1 SCREW PILE APPLICATION SHEETS Advantages of screw piles Exceptionally fast installation rate up to 2... linear metres of pile installed per minute Load bearing capacities of over 300kN SWL Load bearing capacity is equal in tension.. and compression ideal for variable load...situations Requires only lightweight installation equipment can operate on soft terrain without the need for piling mats Ideal for restricted access sites and useable...where headroom is limited and even from...floating platforms Installs to laser level accuracy, within +/-...3mm tolerance necessary for modular...construction Minimal noise and vibration, with little...disturbance of the soil Environmentally friendly as no grouting required and can be reused or recycled perfect for temporary structures No removal of spoil, and no casing or dewatering required well suited for contaminated ground Resistant to desiccation or heave Sustains load immediately after installation enables rapid assembly of offsite construction Thick walled tube and galvanizing provides a truly permanent foundation

2 OAK FRAMED STRUCTURES Housing Garages Barn conversions Conservatories s At least 30 piles per day Tension & compression connection Totally dry installation Restricted access use Positive connection No curing time required Method (Concrete pile cap free system) Screw piles are installed to the required depth based on load requirements and geological conditions, using a torque motor attached to a 5 ton excavator. Once each screw pile reaches the correct level, the torque motor is removed from the pile and a circular termination cap is fitted. A reciprocal circular termination cap is fitted into a pre-cut slot in the end of the oak post and is fixed by inserting 3no. dowels. The post then sits directly on top of the screw pile termination cap where it is attached using 4no. M20 bolts.

3 TIMBER STRUCTURES Garden offices Holiday cabins Pavilions School buildings Visitor centres Completion within 1 week Loads up to 180kN SWL No piling mat required Totally dry installation No muck-away required Build off immediately Method (Machine profiled log structure for a school) The topsoil is stripped back and a vegetation barrier installed, if needed. Using a 5 ton excavator, a grid of screw piles is installed to approximately 100mm above ground. Termination caps and self-levelling shoes are then fitted to the grid of piles. A timber ground beam is then assembled on top of the self-levelling shoes. Finally, the timber connection plates are bolted and screwed to both the perimeter termination caps and the timber ground beam to provide additional lateral restraint. A timber cassette floor or similar can then be mounted straight onto the timber joists.

4 SCREW PILE FOUNDATIONS FOR CLOSED PANEL TIMBER FRAME BUILDINGS Working in partnership with: Garden offices Garages Extensions Self-build housing Holiday accommodation Lower embodied energy Completion within 1 week Loads up to 150kN SWL No piling mat required Totally dry installation No muck-away required Build off immediately Method (Gluelam( timber ground beam construction) The topsoil is stripped back and a vegetation barrier installed, if needed. Using a 5 ton excavator, a grid of screw piles is installed to approximately 100mm above ground. Termination caps are then fitted to the grid of piles. A timber ground beam is then assembled on top where timber connection plates are bolted and screwed to both the perimeter termination caps and the timber ground beam to provide additional lateral restraint. A timber cassette floor or similar can then be mounted straight onto the timber joists. Where isolated column loads exist (see above), piles have a cast in situ RC pile cap formed, ready to receive the column (timber, block-work or reinforced concrete).

5 CONTAINERISED BUILDINGS Medical structures Hotel accommodation Temporary buildings Construction site offices Up to 30 piles per day Up to 180kN SWL Speed of installation No ground beams required Readily removable Potentially reusable Method Using a standard 5 ton excavator, screw piles are installed to precise levels at predetermined locations. Pre-cast or cast-in-situ pile caps are then constructed. Lateral restraint is not required as the structural design of the containers provides for this, saving the additional expense in the formation of ground beams. The buildings are then delivered to site and craned into position with the skids from the containers sitting directly on the pile caps (which can be formed partially above ground especially on sloping sites). The system is ideal for temporary structures as the piles can be unscrewed after use and are potentially reusable for the next project.

6 FOUNDATION REINFORCEMENT Subsidence Foundation repair Storey extensions Loft extensions Up to 20 piles per day Cantilevered needles Up to 180kN SWL No internal works Laser level accuracy Restricted access use Works can be carried out. with occupancy Method 1.75m trenches are dug at 2m intervals, including localised excavation of the existing footing in preparation for the needle formation. Two screw piles are installed in each trench, offset by 500mm and 1500mm from the centre line of the wall being supported. A termination cap is then bolted to each pile ready for the formation of a reinforced concrete needle in the trench. The piles take compressive and tensile loads so that all works can be carried out externally, allowing continued occupancy of the building. Once the needles have cured, the brickwork immediately above is removed between each needle to allow installation of a pre-cast lintel or steel beam to span the loads. Alternatively, a masonry beam can be formed within two beds of chopped out mortar, 4 to 6 courses of brickwork apart, using grouted-in helical steel reinforcing rods.

7 MARINE CONSTRUCTION Jetties Boardwalks Pontoon Guides Moorings Up to 3m spacing 3 to 5 ton excavator Square termination cap Timber or GRP frame Minimal access required No floating working...platforms required Laser level accuracy No muck-away required Build off immediately Method (Jetties) Using a standard 3 to 5 ton excavator, the first four screw piles are installed from the side of the marina until the appropriate torque and level is reached, after which a frame is constructed over the top from the edge of the marina. The excavator then moves out onto the newly-created frame and installs the next set of piles, whereupon another frame is added and the process repeated until the full length of the jetty is created. The machine is then removed and the final surface of the jetty is installed (normally a GRP-wood composite offering increased longevity).

8 SCREW ANCHORING Lateral loads on foundations Excavated wall tie-backs Soil nailing Embankment stabilization Retaining walls Method (Tie-backs) 38.1mm SSS screw pile 5 to 7 ton tracked rig Up to 30 anchors per day Dry installation Up to 165kN SWL Initial excavation of the ground takes place reducing the level by up to 1.5m. At regular intervals, tension piles are installed at an inclination into the side of the newly-formed bank, using a standard tracked rig with a torque motor attached to a rotating mast. Universal steel columns are then installed vertically at each anchor location, with slots to receive the end of the tension pile, and pattress plates are then fitted to provide the tensional restraint of the column. Finally, sleepers are installed into the columns to complete the lateral restraint of the excavated earth wall. The process is repeated for each further reduction in level. Each time sleepers will be inserted into the columns from the top, pushing the existing ones into the latest set of columns at the base of the wall. No grouting required Minimal noise/vibration High load capability No reliance on skin friction Restrains immediately

9 MAST CONSTRUCTION Telecommunications Wind turbines Rail infrastructure Signal posts Matrix columns Installed in one day Up to 180kN SWL Restrains variable loads Laser level accuracy Restricted access use Totally dry installation No curing time required Method (Telecommunication) Using a standard 5 ton excavator, screw piles are installed to precise levels at predetermined locations. A steel grillage is then attached using bolting arrangements which enable it to withstand the variable compressive and tensile loads and the overturning moments associated with mast construction. In the example shown above, piles are installed at a raked angle to increase performance. The mast can be lifted into position immediately after the grillage has been attached, allowing a very swift installation, without the need for curing time and a further visit to site.

10 MEZZANINE FLOOR CONSTRUCTION Retail stores Car decks Office extensions Commercial buildings 3 ton excavator Live working environment Inside existing buildings Up to 150kN SWL No spoil created Laser level accuracy Restricted access use Totally dry installation Method (Retail store) Using a standard 3 ton excavator working in a live store at night, screw piles are installed into a pre-excavated holes through the existing floor without creating any spoil, vibration or requiring the use of grout. Reinforced concrete pile caps are then formed and a temporary steel plate is placed on top to protect the plate whist the pile cap cures. The steel frame can then be erected after 7 days curing. Screw piles are best suited to mezzanine floor construction as CFA creates spoil which has to be removed from within an existing store and steel cased driven through vibration may cause damage to existing foundation and the building itself, both piling systems also require grouting adding further cost to the remediation of the site once piling has taken place.

Modular System Advantages

Modular System Advantages Modular System Advantages The Modular System advantages can be summarised as follows: Truly Modular Off-site build Competitive cost Multi-storey capability Fits any shape, any size Fast programme completions

More information

Lightweight Recoverable Foundations on Suitable Ground

Lightweight Recoverable Foundations on Suitable Ground Lightweight Recoverable Foundations on Suitable Ground Abstract: One of the greatest challenges to be faced in the fight against climate change in the construction sector is the fact that (non-traditional)

More information

Halfen systems for the support and restraint of brickwork

Halfen systems for the support and restraint of brickwork Halfen Brickwork Support Systems Halfen systems for the support and restraint of brickwork Introduction Halfen is a leading supplier of channel fixing systems and building components, with manufacturing

More information

Building Construction

Building Construction Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When

More information

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Lesson 2 Substructure Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD Outline Syllabus 1. Demolition 2. Site problems 3. Substructure 4. Basements 5. Structural Frames 6. Floors 7. External walls

More information

Seven Wonders of the Ancient World

Seven Wonders of the Ancient World Seven Wonders of the Ancient World Pyramid of Meidum shed 250,000 tons of limestone outer casings Typical Pyramid Pyramid at Meidum Mexico Alameda buildings Palace of Fine Arts National Theater

More information

SCREW PILES INFORMATION SHEET

SCREW PILES INFORMATION SHEET INFORMATION SHEET SCREW PILES Screw piles can be used in almost all situations where conventional piled foundations would be specified. They are composite end-bearing/friction piles, well suited for resistance

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc. Grade Separation Systems Single-Span Rail Bridge Construction Procedure An innovation from art engineering inc. GSS Single-Span Example Shown: An existing railroad grade crossing. Existing railroad Existing

More information

Lifting Sockets. Flat Lifting Sockets

Lifting Sockets. Flat Lifting Sockets Lifting sockets are widely used in the application of precast concrete construction, such as lifting beams, wall and floor slabs etc.. A reinforcement bar is to be inserted through the cross hole to transfer

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT Page 220548-1 SECTION 220548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA) Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is

More information

Geotechnical Engineering Software GEO5

Geotechnical Engineering Software GEO5 Geotechnical Engineering Software GEO5 GEO5 software suite is designed to solve various geotechnical problems. The easy -to -use suite consists of individual programs with an unified and user-friendly

More information

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding)

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Always Try To Do The Best In Your Life TYPES OF FOUNDATION TYPES OF FOUNDATION a) Shallow Foundation System i) Spread Foundation

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT Page 230548-1 SECTION 230548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Concrete Framing Systems - Walls and Columns

Concrete Framing Systems - Walls and Columns Concrete Framing Systems - Walls and Columns Casting a Concrete Wall Wall Footing Reinforcing Wall Forms Pouring Concrete Finishing the Concrete Controlling Cracking Insulating Concrete Forms (ICF) Tilt-Up

More information

Concert Halls, Lyric Theatres and Performing Arts Venues

Concert Halls, Lyric Theatres and Performing Arts Venues APPLICATIONS AP-SVI-Concert Halls-13a Acoustic isolation of: CONCERT HALLS Concert Halls, Lyric Theatres and Performing Arts Venues Concert halls are an important and popular part of arts and leisure culture

More information

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP A. TECHNICAL INFORMATION OF OUR FOUNDATION WORKS The major types of our foundation works (with illustrative diagram, where applicable) are set out below: 1. Bored piles 0.80m 3.5m pile shaft By Grabbing

More information

Matrix Helical Anchoring System

Matrix Helical Anchoring System Matrix Helical Anchoring System INNOVATIVE SOLUTIONS FOR PROFESSIONAL MASONRY REINFORCEMENT The uses of Matrix Remedial Ties and Matrix Crack Stitching Bar are both wide and varied and they can be utilised

More information

Topic: Site Formation

Topic: Site Formation Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed

More information

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay External view of Manulife Tower from various location Block plan showing the building layout of the new

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

twenty four foundations and retaining walls Foundation Structural vs. Foundation Design Structural vs. Foundation Design

twenty four foundations and retaining walls Foundation Structural vs. Foundation Design Structural vs. Foundation Design ALIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS SRING 2018 lecture twenty four Foundation the engineered interface between the earth and the structure it supports that

More information

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System For over 65 years the Miller brand has been synonymous with personal fall protection products and services. As the global leader in safety at height solutions, Honeywell Safety Products introduces a new

More information

Aveng Ground Engineering Profile

Aveng Ground Engineering Profile Aveng Ground Engineering Profile Contents Overview 1 2 Piling 2 Renewable Energy 6 Lateral Support 8 Grouting 10 Geotechnical investigations 12 Flagship projects 12 Contact us 12 Visit our website for

More information

FrameFast Shoring System

FrameFast Shoring System FrameFast FrameFast Shoring System The FrameFast shoring system is engineered for maximum strength, labor productivity and reuse capabilities. FrameFast components feature high strengthto-weight ratios.

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Jackson Crossing Located in Alexandria, VA. Technical Report 1 Michael Bologna

Jackson Crossing Located in Alexandria, VA. Technical Report 1 Michael Bologna Jackson Crossing Located in Alexandria, VA Technical Report 1 Michael Bologna Structural Option Advisor: Dr. Linda Hanagan September 11, 2015 Table of Contents Executive Summary.3 Introduction 4 Purpose..4

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 260548 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Isolation pads. 2. Spring isolators. 3. Restrained spring isolators. 4. Channel

More information

INNOVATION IN PROP DESIGN. For propping enquiries Australia wide call:

INNOVATION IN PROP DESIGN. For propping enquiries Australia wide call: Propping Equipment INNOVATION IN PROP DESIGN A leader in innovative design, Coates Hire has designed the Universal Prop System 30 and 60 to meet challenging applications. Able to prop up to 30 and 60 tonne

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.9 Concrete Foundations A foundation is a integral part of the structure which transfer the load of the superstructure to the soil without excessive settlement. A foundation is that member which provides

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

Requirements for Measuring and Pricing of Structural Concrete

Requirements for Measuring and Pricing of Structural Concrete Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012) Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012

More information

HAMBRO COMPOSITE FLOOR SYSTEM

HAMBRO COMPOSITE FLOOR SYSTEM HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.

More information

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE. The Steel Strong-Wall is a corrugated steel panel which is designed to be fixed directly to the concrete foundations of a building, within the external or internal wall, via a bolted connection. FEATURES

More information

Masonry and Cold-Formed Steel Requirements

Masonry and Cold-Formed Steel Requirements PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

twenty six concrete construction: foundation design ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013

twenty six concrete construction: foundation design ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013 ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013 lecture twenty six concrete construction: www.tamu.edu foundation design Foundations 1 Foundation the engineered

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures

TABLE OF CONTENTS. 0 Structural calculations 0.1 General 0.2 Safety concept 0.3 Calculations for waterfront structures Arbeitsausschuß "Ufereinfassungen" der Hafentechnischen Gesellschaft e.v. Recommendations of the Committee for Waterfront Structures Harbours and Waterways 9., completely revised Edition TABLE OF CONTENTS

More information

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016 February 2016 Residential Deck Safety, Construction and Repair Juneau Permit Center, 4 th Floor Marine View Center,(907)586-0770 This handout is designed to help you build your deck to comply with the

More information

WESTPRO PORTUS Use of RD Piles for Marine Construction

WESTPRO PORTUS Use of RD Piles for Marine Construction WESTPRO PORTUS Use of RD Piles for Marine Construction Manish Jaiswal 18-01-2018 Picture: https://www.westpro.fi/portus//taloyhtio TODAY S AGENDA About the Westpro Portus Project Geotechnical conditions

More information

Steel Floor Framing Solutions

Steel Floor Framing Solutions Steel Floor Framing Solutions Complete packages for domestic floors, decks and additions Product Manual & General Information Individually designed solutions Full design and quote service Drawings and

More information

Statement of Special Inspections 2013 CBC

Statement of Special Inspections 2013 CBC BUILDIG & SAFET DIVISIO 2729 Prospect Park Drive Rancho Cordova, CA 95670 Phone: (916) 851-8760 Fax: (916) 851-8762 Statement of Special Inspections 2013 CBC PERMIT #: PROJECT ADDRESS: This Statement of

More information

The construction technology of Chongqing Chaotianmen Bridge

The construction technology of Chongqing Chaotianmen Bridge The construction technology of Chongqing Chaotianmen Bridge Zhongfu Xiang School of Civil Engineering & Architectures, Chongqing Jiaotong University, Chongqing, China Wei Xu China zhongtie major bridge

More information

Purna Fashions Ltd. RH Attire Ltd

Purna Fashions Ltd. RH Attire Ltd Purna Fashions Ltd. RH Attire Ltd SHAHNUR MARKET, 96 MURADPUR, HATHAZARI ROAD, PANCHLAISH THANA, Chittagong, Bangladesh (22.37245N, 91.83334E) 08 June 2014 1 2 Observations 3 High Column Stresses The columns

More information

Metal Web Floor System

Metal Web Floor System Metal Web Floor System Contents Contents Introduction and benefits 3 easi-joist definitions 4 easi-joist webs 5-6 Mechanical services 7 Loading and design 8 Floor stiffness 9 Internal non-loadbearing wall

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 03100 CONCRETE FORMWORK 1.0 GENERAL 1.1 DESCRIPTION This section defines requirements and limitations for design, construction, erection, and removal of concrete formwork for

More information

Racking Solutions for Timber Framed Buildings T-RS-UK Edition. +44 (0)

Racking Solutions for Timber Framed Buildings T-RS-UK Edition. +44 (0) Racking Solutions for Timber Framed Buildings T-RS-UK 2014 Edition +44 (0) 1827 255 600 www.strongtie.co.uk Racking Solutions for Timber Framed Buildings About Simpson Strong-Tie For more than 50 years

More information

THE CONCISE GUIDE TO MASONRY REPAIRS

THE CONCISE GUIDE TO MASONRY REPAIRS THE CONCISE GUIDE TO MASONRY REPAIRS The Helical Originators Range Continuous Development and Improvement since 1978 This comprehensive second generation range of Thor Helical Remedial Wall Ties, Crack

More information

TRITEC light Steel Panel Formwork

TRITEC light Steel Panel Formwork TRITEC light Steel Panel Formwork Perfection made in Germany Various practical illustrations of TRITEC Panel Combinations Guaranteed the largest possible range of sizes with the least possible amount of

More information

twenty seven concrete construction: foundation design Foundation Structural vs. Foundation Design Structural vs. Foundation Design

twenty seven concrete construction: foundation design Foundation Structural vs. Foundation Design Structural vs. Foundation Design ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SRING 2017 lecture twenty seven Foundation the engineered interface between the earth and the structure it supports that transmits

More information

Innovative Construction Technology

Innovative Construction Technology Innovative Construction Technology Learning Objectives Be able to explain the innovativeness of the following construction technology / method Top Down Construction Pre-stressed concrete System Formwork

More information

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London

PIANC UK Seminar Design Developments and Specification for Steel. Duncan Nicholson Arup Fellow 9/3/17 ICE London PIANC UK Seminar Design Developments and Specification for Steel Duncan Nicholson Arup Fellow 9/3/17 ICE London Contents 1. Design Issues 2. SPERWall Edition 3 (2016) 1. Steel Sheet Piles (Section 14)

More information

PRECAST CONCRETE GIRDER ERECTION

PRECAST CONCRETE GIRDER ERECTION 7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks

More information

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2014 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

Building Department Informational Handout

Building Department Informational Handout City of Sonoma Building Department Informational Handout Statement of Special Inspections Handout No: 7 Revised 1/12/2017 Project Name: Project Address: For building permit applications of projects requiring

More information

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA) Advantages / Disadvantages of Piling Methods In this Piling Advice Note we will explore the advantages and disadvantages of differing types of piling methods. Continuous Flight Auger (CFA) The pile is

More information

Recommended Good Practice

Recommended Good Practice Recommended Good Practice Enclosures to Resist Wind Loads conducted on behalf of the Nursery & Garden Industry Queensland (NGIQ) by the James Cook University, Cyclone Testing Centre (JCU CTC) and the Department

More information

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION This Technical Notes contains the guide specifications in CSI format for Part III

More information

Steel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications.

Steel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. Max-A-Form Steel Forming System BROCHURE A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. Max-A-Form System Design The Max-A-Form Forming System combines

More information

Note on the assessment:

Note on the assessment: Excerpt from: Transitional shelter: 8 designs, IFRC, 2012 Note on the assessment: The following is an excerpt from the Book Transitional Shelters: 8 Designs, IFRC, 2012, available from www.sheltercasestudies.org.

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Construction Details 5-37

Construction Details 5-37 5-37 5-38 Construction Details 5-39 5-40 Construction Details 5-41 5-42 Construction Details 5-43 5-44 Construction Details 5-45 5-46 Construction Details 5-47 5-48 Construction Details 5-49 RING ANCHOR

More information

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014 GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh (23.968661, 90.296963) 22 March 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate that the working stresses of columns

More information

CHAPTER III METHODS AND MATERIALS

CHAPTER III METHODS AND MATERIALS CHAPTER III METHODS AND MATERIALS 3.1: Tensile Tests 3.1.1: Introduction The first phase of testing for the experimental program, was to conduct tensile tests of No. 4, No. 5, and No. 6 nominal diameter

More information

Accelerated Bridge Construction in USA

Accelerated Bridge Construction in USA Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration

More information

TITEN HD Heavy Duty Screw Anchor for Concrete & Masonry

TITEN HD Heavy Duty Screw Anchor for Concrete & Masonry TITEN HD Heavy Duty Screw Anchor for & Masonry The Titen HD is a patented, high-strength screw anchor for concrete and masonry. The self-undercutting, non-expansion characteristics of the Titen HD makes

More information

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 48 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Isolation pads. 2. Spring isolators. 3. Restrained spring isolators. 4. Channel

More information

fischer Test Report Fixing Tests for

fischer Test Report Fixing Tests for fischer Test Report Fixing Tests for CONTENTS 1. Test Parameters 2. Fixings Products Tested 2.1 fischer Nylon SX Plug 2.2 fischer Nylon M Unit 2.3 fischer FFS Frame Fixing Screw 2.4 fischer FIS V 360 S

More information

A-BEAM W Erection Manual 2

A-BEAM W Erection Manual 2 2 BEAM W Revision 6/2017 Finland 3 TABLE OF CONTENTS 1 ERECTION INSTRUCTIONS... 4 1.1 A-BEAM W... 4 1.2 Codes and standards to be followed during erection... 4 1.3 Documents to be followed in erection

More information

BY DAYTON SUPERIOR. Max-A-Form FORMING SYSTEM

BY DAYTON SUPERIOR. Max-A-Form FORMING SYSTEM BY DAYTON SUPERIOR Max-A-Form FORMING SYSTEM System Design The Max-A-Form Forming System combines the labor-saving benefi ts of modular forming with the strength of an all-steel design. It is ideal for

More information

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 FOUNDATIONS Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 Liquefaction reduced the soil strength under these apartment buildings in Niigata (Japan) 1964. Liquefaction

More information

Design of Column Base Plates

Design of Column Base Plates Design of Column Base Plates Typical column bases, as shown below, consist of a single plate fillet welded to the end of the column and attached to the foundation with four holding down bolts. The bolts

More information

Site Preparation... 2

Site Preparation... 2 TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls

More information

Introduction. Structures may be classified on the basis of materials used for construction, as follows: Steel structures. Aluminium structures

Introduction. Structures may be classified on the basis of materials used for construction, as follows: Steel structures. Aluminium structures Steel Structures 1 Introduction Structures may be classified on the basis of materials used for construction, as follows: Steel structures Aluminium structures Concrete structures Composite structures

More information

TR ANSMISSION AND SUBSTATION FOUNDATIONS

TR ANSMISSION AND SUBSTATION FOUNDATIONS TR ANSMISSION AND SUBSTATION FOUNDATIONS H ELIC AL PILES AN D GU Y ANCHORS STRUC TU RES BR06082E_Transmission and Substation Foundations.indd 1 2/2/18 9:37 AM FOUNDATION SOLUTIONS SELF-SUPPORTING & GUYED

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

fischer Test Report Fixing Tests for Bison Hollow Core Slabs

fischer Test Report Fixing Tests for Bison Hollow Core Slabs fischer Test Report Fixing Tests for Bison Hollow Core Slabs Testing on Bison Hollow Core Slabs 1. Introduction Contents Test Parameters Bison Hollow Core Slab Information 2. Fixings Products Tested FISV

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 0548 - PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

Garage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures

Garage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures Garage Beam System For Post-Tensioned Beam and Slab Parking Structures FORMING The Garage Beam System is a complete forming system designed specifically for post-tensioned beam and slab multi-story parking

More information

Contents EN :2008+A1:2011 (E) Page

Contents EN :2008+A1:2011 (E) Page Contents Page Foreword... 9 Introduction... 10 1 Scope... 11 2 Normative references... 12 2.1 General... 12 2.2 Constituent products... 12 2.2.1 Steels... 12 2.2.2 Steel castings... 14 2.2.3 Welding consumables...

More information

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels Assembly instructions Handling Receiving of goods Check that the material has not been damaged in transit

More information

The Construction of the Langham Place in Mong Kok An Introduction

The Construction of the Langham Place in Mong Kok An Introduction The Construction of the Langham Place in Mong Kok An Introduction Artist Impression of Langham Place r o j e c t c o m p r i s i n g a i l / h o t e l c o m p a n o f f i c e / r e t Fast Fact The site

More information

VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.)

VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.) DIVISION 94 VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.) SEC. 91.9401. PURPOSE. (Amended by Ord. No. 172,592, Eff. 6/28/99,

More information

Earth Retaining System

Earth Retaining System Hashemite University Department of Civil Engineering Foundation Engineering Dr. Omar Al-Hattamleh Earth Retaining System Earth slopes and earth retaining structures Used to maintain two different ground

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization www.malcolmdrilling.com Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning

More information

INDEX FM Page

INDEX FM Page INDEX Accessory equipment Adaptation of floating cranes Anchoring of pile driver rafts Anchor piles Cast-in-place piles Precast concrete piles Sheet piles Steel sheet piling Timber piles Batter piles:

More information

Plot Plan for Decks Date. Name Phone # Address Zip APN # _- _- _ (see property tax bill or call the assessor s office ) FRONT PROPERTY LINE

Plot Plan for Decks Date. Name Phone # Address Zip APN # _- _- _ (see property tax bill or call the assessor s office ) FRONT PROPERTY LINE City of Beaumont Plot Plan for Decks Date Name Phone # Address Zip APN # _- _- _ (see property tax bill or call the assessor s office 955-600) FRONT PROPERTY LINE House REAR PROPERTY LINE - Show patio

More information

SEISMIC RESTRAINT SYSTEM

SEISMIC RESTRAINT SYSTEM 1. GENERAL 1.1. Description: SECTION 16012 SEISMIC RESTRAINT SYSTEM 1.1.1. This specification covers design and installation of seismic bracing and anchorage required for conduit, cable tray, bus duct,

More information

Typical Deck Details. Shenandoah County, Virginia. Based on the 2012 Virginia Residential Code

Typical Deck Details. Shenandoah County, Virginia. Based on the 2012 Virginia Residential Code Shenandoah County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential decks only. Framing requirements are limited to single

More information

RapidBrace Installation Guide

RapidBrace Installation Guide RapidBrace Installation Guide RapidBrace cast-in Brace Anchor System enables structural bracing in early strength concrete. RapidBrace is cast-into the concrete floor and is ready to load in concrete with

More information

elegrodeck Decking Installation Guide MATERIALS LIST Joist Spacing Installing the Decking Boards

elegrodeck Decking Installation Guide MATERIALS LIST Joist Spacing Installing the Decking Boards can be cut and drilled in the same way as timber, however care should be taken to eliminate drill/saw-slip as this can mark the surface of the product. It is recommended that the decking boards are cut

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Precast Concrete 1 Definition of Precast Concrete Precasting means casting a concrete member at a place other than where it will be used and then moving it to

More information