ACBC Floor Mounted Active Beam

Size: px
Start display at page:

Download "ACBC Floor Mounted Active Beam"

Transcription

1 Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS unit to the occupied area at low velocities. The is ideally suited for perimeter applications that naturally have a permanent cabinet element in the space, such as classrooms. air flow pattern for additional product information, including product videos and brochures.

2 Ideal for Classrooms The design of the makes the unit ideal for classroom applications as it supplies low velocity fresh air at ground level, which improves ventilation effectiveness and thermal comfort. With no fan/ motor in the, noise levels are reduced, thus creadting an ideal learning environment. Improved indoor air quality Improved student concentration and performance Low noise levels air flow pattern Design Integration The can easily be incorporated into any classroom design and building aesthetic. The design can be incorporated into the architectural building features, utilizing bookcases or shelving. The perimeter installation maximizes floor space while maintaining air flow. Heating and cooling capability Heavy gauge construction Classroom application Perfect for Retrofitting With many old buildings being updated to meet today s high building standards, updating HVAC mechanical systems is of great importance. The works well in these applications, replacing old pedestal or window perimeter units to provide energy efficient technology to the system. Retrofitting old products Increased energy efficiency Customization Retrofit application

3 Product Features Models Floor Mounted Active Beam The Floor Mounted Price Active Beam,, is an exposed, perimeter unit suitable for office spaces, schools, hotels, lobbies, or any application where occupant comfort demands are high. The upper portion of the induces room air to pass through a heat exchanger and mix with the fresh ventilation air from DOAS (Dedicated Outdoor Air System). The mixed air is then discharged evenly from the lower portion of the across a louvered or perforated face at a low velocity. During cooling, the cool air flows down to the floor and spreads across the occupied space. During heating, the warm air rises and will heat the perimeter. The can be used as a standalone product or can be connected in series, by interlocking plenums, with other units to create a continuous look. Features 2 or 4 pipe configuration Heavy gauge face Quiet operation Internally painted black to hide internal elements Pressure port for air side balancing and flow verification Casing Construction Steel plenum Louvered or perforated face White powder coat finish Water Coil Construction Aluminum fins Manufacturer pressure tested to 450 psi [3.1 MPa] Vent and drain Water Connection Type Standard Connection Options: - ½ [13mm] SWT - ½ [13mm] NPT (female) Other connection types available - Continuous Air flow Pattern L-132 All Metric dimensions ( ) are soft conversion. Copyright Price Industries Limited 2011.

4 Product Options Optional lint screen for return air inlet to assist in the prevention of dirt accumulation in the coil. Optional 12 [300mm] access blank section for room-side access to water connections and enclosure for controls. Optional internal and external insulation for thermal barrier and sound attenuation. Optional volume flow regulator maintains constant air flow at plenum pressure required for active beams to operate at design conditions. Optional drain pan for condensate collection. - It is uncommon to operate active beams below dew point. Louvered Perforated Copyright Price Industries Limited All Metric dimensions ( ) are soft conversion. L-133

5 Dimensional Data Primary Air Inlet D - 1 /8" 1 /4 Turn Latches for Face Removal Wall Mounting Brackets Outlet Air Discharges from Bottom Louver Face L Air Inlet Left Coil Connection 1R Air Inlet Right Coil Connection Non Coil Side Integrated Pressure Port Water Connections (Left Hand) Water Connections (Right Hand) Length (L) Dimensional Data - Imperial (inches) Nominal Length (L) Dry Weight (lbs) Wet Length Length Length Length Length (1721) Length Length (2201) Length L-134 All Metric dimensions ( ) are soft conversion. Copyright Price Industries Limited 2011.

6 Unit Handing Typically, handing is determined by looking into the return air flow inlet (face of the unit) and locating what side the coil connections are on. Left Hand Right Hand Left Hand Orientation Right Hand Orientation Coil Connection Location active beams are installed with a 2 row water coil, available in 2 or 4 pipe configuration, and come standard with vent and drain. Single or dual circuiting is available for various water flow rates. All connections are ½ [13mm] nom. copper sweat or female NPT. - 2 pipe - 4 pipe Cold Water Return Cold Water Return Hot Water Return Cold Water Supply Hot Water Supply Cold Water Supply Copyright Price Industries Limited All Metric dimensions ( ) are soft conversion. L-135

7 Installation ACBL-HE / ACBM ACBH / ACBV / ACBR / Installation ACBL-HE ACBL-HE active beams come standard with four (72 or less) or six (84 or greater slotted mounting brackets in total along the lengths of the unit. The mounting brackets are adjustable and can slide along the length of the unit to allow for better flexibility of location, especially when coupled with a strut channel (by others) mounted above the beam. installed using threaded rod, carabineer, hanger wire, or wire rope (by others) as per local building codes. The hanging device used should allow for vertical adjustment. If used in a suspended ceiling, do not rest the weight of the active beam on the ceiling grid. ACBM ACBM active beams come standard with four slotted mounting brackets in total along the lengths of the unit. The mounting brackets are adjustable and can slide along the length of the unit to allow for better flexibility of location, especially when coupled with a dual sided strut channel (by others) mounted above the beam. installed using threaded rod, carabineer, hanger wire, gripple, chain, or wire rope (by others) as per local building codes. The hanging device used should allow for vertical adjustment. If used in a suspended ceiling, do not rest the weight of the active beam on the ceiling grid. ACBH ACBH active beams come standard with four slotted mounting brackets in total along the lengths of the unit. Confirm all opening sizes and location prior to installation. installed using threaded rod, carabineer, hanger wire, or wire rope (by others) as per local building codes. The hanging device used should allow for vertical adjustment. Grill and slot diffusers are to be attached as per the relevant product installation instructions. ACBL-HE ACBM ACBH L-136 All Metric dimensions ( ) are soft conversion. Copyright Price Industries Limited 2011.

8 Installation ACBL-HE / ACBM ACBH / ACBV / ACBR / Installation ACBV ACBV active beams come standard with two slotted mounting brackets in total along the top/bottom (depending on discharge orientation) of the unit. Confirm all opening sizes and location prior to installation. installed using threaded rod, carabineer, hanger wire, wire rope, or wall screws (by others) as per local building codes. The hanging device used should allow for vertical adjustment. Grill and slot diffusers are to be attached as per the relevant product installation instructions. ACBR ACBR active beams come standard with six slotted mounting brackets in total along the lengths of the unit. The mounting brackets are adjustable and can slide along the length of the unit to allow for better flexibility of location, especially when coupled with a dual sided strut channel (by others) mounted above the beam. Confirm all opening sizes and location prior to installation. installed using threaded rod, carabineer, hanger wire, gripple, chain, or wire rope (by others) as per local building codes. The hanging device used should allow for vertical adjustment. Grill and slot diffusers are to be attached as per the relevant product installation instructions. active beams come standard with a mounting plate that attaches to the wall, floor and face cover. installed using wall screws (by others) as per local building codes. ACBV ACBR Copyright Price Industries Limited All Metric dimensions ( ) are soft conversion. L-137

9 Active & Passive Beams Suggested Specification Active and Passive Beams SECTION INDUCTION UNITS Part 1 - GENERAL 1.1 Summary A. This Section includes the following: 1. Active Beams 2. Passive Beams 1.2 Related Documents A Operation and Maintenance of HVAC Systems B Common Work Results for HVAC C Instrumentation and Control for HVAC D HVAC Piping and Pumps E HVAC Air Distribution 1.3 Submittals A. Product Data: For each type of product indicated, include rated capacities, furnished specialties, sound-power ratings, and accessories. B. Shop Drawings: Detail equipment assemblies and indicated dimensions, required clearances, method of field assembly, components, and locations and size of each field connection. 1. Include a schedule showing unique model designation, room location, model number, size, and accessories furnished. 2. Wiring Diagrams: Power, signal, and control wiring. C. Coordination Drawings: Reflected ceiling plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved: 1. Ceiling suspension assembly members. 2. Method of attaching hangers to building structure. 3. Size & location of initial access modules for acoustical tile. 4. Ceiling-mounted items including lighting fixtures, diffusers, grilles, speakers, sprinklers, access panels, and special moldings. D. Operation and Maintenance Data: For active or passive beam units to include in emergency, operation and maintenance manuals 1.4 Quality Assurance A. Product Options: Drawings indicating size, profiles, and dimensional requirements of active or passive beam units and are based on the specific system indicated. B. Electrical Components, Devices and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. C. Active or passive beams and accessories shall be rated and tested for pressure as shown on the Drawings. 1.5 Coordination A. Coordinate layout and installation of active or passive beams and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, and partition assemblies. Copyright Price Industries Limited PART 2 - PRODUCTS 2.1 Manufacturers A. In Part 2 articles where titles below introduce lists, the following requirements apply to selection: 1. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified. 2.2 Active Beams A. Approved Manufacturers: 1. Price 2. Alternates: Alternates or approved equals are acceptable if and only if a mock up and witness test is performed to demonstrate that the substitution meets design criteria. B. Operation: 1. [ACBL-HE / ACBM] Active beam shall utilize induction of room air across a water coil mounted within the unit to provide sensible cooling or heating when required. The induced air shall mix with primary air and discharge evenly into the room via lateral discharge slots. 2. [ACBH / ACBR] Active beam shall utilize induction of room or plenum air across a water coil mounted within the unit to provide sensible cooling or heating when required. The induced air shall mix with primary air and discharge evenly into the room via single discharge slots. C. Configuration: 1. [ACBL-HE] Active beams shall consist of an air inlet, pressurization cavity, induction nozzles, enclosed single water coil, 2-pipe or 4-pipe water connections as indicated on the drawings, induction face grille or perforated panel, and shall have either a 1-sided or 2-sided discharge as per contract schedule. 2. [ACBM / ACBR] Active beams shall consist of an air inlet, pressurization cavity, induction nozzles, enclosed single water coil, 2-pipe or 4-pipe water connections as indicated on the drawings, induction face grille or perforated panel, and shall have either a 4-sided discharge as per contract schedule. 3. [ACBH / ACBR] Active beams shall consist of an air inlet, pressurization cavity, induction nozzles, enclosed single water coil, 2-pipe or 4-pipe water connections as indicated on the drawings, induction face grille or perforated panel as indicated on the drawings, and shall have either a single discharge as per contract schedule. Discharge directional orientation determined by discharge face type selected D. Active beam capacity shall be tested and certified by manufacturer in accordance with EN Standard to meet the performance listed on the schedule. Should any performance rating, including supply air volume, chilled water supply temperature, plenum static pressure, etc; deviate from the schedule, Manufacturer shall submit updated capacity, throw and noise data collected as described in Section 2.4 as well as computational fluid dynamic modeling demonstrating that any changes to not impact the air distribution in a room that would cause a detriment to the PMV and ADPI rating from the design conditions. Manufacturer shall have factory testing facility available to perform performance test of units in accordance with said standard, as required. Upon request, up to 1% of units for the project can be tested in accordance with the standard. Request will be made with order and prior to shipment of active beams. Engineer will have the option of witnessing this test. All Metric dimensions ( ) are soft conversion. L-171

10 Active & Passive Beams Suggested Specification Active and Passive Beams E. Casing: Air plenum shall be constructed of 24 gauge galvanneal steel, consisting of at least one (1) air inlet. The frame shall be constructed of aluminum extrusion. F. Water Coil: Coil shall consist of copper tubing mechanically expanded into aluminum plate fins. Coils shall be leak tested by manufacture to 450 PSI and have a working pressure of 250 psi and shall be AHRI 410 certified. Water connections shall be one end only. Water connections shall be ½ and be suitable for solder, compression fittings, push on fittings or threaded connection. Fin spacing shall be no greater than 10 fins per inch to prevent dust bridging. The coil shall be removable from the room side without requiring the removal of the beam casing from the ceiling. The coil shall include a vent and drain to facilitate maintenance on the unit. The coil pipes shall be upturned 90 degrees. G. Fastening: Adjustable mounting brackets shall be factory installed along the length of the air plenum on the unit. Each beam shall be individually supported to the building structure by a minimum of 4 laterally adjustable fixing points, or as recommended by the manufacturer. Installation hardware shall be in accordance with the manufacturer s recommendations and any local codes that dictate hanging requirements. H. Nozzles: Nozzles shall be of a fixed size, selected based on cooling and heating requirement. Only formed metal nozzles are acceptable. I. Face: 1. [ACBL-HE / ACBM] The coil shall be accessible from the room side for inspection and cleaning without the need for tools through a hinged face supported by the beam casing. i. Room side accessible controls enclosure shall be furnished where indicated ii. Integrated return section shall be furnished where indicated 2. [ACBH / ACBR] The coil shall be accessible from the room or return plenum for inspection and cleaning. J. Paint Finish: Internal casing components and exterior shall be painted black, face and frame elements shall be painted white or other color as chosen by the architect. The paint shall be powder coat polyester with 500 hour salt spray rating and periodic cross hatch and bend adhesion tests. K. Balancing: Integrated pressure port shall be included with k-factor to read the plenum pressure and corresponding supply air volume. L. Water and air connections shall be shipped sealed to limit the introduction of dust / dirt during shipping and construction. M. Accessories: 1. Manufacturer shall supply 12 /18 stainless steel braided hose with isolation ball valves 2. Integral manual inlet balancing damper shall be included with locking handle where indicated on the drawings. 2.3 Passive Beams A. Approved Manufacturers: 1. Price 2. Alternates: Alternates or approved equals are acceptable if and only if a mock up and witness test is performed to demonstrate that the substitution meets design criteria. B. Passive beam shall utilize natural convection of room air across a water coil mounted within the unit to provide sensible cooling when required. The air shall be drawn from a ceiling cavity and pass through the coil and into the space below. C. Configuration: Passive beams shall consist of an enclosed water coil of a 2-pipe water connections configuration. Drip pans and/or drain pans are not acceptable. D. Casing: The enclosure shall be constructed of painted sheet metal. E. Water Coil: Coil shall consist of copper tubing mechanically expanded into aluminum plate fins. Coils shall have a working pressure of 300 psi minimum. Water connections shall be one end only. Pipes shall terminate in a ½ connection F. Fastening: Adjustable mounting brackets shall be factory installed along the length of the air plenum on the unit. Each beam shall be individually supported to the building structure by a minimum of 4 laterally adjustable fixing points, or as recommended by the manufacturer. Installation hardware shall be in accordance with the manufacturer s recommendations and any local codes that dictate hanging requirements. G. Paint Finish: Internal casing components and exterior shall be painted black for concealed applications, white for visible applications or other color as chosen by the architect. The paint shall be powder coat polyester with 500 hour salt spray rating and periodic cross hatch and bend adhesion tests. 2.4 Source Quality Control A. Identification: Label each active or passive beam with appropriate tag number. B. Verification of Performance: 1. Rate active beam capacity in accordance with EN Standard 15116, active beam throw and noise criterion in accordance with ASHRAE Standard 70. Active beam supplier shall also provide generated noise in octave bands 2-7, measured as specified in ASHRAE Standard Rate passive beam capacity in accordance with EN Standard PART 3 - EXECUTION 3.1 Pre-Design Services A. Bid shall include the costs to complete final selections and coordination with the Engineer at the Engineers office. Allow for a minimum of three (3) days. L-172 All Metric dimensions ( ) are soft conversion. Copyright Price Industries Limited 2011.

11 Active & Passive Beams Suggested Specification Active and Passive Beams 3.2 Installation General A. Install active or passive beam level and plumb. Maintain sufficient clearance for normal services, maintenance, or in accordance with construction drawings. B. Complete installation and startup checks according to manufacturer s written instructions and perform the following: 1. Verify inlet duct connections are as recommended by manufacture to achieve proper performance. 2. Verify controls and control enclosures are accessible. 3. Verify control connections are complete to control valves as needed. 4. Verify that any identification tags are visible. 5. Verify controls respond to inputs as specified. 3.3 Connections A. Piping installation requirements are specified in other Division 23 Sections. Drawings indicated general arrangement of piping, fittings, and specialties B. Install piping adjacent to active or passive beams to allow service and maintenance. C. In addition to Division 23 Section Hydronic Piping, connect coils to supply with shutoff valve, strainer, control valve, and union or flange, and to return with balancing valve and union or flange. D. Connect ducts to active beams according to Division 23 Section Metal Ducts. E. Connect wiring according to Division 26 Section Low- Voltage Electrical Power Conductors and Cables. F. Tighten electrical connectors and terminals according to manufacturer s published torque-tightening 3.4 Field Quality Control A. Perform the following field tests and inspections and prepare test reports: 1. After installing active or passive beam and after electrical circuitry has been energized, test for compliance with requirements. 2. Leak Test: After installation, fill water coils and test for leaks. Repair leaks and retest until no leaks exist. 3. Operational Test: After electrical circuitry has been energized, start units to conform to proper unit operation. 4. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. B. Manufacturer s Field Service: Engage a factory-authorized service representative to inspect, test, and adjust fieldassembled components and equipment installation, including connections, and to assist in field testing. Report any findings in writing. C. Remove and replace malfunctioning units and retest as specified above. 3.5 Cleaning And Protection A. Clean all visible surfaces of equipment; touch up as required. B. Protect all units before, during and after installation. Damaged materials due to improper protection shall be cause for rejection. 3.6 Construction Phase Services A. Installer shall visit the active or passive beam factory, or factory-authorized representative, prior to the arrival of the product on site, to become familiar with the beams. Manufacturer shall include the cost of such a visit for one (1) installer in the bid. B. Manufacturer or factory-authorized representative shall visit the site regularly during the installation process to ensure proper means and methods are being employed. Bid shall include the cost of a minimum of two (2) such visits. C. Manufacturer or factory-authorized representative shall provide start-up and training services to Owners staff to adjust, operate, and maintain active or passive beam. Refer to Division 01 Section Demonstration and Training. A minimum of eight (8) hours of such services shall be included in bid. Copyright Price Industries Limited All Metric dimensions ( ) are soft conversion. L-173

ACBC Floor Mounted Active Beam

ACBC Floor Mounted Active Beam Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS

More information

Price Active & Passive Beams Division 23 Heating, Ventilating, and Air Conditioning Section Chilled Beams Section Induction Units

Price Active & Passive Beams Division 23 Heating, Ventilating, and Air Conditioning Section Chilled Beams Section Induction Units Price Active & Passive Beams Division 23 Heating, Ventilating, and Air Conditioning Section 23 82 14 Chilled Beams Section 23 82 26 Induction Units The following specification is for a defined application.

More information

YORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE

YORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE YORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE Contents YORK Passive Chilled Beams 3 CB-PBE-YK / CB-PBR-YK Performance Data 5 CB-PBE-YK Dimensions 7 CB-PBR-YK Dimensions 8 Specifications 9 2 YORK Passive

More information

SECTION AIR TERMINAL UNITS

SECTION AIR TERMINAL UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

YORK BULKHEAD MOUNTED CHILLED BEAMS ENGINEERING GUIDE

YORK BULKHEAD MOUNTED CHILLED BEAMS ENGINEERING GUIDE YORK BULKHEAD MOUNTED CHILLED BEAMS ENGINEERING GUIDE Contents YORK Bulkhead Active Chilled Beams 3 CB-ABB-YK / CB-ABC-YK Performance Data 5 CB-ABB-YK Dimensions 10 CB-ABC-YK Dimensions 11 Specifications

More information

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT SECTION 23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION CONVECTORS

SECTION CONVECTORS SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

NVR / NVS / NVF / NVA

NVR / NVS / NVF / NVA NVR / / NVF / NV Product Overview Models Rectangular Roof Stack Unit Square Roof Stack Unit Facade Mounted Natural Vent Wall Mounted Transfer Unit NVR NVF NV The Price natural ventilation system operates

More information

1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units

1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Price High Performance Horizontal Fan Coil Units

Price High Performance Horizontal Fan Coil Units Price High Performance Horizontal Fan Coil Units Division 23 Heating, Ventilating, and Air Conditioning Section 23 82 19 Fan Coil Units The following specification is for a defined application. Price would

More information

SECTION FUEL-FIRED UNIT HEATERS

SECTION FUEL-FIRED UNIT HEATERS SECTION 23 55 33 PART 1 - GENERAL 1.1 DESCRIPTION A. This Section includes gas-fired unit heaters. SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable

More information

SECTION LIGHTING. A. Section Basic Electrical Materials and Methods

SECTION LIGHTING. A. Section Basic Electrical Materials and Methods SECTION 16500 LIGHTING PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide lighting fixtures of sizes, types and ratings as indicated; complete with, but not necessarily limited to, housings, lamps, lamp holders,

More information

Price Flat Faced Displacement Diffusers

Price Flat Faced Displacement Diffusers Price Flat Faced Displacement Diffusers Division 23 Heating, Ventilating, and Air Conditioning Section 23 37 13 Diffusers, Registers, and Grilles PART 1 GENERAL 1.01 Section includes: A. Flat Faced Displacement

More information

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers. SECTION 23 37 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

K. All mechanical rooms shall be designed with a minimum 3-1/2 dropped floor.

K. All mechanical rooms shall be designed with a minimum 3-1/2 dropped floor. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 102239 - FOLDING PANEL PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 82 19.00 40 (May 2017) ------------------------------ Preparing Activity: NASA Superseding UFGS-23 82 19 (May 2014) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Central Station Air Handler Specification

Central Station Air Handler Specification Central Station Air Handler Specification PART 1: GENERAL 1.01 WORK INCLUDED (Model CS 3 ) Mechanical Specification A. Provide complete air handling unit(s) suitable for indoor installation. Contractor

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. This Section includes steel cable trays and accessories.

A. This Section includes steel cable trays and accessories. SECTION 26 05 36 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Price Fan Powered Terminal Units

Price Fan Powered Terminal Units Price Fan Powered Terminal Units Division 23 Heating, Ventilating, and Air Conditioning Section 23 3600 Air Terminal Units The following specification is for a defined application. Price would be pleased

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS 23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters

More information

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

A. This Section includes acoustical panel ceilings installed with exposed suspension systems. SECTION 09511 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

The factory assembled air handler shall conform to the requirements outlined ASHRAE 90.1.

The factory assembled air handler shall conform to the requirements outlined ASHRAE 90.1. PAGE 1 of 5 1.1. REFERENCE STANDARDS 1.1.1. The factory assembled air handler shall conform to the requirements outlined ASHRAE 90.1. 1.1.2. Unit shall be designed to conform to ASHRAE 15. 1.1.3. Unit

More information

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Universal Mount Fan Coil 2-Pipe Nominal Size: 60,000

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish. SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems:

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems: SECTION 221429 - SUMP PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

GUC LNG Facility Phase IIB Expansion 6/20/14 INSTRUMENTATION SPECIFICATION. A. This Section includes instrumentation for process piping systems.

GUC LNG Facility Phase IIB Expansion 6/20/14 INSTRUMENTATION SPECIFICATION. A. This Section includes instrumentation for process piping systems. INSTRUMENTATION SPECIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION ACOUSTICAL CEILINGS

SECTION ACOUSTICAL CEILINGS SECTION 09511 ACOUSTICAL CEILINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Acoustical ceiling panels. B. Exposed grid suspension system. C. Wire hangers, fasteners, main runners, cross tees, and wall angle

More information

SECTION ROTARY SCREW WATER CHILLERS

SECTION ROTARY SCREW WATER CHILLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation.

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation. SECTION 09512 - ACOUSTICAL TILECEILINGS (ACT-01 and ACT-02) PART 1 - GENERAL 1.01 SUMMARY A. Section includes ceilings consisting of acoustical panels and exposed suspension systems. This ceiling system

More information

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY 1 1 1 1 1 1 1 1 0 1 0 1 SECTION 1 DUCTS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Duct Materials.. Insulated flexible ducts.. Single wall spiral round ducts.. Ductwork fabrication.. Duct cleaning.

More information

SECTION DRYWALL GRID LINEAR LIGHTING INTEGRATION

SECTION DRYWALL GRID LINEAR LIGHTING INTEGRATION SECTION 09 22 26 DRYWALL GRID LINEAR LIGHTING INTEGRATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general conditions of Contract, including General and Supplementary Conditions and Divisions-1

More information

SECTION COMPOSITE CORE ACOUSTICAL PANEL CEILINGS. Sound-Rite Inc. #9, rd Avenue NE Calgary, AB T2A 7P3

SECTION COMPOSITE CORE ACOUSTICAL PANEL CEILINGS. Sound-Rite Inc. #9, rd Avenue NE Calgary, AB T2A 7P3 SECTION 09510 COMPOSITE CORE ACOUSTICAL PANEL CEILINGS Sound-Rite Inc. #9, 2821 3rd Avenue NE Calgary, AB T2A 7P3 Tel 403-296-0505 Fax 403-296-0511 Email info@sound-rite.com Web www.sound-rite.com Techstyle

More information

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME SECTION 08331 OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES

More information

B. Shop Drawings: For air terminal units. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For air terminal units. Include plans, elevations, sections, details, and attachments to other work. SECTION 233600 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fan-powered air terminal units. 2. Shutoff, single-duct air terminal units. 1.2 PERFORMANCE REQUIREMENTS A. Structural Performance:

More information

ALL-ALUMINUM DOOR & WINDOW FRAMING

ALL-ALUMINUM DOOR & WINDOW FRAMING ALL-ALUMINUM DOOR & WINDOW FRAMING WITH INTEGRATED ALUMINUM DOOR STOP SECTION 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES: A. Prefinished aluminum

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON- APPLICABILITY (NA). 1. HEATING SYSTEMS: A. GENERAL

More information

B. Provide equipment complying with this specification and manufactured by one of the following:

B. Provide equipment complying with this specification and manufactured by one of the following: SECTION 230910 PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the

More information

ENGINEERING UPDATE JULY VOLUME 11 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 11 OF THE JULY 2013 ENGINEERING UPDATE.

ENGINEERING UPDATE JULY VOLUME 11 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 11 OF THE JULY 2013 ENGINEERING UPDATE. ENGINEERING UPDATE JULY 2013 - VOLUME 11 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 11 OF THE JULY 2013 ENGINEERING UPDATE. TABLE OF CONTENTS: Terminal Unit Acoustical Considerations...

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 09511 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION SECTION 12 31 00.4 Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION PART 1 GENERAL Summary: This Specification identifies the minimum material and construction standards

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1

More information

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

E. Fume hood to have set baffling system. No adjustable baffles allowed.

E. Fume hood to have set baffling system. No adjustable baffles allowed. 1.01 SUMMARY A. Section Includes: 1. Laboratory fume hoods. B. Related Sections: 1. Section 6500 Laboratory casework 2. Section 15 Mechanical: Furnishing and installation of plumbing utilities and final

More information

SECTION PARK NON-SEGREGATED BUS SPECIFICATION

SECTION PARK NON-SEGREGATED BUS SPECIFICATION Page 1 of 5 SECTION ------- PARK NON-SEGREGATED BUS SPECIFICATION 1.0 SCOPE 1.1. This specification describes assemblies of 600V, 5Kv and 15Kv non-segregated bus duct, which will be installed indoors and

More information

DiSorb Diffuser Product Specifications Section Sound Diffuser-Absorber for Ceilings and Walls (DiSorb Diffuser-Absorber)

DiSorb Diffuser Product Specifications Section Sound Diffuser-Absorber for Ceilings and Walls (DiSorb Diffuser-Absorber) DiSorb Diffuser Product Specifications PART 1 - GENERAL 1.01 SUMMARY A. This section includes Sound Diffuser-Absorbers for Ceilings and/or Walls. Types include: 1.02 RELATED SECTIONS 1. DiSorb Diffuser-Absorber,

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

DLE-H LINEAR ENCLOSURE DISPLACEMENT DIFFUSER WITH INTEGRAL HEAT

DLE-H LINEAR ENCLOSURE DISPLACEMENT DIFFUSER WITH INTEGRAL HEAT LINEAR ENCLOSURE DISPLACEMENT DIFFUSER WITH INTEGRAL HEAT The (DLE-H) uniquely combines natural convective heating with low level displacement cooling into one cabinet enclosure. The heating option is

More information

SECTION AIR DUCT CLEANING

SECTION AIR DUCT CLEANING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description Ceiling Systems Between us, ideas become reality METALWorkS General Installation Instructions RH200 Custom Hook-on Panels 1.0 GENERAL 1.1. Product Description RH200 system is a downward accessible, metal

More information

SECTION AIR OUTLETS AND INLETS

SECTION AIR OUTLETS AND INLETS PART 1 - GENERAL 1.1 DESCRIPTION A. Roof Curbs SECTION 23 37 00 AIR OUTLETS AND INLETS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph

More information

SUPPORT AND ANCHORS SECTION 15090

SUPPORT AND ANCHORS SECTION 15090 SUPPORT AND ANCHORS SECTION 15090 PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. Work included in this Section: Materials, equipment, fabrication, installation and tests in conformity with applicable codes

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 095113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 DEFINITIONS A. AC: Articulation

More information

SECTION ORCHESTRA PIT FILLER

SECTION ORCHESTRA PIT FILLER PART 1 - GENERAL 1.1 SECTION INCLUDES A. Orchestra pit filler. 1.2 REFERENCES SECTION 11 61 00 ORCHESTRA PIT FILLER A. American Hardboard Association (AHA): 1. AHA A135.4-95: Basic Hardboard. B. American

More information

1 29SEP03 ALL General update with miscellaneous changes in entire document.

1 29SEP03 ALL General update with miscellaneous changes in entire document. REVISION RECORD SECTION 16461 Dry-Type Transformers (600 V and Less) REV DATE PAGE PARA NO. DESCRIPTION APPROVED BY 28SEP01 ALL Initial issue. 1 29SEP03 ALL General update with miscellaneous changes in

More information

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following: SECTION 10501 PERSONNEL DUTY LOCKERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications

More information

Soundmaster & Modernfold TECHNICAL DATA

Soundmaster & Modernfold TECHNICAL DATA This specification along with product information and model details can be downloaded from www.modernfold.com SPECIFICATION - SECTION 08 35 13 ACCORDION FOLDING DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART

More information

SECTION LINEAR METAL CEILINGS

SECTION LINEAR METAL CEILINGS SECTION 09 5423 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

RULON LINEAR OPEN SUSPENDED WOOD CEILING SYSTEMS ARCHITECTURAL SPECIFICATIONS

RULON LINEAR OPEN SUSPENDED WOOD CEILING SYSTEMS ARCHITECTURAL SPECIFICATIONS 10/3/2012 RULON LINEAR OPEN SUSPENDED WOOD CEILING SYSTEMS ARCHITECTURAL SPECIFICATIONS PART 1 - GENERAL A. The natural wood ceiling systems covered by this specification shall be the products of the Rulon

More information

SECTION NON-STRUCTURAL SEISMIC DESIGN CRITERIA PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION NON-STRUCTURAL SEISMIC DESIGN CRITERIA PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 014100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

Geometrik Manufacturing Inc.

Geometrik Manufacturing Inc. PRODUCT: GEOSQUARE WOOD TILES Page 1 PART I GENERAL 1.1 SECTION INCLUDES 1. GeoSquare wood [acoustical] ceiling tiles. 2. Coordination with other trades that have parts attached to, penetrate through or

More information

SECTION HVAC GRAVITY VENTILATORS

SECTION HVAC GRAVITY VENTILATORS SECTION 23 37 23 HVAC GRAVITY VENTILATORS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ROOF ACCESSORIES

SECTION ROOF ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 72 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Noise Control. Commercial, Industrial, and Environmental Products and Solutions.

Noise Control. Commercial, Industrial, and Environmental Products and Solutions. Noise Control Commercial, Industrial, and Environmental Products and Solutions www.kineticsnoise.com Commercial Duct Silencers Kinetics Noise Control offers the design and engineering assistance to integrate

More information

Architect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition

Architect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 23 81 00 DECENTRALIZED HVAC EQUIPMENT A. The other Contract Documents complement the requirements of this section. The General requirements apply to the work

More information

FXV. Closed Circuit Cooling Towers. Closed Circuit Cooling Towers. Product Detail FXV - C 1. Engineering Data FXV Models... C2

FXV. Closed Circuit Cooling Towers. Closed Circuit Cooling Towers. Product Detail FXV - C 1. Engineering Data FXV Models... C2 - C 1 Product Detail Engineering Data Models... C2 Structural Support Models... C6 Engineering Specifications... C8 - C 2 Engineering Data Models REMARK: Do not use for construction. Refer to factory certified

More information

SECTION PLUMBING PIPING SYSTEM

SECTION PLUMBING PIPING SYSTEM SECTION 15410 - PLUMBING PIPING SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are a part of this Section. 1.02 SUMMARY

More information

GLASS WALL SPECIFICATIONS

GLASS WALL SPECIFICATIONS GLASS WALL SPECIFICATIONS Series GA2 Ultra Acoustical, STC 45/46 Paired, Glass Wall PRODUCT OVERVIEW: Top Supported Center Stack Paired s Manually Operated Maximum Opening Height: 12' 2 [3.7m] Maximum

More information

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) ** NOTE TO SPECIFIER ** Wayne Dalton; Coiling counter door products.. This section is based

More information

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications.

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications. SECTION 32 31 14 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

Engineering Update JANUARY VOLUME 9 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 9 OF THE JANUARY 2013 ENGINEERING UPDATE.

Engineering Update JANUARY VOLUME 9 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 9 OF THE JANUARY 2013 ENGINEERING UPDATE. Engineering Update JANUARY 2013 - VOLUME 9 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 9 OF THE JANUARY 2013 ENGINEERING UPDATE. TABLE OF CONTENTS: Two Sides to Every Noise... 1 Product

More information

LINEAR METAL CEILINGS Section

LINEAR METAL CEILINGS Section PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

EXTERIOR PLANK SERIES SPECIFICATION DATA

EXTERIOR PLANK SERIES SPECIFICATION DATA EXTERIOR PLANK SERIES SPECIFICATION DATA This specification includes the Exterior Plank ceiling system including suspension systems and components along with related work such as mechanical air grills,

More information

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing DIVISION 05 METALS 05 00 00 METALS 05 01 00 Maintenance of Metals 05 01 10 Maintenance of Structural Metal Framing 05 10 20 Maintenance of Metal Joists 05 10 30 Maintenance of Metal Decking 05 10 40 Maintenance

More information

USG Ceiling Solutions. LOGIX Integrated Ceiling Systems SYSTEMS GUIDE

USG Ceiling Solutions. LOGIX Integrated Ceiling Systems SYSTEMS GUIDE USG Ceiling Solutions LOGIX Integrated Ceiling Systems SYSTEMS GUIDE SYSTEMS GUIDE Logix Brand Integrated Ceiling Systems from USG allow you to design ceilings that meet building requirements without

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

METALWORKS RH215 Faceted Custom Hook-on Panels

METALWORKS RH215 Faceted Custom Hook-on Panels METALWORKS RH215 Faceted Custom Hook-on Panels Assembly and Installation Instructions 1. GENERAL 1.1 Product Description MetalWorks RH215 Faceted Custom Hook-on panel system is a downward accessible, custom

More information

A. This Section includes ceilings consisting of acoustical panels and exposed suspension systems.

A. This Section includes ceilings consisting of acoustical panels and exposed suspension systems. SECTION 09 51 13 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

A. Operation and Maintenance Data: For pumps and controls, to include in operation and maintenance manuals.

A. Operation and Maintenance Data: For pumps and controls, to include in operation and maintenance manuals. Page 221429-1 SECTION 221429 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CONSTRUCTION REQUIREMENTS

CONSTRUCTION REQUIREMENTS CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary

More information

SECTION VIBRATION ISOLATION

SECTION VIBRATION ISOLATION SECTION 15240 VIBRATION ISOLATION PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15450 - Plumbing Equipment. 2. 15510 - Piping (HVAC). 3. 15515 Valves, Hangers, and Specialties. 4. 15540 - Pumping

More information

Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034

Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034 Melhart Music Center Modular Music Practice Rooms - E3 Ready Specifications Section 13034 PART 1 - General 1.01 Summary A. Section includes labor, material, equipment, and other considerations required

More information