1 SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012
2 SUNSHINE SKYWAY BRIDGE, FLORIDA
3 Presentation Outline 1. INTRODUCTION 2. SKYWAY STRUCTURAL SYSTEM 3. SKYWAY CONSTRUCTION METHODS 4. PREVIOUS REHABILITATION OF HIGH-LEVEL APPROACH COLUMNS 5. PRECAST SEGMENTAL TRANSITION PIERS 6. REPAIR OPTIONS 7. CONSTRUCTION
4 Introduction The Sunshine Skyway Bridge is located on the west central coast of Florida. Part of I-275 linking Tampa/St. Petersburg to Bradenton/Sarasota across Tampa Bay. In May 1980, a major ship impact caused the collapse of the southbound main span. Sunshine Skyway Bridge St. Petersburg
5 Sunshine Skyway Bridge NORTH LOW LEVEL TRESTLE SPANS (4283 ) NORTH HIGH LEVEL APPROACH (2430 ) MAIN SPAN (4000 ) SOUTH HIGH LEVEL APPROACH (2430 ) SOUTH LOW LEVEL TRESTLE SPANS (8738 ) Total Bridge length: 4.14 miles
6 High Level Approaches and Main Span Unit
7 Structural System High Level Approaches HIGH LEVEL APPROACH HIGH LEVEL APPROACH Total length: 4,860 ft Post-Tensioned Precast Segmental Box Girders (Span-by-Span) Post-Tensioned Precast Segmental Columns
8 Structural System Main Span Unit MAIN SPAN UNIT Total length: 4,000 ft Post-Tensioned Precast Segmental Box (Balanced Cantilever)
9 Precast Segmental Substructure Bearing pad PT anchorage Column cap Transition point External Tendon Segment joint (typ) Internal tendon Precast footing shell Grout pad Cast-in-place concrete Precast concrete strut Tremie seal concrete
10 Previous Rehabilitation of Approach Piers PE Duct Couplers Poor detail of vertical tendon couplers
11 Column 133 NB SE Tendon September 2000 Corroded strands in the zone of 2 ft below the column cap (11 out of strands were failed)
12 Failed strands as a result of severe corrosion
13 Previous Rehabilitation of Approach Piers
14 Previous Rehabilitation of Approach Piers
15 Previous Rehabilitation of Approach Piers Core holes in footing and grout PT bars in place Top of Footing Place reinforcing
16 Previous Rehabilitation of Approach Piers Concrete pumped from top of deck Placing concrete inside column
17 Transition Piers Between HLA and Main Unit
18 Transition Piers 106 (6 S) and 117 (6 N)
19 Expansion Joint Segment at Transition Pier
20 As-Built Transition Columns Tie-Down Tendons Hollow Columns Filled with Concrete for Vessel Impact
21 Transition Pier Analysis Do we need to repair the transition pier columns? How to repair columns with concrete already placed inside segments? What is the purpose of the tie-down tendons Vessel Impact Load Case Hurricane Wind Load Case Impact of vessel impact risk analysis Repair options
22 Transition Column Inspection Column 117 SB Top view of interior column
23 Transition Column Inspection Column 106 SB Poorly done duct couplers
24 Transition Column Inspection Column 117 SB
25 Transition Column Inspection Column 117 NB Tendon T4 E (spiral cracked duct)
26 Transition Column Inspection Column 106 SB Cracked PE duct in 6 gap beween top of pier cap and transition segment
27 Transition Column Inspection Column 117 SB View at column transition point
28 Transition Column Inspection Column 117 SB Void
29 Transition Column Inspection Column 117 SB View of T1 W (cracked duct and void)
30 Purpose of Tie-Down Tendons 4 looped tendons (8 vertical tendons) 2-17x0.5 Tendons extend into superstructure EOR used tie-down tendons for vessel impact and hurricane wind analysis Tie-Down Tendons
31 EOR Original Design Scenario 2100 k 1900 k Vessel Impact Load k Design Load Pier cannot withstand full force; inelastic scenario was used to satisfy requirement
32 Vessel Impact Risk Analysis 3*LOA = 2310 ft CL Channel Limit analysis to 3*LOA limit as specified in AASHTO (piers outside of limit are designed for minimum vessel impact) 8 piers on either side of the channel
33 Aerial View of Sunshine Skyway Bridge First two piers are very well protected, eliminate from risk analysis Conservatively ignore protection of remaining piers
34 Vessel Impact Risk Analysis 1350 k 2000 k Transition Pier 4000 k Protected
35 Wind Load on Bridge Wind Pressure Service Level Ultimate Strength 80 psf 177 mph 250 mph 60 psf 153 mph 217 mph
36 Check Uplift at Bearings Service Level Wind (153 mph) No Uplift at Bearings Tie-Down Tendons Not Required M top Wind Ultimate Wind defined as 1.6 x 80% of Ultimate Strength M u = 1.6 x Moment / 0.8 M top = 7725 kip-ft M base = kip-ft M base
37 Analysis Summary Proposed Vessel Collision Load = 2000 k Actual Column and Foundation Capacity = 2250 k Collapsed Column Scenario would not be required Tie-down tendons not required for vessel collision or hurricane wind load cases
38 Transition Pier Repair Potential Options for Lower Column Repair Option 1: Repair the columns from the inside (coring 55 deep concrete) Option 2: Repair the columns from the outside (using a cofferdam)
39 How do you repair the columns? Hollow Columns Filled with Concrete for Vessel Impact
40 Repair Option 1: Core Holes Inside Column Lower Column Repair: Core 5 φ holes through filled column and footing 28-1 ¾ φ unstressed PT bars Grout bars in place
41 Repair Option 2: Core Holes Outside Column 1 Concrete Shell 1 Concrete Shell Cofferdam
42 Repair Option 2: Core Holes Outside Column Steel Cofferdam (need split form for repair) Precast Dumb-Bell Precast Concrete Strut Precast Dumb-Bell And Steel Cofferdam During Construction
43 Repair Option 1 Chosen: Core Holes Inside Column Column Buttresses Upper Column: 24-1 ¾ φ Bars 5 φ Cored Holes Lower Column: 28-1 ¾ φ Bars
44 Upper Column Repair: Reinforced Column Buttresses Upper Column Repair: Core 5 φ holes through 2 thick lower segments and pier cap 4 column buttresses 24-1 ¾ φ unstressed PT bars
45 Upper Column Repair: Remove External Tendons Upper Column Repair: After column buttresses in place, strip external ducst, add anchorage plates to tendons and encapsulate in concrete to form an anchorage block Cut and remove external tendons Lower tendons to remain and will provide redundancy to lower column repair PT bars connecting pier cap to transition segment added at Department s request
46 Cost Estimate Option 1: Repair from inside (coring concrete) Estimated Total: $ 3 million Option 2: Repair from outside (w/ cofferdam) Estimated Total: $ 4 million Construction Time : 9 months to 12 months. Original Contract Amount: $2.2 million Original Construction Time: 1 year Unforseen conditions will increase total dollar amount and contract time.
47 Construction Photos Core Drill 5 diameter, 5 long steel tubing
48 Construction Photos Cleaning out core holes for lower column repair Core holes in thickened section For upper column buttress bars
49 Construction Photos Preparing and finishing column buttresses
50 Construction Photos Removal of external tendon ducts and addition of anchorage clamps
51 Removal of external PT tendon tie-down and installation of PT bar tiedown Construction Photos
52 Current Project Status 2 columns completed, 2 ongoing Estimated completion: Summer, 2012
53 Thank you. Contact: Antonio Ledesma, P.E.
Florida DOT efforts toward improving Post Tension Durability
Florida DOT efforts toward improving Post Tension Durability By William Nickas 1 (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 73 Post-Tensioning Strategies Enhanced PT Systems
More informationSpecial Considerations for Maintenance of the Sunshine Skyway Bridge
Florida Department of TRANSPORTATION Special Considerations for Maintenance of the Sunshine Skyway Bridge 2014 NATIONAL BRIDGE PRESERVATION PARTNERSHIP CONFERENCE James J. Jacobsen, P.E. District Structures
More informationCorrosion Evaluation of Post-Tensioned Tendons on Mid-Bay Bridge
Corrosion Evaluation of Post-Tensioned Tendons on Mid-Bay Bridge by Siva Venugopalan Principal SCS, Inc. siva007@verizon.net (610) 692-6551 6551 March 7, 2007 Count on Concrete for Performance Slide 1
More informationBonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationTECHNICAL SESSION 3. Strengthening, Repair & Rehabilitation
TECHNICAL SESSION 3 Strengthening, Repair & Rehabilitation 2004 PTI Technical Session 3 T. Theryo, P. Garcia - Repair of Sunshine Skyway Bridge The Post-Tensioning Column Repair of High Level Approaches
More informationNDT in Grouted PT Inspection for Bridges
NDT in Grouted PT Inspection for Bridges PTI Technical Conference & Exhibition Miami, FL May 8, 2007 Hong-gang gang Cao CTLGroup (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 37
More informationUS-131 Over the Muskegon River. Corey Rogers, P.E. Bridge Construction Engineer
US-131 Over the Muskegon River Corey Rogers, P.E. Bridge Construction Engineer NB and SB US-131 Each bridge is a three-span, 580 foot long, cast-in-place, post-tensioned concrete box girder structure resting
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationIronton Russell Bridge Project
Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014
More informationINSPECTION AND LOAD RATING OF P-T SEGMENTAL BRIDGES. Elias Ajami, PE Illinois Tollway Brett Sauter, PE, SE Ciorba Group
INSPECTION AND LOAD RATING OF P-T SEGMENTAL BRIDGES Elias Ajami, PE Illinois Tollway Brett Sauter, PE, SE Ciorba Group PRESENTATION SUMMARY 1. About the Illinois Tollway 2. Project Location and Information
More informationPushing the Envelope For 100 Years
Pushing the Envelope For 100 Years Tunneling under the Chesapeake Bay The Parallel Thimble Shoal Highway Tunnel Presented by: Kevin Abt, PE Chesepeake Bay Bridge and Tunnel District Mike Kling, PE, PTOE
More informationEVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)
EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 1 of 23 The following presentation discusses
More informationI-74 over the Mississippi River
I-74 over the Mississippi River Design and Construction of Arch Foundations 104 th Transportation and Highway Engineering Conference Presented by: Andrew J. Keaschall, PE, SE, Alfred Benesch & Company
More informationModjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction
Introduction This memo presents a summary of a three dimensional (3D) analysis of the Organic concept for the proposed St. Croix River bridge project. The Organic concept has several attributes that are
More informationThe Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects
The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309
More informationConstruction of Long Key Bridge
Construction of Long Key Bridge ^G1 '4 Jean Muller Chairman of the Board and Technical Director Figg and Muller Engineers, Inc. Tallahassee, Florida MARATHON Conch Key Duck Key Long Key Fig. 7. Location
More informationFoundation Strengthening Of Bascule Piers At The Bridge Of Lions
Paper No. 22 Foundation Strengthening Of Bascule Piers At The Bridge Of Lions Structural Elements Jian Huang, Ph.D., P.E. G. Alan Klevens, P.E. Lichtenstein Consulting Engineers TENTH BIENNIAL SYMPOSIUM
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationBridge Construction. Nick Haltvick North Region Bridge Construction Engineer May 17, Bridge Office mndot.gov/bridge/construction.
Bridge Construction Nick Haltvick North Region Bridge Construction Engineer May 17, 2017 Bridge Office mndot.gov/bridge/construction.html Topics Bridge Construction Unit Special Provisions Update Bridge
More informationQUESTION BANK CE6702 PRESTRESSED CONCRETE STRUCTURES UNIT 3 - DEFLECTION AND DESIGN OF ANCHORAGE ZONE PART A (2 marks) 1. What are the functions of water stopper (water bar) in water tank construction?
More informationCity of Mesquite General Design Standards Revision Date:
SCREENING WALLS (Public and Private) Page 1 of 6 Section 1 General Design & Notes 1.1 Standards 1.1.1 All screening walls in the City of Mesquite and within its Extraterritorial Jurisdiction (ETJ), both
More informationBRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.
BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions
More informationJULY 2014 LRFD BRIDGE DESIGN 5-1
JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,
More informationJohn James Audubon Bridge
John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: VDOT Modifications to the AASHTO LRFD Bridge Design Specifications, 8 th
More informationChapter 2 Notation and Terminology
Reorganized 318 Chapter Titles Chapter 1 General 1.1 Scope 1.2 Purpose 1.3 Interpretation 1.4 Drawings and Specifications 1.5 Testing and Inspection 1.6 Administatration and Enforcement 1.6.1 Retention
More informationDesign & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:
Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By: ABSTRACT Shafi M. Sharifan, Ph.D., P.E. Wei Koo & Associates Orange, California Kosal Krishnan,
More informationFor Two Steel Bridges
Load Rating For Two Steel Bridges Jing juan Li PHD, PE, SE Senior Project Manager RHC ENGINEERING September 2013 Project Introduction Outline Load rating procedure: Determine load rating method Determine
More informationLecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...
Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... LECTURE 13 May 17, 2005 May 17, 2005 1 Where we have been Basics Allowable Stress Ultimate Strength Shear Camber
More informationStrengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions
13 th BIENNIAL SYMPOSIUM OCTOBER 25-28, 2010 Strengthened Bascule Piers for the Newly Rehabilitated Bridge of Lions Jian Huang, Ph.D., P.E. and R. Wayne McLennon, P.E. TranSystems Corporation 2400 E. Commercial
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationCONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG
CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What
More informationRt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening
Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction
More informationFEBRUARY 2019 LRFD BRIDGE DESIGN 5-1
FEBRUARY 2019 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing
More informationLRFD Bridge Design Manual Changes
LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and
More informationAccelerated Bridge Construction in USA
Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration
More information2016 ACEC/PA ANNUAL MEETING
2016 ACEC/PA ANNUAL MEETING z I-49 North, Segment K (I-220 to Martin Luther King Drive) Interchange Project Durk Krone, P.E., TRC Engineers Inc., Baton Rouge, La 1 I-49 North Segment K Project 2 AGENDA
More informationIronton Russell Bridge Project
Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationSTATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY
STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY NEWINGTON-DOVER, 11238S August 15, 2016 Vanasse Hangen Brustlin, Inc.
More informationPROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012
PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375
More informationPRECAST CONCRETE CONNECTIONS - US PRACTICE
PRECAST CONCRETE CONNECTIONS - US PRACTICE Larbi Sennour, PhD, SE President Consulting Engineers Group, Inc. SPEAKERS Precast Connections 3 General Types Wet Connections Semi Dry Dry Wet System - Definition
More informationJohn James Audubon Bridge. Introduction
John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of
More informationCritical Structures Construction Issues
Critical Structures Construction Issues FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Specification 1-3: Definitions Contractor s Engineer of Record Specialty Engineer CLASS OF CONTRACTOR
More informationINSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE
INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE Xiaohua H. Cheng 1, Gregory Renman 1 and Richard Dunne 1 Abstract The superstructure of Rt.72 over Manakawkin Bay Bridge consists of
More informationGrade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.
Grade Separation Systems Single-Span Rail Bridge Construction Procedure An innovation from art engineering inc. GSS Single-Span Example Shown: An existing railroad grade crossing. Existing railroad Existing
More informationTitle. Author(s)KIM, D. W.; SHIM, C. S. Issue Date Doc URL. Type. Note. File Information
Title EVALUATION OF STRUCTURAL PERFORMANCE OF PRECAST MODU Author(s)KIM, D. W.; SHIM, C. S. Issue Date 2013-09-13 Doc URL http://hdl.handle.net/2115/54437 Type proceedings Note The Thirteenth East Asia-Pacific
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationSPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit
2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,
More informationSUMMARY SHEETS OF HYBRID CONNECTIONS
APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-1 APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-2 Location:
More informationB R I D G E O F F I C E
LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of
More informationB R I D G E O F F I C E
LRFD Bridge Design Manual BRIDGE OFFICE MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesota Department of
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationA precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability
A precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability John Stanton Marc Eberhard University of Washington PCI Fall Convention 15 Sept 2009, San Antonio, TX.
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationBijan Khaleghi, Ph, D. P.E., S.E.
0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED
More informationStructural Technical Report 1 Structural Concepts / Existing Conditions
Chris Shelow Structural Advisor: M. Kevin Parfitt Koshland Integrated Natural Science Center 10/05/05 AE 481W Structural Technical Report 1 Structural Concepts / Existing Conditions Executive Summary The
More informationIMUA ANNUAL PRESENTATION 2013
IMUA ANNUAL PRESENTATION 2013 1 Who We Are: Founded in 1947 in Colorado Have expanded to a company of approximately 2,000 With Operations Constructing Transportation, Water and Energy Infrastructure throughout
More informationChapter 1. General Design Information. Section 1.03 Loads and Load Factors. Introduction. Load Modifying Factors
Chapter 1 Bridge Design Manual General Design Information Section 1.03 Loads and Load Factors Introduction This section defines the loads and load factors to be used in structural analysis and design.
More informationS T R U C T U R. One-of-a-Kind Design The New San Francisco-Oakland Bay Bridge Self-Anchored Suspension Span. magazine. Copyright
One-of-a-Kind Design The New San Francisco-Oakland Bay Bridge Self-Anchored Suspension Span By Marwan Nader, Ph.D., P.E. and Brian Maroney, Dr. Engr., P.E. How do you design a replacement span that is,
More informationDon Theobald, V.P., Gulf Coast Pre-Stress. Standardizing Existing Spliced Girder Systems
Standardizing Existing Spliced Girder Systems Hugh D. Ronald, P.E. Abstract: Correlation of the span and girder spacing requirements for an existing spliced girder system can be completed using a parametric
More informationTemecula Medical Center Temecula, CA
Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas
More informationIronton Russell Bridge Project
Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September
More informationPUBLIC INFORMATION MEETING June 24, 2015
Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase
More informationRed Wing Bridge Alternates
Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for
More informationDESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY
DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY ABSTRACT Jugesh Kapur, PE, SE 1 The seismic design and detailing of bridges made of precast prefabricated members
More informationOffice Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari
Office Building-G Thesis Proposal Structural Option December 10, 2010 Table of Contents Executive Summary... 3 Introduction... 4 Gravity System...4 Lateral System:...6 Foundation System:...6 Problem Statement...
More informationRehabilitation of Masonry Piers at Nipigon, Ontario
Rehabilitation of Masonry Piers at Nipigon, Ontario Daniel E. J. Adamson, P. Eng. Canadian Pacific Railway 2881 Alyth Road SE Calgary, AB Canada, T2G 5S3 Phone (403) 303-8835 Fax (403) 303-8830 ABSTRACT
More information103rd Annual T.H.E. Conference February 28 & March 1, 2017 University of Illinois at Urbana-Champaign. Planning and Design. of IL-104 BRIDGE OVER
103rd Annual T.H.E. Conference February 28 & March 1, 2017 University of Illinois at Urbana-Champaign Planning and Design of IL-104 BRIDGE OVER ILLINOIS RIVER MEREDOSIA, IL Presenter: Vinod C. Patel, PE,
More informationExecutive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.
Executive Summary "Les Ponts Jacques Cartier et Champlain Incorporée" (PJCCI) requested that Buckland & Taylor (B&T) study the overall condition of the approach span edge girders of the Champlain Bridge
More informationAASHTOWare BrD 6.8 Substructure Tutorial Pier Drilled Shaft Example
AASHTOWare BrD 6.8 Substructure Tutorial Pier Drilled Shaft Example 25'-9" 51'-6" BL SR 456 Superstructure Definition Reference Line 3'-3" 9'-0" 9'-0" 9'-0" 9'-0" 9'-0" 3'-3" EL 76.00 3'-0" 1'-8" 51'-0"
More informationLong Key Bridge, a spectacular example. Design Features and Prestressing Aspects of Long Key Bridge
Design Features and Prestressing Aspects of Long Key Bridge { i Thomas M. Gallaway* Principal Cutler-Gallaway Services, Inc. Consulting Engineers San Antonio, Texas Long Key Bridge, a spectacular example
More informationConnections between precast girders and cap beam
Emerging ABC Connection Details for High Seismic Areas Connections between precast girders and cap beam Sri Sritharan Wilson Engineering Professor CCEE Department, Iowa State University Collaborator Dr.
More informationCONTINUITY OF PRECAST BRIDGE U-GIRDERS CONNECTED TO A CAST-IN-PLACE SUBSTRUCTURE SUBJECTED TO SEISMIC LOADS
October 12-17, 28, Beijing, China CONTINUITY OF PRECAST BRIDGE U-GIRDERS CONNECTED TO A CAST-IN-PLACE SUBSTRUCTURE SUBJECTED TO SEISMIC LOADS K.L. Almer 1 and D.H.Sanders 2 1 Graduate Research Assistant,
More informationEast Lyme Middle School EAST LYME MIDDLE SCHOOL
Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel
More informationAPPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES
APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES Massachusetts Department of Transportation Highway Division I-95 / Whittier Bridge Replacement Type Study Report 6. Evaluation of
More informationSOUTHEAST TEXAS CONTINUING EDUCATION BRIDGE INSPECTION, MAINTENANCE AND REPAIR
EXAM No.109 BRIDGE INSPECTION, MAINTENANCE AND REPAIR 1. Elements of a Bridge Maintenance Program include: A. Inspection and maintenance. B. Inspection and repair. C. Maintenance and documentation. D.
More informationSUMMARY SHEETS OF INTEGRAL CONNECTIONS
APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-1 APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-2
More informationChapter 13 Bridge Load Rating
Chapter 13 Bridge Load Rating Contents 13.1 General 13.1-1 13.1.1 WSDOT Rating (LRFR) 13.1-2 13.1.2 NBI Rating (LFR) 13.1-8 13.2 Special Rating Criteria 13.2-1 13.2.1 Dead Loads 13.2-1 13.2.2 Live Load
More informationAASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example
AASHTOWare BrD 6.8 BrR and BrD Tutorial PS7-3 Stem PS Bridge Example BrR and BrD Training PS7 3 Stem PS Bridge Example From the Bridge Explorer create a new bridge and enter the following description data.
More informationTable of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 1 OCTOBER 5, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI Table of Contents Table of Contents
More informationCrossroads at Westfields Building II
Crossroads at Westfields Building II Chantilly, Va STEPHEN LUMPP Structural option Faculty Consultant: Dr. Andres Lepage Technical Report 2 EXECUTIVE SUMMARY This report is a study of alternate floor systems
More informationAppendix A Proposed LRFD Specifications and Commentary
NCHRP Project 12-71 Design Specifications and Commentary for Horizontally Curved Concrete Box-Girder Highway Bridges Appendix A Proposed LRFD Specifications and Commentary A-1 A-2 4.2 DEFINITIONS (Additional)
More informationNEWINGTON-DOVER WELCOME
NEWINGTON-DOVER Spaulding Turnpike / Little Bay Bridge Project WELCOME SENH/NH-ASCE Joint Meeting September 28, 2011 VHB, Inc. Presentation Outline Introduction Project Overview Bridge Design Considerations
More informationStatement of Special Inspections
Statement of Special Inspections SUCF Project No: Project Title: Registered Design Professionals in Responsible Charge: (Name) (Address) Architect: Structural Engineer: Mechanical Engineer: Identification
More informationReplacing the Aging US 52 Mississippi River Bridge
2019 TRANSPORTATION & HIGHWAY ENGINEERING CONFERENCE F. Duncan, PE, G. Hasbrouck, PE and A. Dour, PE Replacing the Aging US 52 Mississippi River Bridge February 26, 2019 Project Overview US 52 / IL 64
More informationBridge PBEE Overview & Pilot Next Generation Bridge Studies
Bridge PBEE Overview & Pilot Next Generation Bridge Studies Kevin Mackie Central Florida BozidarStojadinovic UC Berkeley AdyAviram UC Berkeley PEER Annual Meeting San Francisco, CA 2009/10/15 Next Generation
More informationStructural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
More informationBlaxland's Crossing Bridge, Wallacia NSW Bearing Replacement
Blaxland's Crossing Bridge, Wallacia NSW Bearing Replacement ABSTRACT Ken Maxwell, Arcadis Australia Pacific, Sydney, Australia The existing bridge (known as Blaxland s Crossing) carries Silverdale Road
More informationLRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1
LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE Mark S. Mahan 1 Abstract The newly approved AASHTO Guide Specification for LRFD Seismic Bridge Design (referred to as LRFD Seismic Guide Spec), July 2007,
More informationSeismic performance of precast concrete segmental bridges: Summary of experimental research on segmentto-segment
Editor s quick points n Researchers recently completed a three-phase research project to investigate the seismic performance of precast concrete segmental bridges. n The research showed that segment joints
More informationModeling and Design of Bridge Super Structure and Sub Structure
Topic 3 Day 2 Modeling and Design of Bridge Super Structure and Sub Structure Naveed Anwar 1. Over view of Bridge Design Process and Bridge Types 2. Advances and recent trends in Modeling and Analysis
More information1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY
Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be
More informationNew Development in Accelerated Bridge Design and Construction in WA
Delivery of Accelerated Bridge Construction WSDOT Workshop Wednesday April 1st, 2015 New Development in Accelerated Bridge Design and Construction in WA Washington State Department of Transportation Bridge
More informationAssalamualaikum & Good Morning (May All Of You Gain A Better Understanding)
Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding) Always Try To Do The Best In Your Life TYPES OF FOUNDATION TYPES OF FOUNDATION a) Shallow Foundation System i) Spread Foundation
More informationTHE FORENSIC MEDICAL CENTER
THE FORENSIC MEDICAL CENTER Image courtesy of Gaudreau, Inc. TECHNICAL REPORT #2 OCTOBER 26, 2007 KEENAN YOHE STRUCTURAL OPTION DR. MEMARI FACULTY ADVISOR EXECUTIVE SUMMARY Image courtesy of Gaudreau,
More informationBasarab Cable Stayed Bridge in Bucharest
Basarab Cable Stayed Bridge in Bucharest Javier MANTEROLA Pr. Dr. Civil Engineer Carlos Fernández Casado,S.L. Madrid, SPAIN jmanterola@cfcsl.com Antonio MARTÍNEZ Dr. Civil Engineer Carlos Fernández Casado,S.L.
More informationStructural Technical Report 1 Structural Concepts/ Structural Existing Conditions Report
Kelly M. Sadusky The Food Science Building Oct. 6, 2004 Professor Parfitt University Park, PA Structural Option Executive Summery: Structural Technical Report 1 Structural Concepts/ Structural Existing
More information2014 HDR, all rights reserved.
2014 HDR, all rights reserved. That s No Ordinary Bridge Ben Zeman, P.E. Lance Peterman, P.E.,S.E. Caahlen McAtee, P.E. 2014 HDR, all rights reserved. Presentation Outline Project Overview Design Behavior
More informationSafety was in everyone's mind when a. Sunshine Skyway Bridge Ship Impact Design of Low Level Approaches
Sunshine Skyway Bridge Ship Impact Design of Low Level Approaches Vijay Chandra Vice President Parsons Brinckerhoff Quade & Douglas, Inc. New York, N.Y. George Szecsei Project Engineer Parsons Brinckerhoff
More information