Building Codes and Ordinances ARC 227

Size: px
Start display at page:

Download "Building Codes and Ordinances ARC 227"

Transcription

1 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction Instructor: Rick Staub, AIA staub@pointonearchitects.com Phone:

2 Fire Resistive Construction Passive Fire Resistance passive protection is built into the building structure and provides a barrier between the structure and the fire. Active Fire Resistance active protection (fire sprinklers) respond to fire by activation of systems to contain or suppress fire and smoke to allow the structure to remain intact for a longer period of time than without protection while allowing occupants to escape Chapter 7 deals with passive fire protection Chapter 9 with active Two primary functions of Fire Resistive Construction First protection of the building structure, such protection is typically applied to the building structural members Second separation of spaces to prevent the spread of fire or smoke within a building and the spread of fire between buildings. The protection of spaces addresses fire or smoke impacts on larger scale building systems like such as floors, walls and ceilings as well as openings within these systems. Fire Area is defined as the aggregate floor area enclosed and bounded by fire walls, exterior walls and floors/roofs.

3 Fire Resistive Construction Trade-Offs between active and passive protection The code allows trade-offs between provisions of active versus passive fire protection for example 1-hour structural protection requirements can be offset by provision of sprinklers for certain occupancies. where active systems are required by code in relationship for given criteria, such as heights and area limits, then the provision of the active systems in lieu of passive is generally not allowed. Trade-offs imply a voluntary selection by the designer of how to provide the required degree of fire resistance. When code provisions otherwise require active systems they are thus not available to offset passive requirements

4 Fire Resistive Construction Fire Resistive Ratings Section 702 defines the fire-resistance rating as the period of time that a building element, component or assembly maintains the ability to confine a fire, continues to perform a given structural function, or both as determined by tests or methods described in section 703 The rating is given in hours Components, materials and assemblies are tested in a controlled environment to replicate real fire situations. ASTM American Society of Testing and Materials Test E 119 Section allows designers to use several alternative methods to show compliance with fireresistive criteria. Use ratings as recognized by Underwriters Laboratory - UL Section 720 and Table 720 shows prescriptive assemblies and their various ratings. Section 721 lets you calculate your own ratings based on formula for various materials.

5 Fire Resistive Construction Exterior Walls Section 704 Projections - Section governs the extent of allowable projections according o their relationship to the property line. projections include such elements as eave overhangs, cornices and balconies that extend beyond the floor area. projections are limited in two ways: -1/3 the length of the required fire-separation distance can project toward the property line - 12 max. projection into the area The combustibility of a projection is the same as required by the wall rating Multiple Buildings Section When two or more buildings are on a site it is assumed that an imaginary line is drawn between Refer to table 601 and 602 for required ratings. Courtyard buildings more than one-story are treated the same way, an imaginary property line must be drawn and ratings applied per the Tables. the imaginary lines do not need to be equal. Section Explains that buildings greater than 5 from the property line can assume that danger of fire is from the inside only. Buildings less than 5 from the property line assume fire danger from both sides and therefore ratings apply to both side of the exterior wall.

6 Fire Resistive Construction Exterior Walls, cont. Section 704 Openings - Section and Review table Vertical separation of openings Section Vertical exposure Section requires protection of openings in any wall that extends above an adjacent roof. Less than 15 vertically above the roof of an adjacent building on the same lot need to be protected Parapets Section makes a general statement that parapets shall be provided at exterior walls of a building. The purpose is to impede the spread of fire from one building to another. Exceptions reduce or eliminate need for a parapet. Typically need to extend 30 above the adjacent roof. No openings (skylights, hatches) with 5 of roof edge in R + M; 10 for others Summary: 1. the wall satisfies the fire-separation distance criteria per table the building area is less than 1,000 s.f. on any floor 3. the roof construction is entirely non-combustible or of at least 2-hour construction 4. the roof framing construction is protected from fire from the inside 5. for residential a fire-barrier is provided by sheathing the underside of the roof framing or the roof sheathing is non-combustible for 4

7 Exterior Walls, cont.

8 Section 705 Fire Resistive Construction Fire Walls Fire Wall A fire-resistance rated wall having protected openings, which restricts the spread of fire and extends, continuously from the foundation to or through the roof, with sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall. - structural stability Fire wall must stand if adjacent wall collapse - requires fire walls to be constructed of non-combustible materials except in Type V construction. Ratings for fire walls - based on the occupancies, for most a 3-hour wall is required. Table allows 2-hours in type II and V for certain occupancies Where different occupancies are separated by a fire wall the more restrictive applies Review table Horizontal Continuity specifies that fire walls are to be continuous horizontally from exterior wall to exterior wall and extend 18 beyond the exterior surface of the exterior walls. Some exceptions Vertical Continuity requires that the fire walls be continuous vertically from the building foundation to a point at least 30 above adjacent roofs.

9 Fire Resistive Construction Fire Walls

10 Fire Resistive Construction Fire Barriers Section 706 Fire Barrier A fire-resistance-rated vertical or horizontal assembly of materials designed to restrict the spread of fire in which openings are protected. fire barriers are similar to fire walls but with simpler criteria. They are used to separate vertical exit enclosures from other egress components, to separate different occupancies, or to divide a single occupancy into different fire areas. Required fire-resistance ratings for fire barriers are determined by their use. Ratings for barriers used in egress protection are rated per the applicable sections in Chapter 10 Egress Fire barriers are to be continuous between floor levels and extend to abutting adjacent interior or exterior walls. Prevent both smoke and fire, some penetrations are allowed but must be protected. Top of the floor assembly to the underside of the deck above. Continuous through concealed spaces. Supporting floor should have the same fire-resistance rating as the barrier

11 Section 707 Fire Resistive Construction Shafts Shaft An enclosed space extending through one or more stories of a building, connecting vertical openings in successive floors, or floors and roof. Shaft enclosures differ from fire barriers in that they typically enclose shafts extending through several floors. Shafts are often constructed of the same materials as barriers but the required ratings for shafts and vertical exit enclosures are usually determined by the number of floors that they connect. Per all shafts need to be protected. 2- hours required if extending for 4 floors or more 1- hour if less than 4 floors (shaft ratings should be equal to those of the required floor assembly but not more than 2- hours) exceptions read carefully 1. openings in residential units extending less than 4 stories need not be enclosed. 2. escalators or stairs not used as egress components (if sprinklered ) do not need protection 3. pipe, vent or conduit penetrations protected at the floor and ceiling according to section need not be protected. 4. ducts protected per do not need to be protected 5. atriums in offices and malls do not need specific shaft protection but a whole lot of other stuff 6. Chimneys do not need to be in a shaft but concealed spaces must be fire blocked 7. openings less than 2-stories that are not part of egress do not need to be protected 8. ramps in parking garages can be open 9. openings connecting mezzanines with space below do not need protection 10. expansion joints at floors and walls do not need to be enclosed but must be protected per 712 as for similar penetrations.

12 Fire Resistive Construction Shafts Section 707 Shafts can not have multiple purposes you can not use a vertical exit enclosure as your duct run Where ducts enter or exit a shaft a fire damper is required so when there is a fire the damper closes to keep the integrity of the shaft rating. Laundry and waste shafts must be separated from the rest of the building by 1-hour rated access rooms at each floor level they usually dump into a room in the basement these rooms require sprinklers. Elevator shafts elevator shafts shall be constructed as other shafts adds the concept of lobbies to the mix. A rated lobby is required when an elevator opens onto an exit access corridor exceptions to lobby requirements 1. when building lobby levels are sprinklered in office the entry lobby can be open 2. with a fully sprinklered building less than 4 stories above the lowest level of firedepartment access lobbies may be eliminated

13 Section 708 Fire Resistive Construction Fire Partitions Fire Partition A vertical assembly of materials designated to restrict the spread of fire in which openings are protected Fire partitions are the next level of fire-resistive wall construction below fire walls and barriers. They typically have 1-hour fire-resistance ratings and are primarily used per section for separations between dwelling units and guest rooms; per section for separation of tenants in a covered mall and per section for exit corridors. Fire partitions have the same requirements for penetrations, openings and ductwork Fire partitions are to extend to the structure above and below with the following exceptions 1. When the floor is 1-hour rated the partition need not extend into the crawl space below. 2. When the room side fire rated membrane of a corridor extends to a fire-resistive floor or ceiling above, the corridor ceiling may be protected. 3. When the walls and ceiling form a tunnel the fir-rating need not extend above the top of the ceiling assembly. 4. In a covered mall building, partitions do not need to go to the structure between tenant spaces 5. In Group R-2, the fire partion does not need to continue up into attic space

14 Section 709 Fire Resistive Construction Smoke Barriers Smoke barrier A continuous membrane, either vertical or horizontal, such as a wall, floor, or ceiling assembly, that is designed and constructed to resist the movement of smoke. Section 709 treats smoke barriers as fire barriers, but with emphasis on restricting the migration of smoke. Smoke barriers are required to have a 1-hour rating with 20 minute opening protection. smoke barriers need to be continuous through concealed spaces unless they abut assemblies that will resist the passage of smoke, such as walls meeting fire-rated ceiling assemblies.

15 Section 710 Fire Resistive Construction Smoke Partitions Smoke partitions are not required to be rated unless they are required in a rated assembly. Continuity is required from floor to underside of deck above Openings Doors and windows should be self-closing and resist the spread of smoke from once space to another louvered doors are not allowed Joints and penetrations shall be sealed to eliminate the passage of smoke Smoke dampers are required for ductwork

16 Fire Resistive Construction Horizontal Assemblies Section 711 Horizontal assemblies are floor and ceiling/roof assemblies that require a fire-resistance rating. Their required fire resistance rating is determined by their use. The rating is primarily determined by the fire resistance rating based on type of construction as dictated in Table 601. When separating occupancies or dividing a single occupancy into fire areas, the fire resistance rating of the horizontal assembly must be examined against the requirements of Table Horizontal assemblies have the same continuity requirements as for vertical assemblies. Penetrations, joints and ducts are to be protected as for vertical assemblies allows in 1-hour rated horizontal assemblies with crawl space or attic to be removed - Unprotected skylights are allowed in a roof as long as they meet the requirements of the adjacent structure in Any structural members or walls supporting a horizontal assembly must have at least the same fire-resistance rating.

17 Fire Resistive Construction Penetrations and joint Systems Section 712 This section requires that penetrations be protected to maintain the fire-resistive integrity of the assembly being penetrated. The governing criteria for protection are that they prevent the passage of flame and hot gases into or through an assembly. Two types of penetrations 1. thru penetration passes completely through the entire assembly 2. membrane penetration only passes thru a portion of the assembly. Sleeves securely fastened to the assembly Any space between the sleeve and the penetrating item or the sleeve and the assembly must be protected by an approved fire-stop material concrete grout can be used around concrete wall penetrations Electrical outlets on either side of a rated assembly shall be staggered not less than 24, or not less than the depth of the wall cavity that is filled with cellulose loose fill or mineral fiber insulation or solid blocking. protection of penetrations in horizontal assemblies is more restrictive than vertical assemblies because heat and smoke tend to rise. Higher rated stop system is required recessed lights can not reduce the ratings of ceilings special rated fixtures

18 Section Fire Resistive Construction Penetrations and joint Systems Fire-resistant joint systems This section requires expansion, seismic movement and construction control joints to be treated in a similar manner to a penetration. The goal is that joints do not compromise the fire-resistive capabilities f the horizontal or vertical assemblies where they occur. Joints in fire-rated assemblies are to be fire tested to match the assembly rating. Joints are tested before and after movement to verify that they meet the requirements either way. joints at the intersection of floor assemblies and at exterior curtain walls are included in this section. Installed to prevent the spread of flame and hot gases

19 Fire Resistive Construction Structural members Section 715 Structural members and assemblies shall comply with the required fire-resistance rating per Table 601 and 602 supporting structural elements can not be less than the members they are supporting Columns, Girders, Beams if supporting multiple floors /roof than entire element needs to be protected individually protected on all sides. protection needs to be continuous if only supporting one story then can be encased or protected by a membrane, such as a ceiling or floor can not embed anything into the required protection layer no wires, conduits, etc. Exterior Load bearing walls reminder to review both tables 601 and 602 most restrictive is the one to follow

20 Fire Resistive Construction Opening Protectives Section 715 The requirements of this section for opening in a fire-resistive construction allow for the opening protectives to have different ratings than those for the wall. Tables and lists the requirements Opening protective are typically tested components glazed window systems or fire doors Fire doors are required to be self closing and latched (meaning when they are closed they can not be pushed open by fire drafts). Doors should be closed under most circumstances, can be on magnetic hold opens that release to close when an alarm is activated. Glazing in protected openings is limited by the code based on tested performance and the area of glazed openings. Wire glass can be installed with required thickness. High performance glazing can also be used much more expensive See Table

21 Fire Resistive Construction Opening Protectives

22 Structural Fire rating - diagram

23 Prescriptive Solutions

24 Prescriptive Solutions

25 Prescriptive Solutions

26 Prescriptive Solutions

27 Prescriptive Solutions

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform

More information

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs Class Outline Inspection of Fire-resistance-Rated Floors, Ceilings and Roofs Based on 2012 International Building Code (IBC) Introduction Determining fire resistance Test standards Definitions Alternate

More information

FIRE-RESISTANCE-RATED CONSTRUCTION

FIRE-RESISTANCE-RATED CONSTRUCTION CHAPTER 7 FIRE-RESISTANCE-RATED CONSTRUCTION SECTION BC 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials and assemblies used for structural fire resistance and fire-resistance-rated

More information

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

2012 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs Accreditation 2012 IBC Inspection of Fire-resistance-Rated Floors, Ceilings and Roofs Based on 2012 International Building Code The International Code Council has been accredited as an Authorized Provider

More information

2015 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs

2015 IBC Inspection of Fire-Resistance Rated Floors, Ceilings and Roofs Class Outline Inspection of Fire-Resistance-Rated Floors, Ceilings and Roofs Based on 2015 International Building Code, (IBC ) Introduction Determining fire resistance Test standards Definitions Alternate

More information

2012 IBC Inspection of Fire-resistance Rated Walls

2012 IBC Inspection of Fire-resistance Rated Walls Accreditation 2012 IBC Inspection of Fire-resistance Rated Walls Based on the 2012 International Building Code (IBC ) The International Code Council has been accredited as an Authorized Provider by the

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

FS , 712, 713, 714

FS , 712, 713, 714 VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL JUNE 28-29, 2012 PUBLIC COMMENTS CTC Code Change Proposal FS50-12 was Approved as Modified as shown below - No public comments for the Group

More information

VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES The following is the Study Group report that was considered by the CTC at its October 13-14, 2011 meeting.

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

SECTION 702 DEFINITIONS

SECTION 702 DEFINITIONS ACTION: Final DATE: 05/6/017 :17 PM 4101:1-7-01 Fire and smoke protection features. [Comment: When a reference is made within this rule to a federal statutory provision, an industry consensus standard,

More information

Excerpts from the Uniform Building Code. (UBC) For The US

Excerpts from the Uniform Building Code. (UBC) For The US Excerpts from the Uniform Building Code (UBC) For The US Index 4301 FIRE-RESISTIVE STANDARDS 1. Section 4301(a) Standards of Quality 2. Section 4301(b) Definitions 4304 WALLS AND PARTITIONS 1. Sec.4304(a)

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings John Buddy Showalter, PE VP, Technology Transfer American Wood Council Copyright This presentation is protected by US and International

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

2009 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

2009 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata) TWELFTH PRINTING (Updated December 6, 2016) Note for 706.5.1: This is an erratum in the 8 th, 9 th, 10 th and 11 th printing only. The reference is correct in other editions. 706.5.1 Exterior walls. Where

More information

IBC FIRE SAFETY. Code Change No: FS1-07/08. Original Proposal SECTION 702 DEFINITIONS

IBC FIRE SAFETY. Code Change No: FS1-07/08. Original Proposal SECTION 702 DEFINITIONS DOCUMENTATION IBC FIRE SAFETY Code Change No: FS1-07/08 Sections: 702.1, 704.8.2, 706.7 Proponent: Philip Brazil, PE, Reid Middleton, Inc., representing himself SECTION 702 DEFINITIONS 702.1 Definitions.

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

WOOD USE IN NONCOMBUSTIBLE BUILDINGS INTRODUCTION The National Building Code of Canada (NBCC) 1 requires that some buildings be of noncombustible construction under its prescriptive requirements. Its use in certain types of buildings such

More information

How to Prepare Your LSE Report

How to Prepare Your LSE Report LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council Copyright This presentation is protected

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council Copyright This presentation is protected

More information

Advanced Studies of the International Building Code. Presented by Steve Thomas, Colorado Code Consulting, LLC

Advanced Studies of the International Building Code. Presented by Steve Thomas, Colorado Code Consulting, LLC Advanced Studies of the International Building Code Presented by Steve Thomas, Colorado Code Consulting, LLC Advanced Studies of the International Building Code Instructor Steve Thomas, CBO President,

More information

FIREBLOCK/DRAFTSTOPPING INFORMATION CODE INFORMATION FOR 1 & 2-FAMILY DWELLINGS FOR WOOD-FRAMED CONSTRUCTION FIREBLOCK

FIREBLOCK/DRAFTSTOPPING INFORMATION CODE INFORMATION FOR 1 & 2-FAMILY DWELLINGS FOR WOOD-FRAMED CONSTRUCTION FIREBLOCK Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 FIREBLOCK/DRAFTSTOPPING INFORMATION CODE INFORMATION FOR 1 & 2-FAMILY DWELLINGS FOR WOOD-FRAMED CONSTRUCTION FIREBLOCK

More information

Code Change No: FS43-06/07

Code Change No: FS43-06/07 CODE CHANGES RESOURCE COLLECTION INTERNATIONAL MECHANICAL CODE PART III IBC MEANS OF EGRESS Approved as Submitted Committee Reason: The revised language in Sections 1021.3 and 1022.2. would provide consistency

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings.

Introduction. This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings. Introduction This Part One will address; Type 1 Fire Resistive and Type 2 Noncombustible buildings. The future presentations, will cover; Type 3 Ordinary Type 4 Heavy Timber and Type 5 Wood Frame buildings.

More information

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,

More information

INTERNATIONAL CODE INTERPRETATIONS

INTERNATIONAL CODE INTERPRETATIONS 2012 INTERNATIONAL CODE INTERPRETATIONS PREFACE The 2012 International Codes promulgated by the International Code Council (ICC ) comprise a comprehensive set of model regulations for the construction

More information

NEWS LETTER MARCH 27, 2009

NEWS LETTER MARCH 27, 2009 PLANNING, BUILDING & DEVELOPMENT SERVICES DEPARTMENT 580-1 Street S.E. Medicine Hat, Alberta T1A 8E6 Telephone: 529-8374 FAX 502-8038 1 NEWS LETTER MARCH 27, 2009 GENERAL As you are probably aware there

More information

What is a Won-Door FireGuard Door?

What is a Won-Door FireGuard Door? What is a Won-Door FireGuard Door?. A horizontal sliding accordion fire door that meets all IBC requirements for use in a means of egress and has fire ratings up to 3 hours. A Reference Guide to special

More information

2017 Commercial Building Code

2017 Commercial Building Code 2017 Commercial Building Code Wisconsin Amendments and Significant Changes Department of Safety and Professional Services Robin Zentner, P.E. Section Chief, Safety and Commercial Building Inspection Division

More information

Module 8: Ontario Building Code Fire and Spatial Separations

Module 8: Ontario Building Code Fire and Spatial Separations Ontario Building Code (OBC) 1. Fire Separations 2. Fire Resistance Ratings By Classification 3. Fire Resistance Ratings By Adjacent Use 4. Fire Resistance Ratings By Specific Space 5. Fire Resistance Ratings

More information

PLASTIC CHAPTER 26. SECTION 2602 DEFINITIONS Definitions. The following terms are defined in Chapter

PLASTIC CHAPTER 26. SECTION 2602 DEFINITIONS Definitions. The following terms are defined in Chapter CHAPTER 26 PLASTIC SECTION 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic veneer,

More information

FCIA Webinar Gypsum Wall Patching

FCIA Webinar Gypsum Wall Patching FCIA Webinar Gypsum Wall Patching Firestop Contractors International Association Hillside, IL +1-708-202-1108 - office Bill McHugh bill @ fcia.org Nestor Sanchez, USG Corp. nsanchez@usg.com DIIM Firestopping

More information

Worksheet for Commercial Building Planning

Worksheet for Commercial Building Planning Worksheet for Commercial Building Planning Note: This checklist helps ensure that all major code items were checked BEFORE applying for permit. ADDRESS OF PROJECT: Chapter 3 Information 301-312 OCCUPANCY

More information

2015 IBC Exit Systems

2015 IBC Exit Systems Objectives 2015 IBC Exit Systems Based on the 2015 International Building Code Upon completion, participants will be better able to: Determine those means of egress components that are defined as exits

More information

ROWHOUSE CONSTRUCTION

ROWHOUSE CONSTRUCTION ROWHOUSE CONSTRUCTION SECTION AO101 SCOPE AO101.1 Scope. This appendix, and other applicable provisions of this code, shall apply to the construction, alteration, enlargement, replacement, repair, equipment,

More information

Building Envelope

Building Envelope 9.36.2. Building Envelope Module 2 BCBC 9.36. 2014 1 Richard Kadulski Architect 9.36.2. Building Envelope Focus is on total building performance, not just thermal insulation Heat transfer and air leakage

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

Interior FRT Wood. References to ICC Building Codes

Interior FRT Wood. References to ICC Building Codes Interior FRT Wood References to ICC Building Codes Table of Contents International Building Code (IBC) 1 International Residential Code (IRC) 6 International Mechanical Code (IMC) 7 INTERNATIONAL BUILDING

More information

This worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings.

This worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings. Application - City of Oxnard WORKSHEET FOR COMMERCIAL PLAN REVIEWS This worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings. Note:

More information

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code)

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code) Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code) Company Overview R.W. Sullivan Engineering (RWS) was established in 1945 and currently has 95 employees.

More information

APPLICATION FOR FINISHED BASEMENT PERMIT

APPLICATION FOR FINISHED BASEMENT PERMIT APPLICATION FOR FINISHED BASEMENT PERMIT REAL ESTATE TAX I.D. #: - - _ - _ 7607 W College Drive Ph: (708) 361-1804 Fax: (708) 923-7112 building@palosheights.org APPLICANTS: COMPLETE ALL ITEMS AND SUBMIT

More information

2003 International Residential Building Code

2003 International Residential Building Code 2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less

More information

COMMUNITY & DEVELOPMENT SERVICES 840 Northgate Drive, Richland, WA Phone: Fax:

COMMUNITY & DEVELOPMENT SERVICES 840 Northgate Drive, Richland, WA Phone: Fax: WORKSHEET FOR COMMERCIAL PLAN REVIEWS THIS WORKSHEET MUST BE SIGNED (AT END OF DOCUMENT) BY THE ARCHITECT OR ENGINEER OF RECORD FOR THE ENTIRE PROJECT (SEC. 106.3.4) FOR ALL COMMERCIAL OR MIXED-USE BUILDINGS

More information

Interior FRT Wood. References of Previous Model Building Codes

Interior FRT Wood. References of Previous Model Building Codes Interior FRT Wood References of Previous Model Building Codes Table of Contents SBBCI Standard Building Code 1 ICBO Uniform Building Code 3 BOCA National Building Code 5 10-SBBCI STANDARD BUILDING CODE

More information

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section ) 8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article

More information

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:

More information

FRAMING INSPECTION GENERAL

FRAMING INSPECTION GENERAL FRAMING INSPECTION GENERAL 20 FRAMING INSPECTION GENERAL Tips Check habitable rooms for minimum light, ventilation and sanitation requirements. Check that stair framing meets headroom, width, and rise

More information

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.

More information

Shaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017

Shaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017 Shaft Wall Solutions for Wood-Frame Structures Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017 Shaft Walls Shaft Walls Form Shaft Enclosures The purpose

More information

CITY OF DANA POINT WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS

CITY OF DANA POINT WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS CITY OF DANA POINT COMMUNITY DEVELOPMENT BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248-3594 www.danapoint.org WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS 2016 CALIFORNIA

More information

General Residential Code Requirements

General Residential Code Requirements General Residential Code Requirements Dear Applicant: This is to advise that our review will be based on compliance with the requirements of the Louisiana State Uniform Construction code in accordance

More information

General Residential Code Requirements

General Residential Code Requirements Residential building code review will be based on compliance with the requirements of the Louisiana State Uniform Construction code in accordance with ACT 12 of the 2005 First Extraordinary Session of

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents.

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents. Certification: Commercial Building Inspector Exam ID: B2 Scope: A Commercial Building Inspector will be responsible for performing inspections of structures to determine compliance with the various Building

More information

2015 MICHIGAN UNIFORM ENERGY CODE Effective: February 8, 2016

2015 MICHIGAN UNIFORM ENERGY CODE Effective: February 8, 2016 CHEBOYGAN COUNTY DEPARTMENT OF BUILDING SAFETY 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 Phone: (231) 627-8813 Fax: (231) 627-8454 www.cheboygancounty.net 2015 MICHIGAN UNIFORM ENERGY

More information

Knowledge Objectives (3 of 3)

Knowledge Objectives (3 of 3) Building Systems Knowledge Objectives (1 of 3) Identify construction types in commercial and residential structures. Explain fire behavior as it relates to the method of construction. Discuss the structural

More information

1. PREINSPECTION RESIDENTIAL ENERGY EFFICIENCY 7

1. PREINSPECTION RESIDENTIAL ENERGY EFFICIENCY 7 Chapter 4 Residential Energy Efficiency [Residential structures include R-3 buildings; R-2 and R-4 buildings three stories or less in height built to the International Building Code (see IBC classifications)]

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

2012 IBC Exit Systems

2012 IBC Exit Systems Accreditation Based on the 2012 International Building Code The International Code Council has been accredited as an Authorized Provider by the International Association for Continuing Education and Training

More information

CHAPTER 6 TYPES OF CONSTRUCTION

CHAPTER 6 TYPES OF CONSTRUCTION CHAPTER 6 TYPES OF CONSTRUCTION SECTION 61 GENERAL 61.1 Scope. The provisions of this chapter shall control the classification of buildings as to type of construction. SECTION 62 CONSTRUCTION CLASSIFICATION

More information

E2-09/ (IFC [B] )

E2-09/ (IFC [B] ) Code Technology Committee 2010 Final Action Agenda The following are code changes and public comments to be considered at the 2010 Dallas Final Action Hearings that are related to the CTC Area of Study

More information

Exception: All layers of single and multilayer reflective plastic core foil insulation shall comply with Section 2604.

Exception: All layers of single and multilayer reflective plastic core foil insulation shall comply with Section 2604. 1. Fiberboard insulation shall comply with Chapter 23. 2. Foam plastic insulation shall comply with Chapter 26. 3. Duct and pipe insulation and duct and pipe coverings and linings in plenums shall comply

More information

SECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES

SECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES SECTION 500.110: FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES A. Purpose. The intent of this regulation is to amend the current adopted edition of the International

More information

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic veneer,

More information

The Building Code for Rookies

The Building Code for Rookies The Building Code for Rookies Or Basic Steps for Using the 7 Ohio Building Code Chapters - Or All the building code stuff you forgot to ask about in college and probably didn t have time for anyway AIA

More information

International Code INTERPRETATIONS

International Code INTERPRETATIONS 2015 International Code INTERPRETATIONS 2015 International Code Interpretations First Printing: June 2016 ISBN#978-1-60983-666.5 Copyright 2016 by International Code Council ALL RIGHTS RESERVED. This 2015

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

Protecting Penetrations in Fire Rated Construction

Protecting Penetrations in Fire Rated Construction Protecting Penetrations in Fire Rated Construction NY State Fire Marshals and Inspectors Conference September 7 th Bruce E. Johnson UL Codes and Advisory Services UL and the UL logo are Trademarks of UL

More information

2012 Code Update Training

2012 Code Update Training 2012 Code Update Training VIRGINIA RESIDENTIAL CODE Jack A. Proctor Virginia Building Code Academy Department of Housing and Community Development R202 Definitions BASEMENT R202 Definitions Story Above

More information

By James Tente, MCP, CBO,CFM

By James Tente, MCP, CBO,CFM Significant Changes (proposed) December 20, 2018 By James Tente, MCP, CBO,CFM jtente@knoxvilletn.gov The goal of these presentations is to identify and discuss the building code changes and the impacts

More information

Shaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Charlotte WSF, November 2, 2017

Shaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Charlotte WSF, November 2, 2017 Shaft Wall Solutions for Wood-Frame Structures Ricky McLain, PE, SE WoodWorks Wood Products Council Charlotte WSF, November 2, 2017 Course Description It is fairly common for light wood-frame commercial

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform Statewide

More information

Code Technology Committee 2010 Final Action Agenda BFP: Vertical Openings & Roof Vents

Code Technology Committee 2010 Final Action Agenda BFP: Vertical Openings & Roof Vents Code Technology Committee 2010 Final Action Agenda BFP: Vertical Openings & Roof Vents The following are code changes and public comments to be considered at the 2010 Dallas Final Action Hearings that

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons (CPHD) (ISD) Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform

More information

CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1

CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1 CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES CHAPTER 10 CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3

More information

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection gift from Faculty of Architecture The University of Hong Kong

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection gift from Faculty of Architecture The University of Hong Kong Ml THE UNIVERSITY OF HONG KONG LIBRARIES Hong Kong Collection gift from Faculty of Architecture The University of Hong Kong CODE OF PRACTICE FOR FIRE RESISTING CONSTRUCTION 1989 BUILDING AUTHORITY HONGKONG

More information

WON-DOOR CORPORATION Won-Door FireGuard Applications

WON-DOOR CORPORATION Won-Door FireGuard Applications WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis THE INTERNATIONAL BUILDING CODE is widely recognized in the United

More information

2007/2008 PROPOSED CHANGES TO THE INTERNATIONAL BUILDING CODE FIRE SAFETY FIRE SAFETY CODE COMMITTEE

2007/2008 PROPOSED CHANGES TO THE INTERNATIONAL BUILDING CODE FIRE SAFETY FIRE SAFETY CODE COMMITTEE 2007/2008 PROPOSED CHANGES TO THE INTERNATIONAL BUILDING CODE FIRE SAFETY FIRE SAFETY CODE COMMITTEE Daniel E. Nichols, PE - Chair Fire Protection Engineer II New York State Division of Code Enforcement

More information

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION Town of Hague Building Inspector: Dale Wagner Home #: 306-225-2265 Cell #: 306-241-4741 Fill all part of the permit application including the date and signature.

More information

Outcomes of ICC Tall Wood Ad Hoc Committee: Proposals and Discussion

Outcomes of ICC Tall Wood Ad Hoc Committee: Proposals and Discussion Outcomes of ICC Tall Wood Ad Hoc Committee: Proposals and Discussion DES605 Sam Francis, C.B.O. Senior Director, National Programs American Wood Council Paul Coats, P.E., C.B.O. Southeast Regional Manager

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance Pei Evaluation Service is an accredited ISO Standard 17065 Product Certifier, accredited by the IAS. This Assembly Evaluation Report represents a product that Pei ES has Evaluated. This Assembly Evaluation

More information

RESIDENTIAL ATTACHED CARPORTS BUILDING PERMIT REQUIREMENTS

RESIDENTIAL ATTACHED CARPORTS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement RESIDENTIAL ATTACHED CARPORTS BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

AIR CRE Industrial Building Standards

AIR CRE Industrial Building Standards AIR CRE Industrial Building Standards Established March 1993 AIR CRE 500 N Brand Blvd, Suite 900, Glendale CA, 91203 AIR CRE INDUSTRIAL BUILDING STANDARDS TABLE OF CONTENTS SECTION 1 Introduction P. 1

More information

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Division of Design, 35 th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242 Phone: (518)

More information

2018 IRC Sections R303 through R310 Building Planning II

2018 IRC Sections R303 through R310 Building Planning II Study Session 3 2018 IRC Sections R303 through R310 Building Planning II OBJECTIVE: REFERENCE: KEY POINTS: To develop an understanding of the health and safety criteria of the code, including light and

More information

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance Pei Evaluation Service is an accredited ISO Standard 17065 Product Certifier, accredited by the IAS. This Assembly Evaluation Report represents a product that Pei ES has Evaluated. This Assembly Evaluation

More information

Centennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No

Centennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No We Bring Buildings to Life www.jbace.com Centennial Hills Skilled Nursing Facility Fire Protection Report July 13, 2016 Revised September 15, 2016 JBA Project No. 16.0667.000 At the request of Yihong Liu

More information

* RESIDENTIAL PLAN REVIEW *

* RESIDENTIAL PLAN REVIEW * CITY OF DES MOINES, IOWA COMMUNITY DEVELOPMENT DEPARTMENT PERMIT AND DEVELOPMENT CENTER 602 Robert D. Ray Drive DES MOINES, IOWA 50309 Phone: 515.283.4200 Facsimile: 515.283.4270 Based on the scope of

More information

1997 Uniform Building Code To 2003 International Building Code Cross Reference Table

1997 Uniform Building Code To 2003 International Building Code Cross Reference Table 1997 Uniform Building Code To 2003 International Building Code Cross Reference Table [Updated from 1997 Uniform Building Code to 2000 International Building Code 1 Cross Reference Table Published by the

More information

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 City of Republic Community Development Department Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 Insulation Requirements Insulation (2012 IRC Section R302.10.1):

More information

Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530)

Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530) 2016 CBC Chapter 7A and CRC Section R337 (The use of paints, coatings, stains, or other surface treatments are not an approved method of protection as required in this chapter.) The Wildland Urban Interface

More information

EFFECTIVE USE OF THE IBC/CBC

EFFECTIVE USE OF THE IBC/CBC Distilling the code review process down to a methodical, sequential list of considerations is generally problematic. In many cases, related provisions from various chapters of the code must be considered

More information

EXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp.

EXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp. Coordination with language throughout code 10/05/2011 Stair vs. stairway Repetitive language with stairways and ramps Including ramps when applicable The locations for stair, stairway and ramp as used

More information