ADDENDUM NO. A. April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR
|
|
- Anthony Richard
- 6 years ago
- Views:
Transcription
1 ADDENDUM NO. A April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR LOTHIAN RESIDENCE HALL SEISMIC UPGRADES BID PACKAGE 4 PROJECT NO CONTRACT NO LF UC Rev. 0, August 1, 2007 UCR Rev
2 Lothian Residence Hall Seismic Upgrades Bid Package 4 Project Number: Contract Number: LF Addendum No. A, April 18, 2017 The following changes, additions, or deletions shall be made to the following documents as indicated for this Project; and all other terms and conditions shall remain the same. Each bidder is responsible for transmitting this information to all affected subcontractors and suppliers before the Bid Deadline. 1. INFORMATION AVAILABLE TO BIDDERS a. Replace the existing Information Available to Bidders Form with the one issued in this Addendum. 2. REQUESTS FOR CLARIFICATION / INTERPRETATION OF THE BIDDING DOCUMENTS RFI No. a. This Addendum answers the following RFI s received during the Bidding Phase. UC Rev 0, August 1, UCR Rev QUESTIONS / ANSWERS 1-1 Question: Please advise Anticipated Start Date. Is it June 20, 2017? Answer: It is anticipated that the start date on the Notice to Proceed will be mid-may,2017, however, the building will not be vacated and ready for work to begin until June 26, The time in between day 1 of NTP and June 26, 2017 is to allow the contractor time to order long lead items and turn in submittals for approval. The actual construction period is from June 26, 2017 to September 7, 2017 with substantial completion by August 28, Question: Drawing A2.10, Note #4 does not quantify or show the location of data, coaxial, and phone lines in each room. Please provide a quantity of each, and a location so that we can quantify this scope. I believe there were 2 data lines, 1 phone line (split between two jacks), and 1 coaxial line per room. Answer: Bidders should allow for (2) data lines, 1 phone line (split between two jacks), and 1 coaxial line per room. 1-3 Question: Drawing A2.10, Note #4 on Sheet A2.10 does not make reference to the existing wire mold raceways within the dorm rooms, are we to remove and reinstall the existing or provide new. If new are to be provided, please provide a specification or product information so that we may price this work. Answer: Remove and reinstall. 1-4 Question: Drawing A4.03 It appears that in order to install the new shower stalls that some of the existing fire sprinkler heads will need to relocate in each restroom. Please confirm that we should include this in our scope of work. For bidding purposes should we assume 2 heads per restroom? Answer: Include work to relocate existing sprinkler heads from inside expanded shower stall to the outside of shower stalls. 1-5 Question: When removing one layer of drywall, and then installing new shear paneling and drywall on walls, the existing wall will become thicker. With that being said any existing outlet on these walls will now need be furred out to meet the new wall elevation. Please provide a quantity of these existing outlets, so that we may price this work. (there were roughly 60 per floor last year.) Answer: For the purposes of bidding, assume 60 per floor to be retrofitted.
3 Lothian Residence Hall Seismic Upgrades Bid Package 4 Project Number: Contract Number: LF Addendum No. A, April 18, Question: The existing dorm rooms have surface mounted mirrors, Surface Mounted lights, closet doors, and closet door tracks that will need to be removed in order to perform the structural work. However none of this work is shown on the drawings. Please clarify what should be done with these items. Answer: Student rooms with existing surface mounted items such as lights and mirrors to be removed, saved and reinstalled. Closet doors, door tracks and miscellaneous related hardware to be reinstalled as well after doors are refinished. Mirrors are to be removed (assume ACM mastic) and new provided. Provide 24 x 36 standard mirrors with metal frames at each room (1 per room) 1-7 Question: Should anything in this building be assumed to contained asbestos or lead? Does UCR have an asbestos and lead survey report for this building, if so can this please be distributed to all bidders? Answer: The building has asbestos report available to the bidders for previous wings. All the ACM in the building is limited to the mirror mastic hockey-pucks and is less than 100 square feet. 1-8 Question: Drawing A2.20, The drawings show the corridor ceilings as existing. In order to install shear paneling all the way up from floor to deck, along with the installation of the new light fixture, the ceiling should be replaced in its entirety. Answer: Correct remove and reinstall all drywall and ceiling framing as required. 1-9 Question: Drawing A2.20, Inside the dorm walls there are existing switches and thermostats at sheer wall locations? Do those need to be removed and reinstalled? Answer: Remove, save, and reinstall existing switches and thermostats to original locations Question: Drawing A2.20, The wiremold 4000 specified on sheet A2.20 needs to be doubled to hold the capacity of wires they now have, the previous years they used a dual channel Panduit instead Answer: Match with what was installed in previous years - Panduit PanwayTwin Question: Drawing A2.10, Are new FEC required? If so what is the model number, and locations? Answer: Provide cost and installation for three Fire Extinguisher Cabinets (FEC) and fire extinguishers per floor. FEC to be able to fit Amerex B500, 5lb multi-purpose dry chemical type. UCR will provide FEC and Extinguishers. END OF ADDENDUM UC Rev 0, August 1, UCR Rev
4 LOTHIAN RESIDENCE HALL SEISMIC UPGRADES - BID PACKAGE 4 PROJECT NO CONTRACT NO LF Addendum No. A, April 18, 2017 INFORMATION AVAILABLE TO BIDDERS The following information is made available for the convenience of bidders and is not a part of the Contract. The information is provided subject to the provisions of Article 3 of the General Conditions. 1. The University of California has contracts for materials, equipment and/or services with the suppliers listed on the Office of the President Procurement Services website at General Contractors or others submitting bids for University construction projects may enter into agreements with these suppliers that utilize the pricing and terms contained in the Universitysupplier agreements. The university does not represent or warrant that materials/equipment/services of these suppliers meet the requirements of the University s construction contracts. Use of such suppliers shall not relieve Contractor from its obligation to meet all contractual requirements in any contracts with the University. The university will not be a party to any agreements with such suppliers and accepts no performance obligations or liability with respect to such agreements. 2. Reports: Ambient Environmental, Inc. Asbestos Report dated June Record Documents and As-Builts: Lothian East Residence Hall V, Project No , As-Built Drawings SHEET NO. TITLE DATE PART I T-1 TITLE SHEET Not Dated A-102 SECOND FLOOR PLAN A-105 ROOF PLAN A-213 BUILDING SECTIONS A-600 WALL SECTIONS A-601 WALL SECTIONS A-602 WALL SECTIONS A-603 WALL SECTIONS A-703 WINDOW DETAILS S-1 GENERAL NOTES AND TYPICAL DETAILS, ADDENDA # S-2.1 DORMITORY FOUNDATION, ADDENDA # S-2.2 FOUNDATION LIVING ROOM AND BATHROOM, ADDENDA # UC LF February 13, 2013 UCR Rev Information Available to Bidders
5 LOTHIAN RESIDENCE HALL SEISMIC UPGRADES - BID PACKAGE 4 PROJECT NO CONTRACT NO LF Addendum No. A, April 18, 2017 S-2.3 DORMITORY CORE FOUNDATION PLAN, ADDENDA # S-2.4 KITCHEN AREA FOUNDATION PLAN, ADDENDA # S-2.5 TUNNEL STRUCTURAL SLAB PLAN & ENTRY STRUCTURE FOUNDATION PLAN, ADDENDA #1 S-2.6 DINING REA FOUNDATION PLAN, ADDENDA # S-3.1 DORMITORY FLOOR, 2 ND FRAMING PLAN, ADDENDA # S-3.2 DORMITORY FLOOR, 3 RD FRAMING PLAN, ADDENDA # S-3.3 DORMITORY FLOOR, 4 TH FRAMING PLAN, ADDENDA # S ND AND 3 RD FLR FRMG LIVING ROOM AND BATHROOM, ADDENDA #1 S-4.1 DORMITORY ROOF FRAMING PLAN, ADDENDA # S-4.2 DORMITORY CORE ROOF FRAMING PLAN, ADDENDA # S-4.3 KITCHEN AREA ROOF FRAMING PLAN, ADDENDA # S-4.4 ENTRY STRUCTURE AND GALLERY ROOF FRAMING PLAN DINING AREA ROOF ALT. #4 (CUPOLA), ADDENDA #1 S-4.5 DINING AREA ROOF FRAMING PLAN, ADDENDA # S-5 TYPICAL DETAILS, ADDENDA # S-6 SECTIONS & DETAILS, ADDENDA # S-7 SECTION AND DETAILS, ADDENDA # S-8 SECTIONS AND DETAILS, ADDENDA # S-9 SECTIONS AND DETAILS, ADDENDA # S-10 DETAILS, ADDENDA # S-11 DETAILS S-12 DETAILS, ADDENDA # PART II M-1 MECHANICAL SCHEDULE M-2 MECHANICAL SCHEDULES, NOTES & LEGEND M-13 SECOND FLOOR WEST WING MECHANICAL PLAN M-16 WEST WING ROOF MECHANICAL PLAN M-18 BASEMENT MECHANICAL PLAN M-19 FIRST FLOOR REMODEL MECHANICAL PLAN M-24 MECHANICAL DETAILS P-2 LEGEND, SCHEDULES AND GENERAL NOTES P-6 FIRST FLOOR PLAN, WEST WING P-7 SECOND FLOOR PLAN, EAST, WEST AND SOUTH WING P-10 ROOF PLAN P-14 PARTIAL PLAN, FIRST FLOOR P-17 TYPICAL TOILET ROOMS, EAST, WEST AND SOUTH WING CCP-1 CONSTRUCTION CHANGE SKETCHES PLUMBING Not Dated E-9 1 st 4 th FLOOR TYP. WEST WING POWER & SIGNAL PLAN E-10 ROOF ELECTRICAL PLAN E-13 GROUND FLOOR REMODEL LIGHTING PLAN E-14 GROUND FLOOR REMODEL POWER & SIGNAL PLAN E-15 SINGLE LINE DIAGRAM & DETAIL E-24 PANEL SCHEDULE E-25 PANEL SCHEDULE E-26 PANEL SCHEDULE E-27 PANEL SCHEDULE E-28 PANEL SCHEDULE UC LF February 13, 2013 UCR Rev Information Available to Bidders
6 LOTHIAN RESIDENCE HALL SEISMIC UPGRADES - BID PACKAGE 4 PROJECT NO CONTRACT NO LF Addendum No. A, April 18, 2017 END OF INFORMATION AVAILABLE TO BIDDER UC LF February 13, 2013 UCR Rev Information Available to Bidders
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
ADDENDUM NO. 3, February 8, Renovations to the Existing Shelby County Center Architect s job no. 2598/BN
ADDENDUM NO. 3, February 8, 2013 RE: Renovations to the Existing Shelby County 9-1-1 Center Architect s job no. 2598/BN FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham, Alabama 35242 (205)
More informationADDENDUM NO 1 Issued November 21, 2017
SEATTLE HOUSING AUTHORITY #4936 SPRUCE STREET TOWNHOMES RENOVATION ADDENDUM 1 ADDENDUM NO 1 Issued November 21, 2017 FROM: TO: Seattle Housing Authority Mel Henley 190 Queen Anne Avenue North P.O. Box
More informationADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM LOWELL HIGH SCHOOL PROJECT #11493 INTERIM HOUSING for VOLUNTARY SEISMIC STRENTHENING ADDENDUM NO. 1 PROJECT: Lowell High School DATE:
More informationSeptember 23, 2016 ADDENDUM #2
September 23, 2016 ADDENDUM #2 To: From: Subject: Prospective Bidders St. Johns County Purchasing Department Bid No. 16-55 St. Johns County Building Services Renovation & Remodeling. This Addendum #2 is
More information131 Stanley Ave. #100 PO Box 129 Estes Park, CO Fax:
Thorp Associates, P.C. Architects and Planners MCKEE RESIDENCE ADDENDUM #2 June 7, 2011 GENERAL 1. Submit bids using the attached Bid Form for General Contract. SHEET A00 - TITLE SHEET AND SITE PLAN 1.
More informationColumbia County Health Care Center Added Amenities
Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center
More informationSee attached answers to questions and requests for clarification received.
Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June
More informationReason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change)
Page 1 of 6 ADCI Bulletin No. 01 Date: March 30, 2015 Project: @580 Renovation for New Apartment Units Address: 580 Walnut Street Cincinnati, OH 45202 Commission: Prepared For: Prepared By: PDT P266 Cincinnati
More informationLANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No
LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 103-111-5-2016 Waterproofing lower level of house, Mold Remediation and Unit Turn Scope of Work AGENCY CONTACT PERSON PRE-PROPOSAL WALK
More informationADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION
ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521
More informationCity of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist
City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist This checklist contains the standard information required on submittals for commercial construction
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationVILLAGE OF MARATHON CITY MARATHON COUNTY WISCONSIN
VILLAGE OF MARATHON CITY MARATHON COUNTY WISCONSIN Instructions to Contractors The Village of Marathon City will be accepting proposals at the Marathon City Village Hall, 311 Walnut Street, PO Box 487
More informationDALLAS-FORT WORTH INTERNATIONAL AIRPORT
DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR
More informationFLOORS 3, 14 & 21 D322, D1422, D2122 Qty. 3 Size 2-6 x 6-0
entirely and masonry as required for installation of new door & frame (Kitchen Floors 5, 12, & 19). 4. At the DEMOLITION NOTES, DELETE Note D-4 in its entirety and REPLACE with the following: Saw cut and
More informationMSA MOORE & SPENCE ARCHITECTS, P.A.
MSA MOORE & SPENCE ARCHITECTS, P.A. ADDENDUM NUMBER THREE (3): October 27, 2009 to the Construction Documents dated October 9, 2009 for: HACFM, Covington Meadows Apartments Lehigh Acres, Florida The following
More informationCLARION UNIVERSITY OF PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION ISSUE DATE: September 4, 2014
CLARION UNIVERSITY OF PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION ISSUE DATE: September 4, 2014 PROJECT NO: PROJECT NAME: BIDS DUE: 2:00 P.M., EST., September 24, 2014 ADDENDUM NO. 3 TO: Prospective
More informationCOUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA ADDENDA No.
COUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA 18940 Doug Taylor, Assoc. AIA, AVS TELEPHONE (215) 944-1015 Supervisor of Operational
More informationPURCHASING DEPARTMENT
PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do
More informationAddendum #1. January 22, 2018
Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing
More informationREQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW:
Police Headquarters Project REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: General description The objective is to renovate an approximately 18 x 24 section of the two-bay attached garage at Town
More informationSTANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author
STANDARD CONSTRUCTION PACKAGE Addendum A REV 7-3-18 SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state authorities Excavate material to pour footings and foundation
More informationPeachStone Capital, Inc. Atlanta s Hard Money Lender When timing is everything, we close! Hard Money Loan Property Worksheet Checklist
Hard Money Loan Property Worksheet Checklist Please complete ALL requested information. Incomplete applications will NOT be reviewed! Fully executed purchase and sale agreement including all exhibits,
More informationThe addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1
ADDENDUM # ENTRYWAY UPGRADES KILLINGLY INTERMEDIATE SCHOOL 99 UPPER MAPLE STREET DAYVILLE, CT 0 S/P+A PROJECT NO. 8.8 DATE: July, 08 The following changes to the Drawings and Project Specifications shall
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More informationDOCUMENT BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) Bidder:.
DOCUMENT 004120 - BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) BID INFORMATION Bidder:. Project Name: Remodeling for Urban Style Apartments 409 N. Broadway Green Bay, WI 54303 Owner: Architect:
More informationADVERTISEMENT FOR BIDS
1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,
More informationTOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS
TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS The Town of East Haddam is seeking bids from qualified contractors who will
More informationAll bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.
Addendum #6 December 4, 2012 IFB #12-08 Westerfield Modernization 20 Units 10-86 Westerfield Drive. Centerville, Ohio 45458 Prepared by: Oregon Group Architects, Inc. 300 S. Patterson Blvd Dayton, OH 45402
More informationTHE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS
THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING
More informationADDENDA NO. 1 Park View Care Facility Asbestos Abatement and Demolition Burlington, Iowa PROJECT No May 30, NOTICE Page 1 of 1
ADDENDA NO. 1 Park View Care Facility Asbestos Abatement and Demolition Burlington, Iowa PROJECT No. 170739.00 May 30, 2017 NOTICE Page 1 of 1 This Addendum is issued to modify, explain or correct the
More informationPermit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2) Applicant must complete
More informationAddendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018
` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request
More information1. Baptist Hospital has added Construction Zone as an approved General Contractor to bid this project (409)
Project: DIALYSIS RENOVATION - 2 NORTH Baptist Beaumont Hospital Addendum No. 2 Date: 5-15-13 All bidders are herewith notified of the following additions, deletions, changes or clarifications to the drawings
More informationTenant Fit-Out for PLCB / Waynesboro Mall
Tenant Fit-Out for PLCB / CODE REVIEW: PROJECT DESCRIPTION TENANT BUILD OUT PROPOSED USE SALE OF BEVERAGE ALCOHOL / PLCB SPRINKLERED: YES ALLOWABLE BUILDING HEIGHT & AREA: GROUP M / TYPE VB ALLOWED 1 STORY
More informationAddress: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One)
1 of! 5 Address: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One) General Scrape popcorn from ceilings throughout done 1 General Sheetrock repair done 3
More informationMPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport
MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport RESPONSES TO QUESTIONS and/or RFI s Date: 6/1/2018 The attention of Contractors submitting Filed Sub-Bids
More informationT H E T O W N O F G U I L F O R D V E R M O N T
Project Title: Contact: Capital Needs Assessments Town of Guilford Buildings Peder Rude, Town Administrator Email: pederrude@guilfordvt.net (802) 254-6857, ext. 105 Town of Guilford 236 School Road Guilford,
More informationCOMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION
COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building
More informationADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES
ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C-22 Bid Package No. 2 Hard Demolition C-21 Bid Package No.
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More informationAddendum #2 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018
Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 Addendum #2 To Request for Proposal For
More informationSurgical Associates Commercial Remodel
ADDENDUM Project Name: Studio 951 Project No.: 17-012 Surgical Associates Commercial Remodel Addendum No.: 01 Issue Date: 6 December 2017 This Addendum serves to clarify, revise and supersede information
More informationALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.
ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED. PARTITION CONSTRUCTION TO BE 3 5/8 METAL STUDS 24 ON CENTER WITH 5/8 TYPE X GYPSUM BOARDS BOTH SIDES.
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationRevised Drawings A, E, and M dated 11/13/18 (that include additional specifications)
Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.
More informationADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5
ADDENDUM NO. 1 TO SCOPE OF WORK: Section 0220, Form 01004/5 PROJECT: Tankless Water Heaters Installation Glenn Edge and Rich Martin Apartments and Main Office Water Heater Replacement New Memorial Community
More informationProposal. Lexington, MA. Price Work Description
PROPOSAL Assumptions Sample Client Lexington, MA The is based on plans dated 3/3/15, with Sally's list of adjustments The price assumes the owners will be living in the house The owners will be responsible
More informationSEMINOLE TRIBE OF FLORIDA INVITATION TO BID
Solicitation #: ITB 151-2017 Title: Description: SEMINOLE TRIBE OF FLORIDA INVITATION TO BID General Home Repairs (Big Cypress Reservation) The Housing Department of the Seminole Tribe of Florida is requesting
More informationAddendum No ALPINE ROAD HOUSE REMODEL PROJECT
To: From: Addendum No. 1 5755 ALPINE ROAD HOUSE REMODEL PROJECT Request for Bid Recipients Jean Chung, Project Manager Date: July 28, 2015 Re: Bidders must acknowledge receipt of Addendum No. 1 by signing
More informationAddendum #3 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018
Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #3 To Request
More informationRUVIN BROS. ARTISANS and TRADES, INC. CHANGE ORDER
RUVIN BROS. ARTISANS and TRADES, INC. CHANGE ORDER Change Order: 5 Date: 7/3/2018 Job Code: WDA TO: Ruvin Bros. Artisans and Trades, Inc: You are hereby directed to change the Plans, Specifications, and/or
More informationBASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS
BASEMENT FINISH REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS A construction permit is required. A homeowner may perform the construction work on his own property where he resides, without a
More information11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.
11/1/2016 Request for Proposal: Make Ready Services McKinney Housing Authority (MHA) requests proposals for vendors to perform make ready services on vacant units within the authority. All bidders must
More information1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) S Pioneer
1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 125 S Pioneer 1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 CRITICAL IMPROVEMENTS Framing Demo Tin Fence Exterior
More informationDOCUMENT POST BID INTERVIEW
DOCUMENT 00 45 90 POST BID INTERVIEW PART 1 GENERAL 1.01 SUMMARY By request of the District, this Section requires the apparent low bidder to attend and participate in a Post Bid Interview with the Construction
More informationProject Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope
Project Scope & Budget Breakdown Mandatory Scope Recommended Additional Scope Wish List Scope Site Plan EXISTING Site Plan PROPOSED First Floor Plan PROPOSED Basement Floor Plan PROPOSED Mandatory Scope
More informationNORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT
NORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT Bid No. 2K18-04 Addendum III The following shall be added to the indicated specification sections. (Changes are in red) SECTION 011000 SUMMARY / SCOPE
More informationNORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT
NORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT Bid No. 2K18-03 Addendum III The following shall be added to the indicated specification sections. (Changes are in red) SECTION 011000 SUMMARY / SCOPE
More informationTECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE
TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations
More informationHC Homes at Tehaleh. Framing
HC Homes at Tehaleh 9/17/15 Addendum II to Purchase and Sale Agreement Specifications for HC Homes at Tehaleh. Attached to and made part of Earnest Money Agreement for the purchase of Lot in the plat of
More informationAddendum No Downsville Pike Hagerstown MD Please note the following changes/clarifications to Bid No.
10435 Downsville Pike Hagerstown MD 21740 301-766-2800 Addendum No. 2 August 28, 2014 TO: All Prospective Offerors FROM: Lisa Freeman, C.P.M., Supervisor of Purchasing REF: Bid No. 2015 05 Renovation of
More informationMultidisciplinary Research Building 1
ADDENDUM NO. 10 to the Request for Proposal documents for the Multidisciplinary Research Building 1 Project No. 950528 University of California, Riverside April 11, 2016 I. GENERAL The following changes,
More informationKitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo
Kitchen Remodel Estimator Thinking about remodeling your kitchen? If you would like a free bid from Excel Builders, we have provided a list of questions that will need to be filled out with detail in order
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationHC Homes at Tehaleh Standard Features
HC Homes at Tehaleh Standard Features 4/19/16 Addendum II to Purchase and Sale Agreement Specifications for HC Homes at Tehaleh. Attached to and made part of Earnest Money Agreement for the purchase of
More informationADDENDUM NO. 2 Consisting of 3 pages and Attachments
10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta
More informationAllied Diversified is the Prime General Contractor Allied Diversified is requesting ADDITIONAL BIDS All Trades INSTRUCTIONS TO BIDDERS
is the Prime General Contractor Allied Diversified is requesting ADDITIONAL BIDS All Trades INSTRUCTIONS TO BIDDERS BIDS DUE NO LATER THAN: PROJECT START DATE: April 2 nd, 2014 4:00 pm As Soon As Awarded
More informationThe Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits
The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits 3. Development and Septic Fees 4. Tarion New Home Warranty
More informationInterior Remodeling Proposal
Date Prospect Name Address Interior Remodeling Proposal General & Administrative Project supervision Dust protection & site preparation (add Build Clean filtration system during remodeling to control dust)
More informationCHANGE ORDER LOG FOR MOUNT NITTANY ELEMENTARY
PROJECT SUMMARY OF CHANGES TOTAL SITE CHANGES $0.00 $6,791.92 ($11,656.12) $11,902.24 $0.00 TOTAL CONCRETE CHANGES $644.78 $2,282.00 $0.00 $2,141.90 TOTAL MASONRY CHANGES $12,815.85 $0.00 $0.00 TOTAL STRUC.
More informationProject: Lake Creek Village Apartments Project No: 0547
TAB Associates, Inc. The Architectural Balance 0056 Edwards Village Boulevard Suite 210, Edwards, Colorado 81632 (970) 766-1470 (970) 766-1471 fax www.tabassociates.com tab@vail.net Addendum Project: Lake
More informationREVISED MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT. Addendum No. 1. May 9, 2018 HUMANITIES SOCIAL SCIENCES BUILDING 26 RESTROOM REMODEL Bid No.
REVISED MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT May 9, 2018 HUMANITIES SOCIAL SCIENCES BUILDING 26 RESTROOM REMODEL To All Bidders: All bidders shall acknowledge receipt of this Addendum on the bid
More informationNewberry. Foundation Framing
Newberry 08/4/17 Addendum II to Purchase and Sale Agreement Specifications for Newberry. Attached to and made part of Earnest Money Agreement for the purchase of Lot in the plat of Newberry dated:, between
More informationQUINN COMMONS. Quinn Ln. SOLD
Quinn Ln. SOLD SOLD Specifications, square footage, renderings and floor plans are for illustration purposes only and are subject to change. Pictures are of similar Sage Built home. Prices may change without
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,
More informationRENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:
RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: 13-146 A D D E N D U M NO. 1 The following shall form part of the tender documents
More informationFLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE
FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE PROVIDENCE Prairie 1713 2 + Den 2 2 $341,400 Country Cottage 1713 2 + Den 2 2 $343,400 Craftsman 1713 2 + Den 2 2 $349,400 2 bedrooms + den or optional
More informationNOTE: All in attendance are plan holders, except Karen s Carpetmax who attended with First Contracting.
JAMES S. JACOBS ARCHITECTS, PLLC CONFERENCE REPORT 25 WASHINGTON STREET MONROE, MICHIGAN 48161 DATE: March 7, 2018 Phone 734-241-7933 Fax 734-241-1181 jimj@jsjacobsarch.com TIME: 10:00 AM 60 Units PROJECT:
More informationA. Remove Table of Contents and insert new attached Table of Contents.
ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been
More informationYardmen Arena Expansion & Renovation Project Update
For Immediate Release 25, September,2017 Yardmen Arena Expansion & Renovation Project Update BELLEVILLE ON With 33 days until puck drop of the home opening game of the American Hockey League s Belleville
More informationAddendum No. 1 April 12, 2017 Rogers Hall Install Fiber Optic Cabling & GPON Equipment Washington State University Pullman, WA
Addendum No. 1 April 12, 2017 Rogers Hall Install Fiber Optic Cabling & GPON Equipment Washington State University Pullman, WA Project No.9414-2017 Washington State University Facility Services, Capital
More informationEquine Barn LLC 213 Crescent Moon Way Canton, Ga Proposal
Equine Barn LLC 213 Crescent Moon Way Canton, Ga 30114 Proposal 2014 We hereby propose to provide all the materials and labor necessary to build a custom barn located in, Ga for. What is included in the
More informationBUILDING PERMIT APPLICATION
TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required
More informationAddendum 4 RFI Questions and Answers
Addendum 4 RFI Questions and Answers Bid Closing:2/1/17 at 2:00 pm (Local Time) Page 1 of 1 Bid Number: FCT 21/JSW Date: 1/24/17 BID MUST BE SUBMITTED ON OR ATTACHED TO THIS SIGNED FORM RETURN BIDS AS
More informationADDENDUM NO. 2 PROJECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No ARCHITECT:
ADDENDUM NO. 2 PROJECT: ARCHITECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No. 7-7 PETERS AND ASSOCIATES, ARCHITECTS, P.C. 427 Dayton Circle, Suite Omaha, Nebraska 6837-5558 Date
More information3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.
1. Page A401 details 3, 4, 5 show storefront sections, but no storefront specification exists. Can this be provided? Answer: This frame these sections apply to is to be changed to hollow metal. Delete
More informationLANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair
LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP102-1338 Christopher-2017 1338 Christopher Repair AGENCY CONTACT PERSON PRE-PROPOSAL MEETING RSVP via email lisap@lanshc.org by 8-8-17.
More informationConsultant: Addenda # Date: No. of Pages: Performance Alternate Bathroom Layouts Sketch Aug.10,
260 1770 Burrard Street Vancouver, BC V6J 3G7 604 669 7710 tel 604-669-6629 fax www.dysarchitecture.com Project Name: City of Vancouver Affordable Housing SITE 6 2922 East Kent Avenue South &8588 Jellicoe
More informationHighland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features
unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview Raised
More informationAlderbrook Homes in Phase 1
Phase One As a family owned and operated business, we at Alderbrook Homes understand the importance of home, family and living the American Dream. With decades of experience, we have earned a reputation
More informationADDENDUM # 1 TO: FROM:
ADDENDUM # 1 TO: FROM: SUBJECT: DATE: bidders Somsri Bond, RA, LEEDap Assistant Architect for Research, University Architect s Office 20180123 - EA802 - Whitewater Hall - Rms 221,223,225-Interior Finishes
More informationADDENDUM No. 1. H.S. Thompson Elementary School Abatement Org #307
ADDENDUM No. 1 for BP# 301A H.S. Thompson Elementary School Abatement Org #307 DALLAS INDEPENDENT SCHOOL DISTRICT December 01, 2017 Any addendum issued will be listed or posted at the Bond Program website
More informationBuilding Architecture
The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L
More informationPRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016
PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new
More informationOFFICE Space STANDARD SPECS Page 1
OFFICE Space STANDARD SPECS Page 1 Standard features listed are based on manufacturer availability- Substitutions may occur and interchanged with items of similar standard likeness at the discretion of
More informationWork Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free
/ / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary
More information--*6 S CONSTRUCTION GROUP, INC SW 87 Avenue Miami, FL Phone:
--*6 S,.- CONSTRUCTION GROUP, INC. FLORIDA STATE CERTIFIED GENERAL CONTRACTOR CGC 1 508637 9505 SW 87 Avenue Miami, FL 33176 Phone: 305-219-6046 Email: jrossel@rosselconstruction.com PRELINIARY ESTIMATE
More informationAlabama A&M University Thigpen Hall Renovations Project No ADDENDUM NUMBER 3
Alabama A&M University Thigpen Hall Renovations 00 91 12-1 Project No. 17940 ADDENDUM NUMBER 3 SECTION 00 91 12 ADDENDUM NUMBER 3 PARTICULARS 1.01 DATE: MAY 11, 2018 1.02 PROJECT: THIGPEN HALL RENOVATIONS
More informationCOMMERCIAL TENANT IMPROVEMENTS
Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94925 (P) 415-927-5062 (F) 415-927-5039 COMMERCIAL TENANT IMPROVEMENTS The following information pertains to the Building Plan Check and Permit
More information