1 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill.02 DESCRIPTION OF WORK A. Excavate trench for pipe installation. B. Stabilize trench and install pipe bedding materials. C. Place backfill material in trench..03 SUBMITTALS Comply with Division - General Provisions and Covenants, as well as the following: A. Gradation reports for bedding materials. B. Results of required testing. C. Dewatering plan..04 SUBSTITUTIONS Comply with Division - General Provisions and Covenants..05 DELIVERY, STORAGE, AND HANDLING Comply with Division - General Provisions and Covenants..06 SCHEDULING AND CONFLICTS Comply with Division - General Provisions and Covenants..07 SPECIAL REQUIREMENTS None. Revised: 202 Edition

2 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill.08 MEASUREMENT AND PAYMENT A. General: The following items are incidental to the underground utility being installed and will not be paid for separately:. Standard trench excavation. 2. Removal and disposal of unsuitable backfill material encountered during standard trench excavation. 3. Removal of abandoned private utilities encountered during trench excavation. 4. Furnishing and placing granular bedding material. 5. Placing and compacting backfill material. 6. Dewatering. 7. Sheeting, shoring, and bracing. 8. Adjusting the moisture content of excavated backfill material to the range specified for placement and compaction. 9. Temporary support for existing water, sewer, gas, telephone, electric, and other utilities or services that cross the trench. B. Rock Excavation:. Measurement: Measurement will be by cubic yards of rock removed. 2. Payment: Payment will be at the unit price per cubic yard for the quantity of rock removed. C. Trench Foundation:. Measurement: Measurement will be in tons for the quantity of stabilization material required to replace material removed by over-excavation. Measurement will be based on the scale tickets for the material delivered and incorporated into the project. Trench foundation required to correct unauthorized over-excavation will not be measured. 2. Payment: Payment will be at the unit price per ton for the quantity of stabilization material furnished and placed. 3. Includes: Unit price includes, but is not limited to, removal and disposal of overexcavated material required to stabilize trench foundation; and furnishing, hauling, and placing stabilization material. D. Replacement of Unsuitable Backfill Material:. Measurement: Measurement will be in cubic yards for the quantity of backfill material required to replace unsuitable backfill material removed during standard trench excavation. Measurement will be based on compacted material in place. 2. Payment: Payment will be at the unit price per cubic yard for the quantity of backfill material furnished. 3. Includes: Unit price includes, but is not limited to, furnishing, hauling, and placing backfill material. 2 Revised: 202 Edition

3 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill.08 MEASUREMENT AND PAYMENT (Continued) E. Special Pipe Embedment or Encasement:. Measurement: Measurement will be by the linear foot along the centerline of pipe for each type of special embedment or encasement. 2. Payment: Payment will be at the unit price per linear foot for each type of special pipe embedment or encasement. 3. Includes: Unit price includes, but is not limited to, furnishing and placing all required special pipe embedment or encasement materials. F. Trench Compaction Testing: If the contract documents specify that the Contractor is responsible for trench compaction testing, measurement and payment will be as follows.. Measurement: Lump sum item; no measurement will be made. 2. Payment: Payment will be at the lump sum price for trench compaction testing. 3. Includes: Lump sum price includes, but is not limited to, all payments associated with retesting resulting from failure of initial tests. 3 Revised: 205 Edition

4 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill PART 2 - PRODUCTS 2.0 MATERIALS EXCAVATED FROM A TRENCH A. Standard Trench Excavation: All materials encountered during trench excavation, except rock and over-excavation.. Suitable Backfill Material: Class II, Class III, Class IVA, or Class IVB as defined in Section 300, Unsuitable Backfill Material: Includes, but is not limited to, the following materials: a. Soils not classified as suitable backfill material, as defined in Section 300, b. Individual stones or concrete chunks larger than 6 inches and averaging more than one per each cubic foot of soil. c. Frozen materials. d. Stumps, logs, branches, and brush. e. Trash, metal, or construction waste. f. Soil in clumps or clods larger than 6 inches, and without sufficient fine materials to fill voids during placement. g. Environmentally contaminated soils. h. Materials removed as rock excavation or over-excavation. 3. Topsoil: Class V material. Comply with Section 300, B. Rock Excavation: Boulders or sedimentary deposits that cannot be removed in trenches without continuous use of pneumatic tools or blasting. C. Over-excavation: Excavation of unsuitable or unstable material in trenches below the pipe zone, comply with Figure BEDDING MATERIAL A. Class I Material:. Crushed stone complying with the following gradation: Sieve Percent Passing / to 00 /2" 25 to 60 No. 4 0 to 0 No. 8 0 to 5 2. The Engineer may allow the use of gravel or authorize a change in gradation subject to materials available locally at the time of construction. 3. The Engineer may authorize the use of crushed PCC for pipe sizes up to 2 inches. 4. Use aggregates having a percentage of wear, Grading A or B, not exceeding 50%, determined according to AASHTO T Revised: 202 Edition

5 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill 2.03 BACKFILL MATERIAL A. Class II Material: Manufactured and non-manufactured open-graded (clean) or densegraded (clean) processed aggregate, clean sand, or coarse-grained natural soils (clean) with little or no fines. Class II materials are further described in Table Table 300.0: Class II Materials Type Coarse-Grained Soils, clean Coarse-Grained Soils, borderline clean to with fines Soil Group Symbol ASTM D 2487 GW GP SW SP e.g. GW-GC, SP-SM Description Well-graded gravels and gravel-sand mixtures; little or no fines. Poorly-graded gravels and gravelsand mixtures; little or no fines. Well-graded sands and gravelly sands; little or no fines. Poorly-graded sands and gravelly sands; little or no fines. Sands and gravels that are borderline between clean and with fines. Percentage Passing Sieve Sizes /2 in. No. 4 No % < 50% of "Coarse Fraction" > 50% of "Coarse Fraction" < 5% 00% Varies 5% to 2% B. Class III Material:. Natural coarse-grained soils with fines. Class III materials are further described in Table Do not use where water condition in trench may cause instability. Table : Class III Material Table Coarse-Grained Soils, with fines Soil Group Symbol ASTM D 2487 GM GC SM SC Description Silty gravels, gravel-sand-silt mixtures. Clayey gravels, gravel-sand-clay mixtures. Silty sands, sand-silt mixtures. Clayey sands, sand-clay mixtures. C. Class IVA Material:. Natural fine-grained inorganic soils. Class IVA materials are further described in Table The Engineer will determine if material is not suitable for use as backfill material under deep fills, surface applied wheel loads, heavy vibratory compactors, tampers, or other conditions. 3. Do not use where water conditions in trench may cause instability. 4. Material is suitable for use in dry trench conditions only. 5 Revised: 204 Edition

6 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill 2.03 BACKFILL MATERIAL (Continued) Table : Class IVA Material Type Fine-Grained Soils (inorganic) Soil Group Symbol ASTM D 2487 ML CL Description Inorganic silts and very fine sands, rock flour, silty or clayey fine sands, silts with slight plasticity. Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clay, lean clay. D. Class IVB Material:. Natural fine-grained inorganic (high elastic silts and plastic clays - fat clay) with a liquid limit greater than 50%. Class IVA materials are further described in Table When approved by the Engineer, material may be used as final trench backfill in a dry trench. 3. Do not use in the pipe embedment zone. Table : Class IVB Material Type Fine-Grained Soils (inorganic) Soil Group Symbol ASTM D 2487 MH CH Description Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts. Inorganic clays of high plasticity, fat clays TOPSOIL A. Class V Material:. Organic soils. Class V materials are further described in Table Use only as topsoil outside of the pavement, unless otherwise specified or allowed by the Engineer. 3. Do not use in the pipe embedment zone. Table : Class V Material Type Organic Soils (unsuitable for backfill) Highly Organic (unsuitable for backfill) Soil Group Symbol ASTM D 2487 OL OH PT Description Organic silts and organic silty clays of low plasticity. Organic clays of medium to high plasticity, organic silts. Peat and other high organic soils. 6 Revised: 204 Edition

7 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill 2.05 STABILIZATION (FOUNDATION) MATERIALS A. Clean 2 /2 inch crushed stone with the following gradation: Table : Stabilization Materials Sieve Percent Passing 2 / to 00 /2 35 to 70 0 to 20 /2 0 to 5 B. If specified, meet Iowa DOT Section 428 for Gradation No. 3 screened over a inch screen or the Engineer may authorize a change in gradation depending on materials available locally at time of construction. C. Crushed concrete may be used, if approved by the Engineer, if it is within + 5% of the gradation for each size of material SPECIAL PIPE EMBEDMENT AND ENCASEMENT MATERIAL A. Concrete Cradle, Arch, or Encasement: Use Iowa DOT Class C concrete. B. Flowable Mortar: Comply with Iowa DOT Article C. CLSM:. Approximate quantities per cubic yard: a. Cement: 50 pounds b. Fly ash: 250 pounds c. Fine aggregate: 2,90 pounds d. Water: 60 gallons 2. A compressive strength of at least 50 psi compressive strength at 28 calendar days can be expected. 3. Comply with material requirements of Iowa DOT Article Revised: 208 Edition

8 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill PART 3 - EXECUTION 3.0 TRENCH EXCAVATION A. Notify the Engineer prior to the start of excavation activities. B. Remove topsoil to a minimum depth of 2 inches and stockpile. C. Excavate trench to required elevations and dimensions. Comply with Figure Protect existing facilities, trees, and shrubs during trench excavation. 2. Place excavated material away from trench. 3. Grade spoil piles to drain. Do not allow spoil piles to obstruct drainage. D. Unsuitable Backfill Material:. If unsuitable backfill material is encountered, notify the Engineer. 2. Remove rock, rubbish, boulders, debris, and other unsuitable backfill materials at least 6 inches below and on each side of the pipe. 3. Keep unsuitable backfill material separated from suitable backfill material and topsoil. 4. Restore trench to design dimensions using bedding or stabilization material ROCK OR UNSTABLE SOILS IN TRENCH BOTTOM A. Notify the Engineer prior to over-excavation. B. The Engineer will determine the need for over-excavation and trench foundation stabilization prior to installation of pipes and structures. C. Comply with Figure for over-excavation of rock and wet or soft foundations TRENCH PROTECTION A. Install adequate trench protection (sheeting, shoring, and bracing) to prevent ground movement or damage to adjacent structures, pipelines, and utilities. B. Move trench boxes carefully to avoid disturbing pipe, bedding, or trench wall DEWATERING A. Maintain water levels below the bottom of trench excavation. B. Perform the dewatering operation according to the dewatering plan approved by the Engineer. The dewatering plan may be modified to meet actual field conditions, with approval of the Engineer. C. Ensure operation of the dewatering system does not damage adjoining structures and facilities. Cease dewatering operations and notify the Engineer if damage is observed. D. Discharged Water:. Do not discharge water into sanitary sewers. 2. Discharging water into storm sewers requires Engineer's approval. 8 Revised: 205 Edition

9 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill 3.04 DEWATERING (Continued) 3. Obtain permission of adjacent property owner prior to discharging water onto their property. 4. Maintain and control water discharge as necessary to prevent a safety hazard for vehicular and pedestrian traffic. 5. Direct water discharge away from electrical facilities or equipment. 6. Use dewatering equipment that will minimize disturbance from noise and fumes. 7. Protect discharge points from erosion. Provide sediment control for sediment contaminated water discharged directly from trench PIPE BEDDING AND BACKFILL A. General: Comply with Figures 300.0, , , , and , as appropriate.. Bedding and backfill used for pipe installation will depend on: a. Type of installation (water main, sanitary sewer gravity main, sanitary sewer force main, or storm sewer). b. Pipe material. c. Depth of bury. d. Pipe diameter. 2. After pipe installation, place remaining bedding material and immediately place backfill in trench. 3. Adjust the moisture content of excessively wet, but otherwise suitable, backfill material by spreading, turning, aerating, and otherwise working material as necessary to achieve required moisture range. 4. Adjust the moisture content of excessively dry, but otherwise suitable, backfill material by adding water, then turning, mixing, and otherwise blending the water uniformly throughout the material until the required moisture range is achieved. 5. Hydraulic compaction (flooding with water) is not allowed unless authorized by the Engineer. B. Pipe Bedding:. Granular Material: a. Class I granular bedding material is required for all gravity mains. Use when specified for pressure pipes. b. Comply with Figures 300.0, , , , and c. Place bedding material in the bottom of the trench in lifts no greater than 6 inches thick. Consolidate and moderately compact bedding material. d. Shape bedding material to evenly support pipe at the proper line and grade, with full contact under the bottom of the pipe. Excavate for pipe bells. e. Install pipe and system components. f. Place, consolidate, and moderately compact additional bedding material adjacent to the pipe to a depth equal to /6 the outside diameter of the pipe. 9 Revised: 205 Edition

10 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill 3.05 PIPE BEDDING AND BACKFILL (Continued) 2. Suitable Backfill Material: a. Only use with pressure pipe. Comply with Figure b. Use suitable backfill material to shape trench bottom to evenly support pipe at the proper line and grade, with full contact under the bottom of the pipe. Excavate for pipe bells. 3. Special Pipe Embedment and Encasement Materials: a. Concrete, Flowable Mortar, or CLSM: ) If specified in the contract documents, use concrete, flowable mortar, or CLSM in lieu of other bedding materials. 2) Secure pipe against displacement or flotation prior to placing concrete, flowable mortar, or CLSM. b. Waterstop: ) Place Class IVA clay backfill material, and compact to at least 90% of Standard Proctor Density. Obtain required compaction within a soil moisture range of optimum moisture to 4% above optimum moisture content. 2) If trench stabilization material is required, extend waterstop through stabilization material to bottom of trench. C. Haunch Support: Place from the top of the pipe bedding to the springline of the pipe.. Granular Material: a. Place Class I material in lifts no greater than 6 inches thick. b. Consolidate and moderately compact by slicing with a shovel or using other approved techniques. 2. Suitable Backfill Material: a. Place in lifts no greater than 6 inches thick. b. For Class II backfill material, consolidate and moderately compact by slicing with a shovel or using other approved techniques. c. For Class III and Class IVA backfill materials, compact to at least 90% of Standard Proctor Density. Obtain required compaction within a soil moisture range of optimum moisture to 4% above optimum moisture content. 3. Special Pipe Embedment and Encasement Materials: a. Concrete, Flowable Mortar, or CLSM: ) If specified in the contract documents, use concrete, flowable mortar, or CLSM in lieu of other bedding materials. 2) Secure pipe against displacement or flotation prior to placing concrete, flowable mortar, or CLSM. b. Waterstop: Place and compact Class IVA clay backfill material according to the suitable backfill material requirement above. D. Primary and Secondary Backfill:. General: a. For primary backfill, place from the springline of the pipe to the top of the pipe. b. For secondary backfill, place from the top of the pipe to foot above the top of the pipe. 2. Granular Material: a. Place in lifts no greater than 6 inches thick. b. Compact to at least 65% relative density. 0 Revised: 205 Edition

11 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill 3.05 PIPE BEDDING AND BACKFILL (Continued) 3. Suitable Backfill Material: a. Place in lifts no greater than 6 inches thick. b. For Class II backfill material, compact to at least 65% relative density. c. For Class III and Class IVA backfill materials, compact to at least 95% of Standard Proctor Density. Obtain required compaction within a soil moisture range of optimum moisture to 4% above optimum moisture content. 4. Special Pipe Embedment and Encasement Materials: a. Concrete, Flowable Mortar, or CLSM: ) If specified in the contract documents, use concrete, flowable mortar, or CLSM in lieu of other bedding materials. 2) Secure pipe against displacement or flotation prior to placing concrete, flowable mortar, or CLSM. b. Waterstop: Place and compact Class IVA clay backfill material according to the suitable backfill material requirement above. E. Final Trench Backfill:. Place suitable backfill material from foot above the top of the pipe to the top of the trench. a. Use no more than 8 inch thick lifts for backfill areas more than 3 feet below the bottom of pavement. b. Use no more than 6 inch thick lifts for backfill areas less than or equal to 3 feet below the bottom of pavement. 2. Place backfill material after recording locations of connections and appurtenances or at the Engineer s direction. 3. Class I and Class II Backfill Material: a. Compact to at least 65% relative density within right-of-way. b. Compact to at least 50% relative density outside right-of-way. 4. Class III and Class IVA Backfill Material: a. Compact to at least 95% of Standard Proctor Density within right-of-way. b. Compact to at least 90% of Standard Proctor Density outside right-of-way. c. Obtain required compaction within a soil moisture range of optimum moisture to 4% above optimum moisture content. 5. In areas to remain unpaved, terminate backfill material 8 inches below finished grade. Use topsoil for the final 8 inches above trench backfill material. 6. Terminate backfill material at subgrade elevation in areas to be paved TRENCH COMPACTION TESTING A. General: When trench compaction testing is specified in the contract documents as the Contractor s responsibility, provide testing of trench backfill material using the services of an independent testing laboratory approved by the Engineer. B. Soil Testing:. Cohesive Soils: a. Determine moisture-density relationships by ASTM D 698 (Standard Proctor). Perform at least one test for each type of cohesive soil used. b. Determine in-place density and moisture content. Use ASTM D 556 (sand-cone method) and ASTM D 226 (laboratory moisture content), or use ASTM D 6938 (nuclear methods for density and moisture content). Revised: 200 Edition

12 SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section Trench Excavation and Backfill 3.06 TRENCH COMPACTION TESTING (Continued) 2. Cohesionless Soils: a. Determine maximum and minimum index density and calculate relative density using ASTM D 4253 and ASTM D b. For Class I granular bedding material, determine gradation according to ASTM C 36. C. Field Testing:. Testing Frequency and Locations: Perform testing of the final trench backfill, beginning at a depth of 2 feet above the top of the pipe, as follows: a. Coordinate the timing of testing with the Engineer. b. The Engineer will determine the location of testing. c. For each 2 vertical feet of consolidated fill, provide tests at a maximum horizontal spacing of 200 feet and at all street crossings. d. Additional testing may be required by the Engineer in the event of non-compliance or if conditions change. e. If necessary, excavate to the depth and size as required by the Engineer to allow compaction tests. Place backfill material and recompact. 2. Test Failure and Retesting: Rework, recompact, and retest as necessary until specified compaction and moisture content is achieved in all areas of the trench. In the event of failed tests, the Engineer may require retesting as deemed necessary. END OF SECTION 2 Revised: 200 Edition

13 Refer to the contract documents for specific material and placement requirements. Required only when specified in the contract documents or when directed by the Engineer. Key OD = Outside diameter of pipe D = Inside diameter of pipe TW = Trench width at top of pipe d = Depth of bedding material below pipe Bury Depth Final Trench Backfill TW OD 2'' min. Secondary Backfill OD/2 Primary Backfill Springline of Pipe D Haunch Support OD/2 REVISION FIGURE 300.0SHEET OF d OD/6 Pipe Bedding Over-excavation and Foundation Stone FIGURE STANDARD ROAD PLAN SW-0 SHEET of REVISIONS:Replaced Iowa DOT and SUDAS logos. SUDAS DIRECTOR DESIGN METHODS ENGINEER TRENCH BEDDING AND BACKFILL ZONES

14

15

16

17 BEDDING CLASSES TW Place remainder of bedding and backfill materials as specified in the contract documents. 2 Minimum depth of bury 2 inches or as specified by the manufacturer. TW TW ALLOWABLE BEDDING CLASSES 2" PIPE MATERIAL STORM SEWER SANITARY SEWER Ductile Iron F-, F-2, F-3 F-, F-2, F-3 OD OD Class I Bedding Material OD HDPE Polypropylene F-2, F-3 F-2, F-3 Not allowed F-3 PVC F-2, F-3 F-3 4'' min. 4'' min. 4'' min. Key CLASS F- Class Bedding Material CLASS F-2 CLASS F-3 OD = Outside diameter of pipe 2 ALLOWABLE BURY DEPTH TW = Trench width at top of pipe: Min. = OD+8 inches OR.25xOD+2 inches (whichever is greater) PVC PIPE DUCTILE IRON, AWWA C5, CLASS 52 HDPE PIPE POLYPROPYLENE PIPE Pipe Diameter (in) ASTM D 3034 Solid Wall SDR 23.5 SDR 26 ASTM F 679 Solid Wall SDR 35 SDR 35 ASTM F 949 Corrug. Exterior ASTM F 803 Closed Profile ASTM D 2680 Composite (Truss Type) Pipe Diameter (in) 4 Class F- Class F-2 Bedding Bedding Class F-3 Bedding Pipe Diameter (in) 2 AASHTO M 294 8' Pipe Diameter (in) 2 ASTM F 2736 ASTM F ' 28' 32' 6 5 9' 5 25' ' 30' 28' 28' 32' 32' ' 9' ' 20' ' 28' 32' ' 3' 28' 37' 25' 34' 23' 32' 20' 29' 38' ' 9' 8' 8' 8' 8' * 48* 54* 60* 22' 22' 2' 22' 23' 2' 2' ' 23' 3' *Storm Sewer Only ' 22' 30' REVISION ' 2' 29' 48 6' 9' 27' 54 6' 9' 27' FIGURE STANDARD ROAD PLAN SW-03 SHEET of 60 REVISIONS:Added polypropylene pipe for storm sewer applications. SUDAS DIRECTOR DESIGN METHODS ENGINEER FLEXIBLE GRAVITY PIPE TRENCH BEDDING

18

19 BEDDING CLASSES TW TW TW Class I Bedding Material OD OD OD d Loose, Suitable Backfill Material or Undisturbed Material with Bell Shaping d d CLASS P- CLASS P-2 CLASS P-3 DUCTILE IRON, AWWA C5, CLASS 52 ALLOWABLE BURY DEPTH PVC, AWWA C900 & C905, DR8 Place remainder of bedding and backfill material as specified in the contract documents. Pipe Diameter (inches) Class P- Bedding Class P-2 Bedding Class P-3 Bedding Pipe Diameter (inches) Class P- Bedding Class P-2 Bedding Class P-3 Bedding Key 4 4 9' 23' OD = Outside diameter of pipe ' ' 23' 9' 23' 9' 23' TW = Trench width at top of pipe: Min. = OD+8 inches OR.25xOD+2 inches (whichever is greater) ' 26' 23' 37' ' 23' 9' 23' 9' 23' d = Depth of bedding material below pipe: Min. = OD/8 OR 4 inches (whichever is greater) 8 20' 34' 8 9' 23' FIGURE SHEET OF ' 32' 6' 29' 3' 23' 3' 22' 3' 2' 3' 9' 3' 9' 38 3' 30' 29' 27' 27' ' 23' 9' 23' FIGURE STANDARD ROAD PLAN REVISION SW-04 SHEET of REVISIONS:Replaced Iowa DOT and SUDAS logos. SUDAS DIRECTOR DESIGN METHODS ENGINEER PRESSURE PIPE TRENCH BEDDING

20

21 6'' min. 6'' min. 6'' min. 6'' min. 2 Place remainder of bedding and backfill material as specified in the contract documents. Place encasement material in two lifts, or as required to prevent pipe flotation. Allow previous lift to reach initial set prior to placing subsequent lifts. 2'' min. 6'' min. 3 Restrain pipe as necessary to prevent flotation. 2 Second Lift 3 2 Second Lift 4 When specified in the contract documents, install waterstops at a nominal spacing of 800 feet or at locations as specified by the Engineer. Springline of Pipe Springline of Pipe 2 First Lift 2 First Lift 4'' min. Flowable Mortar 6'' min. Class I Bedding Material PCC FLOWABLE MORTAR ENCASEMENT PCC ENCASEMENT A 5'-0'' Install compacted clay waterstop between pipe joints 2'' min. OD REVISION FIGURE SHEET OF A PROFILE WATERSTOP FOR TRENCHES 4 OD/8, 4'' min. SECTION A-A FIGURE STANDARD ROAD PLAN SW-05 SHEET of REVISIONS:Replaced Iowa DOT and SUDAS logos. SUDAS DIRECTOR DESIGN METHODS ENGINEER MISCELLANEOUS PIPE BEDDING

22

23 A New Sewer Install pipe support for all new sewers 2 inches in diameter or larger when clearance between bottom of new sewer and top of existing line is 2 inches or less. Comply with Figure OD 2" or Less 2 " Compressible Material 2 Form interior surface of footings. Keep the 2 inch utility clear zone free of concrete. OD = Outside pipe diameter 2" Undisturbed Soil A 2 2 Bedding PCC 3" 2" Existing Utility (Sewer, Water, Gas, etc.) New Sewer 3" OD OD/4 FIGURE SHEET OF 2 " Compressible Material OD +6" SECTION A-A Existing Utility REVISION SHEET of SUDAS Standard Specifications SEWER PIPE SUPPORT OVER EXISTING UTILITY LINE

24

25 REVISION Use reinforced concrete beam utility line support when new sewer excavation is crossing under an existing utility line (sewer lines, water lines, gas lines, etc.) as directed by the Engineer. Allow concrete to cure a minimum of 48 hours before placing backfill material. Existing Utility Line A Pipe Bell Special design required for trench width greater than 7 feet or trench depth greater than 5 feet. Sand (optional) Comply with Figure Concrete 3" 2" 2" 6" o.c. 2 bars min. New Sewer 3" 3" 8" 8" A Undisturbed Soil Hand place and carefully compact backfill material. Bedding Outside width of pipe bell, 2" min. SECTION A-A FIGURE SHEET OF SHEET of SUDAS Standard Specifications REINFORCED PCC BEAM UTILITY LINE SUPPORT

26

27 REVISION Use flowable mortar utility line support when new utility excavation is crossing under an existing utility line (sewer lines, water lines, gas lines, etc.) as directed by the Engineer. Allow flowable mortar fill to cure a minimum of 24 hours before placing backfill material. Trim uncompacted backfill material away from slopes before pouring flowable mortar. Side slopes of flowable mortar fill to be : or greater. See Section A-A Comply with Figure Existing Utility Line A Place flowable mortar to springline of existing utility. FIGURE SHEET OF New Sewer A Bedding Undisturbed Soil Compacted Backfill SECTION A-A SHEET of SUDAS Standard Specifications FLOWABLE MORTAR FILL UTILITY LINE SUPPORT

28

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1.

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1. Table of Contents Section 300 - Trench Excavation and Backfill Page No. Part - General.0 Section Includes.02 Description of Work.03 Submittals.04 Substitutions.05 Delivery, Storage, and Handling.06 Scheduling

More information

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1.

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1. Table of Contents Section 300 - Trench Excavation and Backfill Page No. Part - General.0 Section Includes.02 Description of Work.03 Submittals.04 Substitutions.05 Delivery, Storage, and Handling.06 Scheduling

More information

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1.

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1. Table of Contents Section 300 - Trench Excavation and Backfill Page No. Part - General.0 Section Includes.02 Description of Work.03 Submittals.04 Substitutions.05 Delivery, Storage, and Handling.06 Scheduling

More information

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1.

Table of Contents. Section Trench Excavation and Backfill Section Includes Description of Work 1. 1. Table of Contents Section 300 - Trench Excavation and Backfill Page No. Part - General.0 Section Includes.02 Description of Work.03 Submittals.04 Substitutions.05 Delivery, Storage, and Handling.06 Scheduling

More information

SECTION 500 STRUCTURES

SECTION 500 STRUCTURES SECTION 500 STRUCTURES 500.1 GENERAL This section defines the various construction items that are associated with the completion of a concrete, steel, timber, or masonry unit structures, or a combination

More information

SECTION EXCAVATION, TRENCHING AND BACKFILL

SECTION EXCAVATION, TRENCHING AND BACKFILL SECTION 02315 EXCAVATION, TRENCHING AND BACKFILL PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Excavation, trenching, and backfill necessary for the construction of the facilities as indicated

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

QUOTE DOCUMENTS FOR GREENWOOD ELEMENTARY GREASE INTERCEPTOR PROJECT TH STREET. Des Moines, Iowa QUOTE #7421. Owner

QUOTE DOCUMENTS FOR GREENWOOD ELEMENTARY GREASE INTERCEPTOR PROJECT TH STREET. Des Moines, Iowa QUOTE #7421. Owner QUOTE DOCUMENTS FOR GREENWOOD ELEMENTARY GREASE INTERCEPTOR PROJECT 316 37 TH STREET Des Moines, Iowa QUOTE #7421 Owner Des Moines Independent Community School District 1917 Dean Avenue Des Moines, Iowa

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE

PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE 4 3 2 1 D D C C B B A A 4 3 2 1 Thrust Restraint Design Equations and Soil Parameters These equations and soil

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

INSTALLATION INSTALLATION

INSTALLATION INSTALLATION SCOPE: This is an outline of procedures for the installation of Prinsco corrugated HDPE pipe for Storm Sewer and Culvert applications in accordance with ASTM and AASHTO specifications. PRINCIPAL REFERENCES:

More information

CONTENTS INSTALLATION DETENTION SYSTEMS PHYSICAL PROPERTIES AGRICULTURE INSTALLATION GUIDE

CONTENTS INSTALLATION DETENTION SYSTEMS PHYSICAL PROPERTIES AGRICULTURE INSTALLATION GUIDE INSTALL GUIDE s to b INSTALLATION CONTENTS atco. t has be rig DETENTION SYSTEMS PHYSICAL PROPERTIES AGRICULTURE INSTALLATION GUIDE 4 10 12 15 o. If it INSTALLATION SCOPE This provides information on the

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

BID REQUEST COVER SHEET

BID REQUEST COVER SHEET BID REQUEST COVER SHEET PARTICIPANT'S NAME: PHONE NUMBER: ADDRESS: Cherokee Arts & Humanities Council, Inc. (918) 218 9290 P.O. Box 594 Park Hill, OK 74451 DIRECTIONS: Eight (8) miles East of Salina, OK

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

Excavation for Natural Gas Mains and Services

Excavation for Natural Gas Mains and Services Excavation for Natural Gas Mains and Services Trench Padding & Backfilling Requirements for Mains General Install mains with a minimum of 36 of cover. Exceptions may be made within state and federal codes

More information

EXCAVATION AND BACKF1LL

EXCAVATION AND BACKF1LL S E C T I O N 2 3 1 5 EXCAVATION AND BACKF1LL PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Excavation, trenching, complete and continual dewatering of excavation, sheeting, bracing and shoring of

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings. Section 02110 SITE CLEARING 1.00 General: A. Related Documents: The general provisions of the Contract including General and Supplementary Conditions and General Requirements, apply to the work specified

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 33 TRENCHING AND BACKFILL PART 1 GENERAL... 3 1.1 Description... 3 A. Excavation for Utilities Includes... 3 B. Suitable Fill Material...

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

Section 1I-3 - Bioswales

Section 1I-3 - Bioswales BIOSWALES (Numbering pending) These specifications compliment the bioswale design portion of the Iowa Stormwater Management Manual in Chapter 2, Section 2I-3. Sections of the following documents, as referenced

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL 804.1 DESCRIPTION: This section shall govern the excavation, trenching, and backfilling for water, sanitary sewer, and recycled water construction, unless

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL 804.1 DESCRIPTION: This section shall govern the excavation, trenching, and backfilling for water, sanitary sewer, and recycle mains construction, unless

More information

SECTION EMBANKMENT

SECTION EMBANKMENT 02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

City of Thomasville Water, Sewer & Natural Gas Specifications SECTION TRENCH EXCAVATION AND BACKFILL

City of Thomasville Water, Sewer & Natural Gas Specifications SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02225 TRENCH EXCAVATION AND BACKFILL PART 1 GENERAL 1.01 SCOPE A. The work under this Section consists of furnishing all labor, equipment and materials and performing all operations in connection

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 4653 Polypropylene Pipe 2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene

More information

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered. SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and

More information

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals.

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals. SECTION 312333 - TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION 02215BP TRENCHING AND BACKFILLING

SECTION 02215BP TRENCHING AND BACKFILLING SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information

Thi_ Qar University College of Engineering/Civil Engineering Department. Highway Lectures. Fourth Class. Part #2: - Subgrade Soil

Thi_ Qar University College of Engineering/Civil Engineering Department. Highway Lectures. Fourth Class. Part #2: - Subgrade Soil Thi_ Qar University College of Engineering/Civil Engineering Department Highway Lectures Fourth Class Part #2: - Subgrade Soil Lecture #2 Soil Classification DAS, Chapter 4, Engineering Classification

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed.

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed. SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

Concrete basement walls are

Concrete basement walls are DESIGNING Concrete Basement Walls Make sure the wall is strong enough to resist the lateral pressure of the soil Concrete basement walls are designed to do two main jobs. One job is supporting the house;

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

A. Work of this Section is affected by unit prices for earth moving specified in Section "Unit Prices."

A. Work of this Section is affected by unit prices for earth moving specified in Section Unit Prices. SECTION 312000 EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION SANITARY UTILITY SEWERAGE PIPING SECTION 33 31 00 SANITARY UTILITY SEWERAGE PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer pipe and fittings. 2. Underground pipe markers. 3. Connection to existing manholes. 4.

More information

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by SOIL SURVEY REPORT (Revised March 6, 2013) New Hospital Connector Road GDOT Project No. CSSTP-0006-00(276), PI No. 0006276 Duluth, Gwinnett County, Georgia WILLMER ENGINEERING INC. Willmer Project No.

More information

SECTION TRENCH EXCAVATION AND BACKFILL

SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02221 - TRENCH EXCAVATION AND BACKFILL CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Sections... 2 1.03 Reference Standards... 2 1.04 Quality Assurance... 2 1.05 Measurement

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

SECTION 2 TRENCH AND STRUCTURE EXCAVATION, BACKFILL AND COMPACTION

SECTION 2 TRENCH AND STRUCTURE EXCAVATION, BACKFILL AND COMPACTION SECTION 2 TRENCH AND STRUCTURE EXCAVATION, BACKFILL AND COMPACTION 2.01 GENERAL. A. Scope. This section covers excavation, trenching, backfilling and grading incidental to the construction of sewers, pipelines

More information

EXCAVATION & BACKFILL SPECIFICATION

EXCAVATION & BACKFILL SPECIFICATION REVISION DATE DESCRIPTION BY REVIEWER 0 12/14/2009 ISSUED FOR CONSTRUCTION MJS TDJ SECTION 1 EARTHWORK 1.1 GENERAL. This section covers general earthwork and includes preparation of the construction areas;

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 31 23 00 Trenching, Backfilling, and Compaction of Utilities 1. General A. The Contractor shall furnish all labor, materials, tools, equipment, and perform all

More information

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines. SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION STRUCTURE EXCAVATION AND EARTHWORK SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

STANDARD SPECIFICATIONS SECTION EARTHWORK FOR PIPELINE CONSTRUCTION

STANDARD SPECIFICATIONS SECTION EARTHWORK FOR PIPELINE CONSTRUCTION STANDARD SPECIFICATIONS SECTION 02315 EARTHWORK FOR PIPELINE CONSTRUCTION PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for excavation, backfill, grading, and related items for pipeline

More information