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) REC & PARK: 210V HYDE STREET 0336/003 Case No. 2017-016267ENV Permit No. Addition/ Alteration

More information

APPENDIX C Mystic Shores Property Owners Association, ACC Design Guidelines Information for Construction Applicants

APPENDIX C Mystic Shores Property Owners Association, ACC Design Guidelines Information for Construction Applicants Introduction APPENDIX C Mystic Shores Property Owners Association, ACC Design Guidelines Information for Construction Applicants The purpose of this document is to provide property owners (Owners) a better

More information

Manhattan Greenway Harlem River Project 7394 / Contract Questions & Answers September 13 th, 2018

Manhattan Greenway Harlem River Project 7394 / Contract Questions & Answers September 13 th, 2018 Manhattan Greenway Harlem River Project 7394 / Contract 73940001 Questions & Answers September 13 th, 2018 In connection with the Request for Proposals relating to the Manhattan Greenway Harlem River released

More information

Lealman Community Redevelopment Area Non-Residential Improvement & Demolition Grant Program Application Package

Lealman Community Redevelopment Area Non-Residential Improvement & Demolition Grant Program Application Package Lealman Community Redevelopment Area Non-Residential Improvement & Demolition Grant Program Application Package Applications & supporting documents may be submitted electronically to LealmanCRA@pinellascounty.org

More information

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING Multi family housing is an increasingly popular form of infill development in Shaker Heights because of the city s built out

More information

#4) UN NUVEDA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING

#4) UN NUVEDA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING #4) UN-60-16 NUVEDA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-60-16 Prepared by: Robert Eastman GENERAL INFORMATION:

More information

CALGREEN NON-RESIDENTIAL BUILDING Checklist

CALGREEN NON-RESIDENTIAL BUILDING Checklist CALGREEN NON-RESIDENTIAL BUILDING Checklist REVISED 11/18/14 New non-residential buildings shall be designed to include the green building mandatory measures specified in this checklist. This checklist

More information

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6) www.shawneeok.org RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6) Planning Office 405-878-1666 222 N Broadway Ave Shawnee OK 74801-6917 FAX: (405) 878-1587 cosinspections@shawneeok.org

More information

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507) City of North Mankato 1001 Belgrade Avenue North Mankato, MN 56003 (507) 625-4141 BUILDING PERMIT GUIDELINES Building Permits are required for all improvements with a value** of $300.00 or more. Sheds,

More information

GREEN BUILDING REQUIREMENTS

GREEN BUILDING REQUIREMENTS City of El Cajon Building and Fire Safety Division GREEN BUILDING REQUIREMENTS 200 Civic Center Way FOR NON-RESIDENTIAL CONSTRUCTION El Cajon, CA 92020 Phone: (619) 441-1726 In order to facilitate sustainable

More information

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING # 17 ) UN-101-14 DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN-101-14 Prepared by: Robert Eastman GENERAL

More information

The ARDEN Group Development Standards 05/17/13 Rezoning Petition No (University City Auto Mall) Site Development Data:

The ARDEN Group Development Standards 05/17/13 Rezoning Petition No (University City Auto Mall) Site Development Data: The ARDEN Group Development Standards 05/17/13 Rezoning Petition No. 2013-052 (University City Auto Mall) Site Development Data: --Site Acreage: +/- 39 Ac. --Tax Parcel #: 047-23-108 --Existing Zoning:

More information

New Commercial Construction Permit

New Commercial Construction Permit New Commercial Construction Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts,

More information

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address SF REC & PARK: 6335 FULTON STREET Case No. 2018-003817ENV Block/Lot(s) 1700001 Permit No. Addition/ Alteration

More information

Winters Parking Committee Downtown Parking Report Recommendations

Winters Parking Committee Downtown Parking Report Recommendations Winters Parking Committee Downtown Parking Report Recommendations Topic Lead Entity Recommendations Management Body Downtown Property Owners and Businesses Establish a management body (i.e. BID) to serve

More information

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

20 North Main Alpine, UT (Phone) (Fax)   SITE PLAN Site Plan Instructions New Home Form #1 20 North Main Alpine, UT 84004 801-756-6347 (Phone) 801-756-1189 (Fax) www.alpinecity.org SITE PLAN A detailed site plan, drawn to scale, 1 = 20 min., shall be filed

More information

Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications

Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications Supplemental Information Requested of Staff from Review Panel Bishop Place Economic Hardship Applications During the review of the application materials submitted with the Bishop Place Economic Hardship

More information

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE Please Note: No construction, including site preparation (grading, excavating, vegetation removal, etc.), will be allowed until a building permit or

More information

Seismic Design Requirements

Seismic Design Requirements City of Medford Municipal Code Chapter 9 Presented by the Building Safety Department THESE PROVISIONS PRESCRIBE THE DESIGN REQUIREMENTS OF EXISTING BUILDINGS UNDERGOING: CHANGE OF OCCUPANCY ADDITIONS ALTERATIONS

More information

Rediscover Downtown Peru Commercial Use Facade Improvement Program

Rediscover Downtown Peru Commercial Use Facade Improvement Program Mission Statement: (RDP) is a group of community members and business leaders dedicated to building a vibrant downtown by supporting local businesses and encouraging revitalization and historic preservation

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Addition/ Alteration Demolition (requires HRE for Category B Building)

More information

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS 4-101. FIRE DISTRICTS. The following described area is the city fire district: beginning at a point at the southwest corner of Lot 1, Block 11, Original

More information

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk

More information

Building Permit For new construction projects

Building Permit For new construction projects Building Permit For new construction projects 2/27/2019 City of Sioux Center Application for Building Permit Please provide as much of the following information as possible. Project Address Brief Description

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Plans Dated Addition/ Demolition Alteration (requires HRER if over 45

More information

Community Development Department Council Chambers, 7:30 PM, July 20, 2017

Community Development Department Council Chambers, 7:30 PM, July 20, 2017 STAFF REPORT 2017-26P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, July 20, 2017 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Steve Marciani, AICP, Planning

More information

Civil Engineering and Architecture Topical Outline

Civil Engineering and Architecture Topical Outline Civil Engineering and Architecture Topical Outline Unit 1: Overview of Civil Engineering and Architecture Week 1 Lesson 1.1: Civil Engineering and Architecture Overview 1.1.1 Civil Engineering 1.1.2 Architecture

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

2012 International Building Code 2011 National Electrical Code Local amendments to the codes are in Chapter 6 of the Code of City Ordinances

2012 International Building Code 2011 National Electrical Code Local amendments to the codes are in Chapter 6 of the Code of City Ordinances Sign Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each with minimum

More information

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider

More information

Grovewood Homeowners Association, Inc. Architectural Review Committee Guidelines Adopted September 18, 2018

Grovewood Homeowners Association, Inc. Architectural Review Committee Guidelines Adopted September 18, 2018 Grovewood Homeowners Association, Inc. Architectural Review Committee Guidelines Adopted September 18, 2018 These Guidelines do not change or replace anything in the Grovewood Deed Restrictions or any

More information

University of New Mexico Environmental Services Design & Development Standard Requirements

University of New Mexico Environmental Services Design & Development Standard Requirements University of New Mexico Environmental Services Design & Development Standard Requirements Please review the following standards to be considered on all construction specifications. Your consideration

More information

CITY OF ENUMCLAW January 18, 2018 DESIGN REVIEW BOARD MINUTES Page 1 of 5

CITY OF ENUMCLAW January 18, 2018 DESIGN REVIEW BOARD MINUTES Page 1 of 5 DESIGN REVIEW BOARD MINUTES Page 1 of 5 Call to Order: The Design Review Board met in a regular session on January 18, 2018 at City Hall, 1339 Griffin Avenue. Chairperson Christiansen called the meeting

More information

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET 1. Building permits are required for any construction, erection, enlargement, alteration, remodeling, repair, moving or conversion of occupancy

More information

Slope = or > 20%: Does the project involve any of the following: (1) square footage expansion greater

Slope = or > 20%: Does the project involve any of the following: (1) square footage expansion greater CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Plans Dated Addition/ Alteration Demolition (requires HRER if over 45

More information

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL COMMERCIAL Building Permit Application 16033 S. 94th Avenue, Orland Hills, IL. 60487-4623 (PRINT or TYPE to complete this form only) Construction Address: {Construction Cost } Owner's Name: Applicant:

More information

COMMERCIAL BUILDING PERMIT APPLICATION

COMMERCIAL BUILDING PERMIT APPLICATION COMMERCIAL BUILDING PERMIT APPLICATION Permit No.: Date: PART 1 OWNER/APPLICANT INFORMATION Name Email Address Business Name Address Home/Business Phone Cell Phone PART 2 PROPERTY INFORMATION Street Address

More information

Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks

Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks 1 st 3 weeks 2 nd 3 weeks 3 rd 3 weeks 4 th 3 weeks 5 th 3 weeks 6 th 3 weeks Topics/ Concepts I. Overview

More information

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL CPC-2014-3808-GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL Pursuant to Los Angeles Municipal Code Section 12.32 G, the T Tentative Classification shall

More information

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: July 5, 2012

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: July 5, 2012 PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: July 5, 2012 APPLICANT NAME DEVELOPMENT NAME LOCATION Gulf Coast Asphalt Gulf Coast Asphalt Company 835 Cochrane Causeway (West side of Cochrane

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: JANUARY 18, 2012 TO: THRU: FROM: SUBJECT: Chair Cathcart and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

Plan Routing Information:

Plan Routing Information: Plan Routing Information: BUILDING INSPECTIONS 800 4 TH AVENUE EAST WEST FARGO, ND 58078 PHONE: 701-433-5480 The Inspections Department receives and routes plans to the various departments. The plan holder

More information

Submittal Requirements for Administrative Design Review of Signage

Submittal Requirements for Administrative Design Review of Signage CITY OF MERCER ISLAND, DEVELOPMENT SERVICES GROUP 9611 S.E. 36 ST., MERCER ISLAND, WA 98040 (206) 275-7605 FAX: (206) 275-7726 WWW.MERCERGOV.ORG Submittal Requirements for Administrative Design Review

More information

CITY OF TYLER COMMERCIAL BUILDING PERMIT APPLICATION

CITY OF TYLER COMMERCIAL BUILDING PERMIT APPLICATION CITY OF TYLER COMMERCIAL BUILDING PERMIT APPLICATION Application Date: Permit No.. Estimated Cost of Project $ Square Footage # of Stories All projects over $50,000 must be submitted to the Texas Department

More information

REQUEST FOR PROPOSALS (RFP # ) FOR ARCHITECTURAL SERVICES FOR THE REMODEL OF THE HOBBLE CREEK GOLF COURSE CLUBHOUSE

REQUEST FOR PROPOSALS (RFP # ) FOR ARCHITECTURAL SERVICES FOR THE REMODEL OF THE HOBBLE CREEK GOLF COURSE CLUBHOUSE REQUEST FOR PROPOSALS (RFP # 2015-06) FOR ARCHITECTURAL SERVICES FOR THE REMODEL OF THE HOBBLE CREEK GOLF COURSE CLUBHOUSE Springville City desires to retain the services of a qualified architectural and

More information

Title 15 BUILDINGS AND CONSTRUCTION

Title 15 BUILDINGS AND CONSTRUCTION Title 15 BUILDINGS AND CONSTRUCTION Chapters: 15.04 International Codes Adopted 15.08 Building Permits 15.12 Movement of Buildings Chapter 15.04 INTERNATIONAL CODE COMMISSION CODES Sections: 15.04.010

More information

Plan Review Application Form

Plan Review Application Form Plan Review Application Form Application date: Date of ARC Meeting: Type of Review: (circle one) Concept Plan / Schematic Plan / Design Plan / Construction Plan / Modification / Miscellaneous 1. Application

More information

Z O N I N G B Y L A W N O

Z O N I N G B Y L A W N O VILLAGE OF SENNEVILLE PROVINCE DE QUÉBEC Z O N I N G B Y L A W N O 4 4 8-5 NOTICE OF MOTION: SEPTEMBER 24, 2018 ADOPTION 1 ST DRAFT: SEPTEMBER 24, 2018 PUBLIC COUNSULTATION: OCTOBER 15, 2018 ADOPTION 2

More information

STREET ADDRESS OF EVENT: Description of Event:

STREET ADDRESS OF EVENT: Description of Event: TEMPORARY USE PERMIT STREET ADDRESS OF EVENT: Description of Event: To Run from: (Date) (Hour) AM PM To: (Date) (Hour) AM PM Applicant: (Print) Applicant address: (Print) City, State Zip: Phone: Fax: Email:

More information

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Minimum Standards for Construction of Aircraft Hangars ARTICLE 1. MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Section 1. - Purpose Section 2. - Goals Section 3. General Provisions Section 4.

More information

RESIDENTIAL REMODELS ADDITIONS AND ALTERATIONS

RESIDENTIAL REMODELS ADDITIONS AND ALTERATIONS RESIDENTIAL REMODELS ADDITIONS AND ALTERATIONS PLAN CHECK SUBMITTAL RESIDENTIAL ADDITIONS/ALTERATIONS Design Criteria Seismic Design Category D (Most cases) Basic Wind Speed 85 mph Exposure B or C Maximum

More information

Sidewalk Regulations. Table of Contents

Sidewalk Regulations. Table of Contents Sidewalk Regulations Table of Contents Section 1. Purpose and Intent... 2 Section 2. Pedestrian Sidewalk, Driveway Apron and Curb and Guttering Requirements... 2 Section 3. Sidewalk Provision Criteria...

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside

More information

T H E T O W N O F G U I L F O R D V E R M O N T

T H E T O W N O F G U I L F O R D V E R M O N T Project Title: Contact: Capital Needs Assessments Town of Guilford Buildings Peder Rude, Town Administrator Email: pederrude@guilfordvt.net (802) 254-6857, ext. 105 Town of Guilford 236 School Road Guilford,

More information

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2 Addendum Number 1 Request for Proposals No. 17-001 Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No. 17-001,

More information

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE Chapter 23.12 UNIFORM CODES FOR CONSTRUCTION BUILDING CODE 23.12.010 Adoption of the 2010 California Building Code. Part 2. Title 24 of the California Code of Regulations. There is adopted and incorporated

More information

team a 5-schematic refinement and design development

team a 5-schematic refinement and design development team a 5-schematic refinement and design development building structural system building bays: 30 x 30 concrete columns 10 x 10 continuous structure vertically for 75 supported by 48 transfer beams in

More information

City of Tacoma Planning and Development Services

City of Tacoma Planning and Development Services City of Tacoma Planning and Development Services ORDINANCE NO. 28155 Adopt and Amend the City s Building Code; amending Title 2 of the Tacoma Municipal Code, implement the 2012 International Building,

More information

ANALYSIS MAJOR USE SPECIAL PERMIT for Brickell Flatiron located at approximately 1001, 1015, 1023, 1101 and 1121 South Miami Avenue

ANALYSIS MAJOR USE SPECIAL PERMIT for Brickell Flatiron located at approximately 1001, 1015, 1023, 1101 and 1121 South Miami Avenue ANALYSIS MAJOR USE SPECIAL PERMIT for Brickell Flatiron located at approximately 1001, 1015, 1023, 1101 and 1121 South Miami Avenue LEGISTAR FILE ID: Pursuant to Ordinance 11000, as amended, the Zoning

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

Z O N I N G B Y L A W N O

Z O N I N G B Y L A W N O PROPOSAL SUBMITTED AT THE SECOND PUBLIC CONSULTATION MEETING (AUGUST 21) Modifications in «red» Modifications «in blue» following consultation (August 28) VILLAGE OF SENNEVILLE PROVINCE DE QUÉBEC Z O N

More information

CONDITIONAL USE PERMIT REQUEST TO REOPEN A FORMER GAS STATION LOCATED AT 401 MERCHANT STREET.

CONDITIONAL USE PERMIT REQUEST TO REOPEN A FORMER GAS STATION LOCATED AT 401 MERCHANT STREET. CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.3 STAFF REPORT June 15, 2010 Staff Contact: Ward Stewart (707) 449-5140 TITLE: REQUEST: QUICK WAY GAS STATION CONDITIONAL USE PERMIT REQUEST TO REOPEN

More information

Town of Atkinson, New Hampshire INVITATION TO BID. Town Garage Roof Replacement Issued: June 30, 2015

Town of Atkinson, New Hampshire INVITATION TO BID. Town Garage Roof Replacement Issued: June 30, 2015 Town of Atkinson, New Hampshire INVITATION TO BID Town Garage Roof Replacement Issued: June 30, 2015 The Town of Atkinson invites qualified contractors to bid on the replacement of the roof of the Town

More information

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT March 29, 2011 Staff Contact: Ward Stewart or Peyman Behvand (707)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT March 29, 2011 Staff Contact: Ward Stewart or Peyman Behvand (707) CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT March 29, 2011 Staff Contact: Ward Stewart or Peyman Behvand (707) 449-5140 TITLE: REQUEST: A1 TIRES AND WHEELS CONDITIONAL USE PERMIT

More information

Discussion of the City of Vernon s COMPREHENSIVE ZONING ORDINANCE

Discussion of the City of Vernon s COMPREHENSIVE ZONING ORDINANCE Discussion of the City of Vernon s COMPREHENSIVE ZONING ORDINANCE Zones and Overlay Zones The Entire City is Zoned General Industrial (I) Overlay zones include: Commercial (C) Slaughtering (S) Rendering

More information

Exhibit G. Construction Mitigation Plan

Exhibit G. Construction Mitigation Plan Exhibit G Construction Mitigation Plan Construction Period Mitigation 1. A construction period mitigation plan shall be prepared by the applicant for approval by the Public Works Department prior to issuance

More information

PLANNING & DEVELOPMENT DEPARTMENT STAFF REPORT SLX DCI MAJOR MODIFICATION AND VARIANCE

PLANNING & DEVELOPMENT DEPARTMENT STAFF REPORT SLX DCI MAJOR MODIFICATION AND VARIANCE PLANNING & DEVELOPMENT DEPARTMENT Meeting Date: April 16, 2019 Item #: PZ2019-439 Project Name: Applicant: Owner: STAFF REPORT SLX DCI MAJOR MODIFICATION AND VARIANCE Proposed Development: Requests: Site

More information

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS OVERLAY REGULATIONS Effective September 1, 2017 On May 29, City Council approved the following changes to the Mature Neighbourhood Overlay (Section 814 of Edmonton Zoning Bylaw 12800). These new regulations

More information

Technical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program

Technical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program Technical Facility Management FACILITY CONSULTING SERVICES The Facility Audit Program TFM Audit Program - Schedule Customer: Dates of Visit: AREA TFM CUSTOMER SUBJECT Goals/Objectives Schedule Key Interviews

More information

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town

More information

LEAD DESIGN PROFESSIONAL:

LEAD DESIGN PROFESSIONAL: 2009 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

PROPERTY HIGHLIGHTS. 219 S. Tustin St. Orange, CA, Site

PROPERTY HIGHLIGHTS. 219 S. Tustin St. Orange, CA, Site 9 S. Tustin St. Orange, CA, 9865 PROPERTY HIGHLIGHTS 347 Square feet available 7 New construction highly visible and direct access to Tustin St. Centrally located with Easy Access to interstate 5,55,57,,

More information

SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes

SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes SUMMARY OF FIRE SPRINKLER REQUIREMENTS FOR ALTERATIONS TO EXISTING BUILDINGS 2015 I-Codes SCOPE: The City of Lawrence requirements for application of current code provisions. This shall apply to alterations

More information

BUILDING PERMIT GUIDE SHEET

BUILDING PERMIT GUIDE SHEET Lake Lorelei Property Owners Association 615 Lorelei Drive Fayetteville, OH 45118 (513) 875-3435 Fax (513) 875-4244 Email: gm@lakeloreleiohio.com www.lakeloreleiohio.com BUILDING PERMIT GUIDE SHEET The

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

RFP for Building Enclosure Consulting Services Proposal Request No Answers to Questions Asked as of 11/01/2017

RFP for Building Enclosure Consulting Services Proposal Request No Answers to Questions Asked as of 11/01/2017 RFP for Building Enclosure Consulting Services Proposal Request No. 17-0137 Answers to Questions Asked as of 11/01/2017 1. What extent of project documents will be available for the building enclosure

More information

Capital Investment Program CAPITAL BUDGET

Capital Investment Program CAPITAL BUDGET Capital Investment Program 2012-2014 CAPITAL BUDGET Table of Contents Page CAPITAL BUDGET FUNDING ALLOCATION 3 S Asset Management Projects Roadway Maintenance 4 Downtown ADA Ramp Upgrades 5 Storm Drain

More information

ATTACHMENT C MITIGATED NEGATIVE DECLARATION AND MITIGATION AND MONITORING REPORTING PROGRAM

ATTACHMENT C MITIGATED NEGATIVE DECLARATION AND MITIGATION AND MONITORING REPORTING PROGRAM ATTACHMENT C MITIGATED NEGATIVE DECLARATION AND MITIGATION AND MONITORING REPORTING PROGRAM CITY OF PASADENA 175 NORTH GARFIELD AVENUE PASADENA, CA 91109 PROPOSED MITIGATED NEGATIVE DECLARATION PROJECT

More information

New Home Construction Review Process

New Home Construction Review Process New Home Construction Review Process The official submittal of plans and specifications to the Architectural Control Committee (ACC) is to provide a review process for conformance to guidelines and standards,

More information

# 8 ) UN MME DISPENSARY AT 2113 N. LV BLVD SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

# 8 ) UN MME DISPENSARY AT 2113 N. LV BLVD SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING # 8 ) UN-75-14 MME DISPENSARY AT 2113 N. LV BLVD SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN-75-14 Prepared by: Marc

More information

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS

MATURE NEIGHBOURHOOD OVERLAY REGULATIONS MATURE NEIGHBOURHOOD OVERLAY REGULATIONS PROPOSED REGULATION 01 FRONT SETBACK The Front Setback shall be a minimum of 3.0 m and shall be consistent within 1.5 m of the Front Setback on Abutting Lots, to

More information

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811 CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811 ACTION OF THE ZONING ADMINISTRATOR On Thursday, October 16, 2014, the Zoning

More information

SAFEGUARDS DURING CONSTRUCTION

SAFEGUARDS DURING CONSTRUCTION CHAPTER 14 SAFEGUARDS DURING CONSTRUCTION SECTION 1401 GENERAL [B] 1401.1 Scope. The provisions of this chapter shall govern safety during construction that is under the jurisdiction of this code and the

More information