The Building Codes A.R.E. Building Design and Construction Exam Prep
|
|
- August Shaw
- 6 years ago
- Views:
Transcription
1 Know Thy Codes! The Building Codes
2 Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire ratings, egress, fire protection, occupancy, Specify materials, prescriptive
3 Building Codes Insurance companies developed first standards Regional building codes National Building Codes International building codes Competing codes NFPA IBC Federal Guidelines vs. local codes
4 Use and Occupancy Group A Assembly Group B Business Group E Educational Group F Factory Group H Hazardous Group I Institutional Group M Mercantile Group R Residential Group S Storage Group U Utility Could be mixed occupancy!
5 Types of Construction Two characteristics considered: 1. Are the structural materials classified as combustible or non-combustible? 2. How long can the structure be anticipated to not collapse under fire load Non Combustible Structural components made of steel, concrete, masonry or other limited combustible, not wood TYPE I and TYPE II Combustible Structural components made of wood or other materials deemed combustible TYPE III, TYPE IV, TYPE V
6 Fire rated Construction Goal Protect the occupants in the event of a fire until the reach the public way. 4, 3, 2, or 1 hour fire rated construction based on occupant type how much time to get them out Codes differ in ratings and requirements! KNOW your IBC, Check your NFPA
7 Building Volume Area & Height Building height and area is determined by the type of construction along with occupancy based on Table 503 in the IBC and Table in NFPA 5000 Area increases for frontage and sprinkler system Area increases on having more than one story
8 Fire Collapse support the building until it is evacuated Containment or compartmentalize the fire with fire separations of walls, floors, ceilings, shafts, doors, windows Floor finishes ASTM D 2859 for flame spread Smoke Development per ASTM E 84 Flame Spread Class A, B, C
9 Egress Means of egress is defined as a continuous unobstructed path from any occupied portion of the facility to the public way Exit access Exit Exit discharge
10 Occupant Loads 1 st step in designing egress system Determined based on model codes Table in IBC Table in NFPA 5000 Variations on the exceptions and interpretations Load determined per defined floor area, then for floor Could be mixed occupancy, or a assessor to the main occupancy
11 Know Thy Codes! Partial IBC Table
12 Egress Width Once occupant load is determined, you can determine the egress width required Occupant load x 0.3 = egress width for stairs Occupant load x 0.2 = egress width for other egress components Total width required divided by # of exits = Exit width required from space. Minimum of 32 clear width and maximum of 48 nominal width for doors Know Thy Codes! MAJOR DIFFERENCES IN WIDTH REQUIREMENTS BETWEEN MODEL CODES!
13 Exit Access Requires consideration of the number of exits required from a space, requiring separate exits when one or more are required Considers travel distance Egress through intervening spaces Separation of exists When 2 required, separation is ½ diagonal distance apart When more than 2, reasonably separated Know Thy Codes!
14 Travel Distance Most remote point to closest exit 200 feet n un-sprinklered 250 feet in sprinklered Business occupancies allow up to 300 with sprinkler system Hazardous occupancies less Factories, storage, utilities up to 400 feet Know Thy Codes!
15 Intervening Spaces Travel to an exit may pass through intervening spaces before reaching the exit Must have discernible path to the exit Not allowed to intervene with an exit path through Kitchens, Storage Rooms, closets, Toilets Know Thy Codes!
16 Corridors Final segment of an egress path leading to an exit Standard min. width is 44, but may be more for different occupancies (72 for education, for example) Dead ends allowed, but limited in depth to 20 feet. Business occupancies which are sprinklered can extend to 50 Fire rated corridors if not sprinklered FR corridors are continuous to an exit FR corridors always in Hazardous or Institutional Know Thy Codes!
17 Exits Know Thy Codes! The exit is the part of the path of egress that either takes the occupant from the building or floor to a vertical exit enclosure (stair) and exit passage, a horizontal exit or an exterior exit ramp or stairway
18 Exits Know Thy Codes! Vertical exit enclosures are exit stairways or ramps and typically require a 2 hour fire rating when serving 4 or more stories Less than 4 stories, 1 hour vertical enclosures Exit passageways connect multiple vertical enclosures The horizontal exit divides a building or floor into separate fire compartments (2hr)
19 Exits Exterior exit ramps and stairways up to 6 stories or 75 feet Know Thy Codes! Exit discharge delivery to the public way from the egress system
20 Accessibility Provide requirements for accessible routes, accessible entrances, parking, passenger loading, dwelling units, assemblies, toilets, bathing facilities, drinking fountains, elevator, lifts, storage, cabinets, doors and hardware, ANSI A117.1 Know Thy Codes!
21 Federal Standards OSHA and Cal OSHA provide specific requirements for the workplace that includes ladders, stairs, railings, and protection of openings. ADAAG - Americans with Disabilities Act Accessibility Guidelines (Public and Private) FHAG Fair Housing Accessibility Guide UFAS Uniform Federal Accessibility Standards for GSA, USPS, DOD, (Federally funded)
22 State and City Codes Most States rely on the model codes California and Florida have their own codes Cal Title 24 at variance with ADAAG in places Some jurisdictions adopt revisions to the model codes
23 Planning and Zoning Codes Designed for local conditions and interests Restrict building occupancy types (commercial, Residential, industrial..) Limit heights, S.F., type of construction, open space, shadowing, materials, color Prevent fire, flooding, pollution, seismic and more
24 Fire Codes and Fire Zones Intended to provide for public health and safety related to management and use of existing structures Provide design information Standpipes (Wet or Dry) Sprinklers have water or fire suppression chemical at all times Fire Zones recognize the firefighting ability available for the area. Height is usual factor.
25 Code Conclusion The Publics health, safety and welfare are the primary charge of every Architect Code officials need to be brought into the discussion early and integrated into the project and the process You need to understand the concepts of the code, and make sure the requirements are met in the design and the field
26 Know Thy Codes! The Building Codes
Applying the Building Code During Design
Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education
More informationPRESCRIPTIVE COMPLIANCE METHOD
CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already
More informationGeneral Building Information
Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification
More information2015 IBC Exit Systems
Objectives 2015 IBC Exit Systems Based on the 2015 International Building Code Upon completion, participants will be better able to: Determine those means of egress components that are defined as exits
More information&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &
&01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.
More informationEGRESS AZMIR SULTANA NICOLAS MIMU SAKUMA EDWIN VEGA CHAMORRO
EGRESS AZMIR SULTANA NICOLAS CHAMORRO MIMU SAKUMA EDWIN VEGA DEFINITIONS NC ACCESSIBLE MEANS OF EGRESS. A continuous and unobstructed way of egress travel from any accessible point in a building or facility
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationCity of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:
City of Des Moines Permit and Development Center 602 Robert D Ray Drive Des Moines, IA 50309 Phone: 515-283-4200 Fax: 515-283-4270 This Code Analysis Form must be completed and returned with the Building
More informationCODE ANALYSIS REPORT SECOND FLOOR
CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary
More informationLEAD DESIGN PROFESSIONAL:
2009 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More informationThe Building Code for Rookies
The Building Code for Rookies Or Basic Steps for Using the 7 Ohio Building Code Chapters - Or All the building code stuff you forgot to ask about in college and probably didn t have time for anyway AIA
More informationCALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%
CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,
More information2012 IBC Exit Systems
Accreditation Based on the 2012 International Building Code The International Code Council has been accredited as an Authorized Provider by the International Association for Continuing Education and Training
More informationAccessible Means Of Egress
Accessible Means Of Egress 2 New ADA Standards DOJ s 2010 standards (mandatory as of March 15) Based on the Board s ADA-ABA Guidelines (2004) 3 Standards Department of Transportation s ADA Standards Federal
More informationComparison of the life safety elements of the 1997 UBC and the IBC 2000.
Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.
More informationProject Address Applicant: (Please Print) Plan review Engineer: Phone: Date
BUILDING AND SAFETY Tenant Improvement Checklist Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date APPLICATION The following items will be required at the permit counter before
More informationHERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW
HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com
More informationPRESCRIPTIVE COMPLIANCE METHOD
CHAPTER 3 PRESCRIPTIVE COMPLIANCE METHOD [B] SECTION 301 GENERAL 301.1 Scope. The provisions of this chapter shall control the alteration, repair, addition and change of occupancy of existing structures,
More informationINTERNATIONAL EXISTING BUILDING CODE
INTERNATIONAL EXISTING BUILDING CODE EB10-09/10, Part I IEBC 605.1, 705.2, 706.1, 805.4 (New), 805.4.1 (New), 912.4.1, 912.4.2, 912.8.2, 1004.1(New), 1005.1, 1103.3, 1105.6; IBC 3411.4, 3411.4.1, 3411.4.2,
More informationPLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure
More information2015 IBC Accessible Means of Egress
2015 IBC Accessible Means of Egress Based on the 2015 International Building Code Description Upon completion, the participant will be able to apply the accessible means of egress provisions of Section
More informationBUILDING CODE VARIANCE
BUILDING CODE VARIANCE April 2009 06-BCV-011-R1 Page 1 of 8 DISCUSSION MULTI-LEVEL STORAGE RACKING SYSTEMS The Alberta Building Code 2006 contains no specific requirements for multi-level storage racking
More informationThe Lexington Division of Fire and Emergency Services. Fire Chief Robert G. Hendricks
The Lexington Division of Fire and Emergency Services Fire Chief Robert G. Hendricks The Code of Hammurabi 229. If a builder builds a house for someone, and does not construct it properly, and the house
More information2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More informationEFFECTIVE USE OF THE IBC/CBC
Distilling the code review process down to a methodical, sequential list of considerations is generally problematic. In many cases, related provisions from various chapters of the code must be considered
More informationWhat is a Won-Door FireGuard Door?
What is a Won-Door FireGuard Door?. A horizontal sliding accordion fire door that meets all IBC requirements for use in a means of egress and has fire ratings up to 3 hours. A Reference Guide to special
More informationWON-DOOR CORPORATION Won-Door FireGuard Applications
WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis THE INTERNATIONAL BUILDING CODE is widely recognized in the United
More informationCompany Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code)
Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code) Company Overview R.W. Sullivan Engineering (RWS) was established in 1945 and currently has 95 employees.
More information2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More informationLIFE SAFETY 101. Architecture Interior Design Planning Sustainable Design
LIFE SAFETY 101 Drew Underwood, AIA, ACHA Senior Healthcare Principal TMPartners, PLLC 211 Franklin Road, Suite 200 Brentwood, TN 37027 615-523-5234 aunderwood@tmpartners.com Architecture Interior Design
More information2009 IBC/IFC Photoluminescent Signs & Pathway Marking Systems Frequently Asked Questions
2009 IBC/IFC Photoluminescent Signs & Pathway Marking Systems Frequently Asked Questions 1. What is the difference between IBC & IFC? a. IBC International Building Code covers new construction b. IFC International
More informationBUILDING CODE VARIANCE
BUILDING CODE VARIANCE December 2017 14-BCV-015 Page 1 of 6 MULTI-LEVEL STORAGE RACKING SYSTEMS PURPOSE The purpose of this variance is to allow for an alternative solution for multi-level storage racking
More informationSPARTANBURG COUNTY BUILDING CODES DEPARTMENT
SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,
More information(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS
Florida Specific Amendment Code Reference NFPA 101 Open Parking Structure. A parking structure that, at each parking level, has wall openings open to the atmosphere, for an area of not less than 1.4 ft2
More informationCode Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings
Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council Copyright This presentation is protected
More informationCode Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council
Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings John Buddy Showalter, PE VP, Technology Transfer American Wood Council Copyright This presentation is protected by US and International
More informationA minimum of 25% of any money spent upgrading areas of primary function shall be devoted to ADA upgrades. Existing non-compliant areas include:
October 23, 2012 PIX THEATER BUILDING CODE ANALYSIS 461 N 1 st St Woodburn, OR 97071 Executive Summary Since the most recent use in the building was a furniture store, the existing legal occupancy classification
More informationINTERNATIONAL CODE INTERPRETATIONS
2012 INTERNATIONAL CODE INTERPRETATIONS PREFACE The 2012 International Codes promulgated by the International Code Council (ICC ) comprise a comprehensive set of model regulations for the construction
More informationCHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1
CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,
More informationSIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING
PROJECT: 25 E 5 S SALT LAKE CITY, UTAH 84111 CODE ANALYSIS APPLICABLE CODES 675 E. 5 S. Suite 4 DFCM PROJECT NUMBER: 182782 DFCM CONTRACT NUMBER: 18793 STRUCTURAL ENGINEER: REAVELEY ENGINEERS + ASSOCIATES
More informationPg. xiv, xv Definitions. Pg. 2 A brief history pg. 12 Codes definition. Pg. 13 The principal purpose of code. Pg. 16 IBC. PG. 27 PG.
Last Lec. output Pg. xiv, xv Definitions. Pg. 2 A brief history pg. 12 Codes definition. Pg. 13 The principal purpose of code. Pg. 16 IBC. PG. 27 PG. 55, 98 2 Construction Types and Building Sizes Chapter
More informationInternational Code INTERPRETATIONS
2015 International Code INTERPRETATIONS 2015 International Code Interpretations First Printing: June 2016 ISBN#978-1-60983-666.5 Copyright 2016 by International Code Council ALL RIGHTS RESERVED. This 2015
More informationE?? , , , , , , , , , , , , Table ,
CTC to BCAC Unenclosed Exits 2015 Group A Code Change Cycle Copyright 2014 International Code Council, Inc. IBC 10-31 E?? 15 202, 1005.3.2, 1009.3, 1009.4, 1019.3, 1029.6, 1029.6.3, 1029.7, 1029.8, 1029.8.1,
More information2009 IBC Section 1024 Approved Luminous Egress Path Markings
2009 IBC Section 1024 Approved Luminous Egress Path Markings Where Required Buildings of Groups A (Assembly), B (Business), E (Education), I (Institutional), M (Mercantile) and R-1 (Residential transient
More informationNOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.
Applicant s Name: New Commercial - Commercial Additions Renovations Permit Plan Submittal Check List Applicant s Phone Number (s): Project Address: Project Type: _New Commercial or Commercial Addition
More informationThis worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings.
Application - City of Oxnard WORKSHEET FOR COMMERCIAL PLAN REVIEWS This worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings. Note:
More informationICC CODE CORNER 2012 IFC Code & Commentary
Chapter 10: Means of Egress General Comments The general criteria set forth in Chapter 10 regulating the design of the means of egress are established as the primary method for protection of people in
More informationBuilding Code 8 th Edition
Massachusetts State Building Code 8 th Edition Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com RW R.W. Sullivan Engineering
More informationSPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,
More informationCode Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings
Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council Copyright This presentation is protected
More informationCOMMUNITY & DEVELOPMENT SERVICES 840 Northgate Drive, Richland, WA Phone: Fax:
WORKSHEET FOR COMMERCIAL PLAN REVIEWS THIS WORKSHEET MUST BE SIGNED (AT END OF DOCUMENT) BY THE ARCHITECT OR ENGINEER OF RECORD FOR THE ENTIRE PROJECT (SEC. 106.3.4) FOR ALL COMMERCIAL OR MIXED-USE BUILDINGS
More information2015 IBC Special Building Types and Features IBC Special Building Types and Features. Copyright 2016 International Code Council 1
Description 2015 IBC Special Building Types and Features Based on the 2015 International Building Code (IBC ) This course provides an overview of selected 2015 IBC Chapter 4 provisions and the application
More informationInternational Building Code Essentials for Wood Construction
International Building Code Essentials for Wood Construction Dennis Richardson, P.E., C.B.O., CASp Western Regional Manager American Wood Council The Wood Products Council is a Registered Provider with
More informationHow to Prepare Your LSE Report
LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints
More informationModule 8: Ontario Building Code Fire and Spatial Separations
Ontario Building Code (OBC) 1. Fire Separations 2. Fire Resistance Ratings By Classification 3. Fire Resistance Ratings By Adjacent Use 4. Fire Resistance Ratings By Specific Space 5. Fire Resistance Ratings
More informationKnowledge Objectives (3 of 3)
Building Systems Knowledge Objectives (1 of 3) Identify construction types in commercial and residential structures. Explain fire behavior as it relates to the method of construction. Discuss the structural
More informationFlorida Accessibility Code for Building Construction
Florida Accessibility Code for Building Construction Accessibility Training Course Florida Building Commission Introduction Course will review the Florida Accessibility Code for Building Construction as
More informationBUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)
BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL 32907 Phone: (321) 953-8924 Fax: (321) 953-8925 CUSTOMER SERVICE INFORMATION ON COMMERCIAL PLAN REVIEW REQUIRED DOCUMENTS MUST BE SUBMITTED AT TIME
More informationSFS Form: 4 PROJECT NAME ADDRESS FIRE SAFETY ENGINEERING DESIGN REPORT. Date. 1.0 Introduction
PROJECT NAME ADDRESS FIRE SAFETY ENGINEERING DESIGN REPORT Date 1.0 Introduction 1.01 This report describes the fire safety requirements and the provisions for this project. This fire safety report has
More informationBuilding Codes and Ordinances ARC 227
Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive
More informationAPPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:
COUNTY OF KAUAI BUILDING DIVISION, DEPARTMENT OF PUBLIC WORKS 4444 RICE STREET, SUITE 175, LIHUE, HAWAII 96766 Telephone: (808) 241-6655 Fax Number: (808) 241-6806 BUILDING CODE COMMERCIAL CHECKLIST APPLICATION
More informationE2-09/ (IFC [B] )
Code Technology Committee 2010 Final Action Agenda The following are code changes and public comments to be considered at the 2010 Dallas Final Action Hearings that are related to the CTC Area of Study
More informationReport of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting and
BCAC MOE Work Group Summary with Files Revised 11-20-2017 with meeting notes Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting ITEM Topic SECTION Notes
More informationApproved Items IBC-Means of Egress
Important Changes to the 2018 IBC for R-2 (Apartments) Green - Favorable Action for Multifamily Construction Red - Unfavorable Action for Multifamily Construction Yellow - Item of interest to Multifamily
More informationUBC. (1997 Edition) (p.1-116) 2-hr. shaft required for
Protection of Shaft Enclosures (Exit Stairs) Protection of Shaft Enclosures (Other Shafts) Comparison on Fire Safety Provisions* (Revised 2/28/03) (S) = Small difference in fire protection, (M) = Moderate
More informationIBC MEANS OF EGRESS. Code Change No: E5-07/08. Original Proposal
DOCUMENTATION IBC MEANS OF EGRESS Code Change No: E5-07/08 Sections: 1002.1 (IFC [B] 1002.1) Proponent: Gerard Hathaway, New York State Department of State Building Codes Division, representing himself
More informationPlan Check No. A. ELEVATORS
Elevators, Egress and Areas of Refuge, Platform Lifts Plan Check No. A. ELEVATORS NOTE: In buildings two or more stories in height, served by an elevator, or a building served by an elevator required by
More informationINTERNATIONAL BUILDING CODE MEANS OF EGRESS
INTERNATIONAL BUILDING CODE MEANS OF EGRESS E1-09/10 1001.4 (New) (IFC [B] 1001.4 (New)) Proposed Change as Submitted Proponent: Paul K. Heilstedt, PE, FAIA, Chair, representing ICC Code Technology Committee
More informationCOMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION
COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building
More informationDocument G808. Project Data CONSTRUCTION DOCUMENTS DATE IDENTIFICATION DESIGN DEVELOPMENT DATE IDENTIFICATION INITIAL INFORMATION DATE IDENTIFICATION
Document G808 TM 2001 Project Data PROJECT: (Name and address) PROJECT NUMBER: CONTRACTOR: (Name and Address) ARCHITECT: (Name and Address) OWNER S APPROVALS/AGREEMENTS INITIAL INFORMATION DATE IDENTIFICATION
More informationWorksheet for Commercial Building Planning
Worksheet for Commercial Building Planning Note: This checklist helps ensure that all major code items were checked BEFORE applying for permit. ADDRESS OF PROJECT: Chapter 3 Information 301-312 OCCUPANCY
More informationCommon Plan Review Rejection Reasons
Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform Statewide
More informationFCIA Webinar Gypsum Wall Patching
FCIA Webinar Gypsum Wall Patching Firestop Contractors International Association Hillside, IL +1-708-202-1108 - office Bill McHugh bill @ fcia.org Nestor Sanchez, USG Corp. nsanchez@usg.com DIIM Firestopping
More information780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016
780 CMR: 9 th Edition Massachusetts State Building Code Presented to: BSA Codes Committee DATE: January 20, 2016 This course is registered with AIA CES for continuing professional education. Credit(s)
More informationSUPPLEMENTAL ACCESSIBILITY NO. 5 PLAN REVIEW CHECKLIST
GEORGE CHAVEZ, City Building Official DAVID YELTON, Building Inspection Manager NESTOR OTAZU, Community Preservation Manager BUILDING & SAFETY DIVISION 455 North Rexford Drive, 1 st Floor Beverly Hills,
More informationCommon Plan Review Rejection Reasons
(CPHD) (ISD) Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform
More informationIBC Significant Changes Summary Tier I
2009-2015 IBC Significant Changes Summary Tier I 503 General Building Height & Area Limitations Methods for determining allowable heights and areas have been dramatically revised and reformatted to improve
More information2012 International Existing Building Code. Jim Tinner, Building Official City of Bellingham May 15, 2013
2012 International Existing Building Code Jim Tinner, Building Official City of Bellingham May 15, 2013 Adopted by State Law IEBC is referenced by the International Building Code. Does not apply to single-family
More informationLuminous Egress Path Markings
2009 IBC/IFC Requirements for Luminous Egress Path Markings In New and Existing High Rise Buildings By Manny Muniz California Deputy State Fire Marshal (Ret.) Sponsored by FCIA 1 IBC 403.5.5 Luminous egress
More informationCODE COMPLIANCE PLAN REVIEW PROCEDURES
CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews
More informationChapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION
Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION Sections: 4-16-01 PURPOSE 4-16-02 APPLICABLE AREA 4-16-03 CONSTRUCTION AND OCCUPANCY 4-16-04 UPPER BUILDING AREA, HEIGHT, NUMBER OF STORIES
More informationName of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More informationName of Project: Address: Zip Code Owner/Authorized Agent: Phone # ( ) - Owned By: Select one Code Enforcement Jurisdiction: Select one
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More information2006 International Building Code Modified for the 2007 Florida Building Code 6/5/06
Chapter 10 Means of Egress Chapter 10 Mean of Egress 1001.3 Maintenance. Means of egress shall be maintained in accordance with the International Fire Code. na 1001.3 Maintenance. Means of egress shall
More information2006 to 2012 IBC. Significant Changes
2006 to 2012 IBC Significant Changes 1. Addition 303.3 Assembly Group A 2. Assembly uses intended for food and/or drink consumption including, but not limited to: Banquet halls Casinos (gaming areas) added
More informationMVRTA Newburyport Intermodal Parking Facility Newburyport, Massachusetts
PARKING CONSULTANTS GREEN PARKING CONSULTING PLANNERS ARCHITECTS STRUCTURAL ENGINEERS RESTORATION ENGINEERS MVRTA Newburyport Intermodal Parking Facility Newburyport, Massachusetts Code Analysis 12/9/2016
More informationCONSTRUCTION TECHNOLOGY UPDATE
CONSTRUCTION TECHNOLOGY UPDATE No. 78, September 2011 Building Egress Using Photoluminescent Markings by Noureddine Benichou and Guylene Proulx The use of photoluminescent material systems in buildings
More informationMinnesota Health Care Engineers Association
Minnesota Health Care Engineers Association Life Safety Code Potpourri Friday, May 1, 2015 Presenter: Bob Dehler, P.E., Engineering Program Manager, Minnesota Department of Health Minnesota Department
More informationUNDERSTANDING THE MASS TIMBER CODE PROPOSALS. A Guide for Building Officials
UNDERSTANDING THE MASS TIMBER CODE PROPOSALS A Guide for Building Officials 1 Background on ICC Ad Hoc Committee on Tall Wood Buildings The Board of the International Code Council (ICC), the developer
More information2012 IBC Inspection of Fire-resistance Rated Walls
Accreditation 2012 IBC Inspection of Fire-resistance Rated Walls Based on the 2012 International Building Code (IBC ) The International Code Council has been accredited as an Authorized Provider by the
More informationFIRE-RESISTANCE-RATED CONSTRUCTION
CHAPTER 7 FIRE-RESISTANCE-RATED CONSTRUCTION SECTION BC 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials and assemblies used for structural fire resistance and fire-resistance-rated
More information2009 International Building Code Text Florida Building Code with 2009 Supplement. Recommendation
2009 Changes of the International Building Code Compared to the National Fire Protection Association- 101 For the Florida Building Commission And the Fire Code Advisory Council Introduction The scope of
More information2015 IBC Update. Copyright 2014 International Code Council #1000PDF15 1
Goal 2015 IBC Update Based on the International Building Code (IBC ) The goal is to familiarize building officials, fire officials, plans examiners, inspectors, design professionals, contractors, and others
More information635 BUREAU OF BUILDING CODES AND STANDARDS MAINE UNIFORM BUILDING AND ENERGY CODE - COMMERCIAL BUILDING CODE OF MAINE
16 DEPARTMENT OF PUBLIC SAFETY 635 BUREAU OF BUILDING CODES AND STANDARDS Chapter 3: MAINE UNIFORM BUILDING AND ENERGY CODE - COMMERCIAL BUILDING CODE OF MAINE SUMMARY: This chapter establishes the Commercial
More informationIBC/IFC Egress Path Marking System Compliance Manual
IBC/IFC Egress Path Marking System Compliance Manual JESSUP MANUFACTURING COMPANY P.O. Box 366 McHenry, IL 60051 2815 West Route 120 McHenry, IL 60051 USA www.jessupmfg.com 1701 Rockland Road Lake Bluff
More informationMunicipal Code of Chicago CHAPTER EXIT REQUIREMENTS
Municipal Code of Chicago CHAPTER 13-160 EXIT REQUIREMENTS 13-160-010 General provisions. 13-160-020 Definitions. 13-160-030 Exit types - Requirements. 13-160-040 Exit types - Above or below grade. 13-160-050
More informationHOUSING CONVERSION Guidelines for the conversion of a house to commercial use.
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT HOUSING CONVERSION Guidelines for the conversion of a house to commercial use. HAIR 105 January 2017 contents General Information 3 Zoning Information 4 Building
More information2012 IEBC Fundamentals 12/11/2017. Copyright 2012 International Code Council 1
Overview 2012 IEBC Fundamentals The purpose of the IEBC is to encourage the use and re-use of existing buildings while requiring reasonable upgrades and improvements Based on the 2012 International Existing