1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Kayseri Province, Yahyali District
2 ENVIRONMENTAL MANAGEMENT PLAN-MITIGATION PART Phase Issue Mitigating Measure Responsibility* Sitting - Construction camps will not be established near the forested areas I. Sitting of construction camps and municipal services for worker camps -Construction camps will be sited at least: (a) (b) (c) 1 km from any protected areas 50 meters from any surface water bodies, and 1 km from any villages or sites of cultural significance Services (a) Water for the camps will be purchased from the Yahyalı Municipality. (b) Compact waste water treatment unit will be established at Çamlıca III main camp. Treated water will reach at least to minimum allowable water discharge criteria and than it will be discharged to zamantı River. (c) Recycleable solid waste will be collected at suiatable storage area and then will be given to recycling firms. (d) Garbage from the camps will be put in garbage drums and it will be collected periodically by Yahyalı Municipality. - Construction camp restored to compatible use after work is completed. Construction II. Construction solid waste management (soil, rock, packaging materials etc.) - Rock shall be used as fill to the greatest extent possible, excess to be disposed of at site approved by authorities - Topsoil will be stored and covered to prevent erosion. After construction completion, soil will be restored to original location and revegetated. - Packaging wastes from electrical equipment will be recycled wherever possible. otherwise it will be collected by Yahyalı Municipality. - Burning is to be limited to prevent forest fires. - Verify construction equipment has valid operating permits III. Construction engine equipment exhausts - Minimize engine idling by turning off equipment not in use for more than 5 minutes
3 IV. Construction equipment storage - Avoid tree cutting to create storage area - Place equipment on impervious surface to prevent oil leaks from contaminating soil - Locate storage area at least 50 meters away from any surface water bodies, avoid villages and any population centers Elektrik Üretim Construction V. Noise - Construction would take place only during daytime (from 7.00AM to 7.00PM) - The noise level will be kept under the stated limit in "Environmental Noise Assessement and Management Regulation". If noise level exceeds the limit (except during blasting), measures such as installing protection walls will be taken. - Workers who exposed to high level of noise will use necessary equipments such as headset or earplug. - If construction during evening is required, the local affected people will first be consulted at least one week in advance. - Sub-contractor VI. Dust - Water spraying in dry and windy conditions on local roads where trucks pass and at any construction sites - Dusty materials will be covered with canvas cloth during transportation VII. Worker safety - Contractor will be required to develop a health and safety plan two weeks before starting construction work, and then subproject sponsor will review and approve it; workers will be subjected to health screening and health and safety training sessions will be provided; public health education will be part of the construction program - Necessary safety tools such as helmets, working shoes, ear protection, dust filter and others will be provided and be required to be used by workers. VIII. Soil erosion and silt runoff - Any transmission towers or other structures will be located to avoid high slope (>30 ) areas - In case selection of such slope areas cannot be avoided, structures will be designed to minimize excavation on slopes - Construction will proceed during dry conditions - Bunds, sedimentation ponds, or other silt trapping devices constructed to avoid siltation into surface waters IX. Existing roads - Minimize additional traffic movements on existing roads - Repair any roads as soon as damage becomes evident - Keep roads free from mud, debris and other obstacles Elektrik Üretim X. Access road siting and construction - Use existing access roads wherever possible - Avoid tree cutting or economically productive lands wherever possible
4 Construction XI. Transmission line routing and construction XII. Historical, archeological and cultural artifacts, and areas/structures of local/international cultural value - Use existing ROWs wherever possible - Avoid migratory or local bird routes, particularly protected areas (e.g. Ramsar sites) - In case any historical, cultural or archeological asset in encountered during excavation/construction, the excavation/construction work shall be stopped and the Provincial/Municipal Directors of Culture and Museum Directorate shall be immediately informed thereof. No persons are permitted to remove articles or disturb the area: such action are grounds for dismissal or contract cancellation. The construction work will be resumed after inspection and written approval by the authorities. - In case any transmission line or access road or structure passes through or is to be sited on village cemeteries, the alignment or site would normally be changed. If it is unavoidable, a special consultation with the affected communities would be held to determine culturally appropriate means of relocating the gravesites in accordance to local customs/beliefs/traditions. No tower pads are to be placed in cemeteries. C lt t -Museum Directorate -Provincial Directorate of Culture and Nature XIII. Raw material supply All materials supplied to the subproject, e.g. stone, concrete, sand, etc. must be provided by contractors with valid operating permits XIII. Management of hazardous materials (fuels, lubricants, explosives etc.) XIV. Fish passage XV. Loss of forest - All hazardous materials are to be stored on impervious surfaces, in well ventilated buildings that are locked and fenced when not in use and to which public access is denied and at least 50 meters from any surface waters. - Maintanance and lubrication of all trucks and construction equipment will be done at authorized service centers at neighbouring towns. In emergency case, it may be done at construction site but in this case, waste lubricants will be collected in drums and send to service centers. - Population centers and forested areas are to be avoided - In order to maintain natural life of every kind of fishes, a fish passege will be constructed. The project for fish passage will be prepared together with a hydrobiologist, in order to make sure that all type of fishes easily move forward through zamantı River. - Avoid siting project in forested areas, to the extent possible. Any forest removed must be restored after construction or replaced at some other location Consultant Consultant Consultant Noise (from power house) - Equipment should be housed in sound insulated buildings, and/or trees shrubs planted around noisy equipment to further absorb sound. - Workers who exposed to high level of noise will use necessary equipments such as headset or earplug. Elektrik Üretim Consultant ion - Workers will be subjected to health screening and health and safety training sessions will be provided retim onsultant
5 Operation Operati Worker safety - Necessary safety tools such as helmets, working shoes, ear protection, dust filter and others will be provided and be required to be used by workers. - All operational activities will be in compliance with the relevant Turkish Occupational Health and Safety Regulation Domestic sewage (operations staff) - Domestic sewage will be stored temporarily in a isolated underground septic tank and will be periodically collected by Sambeyli Municipality. Domestic solid waste (operations staff) - Recycleable solid waste will be collected at suiatable storage area and then will be given to recycling firms. - Domestic garbage will be put in garbage drums and it will be collected periodically by Yahyalı Municipality. - Accumulated clay and sandy soils in sedimentation pool will be collected periodically. Sınce this soil is very useful for agricultural activities, it will be given to neighbouring farmers. Elektrik Ür Co - Environmental Consultant
6 ENVIRONMENTAL MANAGEMENT PLAN-MONITORING PART Phase/Issue What parameter is to be monitored? Where How When is the parameter to be monitored? is the parameter to be monitored/ type of monitoring equipment? is the parameter to be monitoredfrequency of measurement or continuous? Construction - Camp location - Camp site - Quarterly, greater frequency (e.g. weekly) if improper practices are noted Responsibility I. Siting of construction camps and municipal services for worker camps - Arrangements for water - Water supply site, sewage and supply, sewage, and garbage disposal sites municipal solid waste - Campsite properly restored? - Quarterly, greater frequency (e.g. weekly) if improper practices are noted - Campsite - Completion of construction work - Packaging waste recycling and disposal practices - Package waste storage and/or disposal site II. Construction solid waste management (soil, rock, packaging materials etc.) III. Construction engine equipment exhausts - Rock and soil reuse or disposal practices - Adequacy of topsoil temporary storage site (covered and erosion protection measures in place), restored area properly revegetated - Rock and soil storage and or disposal site - Topsoil temporary storage site and revegetation site when completed - Turkish registration - At project site entrance - Once, when equipment enters construction site - Unused equipment idling times Quarterly, greater frequency (e.g. weekly) if improper practices are noted - At construction site - Monthly, greater frequency (e.g. weekly) if improper practices are noted - Tree cutting involved in preparing storage site?
7 IV. Construction equipment storage - Site avoids population centers and surface water bodies? Proposed construction equipment storage site Once, before site is prepared - Equipment situated on an impervious surface? - Construction hours - Site observation - Monthly - Sound barriers needed and installed? (if necessary) - - Monthly - Headset or earplug V. Noise provided to and being used by workers who exposed to high level of noise? Construction site - - Monthly - Local population informed of any off-hour construction at least one week in advance - Consult with local affected groups - One week before off-hour construction starts - Water spraying performed properly? - Construction site and access roads - During hot, dry, or windy weather VI. Dust - Covering of dusty materials - Construction site and access during transportation or at roads storage areas performed properly? - Monthly - Acceptable health and safety plan prepared? - (with a copy of the - Before any physical worker activities are health and safety plan for initiated verification) VII. Worker safety - Safety equipment provided to and being used by workers? In areas where workers are performing their assignments - - Weekly. More frequently (at random) if violations are observed - Construction proceeding in dry season? Structure site Prior to start of construction VIII. Soil erosion and silt runoff Slope of structure site <30 0?
8 Appropriate silt trapping Areas of major runoff systems included? During or immediately after rainstorm Existing roads Condition, cleanliness within 1km of site Site visit/visual Weekly during construction More frequently (at random) if violations are observed Access road siting and construction Route selection offers Access road route review of plans, site visit Before construction minimal intrusion with new construction, tree cutting, use of productive land etc. Route selection offers minimal intrusion with new construction, tree cutting, Transmission line use of productive land etc. routing and construction Transmission line route review of plans, site visit Before construction Migratory bird paths, Ramsar sites etc. avoided? Accidental find of articles of At any excavation site Determine of authorities cultural value notified and proper procedures followed? Chance find of cultural artifacts, and areas/structures of local cultural value Location of any cemeteries Along planned alignment or structures (natural or man-routemade) of local value towers, or newly planned of any transmission access road Determine if proper consultations conducted by speaking with local affected groups During construction - Environmental Consultant Raw material supply Validity of the suppliers operating license At the entrance of the project site or at the suppliers office inspection of license Before signing an agreement for material supply Management of hazardous materials (fuels, lubricants, explosives etc.) Storage facilities locked, fenced, well ventilated, on impervious ground? Hazardous materials storage site inspection of building and site Before start of construction and quarterly thereafter.. Increase frequency if improper practices observed. - Environmental Consultant
9 Location far from population centers? Fish passage Adequacy of fish passage At construction site review of plans, site visit Before start of construction and twice in a year thereafter.. Increase frequency if - Hydrobiologist improper practices observed. Loss of forest Removal of trees, forest clearing Project site as well as off-sites (storage facilities, access roads, transmission line routes, etc.) Prior to any land clearing activities Noise (from power house) Operation Noise levels At or near power house db meter Sound absorbing measures Nearest population centers installed (housing, tree (particularly if there are planting, sound barriers etc.) complaints) Quarterly, or immediately after any complaint is lodged by local population Acceptable health screening and safety training made? (with a copy of the health and safety reports for verification) Worker safety Safety equipment provided to and being used by workers? In areas where workers are performing their assignments Quarterly, or immediately after any complaint is lodged by workers Complience with Turkish Occupational Health and Safety Regulation Has a septic tank of proper design been installed and is it operating properly. (system design and construction) Before start of operations Domestic sewage (operations staff) Domestic sewage in the septic tank collected by Yahyalı Municipality on a regular basis? Immediate area surrounding septic tank and groundwater underneath septic tank Quarterly, or immediately after any complaint is lodged by workers
10 Waste collected by Yahyalı Municipality on a regular (at least weekly) basis? Domestic solid waste (operations staff) Recycleable solid waste and accumulated clay and sandy soil given to suitable firms/person General area where staff are working or housed and temporary waste disposal site Every two weeks more frequently (weekly or daily) if observations reveal poor operation Temporary storage facilities properly protected?
YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT
More informationDust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation
Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission
More informationMATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES
MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation
More informationYEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP)
YEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Kahramanmaras Province, Andirin District PROJECT SPECIFIC ASPECTS FOR RENEWABLE ENERGY
More informationE1184 v1. 6. Environmental Management Plan (EMP)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 6. Environmental Management Plan (EMP) This EMP reviews the potential negative impacts
More informationRepublic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY
More informationIN THE KYRGYZ REPUBLIC
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY
More informationROADS: OPERATION AND MAINTENANCE
ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service
More informationGENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER
More informationMatrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments
District Capitals Water Supply Project (RRP TIM 44130-02) Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments PRE-CONSTRUCTION ACTIVITIES Safety at Work Accidents Include
More informationEnvironmental Assessment Registration Destination RV Resort
Environmental Assessment Registration Destination RV Resort Nine Island Pond South,Newfoundland and Labrador Prepared for: Department of Environment and Conservation Environmental Assessment Division Prepared
More informationCHINA: Green Energy Schemes for Low-Carbon City in Shanghai -- Environmental and Social Management Framework
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CHINA: Green Energy Schemes for Low-Carbon City in Shanghai -- Environmental and Social
More informationConstruction Best Management Practices Handbook BEST MANAGEMENT PRACTICES
Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN
More information7 Frame of Environmental Impact Assessment. 7.1 Outline of Project
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 7 Frame of Environmental Impact Assessment 7.1 Outline of Project The subprojects of
More informationEnvironmental Control Plan
Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which
More informationLivezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF
More informationE3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management
More informationActivity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes
MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline
More informationBuilding Better Storm Water Quality
Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction
More informationCONSTRUCTION SPECIFICATION FOR DEWATERING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN
More informationConstruction Waste Management
Title: Waste Management Effective Date: 2/27/2012 Control Number: THG_0015 Revision Number: 1 Date: 10/10/15 Annual Review Completed: 5/13/2015 Construction Waste Management CONTENTS I. INTRODUCTION II.
More informationOverburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.
ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked
More informationSANKO GEOTHERMAL POWER PROJECT EFFLUENT MANAGEMENT PLAN
Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal
More informationQ. CONSTRUCTION IMPACTS
Q. CONSTRUCTION IMPACTS 1. Construction Plan As noted on Exhibit 3Q-1, Overall Phasing Plan and SWPPP Notes, construction of the Proposed Project is anticipated to include five phases. The entire construction
More informationPROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES
PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:
More informationEnvironmental Guidelines for Construction Sites
Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building
More informationStorm Water Pollution Prevention Plan (SWP3) Checklist
. Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:
More informationTemporary Watercourse Crossing: Fords
Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationE1463. Environmental Management Plan For Gas Seep Harvesting Projecti. The Democratic Republic of Timor-Leste. August, 2006
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Democratic Republic of Timor-Leste Environmental Management Plan For Gas Seep Harvesting
More informationE. STORMWATER MANAGEMENT
E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationCEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E
Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT
More informationNew Administration Building
New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180
More informationENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)
ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) Disclaimer: The information contained in this communication document is intended solely for the use of guidance cannot be
More informationAM-PR-003 Construction Environmental Management Plan (C-EMP)
OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been
More informationEnvironmental Management Plan during Construction Phase
Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area
More informationEnvironmental Plans and Procedures
ACC RUCKERSVILLE Environmental Plans and Procedures OMM and SWPPP Permit # VAG110065 581 Luckstone Rd Ruckersville, Va. 22968 Contents OMM... 2 O&M practices for wastewater treatment... 2 Chemical and
More informationCCSD#1 Stormwater Standards
SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless
More information10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION
10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More informationSFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure
More information11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...
Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3
More informationLOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE
TITLE: NUMBER: ISSUER: Storm Water Discharges Associated with Construction and Land Disturbance Activities REF-6286.0 John Sterritt, Director Enrique G. Boull t, Chief Operating Officer Office of the Chief
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationAbout the RRC. February
Resource Recovery Centre (RRC) and Conveyance Pipe About the RRC Siting of the RRC Resource Recovery and Biosolids Management Odour, Noise, Traffic and Safety About the Residual Solids Pipe Spill Protection
More informationPerformance Standards Compliance Checklist
Truckee Meadows Regional Stormwater Quality Management Program Performance Standards Compliance Checklist The checklist that follows identifies the BMPs that can be used at construction sites to meet each
More informationSANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN
Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal
More informationMINISTRY OF EDUCATION YEMEN SECONDARY EDUCATION DEVELOPMENT AND GIRLS ACCESS PROGRAM (SEDGAP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) November 27, 2008.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF EDUCATION YEMEN SECONDARY EDUCATION DEVELOPMENT AND GIRLS ACCESS PROGRAM
More informationAlberta Transportation The City of Edmonton The City of Calgary
Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for
More informationEXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ
EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE EXAMPLES OF COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationRefer to Chapter 3.0 (Description of Development) for a detailed site and development description.
7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological
More informationWater Pollution Control for Work in Sensitive Areas
Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed
More informationTexas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3
Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-3 Form 2448 IH 35E Managed Lanes Project Book 2 - Technical Provisions Attachment 4-3 Show Form
More informationWest Village, 70 Mississauga Road South, Mississauga. Construction Management Plan Phase I: Demolition & Remediation
West Village, 70 Mississauga Road South, Mississauga Construction Management Plan Phase I: Demolition & Remediation FINAL, revision 1 January 26, 2018 Table of Contents 1.0 INTRODUCTION... 2 2.0 HOARDING
More informationMINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014
MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of
More informationSchedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw
Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture
More informationAlberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects
Alberta Transportation Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects January 9, 2009 INFTRA Table of Contents Page Table of Contents... i 1.0 INTRODUCTION...1
More informationTown of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /
Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE
More informationManningham Works Code of Practice
Manningham Works Code of Practice June 2017 Manningham City Council 699 Doncaster Road (PO Box 1) Doncaster Vic 3108 t 9840 9333 f 9848 3110 e manningham@manningham.vic.gov.au www.manningham.vic.gov.au
More informationEnvironmental Plans and Procedures
ACC CULPEPER Environmental Plans and Procedures OMM and SWPPP Permit # VAG110315 16273 Allied Way Culpeper, Va. 22701 Contents OMM... 2 O&M practices for wastewater treatment... 2 Chemical and material
More informationSWPPP Inspection Procedures and Form 247 Instructions
SWPPP Inspection Procedures and Form 247 Instructions 1. Pre-Construction Conference a. A stormwater pollution pre-construction conference shall be held prior to beginning work on each project. b. The
More informationGENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ
GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR PROJECT BEING DEVELOPED
More informationEnvironmental Management Programme (EMP)
Appendix D Environmental Management Programme (EMP) Please note that although Construction and Operational Phase measures are included in this EMP they are relevant to the issued Waste Management Licence
More informationGRADING, EROSION AND SEDIMENTATION CONTROL
SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,
More informationEnvironmental Management Plan Checklist and Format
Part II : Environmental Management Plan Checklist and Format EMP Checklist for Activities PART A: INSTITUTIONAL & ADMINISTRATIVE FOR THE AFRICA CENTERS OF EXCEL- LENCE PROJECT Country GHANA Project title
More information1.2 REGULATORY REQUIREMENTS
Table 1.1. Soil textural classes and general terminology used in soil descriptions (Source: US Environmental Protection Agency 1977). Name Texture Basic soil textural common class names Sandy soils Coarse
More informationPublic Disclosure Authorized EXECUTIVE SUMMARY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting
More informationAddressing Key Environmental Hazards after an Earthquake
Addressing Key Environmental Hazards after an Earthquake A. International Experience 1. Environmental management is not a well-recognized priority issue in an emergency situation. So rather than confine
More informationMitigation Monitoring Program Campus Master Plan 2015
Mitigation Program Campus Master Plan 2015 California State University, Sacramento May 2015 Environmental Mitigation Program Sacramento Campus Master Plan 2015 Project Section 1: Authority This Environmental
More informationDRAFT FOR CONSULTATION OCTOBER 7, 2014
The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness
More informationSTORMWATER POLLUTION PREVENTION PLAN
STORMWATER POLLUTION PREVENTION PLAN PART I GENERAL PROJECT INFORMATION - To be completed by Owner or Consultant PROJECT NAME: PROPERTY OWNER S NAME: ADDRESS: CITY: STATE: ZIP: PHONE #: FAX #: MOBILE #:
More informationFacilities Environmental Protection Plan: Burnaby Terminal
Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation
More informationLAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET
Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000
More informationWorks, services and infrastructure code
9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the
More informationStorm Water Pollution Prevention Plan for CES Gravel #3800
David Lewis Cell: (870) 310-2757 Rickey Vaughn Cell: (870) 310-9602 Buddy McAdams Cell: (870) 310-8733 Local (870) 881-8830 Fax: (870) 881-8809 LICENSED, BONDED & INSURED Howard Cupp, Jr. Cell: (870) 314-2877
More informationErosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)
Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential
More informationENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors
1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction
More informationClean Marina Boatyard Checklist
Clean Marina Boatyard Checklist Boatyard Marina Name Owner Manager Address Phone Date of Visit E mail Weather Conditions Boatyard with Marina Boatyard no slips Marina without boatyard Other This document
More informationOrder of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.
SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including
More informationCONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction
2.7 Generic Mitigation Measures 2.7.1 Avifauna CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction Vehicles and machinery can impact on natural vegetation
More informationAztec Substation. Demolition Specifications. May 13, 2016
Aztec Substation Demolition Specifications May 13, 2016 GENERAL REQUIREMENTS I. Applicability of Requirements Requirements listed within shall apply to the earthworks involved with the demolition of the
More informationLAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET
Permit. ARR150000 SITE WITH AUTOMATIC COVERAGE (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR150000
More informationContractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector
Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity
More informationEROSION CONTROL AND GRADING PERMIT APPLICATION
EROSION CONTROL AND GRADING PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 1735 MONTGOMERY STREET OROVILLE, CA 95965 530-538-2420 FAX (530) 5382426 www.cityoforoville.org APPLICATION DATE PERMIT FEE
More informationFRAMEWORK EMP (femp) FOR OPEN CYCLE GAS TURBINE POWER STATION AND ASSOCIATED INFRASTRUCTURE NEAR MOSSEL BAY
FRAMEWORK EMP (femp) FOR OPEN CYCLE GAS TURBINE POWER STATION AND ASSOCIATED INFRASTRUCTURE NEAR MOSSEL BAY ACTIVITY ASPECT IMPACT MITIGATION MEASURE: 1. COMPLIANCE WITH ENVIRONMENTAL LEGISLATION All Activities
More informationCOMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM
AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN
More informationRegulation of Mines In South Florida
Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines In South Florida Howard J. Hayes, Program Administrator February 8, 2011 What is a mine? Nonphosphate
More informationSTORM WATER POLLUTION PREVENTION PLAN TEMPLATE
STORM WATER POLLUTION PREVENTION PLAN TEMPLATE Cover Page Certifications Project, Owner, Operator, SWPPP Preparer, Date, Project Dates Signed by RIDOT (Owner) and CONTRACTOR (as Operator) of Contents Introduction
More informationDOORNVALLEI EXT 5 & 6
DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED
More informationSECTION TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall provide environmental controls consistent with regulatory requirements throughout the duration
More informationSite C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017
Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...
More informationENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)
ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation
More informationCanadian Solar Developers Ltd.
Canadian Solar Developers Ltd. Type of Document Draft Report Project Name Proposed Ground Mount Solar Facility L.P #5 8338 Scotchmere Drive, Strathroy, ON OPA FIT Program: FIT-FL67GB5 Project Number V00002250-00
More informationStormwater Pollution Prevention Best Management Practices (BMP s)
PHONE 931-648-5718 BUILDING AND CODES DEPARTMENT 350 PAGEANT LANE, SUITE 309 CLARKSVILLE, TN 37040 FAX 931-553-5121 Stormwater Pollution Prevention Best Management Practices (BMP s) Preface Since the passage
More information378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE
378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,
More informationSECTORAL ENVIRONMENTAL ASSESSMENT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Regional and Roads Program Support Project SECTORAL ENVIRONMENTAL
More informationProject Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)
Compliance Assistance Program Checklist 1 Start of Construction Stormwater Self-Certification Checklist Note: This checklist must be completed and submitted to the DEM no later than 30 days after initiating
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with