Nu-Wool U382 2 Hour Firewall Guide Please note that this firewall can only be installed by approved Nu-Wool U382 installers
|
|
- Rose Stanley
- 6 years ago
- Views:
Transcription
1 Nu-Wool 2 Hour Firewall Guide Please note that this firewall can only be installed by approved Nu-Wool installers For Information, please contact: Bill Hulstrunk (413) Rev 01/13
2 Wall Construction Double row of staggered 2x4 studs. Opposite rows spaced 1 in. apart. Bearing plates: Two layers on the top and one layer on bottom. Continuous 5/8 Type C drywall on both sides. Nu-Wool WALLSEAL installed at a density of 4.6 lbs/ft. 3 Cross-bracing at midheight or diagonally. Side View Top View
3 Cross-Bracing
4
5 Note: Unlike this picture, the 2 x 4 cross bracing should be staggered on each of the two sides of the firewall
6 Partition Walls and Other Issues In order for the type C drywall to be continuous, the type C drywall must be installed before framing any intersecting partition walls. Any partition wall framed directly against the firewall without type C drywall behind it will need approval by the appropriate local code official. Make sure that the type C drywall is continuous behind the stairwell, tub and shower enclosures, cabinets, built ins or any drop soffits or drop ceiling areas.
7 Firewall Penetrations All wire penetrations must be fire sealed No gas lines or waste pipes can run inside the firewall All plumbing penetrations must have U.L. approved collars and assembly listings
8 All Outlets in Firewall Must be 2 Hr UL Approved Electrical boxes must not exceed 100 square inches per 100 square feet
9 Wall Construction Review Two ways to frame the wall: Blocking staggered at 4.5 feet on each of the walls or diagonal bracing between walls Continuous type C drywall must be installed. One layer of type C drywall must be installed prior to application of insulation. Minimum gap between the framed walls is 1 inch. 4.6 lbs./ft. 3 tested Nu-Wool insulation density.
10 Floor-Ceiling Assembly There is no ASTM test for this area of the wall system. There is no third party testing facility to ensure an hourly rating. The builder/architect doesn t need to change anything they are specifying right now.
11 Floor-Ceiling Assemblies Perpendicular floor joists. (Rim & Band Joist application) Attic, floor-ceiling assembly, and foundation details will vary. Two layers of Type X drywall must extend from the bottom of the top plate on the lower wall and extended up to the top of the bottom plate on the upper wall (area circled). 5/8" GYP. BD. CEILING (TYP.) DOUBLE TOP PLATE (TYP.) 2 LAYERS TYPE X GYP. BD. 5/8" GYP. BD. CEILING (TYP.) CONTINUOUS RIMBOARDS - SEE STRUCTURAL DESIGN SECOND FIRST FLOOR FLOOR INSULATION PER SPECS WALLSEAL INSULATION (SLAB TO ROOF DECK) FLOOR-CEILING INTERSECTION MAY VARY BY LOCALE AND MUST BE APPROVED BY LOCAL INSPECTOR SEE FRAMING PLANS FOR FLOOR SYSTEM USED (PERPENDICULAR FLOOR JOIST CONDITION SHOWN) NU-WOOL WALLSEAL - APPLIED BETWEEN JOISTS AT A DENSITY OF 4.6 LBS./CUBIC FT. (MUST BE INSTALLED BY A NU-WOOL CERTIFIED DEALER) WALLSEAL INSULATION (SLAB TO ROOF DECK) SEE FOUNDATION PLAN FOR FOOTING DETAIL (FOUNDATION SYSTEM MAY VARY)
12 Floor-Ceiling Assemblies (cont.) Parallel floor joists. The wall system is fully load bearing so this wall detail may be rare. Two layers of Type X drywall must extend from the bottom of the top plate on the lower wall and extended up to the top of the bottom plate on the upper wall (area circled). 5/8" GYP. BD. CEILING (TYP.) DOUBLE TOP PLATE (TYP.) 5/8" GYP. BD. CEILING (TYP.) CONTINUOUS RIMBOARDS - SEE STRUCTURAL DESIGN (Material May Vary) SECOND FIRST FLOOR FLOOR INSULATION PER SPECS WALLSEAL INSULATION (SLAB TO ROOF DECK) FLOOR-CEILING INTERSECTION MAY VARY BY LOCALE AND MUST BE APPROVED BY LOCAL INSPECTOR SEE FRAMING PLANS FOR FLOOR SYSTEM USED (PARALLEL FLOOR JOIST CONDITION SHOWN) 2 LAYERS TYPE X GYP. BD. WALLSEAL INSULATION (SLAB TO ROOF DECK) SEE FOUNDATION PLAN FOR FOOTING DETAIL (FOUNDATION SYSTEM MAY VARY)
13 Floor-Ceiling Assemblies (cont.) Perpendicular floor joists. (Rim & Band Joist application) Attic section dependant on inspector. Two layers of Type X drywall must extend from the bottom of the top plate on the lower wall and extended up to the top of the bottom plate on the upper wall (area circled). 5/8" GYP. BD. CEILING (TYP.) DOUBLE TOP PLATE (TYP.) 2 LAYERS TYPE X GYP. BD. 5/8" GYP. BD. CEILING (TYP.) CONTINUOUS RIMBOARDS - SEE STRUCTURAL DESIGN SECOND FIRST FLOOR FLOOR ATTIC SYSTEM MAY VARY BY LOCALE - THE ATTIC SYSTEM MUST BE APPROVED BY A LOCAL BUILDING OFFICIAL INSULATION PER SPECS WALLSEAL INSULATION FLOOR-CEILING INTERSECTION MAY VARY BY LOCALE AND MUST BE APPROVED BY LOCAL INSPECTOR SEE FRAMING PLANS FOR FLOOR SYSTEM USED (PERPENDICULAR FLOOR JOIST CONDITION SHOWN) NU-WOOL WALLSEAL - APPLIED BETWEEN JOISTS AT A DENSITY OF 4.6 LBS./CUBIC FT. (MUST BE INSTALLED BY A NU-WOOL CERTIFIED DEALER) WALLSEAL INSULATION SEE FOUNDATION PLAN FOR FOOTING DETAIL (FOUNDATION SYSTEM MAY VARY)
14
15 Floor-Ceiling Assemblies (cont.) Perpendicular floor joists. (Rim & Band Joist application) Foundation will vary. No need to change the attic detail the builder/architect has been using. Two layers of Type X drywall must extend from the foundation extending up to the top of the bottom plate on the upper wall (area circled). 5/8" GYP. BD. CEILING (TYP.) DOUBLE TOP PLATE (TYP.) 2 LAYERS TYPE X GYP. BD. 5/8" GYP. BD. CEILING (TYP.) CONTINUOUS RIMBOARDS - SEE STRUCTURAL DESIGN SEE FOUNDATION PLAN FOR WALL DETAIL (FOUNDATION SYSTEM MAY VARY) SECOND FLOOR ATTIC SYSTEM MAY VARY BY LOCALE - THE ATTIC SYSTEM MUST BE APPROVED BY A LOCAL BUILDING OFFICIAL INSULATION PER SPECS WALLSEAL INSULATION FLOOR-CEILING INTERSECTION MAY VARY BY LOCALE AND MUST BE APPROVED BY LOCAL INSPECTOR SEE FRAMING PLANS FOR FLOOR SYSTEM USED (PERPENDICULAR FLOOR JOIST CONDITION SHOWN) NU-WOOL WALLSEAL - APPLIED BETWEEN JOISTS AT A DENSITY OF 4.6 LBS./CUBIC FT. (MUST BE INSTALLED BY A NU-WOOL CERTIFIED DEALER) SEE FOUNDATION PLAN FOR FOOTING DETAIL (FOUNDATION SYSTEM MAY VARY)
16
17 Floor-Ceiling Assemblies (cont.) Perpendicular floor joists. (Rim & Band Joist application) Builders/Architects must get floor-ceiling intersection approved through local building department. Two layers of Type X drywall must extend from the foundation extending up to the top of the bottom plate on the upper wall (area circled). 5/8" GYP. BD. CEILING (TYP.) DOUBLE TOP PLATE (TYP.) 2 LAYERS TYPE X GYP. BD. 5/8" GYP. BD. CEILING (TYP.) CONTINUOUS RIMBOARDS - SEE STRUCTURAL DESIGN SEE FOUNDATION PLAN FOR WALL DETAIL (FOUNDATION SYSTEM MAY VARY) SECOND FLOOR INSULATION PER SPECS WALLSEAL INSULATION (BASEMENT WALL TO ROOF DECK) FLOOR-CEILING INTERSECTION MAY VARY BY LOCALE AND MUST BE APPROVED BY LOCAL INSPECTOR SEE FRAMING PLANS FOR FLOOR SYSTEM USED (PERPENDICULAR FLOOR JOIST CONDITION SHOWN) NU-WOOL WALLSEAL - APPLIED BETWEEN JOISTS AT A DENSITY OF 4.6 LBS./CUBIC FT. (MUST BE INSTALLED BY A NU-WOOL CERTIFIED DEALER) SEE FOUNDATION PLAN FOR FOOTING DETAIL (FOUNDATION SYSTEM MAY VARY)
18
19 Acoustics TOP PLATE 2 LAYERS 5/8" GYP. BD. STC 58 (Double Layer of Drywall on One-Side) WALLSEAL INSULATION (SLAB TO ROOF DECK) TOP PLATE STC 53 (Standard) WALLSEAL INSULATION (SLAB TO ROOF DECK) TOP PLATE 2 LAYERS 5/8" GYP. BD. 2 LAYERS 5/8" GYP. BD. STC 63 (Double Layer of Drywall on Both Sides) WALLSEAL INSULATION (SLAB TO ROOF DECK)
20 Alternate 2 Hr Firewall Design U360 This firewall design does not require the special certification and therefore can be insulated by any Nu-Wool Installer
21 Firewall Continued
A.ENVELOPE AIR SEALING
(Page 1 of 4) Note: The Energy Efficiency Standards Section 110.7 requires that all joints, penetrations and other openings in the building envelope that are potential sources of air leakage shall be caulked,
More informationNATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System
-Hour Wall System The -hour Wall System is a -hour fire wall consisting of two layers of in. (. mm) shaftliner panels friction-fit between in. (0. mm) light-gauge steel H-Studs and a layer of /" Fire-Shield
More informationChapter 14 - Air Sealing
Chapter 14 - Air Sealing Contents Chapter 14 - Air Sealing... 14-1 Pre-Mechanicals Activities... 14-3 Insulate Bathtub Enclosures... 14-3 Insulate Double Walls and Chases... 14-3 Pre-Inspection Checklist...
More informationNATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System
0 00/NGC NATIONAL GYPSUM COMPANY -Hour Wall System The -Hour is a -hour fire wall consisting of in. (0. mm) light-gauge steel H-Studs that secure two layers of in. (. mm) shaftliner panels friction-fit
More informationIn addition to performing as an interior vapor retarder, MemBrain the Smart Vapor Retarder may be installed as a continuous, interior
C e r t a i n Te e d The SMART Vapor Retarder & Air Barrier Film Air Barrier Installation Instructions for Wood Framing In addition to performing as an interior vapor retarder, MemBrain the Smart Vapor
More informationA Rater s perspective from the field. Thomas H. Marston, February 21, 2007
A Rater s perspective from the field Thomas H. Marston, February 21, 2007 The checklist looks at the thermal envelope - the place where air sealing and insulation meet. Each of the items addresses a potential
More informationChapter 4: Insulation
Chapter 4: Insulation Insulation levels expressed in R-values are determined by the compliance path as explained in Chapter 1, Compliance. For below-grade walls and slab-on-grade insulation details see
More informationFeature Zone IECC 2009 IECC
Feature Zone 3 2006 IECC 2009 IECC Window U factor 0.65 0.50 Skylight U factor 0.65 0.65 Window SHGC 0.40 0.30 Ceiling R value 30 30 Wood frame R value 13 13 Mass wall R value 1 5 5/8 Floor R value 19
More informationProject Name: Enforcement Agency: Permit Number:
Installation (Page 1 of 4) If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate applicable to the portion of construction
More informationSECTION THERMAL INSULATION
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 21 13 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable
More informationQuality Inspection 8618 London Heights San Antonio, TX Phone: (210)
Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address
More informationBuilding Division Informational Handout
CITY OF SAN JOSÉ, CALIFORNIA Building Division Informational Handout Conventional Light Frame Construction Design Provisions 2007 CBC Handout No. 2-21 Published: 1/1/08 Page 1 of 3 This document summarizes
More informationStandard Practice for Installing Sound-Isolating Lightweight Partitions 1
Designation: E 497 99 Standard Practice for Installing Sound-Isolating Lightweight Partitions 1 This standard is issued under the fixed designation E 497; the number immediately following the designation
More information2015 MICHIGAN UNIFORM ENERGY CODE Effective: February 8, 2016
CHEBOYGAN COUNTY DEPARTMENT OF BUILDING SAFETY 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 Phone: (231) 627-8813 Fax: (231) 627-8454 www.cheboygancounty.net 2015 MICHIGAN UNIFORM ENERGY
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More information2. Heat Transfer is quantified in British Thermal Units (BTU s)
Basic Concepts 2. Heat Transfer is quantified in British Thermal Units (BTU s) 1 Btu is approximately equal to the energy in a single match. 3 INNOVATION & INTEGRATION: Transforming the Energy Efficiency
More informationGYPSUM BOARD
SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationSECTION GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.01 SUMMARY A. Section Includes 1. Gypsum board screw attached to wood framing and furring members, joint treatment, and accessories. 2. Installation of
More informationAndy Schreder CBO Building Official for St Francis, Nowthen
Andy Schreder CBO Building Official for St Francis, Nowthen Voluntary Compliance Webster says: Voluntary means from one s own choice or consent. Of their own free will Compliance is conformity in fulfilling
More informationFIELD COPY ATTACHMENT
FIELD COPY ATTACHMENT The released plans for the project must be on site and available to the inspectors at all times. No inspection will be done without the released field plans. If you have any questions,
More informationLISTING INFORMATION OF Mitek Design No. MCI/WI SPEC ID: MiTek Canada, Inc. 100 Industrial Road Bradford, ON L3Z 3G7 Canada
LISTING INFORMATION OF Mitek Design No. MCI/WI 60-02 SPEC ID: 27680 MiTek Canada, Inc. 100 Industrial Road Bradford, ON L3Z 3G7 Canada This report is for the exclusive use of Intertek s Client and is provided
More informationSTRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION. Presented by: Susan L. Lasecki P.E., S.E.
STRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION Presented by: Susan L. Lasecki P.E., S.E. Presentation Outline Gravity Design Load Paths from Roof to Foundation Roof Framing Floor Framing Wall Framing Lateral
More informationChevy Chase Club June 30, 2008 Bowie Gridley Architects
SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationTable Air Barrier and Insulation Inspection Component Criteria
Table 40.4. Air Barrier and Insulation Inspection Component Criteria NUMBER COMPONENT CRITERIA Air barrier and thermal barrier Exterior thermal envelope insulation for framed walls is installed in substantial
More informationA. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.
SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationHardin County Planning and Development Commission
Location by Climate Zone: Hardin County (per Table N1101.2), and the entire state of Kentucky is located in Climate Zone 4, the HDD is 4000 to 4999. Building Requirements; Building Thermal Envelope The
More informationBASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)
BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from
More informationDead Load Weight of Roof Trusses. Dead Load Weight of Floor Trusses
Dead Load Weight of Roof Trusses Top Chord Bottom Chord Webs Weight per Lineal Foot (plf) 2x4 2x4 2x4 4.3 2x4 2x8 2x4 5.6 2x6 2x4 2x4 4.8 2x6 2x6 2x4 5.5 2x6 2x6 2x6 6.2 2x6 2x8 2x4 5.9 2x6 2x10 2x4 6.6
More informationQuality Insulation Installation (QII) Insulation Installation (Page 1 of 4)
Quality Insulation Installation (QII) Insulation Installation (Page 1 of 4) A. QUALITY (QII) PREPARATION FOR INSULATION 01 Air barrier installation and preparation for insulation was done and verified
More informationExplaining the Thermal Bypass Checklist. Ed Minch, Energy Services Group Kelly Parker, GWS
Explaining the Thermal Bypass Checklist Ed Minch, Energy Services Group Kelly Parker, GWS ENERGY STAR Thermal Bypass Checklist WHY? ENERGY STAR is roughly doubling the number of houses verified each year,
More informationFIRESTOP 201 WHAT EVERY A&E PROFESSIONAL SHOULD KNOW CHRIS ALLINGTON - HILTI - CHRIS LYNCH - CODE RED CONSULTANTS NATHAN BENNETT - HILTI
FIRESTOP 201 WHAT EVERY A&E PROFESSIONAL SHOULD KNOW CHRIS ALLINGTON - HILTI - CHRIS LYNCH - CODE RED CONSULTANTS NATHAN BENNETT - HILTI BALANCED APPROACH TO FIRE PROTECTION We cannot rely on any single
More informationSECTION GYPSUM BOARD
SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationInstallation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips)
Installation Guide and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIP SPECIFICATIONS Width...1.00 inch Height...1.06 inch Length...3.86 inch Weight....025 lbs Max Spacing...48
More informationACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)
ACCESSORY BUILDING Before your application can be deemed complete and ready for processing you will need the following: (Please hand in entire application package including this cover sheet) Zoning- check
More informationRAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION C 2012
SECTION 09260 - GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationUL Design System HW-D-1012 continued
UL System No. HW-D-1012 Assembly Ratings 1, 2 and 3 Hr (See Item 2) Nominal Joint Width 3 in. Class II and III Movement Capabilities 100% Compression or Extension Page 1 of 5 1. Floor Assembly The fire-rated
More informationCavity ShAftwall System
09 9 00/NGC Cavity shaftwall systems are non-load-bearing, -hour to -hour, fire-rated partitions constructed from one side used to enclose elevator shafts, stairs and mechanical shafts where the design
More informationA Closer Look Inspection Service 2015 IECC Residential DFW area handout
103.2 Information required on construction documents 1. Designation of the Thermal Building Envelope on the plans 2. Insulation Material and their R Value 3. Fenestration U and SHGC values 4. Area weighted
More informationFollowing contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.
Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform
More informationWoodWorks. Learning Objective. Presentation Overview. Fire Protection II Requirements for rated assemblies and common detailing
WoodWorks Fire Protection II Requirements for rated assemblies and common detailing Scott Lockyear, PE Learning Objective Discuss the type of rated assembly requirements in the International Building Code.
More informationStudent Services & Classroom Addition
SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationInstallation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips)
Installation Guide and Safety Manual Resilmount A237R (Resilient Sound Isolation Clips) 3" RESILMOUNT A237R SPECIFICATIONS 1d " f" Width...1.375 inch Height...3.25 inch Depth...1.125 inch Weight....025
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationSAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Various gypsum board panels types. 2. Joint treatment materials. 3. Panel trim. 4. Supplementary components and accessories
More informationGypsum Board Systems Manual
CertainTeed Gypsum Board Systems Manual Fire Resistance and Sound Control Design Manual Division 09 GYPSUM BOARD SYSTEMS MANUAL TABLE OF CONTENTS Introduction General Fire Resistance...1 Sound Control...3
More informationG703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project
Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor
More informationInstruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips)
SOUND ISOLATION CLIPS Installation Manual Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips) SOUND ISOLATION CLIP SPECIFICATIONS Width...1.00 inch Height...1.06 inch Length...3.86
More informationSTEEL FRAMING INDUSTRY ASSOCIATION OBSERVATION REPORT PROTOCOL STRUCTURAL FRAMING GUIDELINES FOR THE INSPECTOR
STEEL FRAMING INDUSTRY ASSOCIATION OBSERVATION REPORT PROTOCOL STRUCTURAL FRAMING GUIDELINES FOR THE INSPECTOR 1. On site Observation Report by Recognized Engineer (PE) every year (prior to issuance of
More informationLISTING INFORMATION OF International Beams - IB Series Joists SPEC ID: 27316
LISTING INFORMATION OF International Beams - IB Series Joists SPEC ID: 27316 International Beams Inc. 2010 Boul. St-Elzear Quest Laval, QC H7L 3N4 CANADA This report is for the exclusive use of Intertek
More informationWhere to Draw the Line with Thermal Boundaries
PHRC Webinar Series Tuesday, October 13, 2015 @ 1pm Where to Draw the Line with Thermal Boundaries Christopher Hine Housing and Land Development Specialist Pennsylvania Housing Research Center 219 Sackett
More informationFIREBLOCK/DRAFTSTOPPING INFORMATION CODE INFORMATION FOR 1 & 2-FAMILY DWELLINGS FOR WOOD-FRAMED CONSTRUCTION FIREBLOCK
Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 FIREBLOCK/DRAFTSTOPPING INFORMATION CODE INFORMATION FOR 1 & 2-FAMILY DWELLINGS FOR WOOD-FRAMED CONSTRUCTION FIREBLOCK
More informationSECTION GYPSUM BOARD PART 1 - GENERAL
SECTION 09250 - GYPSUM BOARD PART 1 - GENERAL 1.01 DESCRIPTION: A. Work under this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions
More informationCONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008
SECTION 092900 - GYPSUM BOARD 1.1 SUMMARY A. This Section includes the following: 1. Interior gypsum board. 2. Tile backing panels. B. Related Sections include the following: 1. Division 06 Section "Rough
More informationInspection of New One- and Two- Family Dwellings
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development
More informationINSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required:
ISO-WALL SYSTEM ACOUSTIC SCIENCES CORPORATION INSTALLATION GUIDE ASC Iso-Wall System Includes: 4" x 4" WallDamp Squares 1-1/2" x 48" WallDamp Strips 1-1/2" x 3" WallDamp RC Pads (optional) drc-1 (Damped
More informationShaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017
Shaft Wall Solutions for Wood-Frame Structures Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017 Shaft Walls Shaft Walls Form Shaft Enclosures The purpose
More informationIntertek Testing Services
Acoustical 3933 U.S. Rt. Cortland, NY 13045 Phone: 607-753-6711 Fax: 607-756-9891 Order No. J99031102-003 December 10, 1999 REPORT NO. J99031102-003 SOUND TRANSMISSION LOSS TEST AND CLASSIFICATION OF A
More informationSECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION
Section R614 Add new section to read as shown: (RB34-06/07) SECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION R614.1 General. Structural insulated panel (SIP) walls shall be designed in accordance
More informationPrescriptive Checklist for the 2015 Washington State Energy Code
Prescriptive Checklist for the 2015 Washington State Energy Code Chapter 51-11R WAC STATE BUILDING CODE ADOPTION AND AMENDMENT OF THE 2015 EDITION OF THE INTERNATIONAL ENERGY CONSERVATION CODE, RESIDENTIAL
More informationInsulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017
City of Republic Community Development Department Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 Insulation Requirements Insulation (2012 IRC Section R302.10.1):
More informationCOOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.
SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationRSH ENGINEERING, INC. END OF BUILDERS WARRANTY INSPECTION REPORT INSP#: K00001 DATE: 00/00/11 PAGE #: 1
PAGE : 1 1 2 3 4 LEFT SIDE OF HOUSE: SEE. 3 TO. 10 FOR DETAILS. LEF T SIDE OF HOUSE: GENERAL NOTE: SOFFIT VENTS ARE MISSING AND/OR IS INADEQUATE ADD SOFFIT VENTS. PROVIDE ADEQUATE OF SOFFIT VENTS TO MEET
More informationFIGURE R502.2 FLOOR CONSTRUCTION
CHAPTER 5 FLOORS 11 I SECTION R501 GENERAL R501.1 Application. The provisions of this chapter shall control the design and construction of the floors for all buildings including the floors of attic spaces
More informationEXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,
More informationSuccess with 2012 NC Energy Conservation Code in North Carolina: Tech Tips for Builders. insulation
Success with 2012 NC Energy Conservation Code in North Carolina: Tech Tips for Builders insulation Copyright 2014 Advanced Energy. All Rights Reserved TEch Tips: 1. Install insulation to meet the 2012
More informationShaftwall & Stairwell Systems Fire protection & sound isolation for shafts & stairwells
Shaftwall & Stairwell Systems Fire protection & sound isolation f shafts & stairwells what the job demands Shaftwall & Stairwell Systems Fire protection & sound isolation systems f elevat shafts, stairwells
More informationGarage/Accessory Structures
Garage/Accessory Structures City of New Prague Building Inspections Department 118 Central Ave N New Prague, MN 56071 (952) 758-4401 Fax (952) 758-1149 Requirements for submitted Building Plans Signed
More information206 Basic Construction Management
7024_CH13_APP2.QXP_pz 10/23/08 10:13 AM Page 206 206 Basic Construction Management Framing Trade Contractor Job Name, Number Pass/Fail/NA All work complies with locally adopted codes and International
More informationIRC 2012 Key Changes
IRC 2012 Key Changes Overview of changes between the 2009 and 2012 IRC A Webinar Provided by The Pennsylvania Housing Research Center November 4, 2011 Presented by Mike Turns; Associate Director, PHRC
More informationType III Fire-Resistant Design and Detailing: Exterior walls, Intersections and Balconies. For Light-Frame Wood Construction
Type III Fire-Resistant Design and Detailing: Exterior walls, Intersections and Balconies For Light-Frame Wood Construction The Wood Products Council is a Registered Provider with The American Institute
More informationThe Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationPresentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process
Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process NC Energy Code Requirements ENERGY STAR and NC Energy Code in Alignment RESNET Standards HERS Index A scoring
More informationThe GlasRoc Shaftliner Type X advantage...
C e r t a i n T e e d SHAFTLINER F o r A r e a S e p a r a t i o n F i r e w a l l s Shaftliner S Type X for Area Separation GlasRoc Shaftliner is a specially formulated product for applications where
More informationStrong-Drive SDWS TIMBER Screw
Simpson Strong-Tie Fastening Systems Structural Wood-to-Wood Connections including Ledgers Designed to provide an easy-to-install, high-strength alternative to through-bolting and traditional lag screws.
More information2015 IECC Air Sealing Multifamily For Code Compliance Funding for Energy Code Training
2015 IECC Air Sealing Multifamily For Code Compliance 2 Funding for Energy Code Training 1 Sponsor Also Recognize Resources Provided by Department of Energy: DOE Building America Program https://www.energycodes.gov/
More informationStructural Technical Report #2 By Robert Whitaker
Structural Technical Report #2 By Robert Whitaker Robert Whitaker Structural ~ Parfitt Parkview at Bloomfield Station Bloomfield, NJ 10-31-05 Executive Summary This report covers the comparative redesign
More informationAsh Brook Golf Course Scotch Plains, New Jersey
SECTION 092500 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationTYPICAL BEARING WALL FRAMING
BASIC WOOD FRAMING City of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code,
More informationAPPLICATION FOR FINISHED BASEMENT PERMIT
APPLICATION FOR FINISHED BASEMENT PERMIT REAL ESTATE TAX I.D. #: - - _ - _ 7607 W College Drive Ph: (708) 361-1804 Fax: (708) 923-7112 building@palosheights.org APPLICANTS: COMPLETE ALL ITEMS AND SUBMIT
More informationPresented by: Stephen Carr Regional Building Science Manager (386)
Presented by: Stephen Carr Regional Building Science Manager (386) 846-9155 stephen.carr@topbuild.com Understanding the Energy Code 2015 IECC CZ 1 CZ 2 CZ 3 CZ 4 CZ 5 CZ 6 CZ 7&8 Ceiling 30 38 38 49 49
More informationGeneral Contractor: Company Name: Location of Proposed Structure: Tax Map #: Lot #:
New Hampshire Residential Energy Code Application Town of Sutton for Certification of Compliance for New Construction, Additions and/or Renovations to be submitted with completed building permit (EC-1
More informationESR-1826 Reissued May 1, 2009 This report is subject to re-examination in one year.
ICC-ES Evaluation Report ESR-1826 Reissued May 1, 2009 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council
More informationACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings
ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory
More informationChapter 19 - Interior Insulation
Chapter 19 - Interior Insulation Contents Chapter 19 - Interior Insulation... 19-1 Timing & Prerequisites... 19-2 Wall Insulation... 19-4 Insulate behind Chases and Sealed Walls... 19-4 Insulate Wall Cavities...
More informationSECTION GYPSUM BOARD
SECTION 09250 GYPSUM BOARD PART 1GENERAL 1.1 SUMMARY A. Related Documents: General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and Drawings are collectively applicable
More informationPICK YOUR POISON AND HOW TO GET THERE. Presented By Robby Schwarz
PICK YOUR POISON AND HOW TO GET THERE Presented By Robby Schwarz Code Adoption Cycle 2012 International Energy Conservation code The code that got peoples attention Adoption and development are out of
More informationINSULATION INSTALLATION
City of Bullhead City Development Services/Public Works Residential Permit Submittal Requirements INSULATION INSTALLATION Contact Information: Building Division (928) 763-0124 Planning & Zoning Division
More informationInstallation Guide and Safety Manual QuietClip (Resilient Sound Isolation Clips)
Installation Guide and Safety Manual QuietClip (Resilient Sound Isolation Clips) 1d" 2 2" 1 4" f" QUIETCLIP SPECIFICATIONS Width...1.25 inch Height...4.25 inch Depth...1 inch Weight....025 lbs Max Spacing...48
More informationTHE FLORIDA BUILDING CODE
THE FLORIDA BUILDING CODE 1. According to the Florida Building Code, spiral stairway treads must all be identical and rise must be sufficient enough to provide a headroom of minimum. A. 6'- 4" B. 6'- 6"
More informationCity of Kasson Building Permit Process
City of Kasson Building Permit Process 1. All structures (except storage buildings under 200 sq. ft.) require a building permit, all must conform to the applicable zoning regulations. Applicant must submit
More informationTown/City: State: Zip: Town/City: State: Zip: Phone: Cell: Phone: Cell:
Town of Durham, N.H. Residential Energy Code Application for 2012 IECC Code for Certification of Compliance for New Construction, Additions and/or Renovations (EC-1A Form) Minimum Provisions Effective
More informationBoulder City NV Prepared by (Print Name) Signature Date
City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy
More informationPrefabricated Light Weight Steel Structures. Systems Guide WALLS, FLOORS, TRUSSES
Prefabricated Light Weight Steel Structures WALLS, FLOORS, TRUSSES www.psiincusa.com 14869 Persistence Drive Woodbridge, Virginia 22191 Phone: 703.550.1466 Fax: 703-550-0486 Systems Guide Introduction
More informationADDENDUM A CONSTRUCTION SPECIFICATIONS
ADDENDUM A Description of Improvements: CONSTRUCTION SPECIFICATIONS The Improvements shall consist of constructing an approximate square foot single-family residence including car garage on the real property
More informationBuilding Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide
12/29/16 Building Guide Colorado Chapter of the International Conference of Building Officials Building Guide Colorado Chapter of the International Code Council Single Family Residential Enclosing Existing
More informationSection numbers refer to the 2018 International Residential Code (IRC), as modified, unless otherwise noted. Revised Effective Sept.
Residential Plan Check Addendum Page 2 of 5 Building Permit # Section numbers refer to the 2018 International Residential Code (IRC), as modified, unless otherwise noted. Revised Effective Sept. 5 th,
More informationPresented by: Stephen Carr Regional Building Science Manager (386)
Presented by: Stephen Carr Regional Building Science Manager (386) 846-9155 stephen.carr@topbuild.com Understanding the Energy Code 2015 IECC CZ 1 CZ 2 CZ 3 CZ 4 CZ 5 CZ 6 CZ 7&8 Ceiling 30 38 38 49 49
More informationBuilding for Energy Efficiency Part 2 Advanced Framing Workshop. Objectives for this presentation...
Building for Energy Efficiency Part 2 Advanced Framing Workshop Aaron Grin Corporation www.buildingscience.com Objectives for this presentation... 1. Brief History of Advanced Framing 2. Overview 3. Benefits
More informationSECTION GYPSUM BOARD SYSTEM
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 09 29 00 GYPSUM BOARD SYSTEM A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections,